N6945013R7999SectionFAmendment0010.pdf
PDF 302 KB Posted
- Solicitation number
- N6945013R7999
About this file
Section F - Amendment 0010
View the file
Other files
Show 40 more
Latest 50 of 96 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0200000 – Management and Administration
SECTION F: DELIVERIES OR PERFORMANCE
DELIVERABLES
Annex/Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency/ Media Original
Copies (including original)
0200000/ 2.3.4
N/A Permits and Licenses
30 calendar days after award and as requested by the KO.
KO 1 Once for initial submittal and as requested /
Electronic 0200000/
2.3.5 N/A Certificate of
Insurance 30 calendar days after award and as requested by the KO
KO 1 Once for initial submittal and as requested / Electronic
2.3.12 N/A Detailed Site And
Erection/ Construction Plan And Schedule
30 calendar days prior to construction
KO/COR/
FMD
3 Once for initial submittal and as requested / Electronic
2.3.12 N/A Maintenance and
Service Plan
30 calendar days after award and as requested by the KO
KO/COR/
FMD
3 Annually and as requested/ Electronic
0200000/ 2.6.6.2
N/A Inventories 15 calendar days after the end of each contract period of performance and within 15 days after request by the KO
KO/COR 2 Annually and as requested/ Electronic
0200000/ 2.6.7.1
N/A Quality Management Plan
Within 15 calendar days after award and within seven calendar days of changes.
KO/COR 2 As specified/ Electronic
0200000/ 2.6.7.3
N/A Quality Inspection and Surveillance Report
First work day of each month.
KO/COR 2 Monthly/ Electronic
0200000/ 2.6.8
N/A Property Management Plan
Within 45 calendar days after award.
KO/COR 2 As specified/ Electronic
0200000/ 2.7.1
N/A List of Key Personnel
Within 30 calendar days after award and as requested by the KO
KO/COR 2 Once for initial submittal and as requested or if there is a change of personnel / Electronic
N69450-13-R-7999 Section F
Amendment 0010
Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency/ Media Original
Copies (including original)
1502000/ 2.7.1
N/A
Resumes of Key Personnel
Within 30 calendar days after award and as requested by the KO
KO/COR 2 Once for initial submittal and as requested or if there is a change of personnel / Electronic
0200000/ 2.7.1
N/A Organizational Chart
Within 30 calendar days after award or as requested by the
KO
KO/COR 2 Once for initial submittal and as requested or if there is a change of personnel / Electronic
2.7.2 N/A Monthly
Employee Roster
Fifth day of each month.
KO/COR 2 Monthly/ Electronic/
Yes
2.7.2 N/A Weekly
Population Report 0800 each Monday
KO/COR 2 Weekly/ Electronic/
Yes 0200000/
2.8.1 N/A Employee List Within 30
calendar days after award and within seven calendar days of changes.
KO 1 As specified / Electronic
0200000/ 2.9.2
N/A Accident Prevention Plan
Within 30 calendar days after award and within seven calendar days of changes.
KO/COR 2 As specified / Electronic
0200000/ 2.9.5
J-0200000-05 Navy Contractor Significant Incident Report
Within one calendar day of accident.
KO/COR 2 As specified/ Electronic
0200000/ 2.9.5
N/A Weight Handling Equipment Accident Report
Within 30 calendar day of accident.
KO/COR 2 As specified/ Electronic
0200000/ 2.9.5.1
N/A Initial Accident Reporting Notification Report
Immediately after that an accident or near miss.
KO/COR 2 As specified/ Electronic
N69450-13-R-7999 Section F
Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency/ Media Original
Copies (including original)
0200000/ 2.9.5.1
N/A Follow-on Accident Reporting Notification Report
Close of business the day of the accident, or if the accident occurs after hours, at start of business the following morning.
KO/COR 2 As specified/ Electronic
0200000/ 2.9.5.1
N/A Final Accident Reporting Notification Report
Within 24 hours after completing the investigation of the accident.
KO/COR 2 As specified/ Electronic
0200000/ 2.9.7
N/A On-Site Labor Report
Fifth day of each month.
KO/COR 2 Monthly/ Electronic
0200000/ 2.9.8
N/A OSHA Citations and Violations Corrective Action Report
Within 48 hours after receiving a citation.
KO/COR 2 As specified/ Electronic
0200000/ 2.9.10
N/A Safety Certifications
Prior to start of work and as old certifications expire.
KO/COR 2 As specified/ Electronic
0200000/ 2.10.1.1
N/A Water Conservation Plan
Within 15 calendar days after award and for changes.
KO/COR/
PWD
Environmental Manager
3 As specified/ Electronic
0200000/ 2.10.2
N/A ECATTS Training Documentation/ Certificates
Within 60 calendar days after award and for changes.
KO/COR/
PWD
Environmental Manager
3 As specified/ Electronic
0200000/ 2.10.2.1
N/A Class I ODS Report
Within 5 calendar days after delivery of refrigerant to
DLA
KO/COR/
PWD
Environmental Manager
3 As specified/ Electronic
0200000/ 2.10.2.10
N/A Asbestos Containing Material Notification
Within 24 hours if ACM is encountered or suspected in the performance of work.
KO/COR/
PWD
Environmental Manager
3 As specified/ Electronic
0200000/ 2.10.3
N/A Sustainable Procurement and Practices Plan
Within 30 calendar days after award.
KO/COR/
PWD
Environmental Manager
3 As specified/ Electronic
0200000/ 2.10.3
N/A Sustainable Delivery of Services Report
Within five calendar days after each contract period.
KO/COR/
PWD
Environmental Manager
3 Annually/ Electronic
N69450-13-R-7999 Section F
Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency/ Media Original
Copies (including original)
0200000/ 2.10.3.2
N/A Recovered Material Certification
When a product containing recovered materials is equal to or better than the original and could be used.
KO/COR/
PWD
Environmental Manager
3 As specified/ Electronic
0200000/ 2.15.2.1
N/A IDIQ Proposal Within two working days after Government's Request for Proposal.
KO 1 As specified/ Electronic
N69450-13-R-7999 Section F
1401000 – Family Housing
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency/ Media Original
Copies (including original)
1401000/ 2.3.1.1
N/A Resumes of Family Housing Key Personnel
30 days after award
KO 2 Once for initial submittal, then as requested /
Electronic 1401000/2.3.3 N/A Updated Inventories First work day of each quarter KO 2 Quarterly/
Electronic 1401000/3.2 N/A FF&E Inventory List Five work days prior to the beginning of each month
KO/
Housing Officer
2 Monthly or as requested/ Electronic
1401000/3.2 N/A FF&E Disposal Documentation
Within 2 days of disposal
Housing Officer
2 As required / Electronic
1401000/3.3.1 N/A Minor Maintenance, Repair, and Replacement Report of Accomplish and Unaccomplished Work
Five work days prior to the beginning of each month
KO/
Housing Officer
1 Daily/ Electronic
1401000/3.3.2 N/A Daily Service Call Report
0900 AM Daily Housing Officer/ KO/
FMD/ COR
4 Daily/ Electronic
1401000/3.3.2 N/A Monthly Service Call Report
First work day of each month
Housing Officer / KO
2 Monthly/ Electronic
1401000/3.3.3 N/A Playground PM Program
45 calendar days after contract award
KO 2 Annually/ Electronic
1401000/3.3.3 N/A Monthly Playground PM Work Schedule and Unaccomplished Maintenance Report
Five work days prior to the beginning of each month
Housing Officer / KO
2 Monthly/ Electronic
1401000/3.3.4 N/A HVAC Integrated Maintenance Program
45 calendar days after contract award and one business day after any changes
COR / KO 2 Annually/ Electronic
1401000/3.3.4 N/A Monthly HVAC IMP Schedule and HVAC IMP Maintenance and Repair Status
Five work days prior to the beginning of each month
KO 1 Monthly/ Electronic
1401000/3.3.5 N/A COM Inspection Report
At completion of each COM
Housing Officer
1 At completion of each COM
1401000/3.3.6 N/A Housing Area Sign Painting Schedule
45 calendar days after contract award
KO 2 Annually/ Electronic
N69450-13-R-7999 Section F
1502000 – Facility Investment
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency/ Media Original
Copies (including original)
1502000/ 2.2.1
Certification and Licenses
Within 30 days after award or as requested by the
KO
KO 1 Once for initial submittal, then as requested /
Electronic 1502000/ 2.2.2
Resumes of HVAC Supervisor
Within 30 days after award or as requested by the
KO
KO 1 Once for initial submittal, then as requested or change of personnel / Electronic
1502000/ 3.1
Service Call Summary Report
First work day of each month
KO/ COR/
FMD/ JTF
Engineering
4 Monthly/ Electronic
1502000/ 3.2
Preventive Maintenance Program Plan
30 calendar days after contract award and one business day after any changes
KO/ COR/
FMD/ JTF
Engineering
4 Annually and as specified /
Electronic
1502000/ 3.2
N/A Monthly PM Work Schedule
Five work days prior to the beginning of each month
KO/ COR/
JTF
Engineering
3 Monthly/ Electronic
1502000/ 3.2, 3.3
N/A Weekly Unaccomplished Maintenance Report
0800 each Monday
KO/COR/JTF
Engineering
3 Weekly/ Electronic
1502000/ 3.3
Integrated
Program Plan
30 calendar days after contract award and one business day after any changes
KO/ COR/
FMD/ JTF
Engineering
4 Annually and as specified /
Electronic
1502000/ 3.3
N/A Monthly IMP Schedule and IMP Maintenance and Repair Status
Five work days prior to the beginning of each month
KO/ COR/
JTF
Engineering
3 Monthly/ Electronic
1502000/ 3.4
Inspection, Testing, and Certification Program Summary Report
First work day of each month
KO/ COR/
JTF
Engineering
3 Monthly/ Electronic
1502000/
Inspection, Testing
Schedule and Equipment Certifications
First work day of each month
KO/ COR/
JTF
Engineering
3 Monthly/ Electronic
N69450-13-R-7999 Section F
1502000/ 3.4.1
Inspection and Test Report for Vertical Transportation Equipment
First work day of each month
KO/ COR/
JTF
Engineering
3 Monthly/ Electronic
3.5 N/A Other Recurring
Service Program
30 calendar days after contract award and one business day after any changes
KO/ COR/
FMD/ JTF
Engineering
4 Annually and as specified /
Electronic
1502000 / 3.5
N/A Other Recurring Work Schedule
Five work days prior to the beginning of each month
KO/COR/
FMD/ JTF
Engineering
4 Monthly/ Electronic
1502000 / 3.5
N/A Other Recurring Services Program Summary Report
Five work days prior to the beginning of each month.
KO/COR/
FMD/ JTF
Engineering
4 Monthly/ Electronic
1502000 / 3.5.2
N/A Exterior Lighting Systems Inspection, Re-lamping, and Repair Program
30 calendar days after contract award and one business day after any changes
KO/ COR/
FMD/
3 Annually and as specified/ Electronic
1502000/ 3.6
N/A Minor Maintenance, Repair, and Replacement Report of Accomplish and Unaccomplished Work
Five work days prior to the beginning of each month
KO/ UH
Manager
2 Monthly/
1502000 (BUMED)– Facility Investment
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency/ Media Original
Copies (including original)
1502000
(BUMED) /
Within 30 days after award or as requested by the
KO
KO/ COR/
USNH
Facility
Manager
3 Once for initial submittal, then as requested /
Electronic 1502000
(BUMED) /
Resumes of HVAC Supervisor
Within 30 days after award or as requested by the
KO
KO/ COR/
USNH
Facility
Manager
3 Once for initial submittal, then as requested or change of personnel / Electronic
1502000
(BUMED)
J-1502000-
02(BUMED)
/ 2.3.2
Above Ceiling Work Permits
Prior to any work where ceiling tiles are moved
COR/ USNH
Facility
Manager
As specified/ Electronic
1502000
(BUMED)
J-1502000-
02(BUMED)
/ 2.3.3.1
Infection Control Construction Permit Form
Five business days prior to any work involving construction, repairs, demolition or evasive maintenance Features of
USNH facilities
COR/ USNH
Facility
Manager
As specified/ Electronic
1502000
(BUMED)
J-1502000-
02(BUMED)
/ 2.3.4
Pre-Construction Survey-External Form
Five business days prior to any work involving construction, repairs, demolition or evasive maintenance Features of
USNH facilities
COR/ USNH
Facility
Manager
As specified/ Electronic
1502000
(BUMED)
J-1502000-
02(BUMED)
/ 2.3.5
Life Assessment Tool Form
Five business days prior to any work involving work to Life Safety Feature of USNH facilities
Features of USNH facilities
COR/ USNH
Facility
Manager
As specified/ Electronic
1502000
(BUMED) /
Summary Report
First work day of each month
KO/ COR/
USNH
3 Monthly/ Electronic
N69450-13-R-7999 Section F
3.1 Facility
Manager
1502000
(BUMED) /
3.2
Preventive
Program Plan
30 calendar days after contract award and one business day after any changes
KO/ COR/
USNH
Facility
Manager
3 Annually and as specified /
Electronic
1502000
(BUMED) /
3.2
N/A Monthly PM Work Schedule
Five work days prior to the beginning of each month
KO/ COR/
USNH
Facility
Manager
3 Monthly/ Electronic
1502000
(BUMED) /
3.2, 3.3
N/A Weekly Unaccomplished Maintenance Report
0800 each Monday
KO/ COR/
USNH
Facility
Manager
3 Weekly/ Electronic
1502000
(BUMED) /
3.3
Integrated
Program Plan
30 calendar days after contract award and one business day after any changes
KO/ COR/
USNH
Facility
Manager
3 Annually and as specified /
Electronic
1502000
(BUMED) /
3.3
N/A Monthly IMP Schedule and IMP Maintenance and Repair Status
Five work days prior to the beginning of each month
KO/ COR/
USNH
Facility
Manager
3 Monthly/ Electronic
1502000
(BUMED) /
Inspection, Testing, Program Summary Report
First work day of each month
KO/ COR/
USNH
Facility
Manager
3 Monthly/ Electronic
1502000
(BUMED) /
Inspection, Testing
Schedule and Equipment Certifications
First work day of each month
KO/ COR/
USNH
Facility
Manager
3 Monthly/ Electronic
1502000
(BUMED) /
3.4.1
Inspection and Test Report for Vertical Transportation Equipment
First work day of each month
KO/ COR/
USNH
Facility
Manager
3 Monthly/ Electronic
1502000
(BUMED) /
3.4.4
N/A Medical Air, Gas & Vacuum Systems Certification And System Verification Documentation And Reports
Within 30 calendar days from inspection.
KO/ COR/
USNH
Facility
Manager
3 As Specified/ Electronic
1502000
(BUMED) /
3.4.5
N/A Fire Doors And Fire Walls Inspections And The Findings Report
No later than 14 calendar days from the completion of each inspection
KO/ COR/
USNH
Facility
Manager
3 As Specified/ Electronic
1502000
(BUMED) /
3.5
N/A Other Recurring Service Program
30 calendar days after contract award and one business day after any changes
KO/ COR/
USNH
Facility
Manager
3 Annually/ Electronic
1502000
(BUMED) /
N/A Other Recurring Work Schedule
Five work days prior to the
KO/ COR/
USNH
3 Monthly/ Electronic
N69450-13-R-7999 Section F
3.5 beginning of each month
Facility Manager
1502000
(BUMED) /
3.5
N/A Other Recurring Services Program Summary Report
Five work days prior to the beginning of each month.
KO/ COR/
USNH
Facility
Manager
3 Monthly/ Electronic
1502000 / 3.5.1
N/A Schedule For Cleaning And Sanitizing Designated Grease Trap
30 calendar days after contract award and one business day after any changes
KO/ COR/
USNH
Facility
Manager
3 Annually and as specified/
1503010 – Custodial Services
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency/ Media Original
Copies (including original)
1503010/ 2.2.1.1
N/A Pathogen Training Certificates
Upon request KO 1 Upon request/ Electronic
1503010/ 3.1
N/A Annual Work Schedule
Within 15 days after award and annually thereafter
KO 1 Annually / Electronic
1503010/ 3.1
N/A Monthly Work Schedule
First work day of each month
KO 2 Monthly / Electronic
1503010/ 3.2
N/A Unscheduled Services Report
First work day of each month
KO 2 Monthly /
1503020 – Pest Control
Item
Form Attachment
Number
Deliverable Title Date(s) of
Submission
Distribution Frequency/
Media Original No. of Copies
1503020/2.2.1 N/A Copy of a State Certification for Contractor Personnel
30 calendar days prior to start of work.
Copies of renewed certifications shall also be submitted.
KO 2 As required / Electronic
1503020/2.3.1 N/A Copy of a State Business License
Prior to contract award.
Copies of renewed licenses shall also be submitted.
KO 2 1 per state/ Electronic
1503020/2.3.2 N/A Permits 5 days prior to the start of work requiring permits.
KO 2 As required / Electronic
1503020/2.3.4 N/A Ultra-Low Volume (ULV) Equipment Calibration and Droplet Analysis Report
15 days prior to the start of work and thereafter every 50 hours of ULV equipment use.
KO 2 As required / Electronic
1503020/2.3.5 J-1503020-02 Planned Pesticide Use Sheets including Pesticide Labels and Material Safety Data Sheets (MSDS)
30 calendar days after award.
Note: Any proposed changes in pesticide usage shall be submitted for KO approval at least 5 business days in advance of pesticide use.
KO 2 1 for each pesticide per pest as required / Electronic
1503020/3 N/A Contractor's Work Plan
30 calendar days after award.
KO 2 As required/ Electronic
N69450-13-R-7999 Section F
Item
Form Attachment
Number
Deliverable Title Date(s) of
Submission
Distribution Frequency/
Media Original No. of Copies
1503020/2.3.12, N/A Report of Conditions Conducive to Pest Infestation
1 working day after citing conditions.
KO 2 As required / Electronic
1503020/3, 4 N/A Five-year Termite Treatment Warranties
10 days following the treatment.
KO 2 As required / Electronic
1503020/3, 4 N/A Termite and Wood Decay Inspection (DD Form 1070) (per the appropriate Pest Group Sheet)
10 working days after inspection completed.
KO 2 As required / Electronic
1503020/3, 4 N/A Larval Mosquito Survey Report (per the appropriate Pest Group Sheet)
Within 1 day of the survey.
KO 2 As required / Electronic
1503020/3, 4 N/A Stored Product Pest Survey (per the appropriate Pest Group Sheet)
Within 1 day of the survey.
KO 2 As required Electronic
1503020/3.1.2 N/A Monthly Larvaciding Work Schedule
Five work days prior to the beginning of each month and immediately after any revisions
KO 2 Monthly / Electronic
1503020/3.2 N/A Service Call Summary Report
First work day of each month
KO 2 Monthly / Electronic
1503020/3.3 N/A Report of Pest Management Operations
Within 1 day of each pest management operation.
KO 2 As required / Electronic
1503020/3.3 N/A Report of Pest Management Operations
Once per month by the 15th of the following month (Example:
July data must be submitted by August 15).
KO 2 Monthly /
Instructions for Contractor's Work Plan
The CWP shall adhere to applicable publications and directives contained in J-1503020-02 (Applicable Publications and Directives). The CWP will require approval by the Contracting Officer (KO). The CWP shall establish the strategy and methods for conducting a safe, effective, and environmentally sound pest management program in compliance with these specifications. Prospective contractors may review the installation’s historical records of pest activity and abatement actions, survey facilities and grounds, and consult with the Installation PMC in development of a plan. The CWP shall address continuous monitoring, pest response and removal procedures, record keeping, warranties, education and communication to installation personnel to prevent pests and disease vectors, bird control on applicable airfields and in hangars, etc. The IPM approach should use targeted (i.e., effective, environmentally sound) methods including habitat/facility modification, biological/genetic/cultural control, mechanical/physical control, and where necessary, the judicious use of least hazardous pesticides. The CWP shall include labels, MSDS sheets, and planned pesticide use sheets and comply with all applicable installation and Federal regulations, and the
IPMP.
N69450-13-R-7999 Section F
Instructions for Field Pest Management Record Form
The Contractor shall use the NAVFAC PPMC approved/provided on-line reporting system to provide a summary printout electronic copy of the data. The website is: https://clients.emainc.com/dcs/ pestmanagement/PesticideLogon.asp. The regional NAVFAC Applied Biology Center should be contacted to obtain a password and instructions to use the system. The report shall include individual daily records of all pest control operations, both chemical and non-chemical, including surveys. Records should be electronically submitted on a monthly basis to the KO by the 15th day of the month in Microsoft Excel (1997 or later version) via diskette, e-mail attachment, etc. J-1503020-XX (Field Pest Management Record Form) may be used as a field data entry sheet at the contractor’s discretion.
https://clients.emainc.com/dcs/
1503030 – Integrated Solid Waste Management
Item
Form Attachment
Number Deliverable Title Date(s) of
Submission
Distribution Frequency/
Media Original No. of Copies
1503030 / 2.3.1
N/A Weight Tickets With invoice KO 1 Monthly / Electronic
1503030 / 3.1
N/A Solid Waste Collection Schedule
30 days after award
KO 1 Annually / Electronic
1503030 / 3.1
N/A Weekly Solid Waste Collection Work Completion Report
At 0900 on Tuesday of each week.
KO 2 Weekly / Electronic
1503030 / 3.1.1.2, 3.1.2.2, 3.2.2
J-1503030-06 Recyclable Products Report
Submit by 5th of the month following the end of the Quarter
KO 2 Quarterly / Electronic
1503030 / 3.1.1.2
N/A Recycling Residents Weekly Report
At 0900 on Tuesday of each week
KO /
Environmental
Department
2 Weekly / Electronic
1503030 / 3.1.1.3, 3.1.2.3
N/A Weekly Curbside Bulk Item Pickup Program
At 0900 on Tuesday of each week
KO 2 Weekly / Electronic
1503030 / 3.5
N/A Recyclable Stockpile Processing Schedule
60 days after contract award
KO 2 Annually / Electronic
1503030 / 3.6
N/A Landfill Daily Logs 0900 AM Daily
KO 2 Daily / Electronic
1503030 / 3.6
N/A Landfill Monthly Reports
Submit by 5th of following month
KO /
Environmental
Department
2 Daily / Electronic
1503030 / 3.6
N/A Landfill Quarterly Reports
Submit by 5th of the month following the end of the Quarter
KO /
Environmental
Department
2 Quarterly /
1503040 – Other (Swimming Pools)
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency/ Media Original
Copies (including original)
1503040
N/A Maintenance Summary Report
First work day of each month
KO/COR 2 Monthly/ Electronic
1503040/
Integrated Maintenance Plan
30 calendar days after contract award
KO/COR 2 Annually/ Electronic
1503040 / 3.1
N/A Monthly IMP schedule Five work days prior to the beginning of each month
KO/COR 2 Monthly/ Electronic
1503040 / 3.1
N/A Unaccomplished maintenance report
Five work days prior to the beginning of each month
KO/COR 2 Monthly/ Electronic
1503040 / 3.1
N/A Repair status report Five work days prior to the beginning of each month
KO/COR 2 Monthly/ Electronic
1503040 / 3.1
N/A Summary of maintenance and repair accomplished under the
IMP report
Five work days prior to the beginning of each month
KO/COR 2 Monthly/
1503050 – Grounds Maintenance & Landscaping
DELIVERABLE
Spec Item
Form Attachment
Number Deliverable
Title Date (s) of Submission
Distribution Frequency/
Media Original No. of
Copies 1503050 / 3.1, 3.2, 3.3, 3.4
N/A Weekly Work Schedule
0730 every Monday
KO/COR 2 Weekly/ Electronically
1503050 / 3.1.2, 3.2.3
N/A Vegetation Control Schedule
30 days after award
KO/COR 2 Annually/ Electronically
1503050 / 3.1.4
N/A Debris Removal Schedule
30days after award
KO/COR 2 Annually/ Electronically
1503050 / 3.4
N/A Policing of Roads and Locations
30days after award
KO/COR 2 Annually/ Electronically
1602000 - Electrical
Spec Item
Form Attachment
Number Deliverable
Title Date (s) of Submission
Distribution
Frequency/ Media Original
Copies (including original)
1602000/2.2.1 N/A
Certification and Licenses
Within 30 days after award and as required
KO/COR 2 Once for initial submittal, then as requested / Electronic
1602000/ 2.3.2.1
N/A Scheduled Outage Plan/ Service Disruption Plan
Within 15 days prior to contract start
KO/COR 2 Once for initial submittal, then as requested / Electronic
1602000 / 3 N/A Critical Spare Parts Inventory
30 days after award and within five days of any changes
KO/COR 2 Once for initial.
And any time after an update in change of requirements / Electronic
1602000/
Summary Report
First work day of each month
KO/COR 2 Monthly/ Electronic
1602000 / 3.2 N/A Standard Operation Procedures
Within 30 days after contract start and within five days of any changes
KO/COR 2 Once and any time after an update in change of requirements/
Electronic 1602000 / 3.2 N/A Unscheduled
Outage Report Within one business day of the outage.
KO/COR 2 As needed/ Electronic
1602000 / 3.2 N/A Fuel Tickets Close of Business each day
KO/COR 2 Daily
1602000 / 3.2.2
N/A Operating Records Report, Diesel/Gas
3rd work day of each month.
KO/COR 2 Monthly/ Electronic
1602000 / 3.3 N/A Integrated Maintenance Program (IMP)
30 calendar days after contract award and one business day after any changes
KO/COR 2 Annually/ Electronic
1602000 / 3.3 N/A Monthly IMP schedule
Five work days prior to the beginning of each month.
KO/COR 2 Monthly/ Electronic
1602000 / 3.3 N/A Weekly Unaccomplished Maintenance Report
0800 each Monday
KO/COR 2 Weekly/ Electronic
1602000 / 3.3 N/A Repair status Five work days KO/COR 2 Monthly/
N69450-13-R-7999 Section F
Spec Item
Form Attachment
Number Deliverable
Title Date (s) of Submission
Distribution
Frequency/ Media Original
Copies (including original) report prior to the beginning of each month.
Electronic
1602000 / 3.3 N/A Monthly Summary of maintenance and repair accomplished under the IMP report
Five work days prior to the beginning of each month.
KO/COR 2 Monthly/ Electronic
1602000 / 3.3 N/A Corrosion Control Plan
30 calendar days after contract award and one business day after any changes
KO/COR 2 Annually/ Electronic
1602000 / 3.4 N/A Other Recurring Services Program
30 calendar days after contract award and one business day after any changes
KO/COR 2 Annually/ Electronic
1602000 / 3.4 N/A Other Recurring Services Program Summary Report
Five work days prior to the beginning of each month.
KO/COR 2 Monthly/ Electronic
1602000 / 3.4.1
N/A Monthly meter reading report
Per Government’s billing cycle
1604000 - Wastewater
Spec Item
Form Attachment
Number Deliverable
Title Date (s) of Submission
Distribution
Frequency/ Media Original
Copies (including original)
1604000/2.2.1 N/A
Certification and Licenses
Within 30 days after award and as required
KO/COR 2 Once for initial submittal, then as requested / Electronic
1604000/ 2.3.2.1
N/A Scheduled Outage Plan/ Service Disruption Plan
Within 15 days prior to contract start
KO/COR 2 Once for initial submittal, then as requested / Electronic
1604000 / 3 N/A Critical Spare Parts Inventory
30 days after award and within five days of any changes
KO/COR 2 Once for initial and any time after an update in change of requirements /
Electronic 1604000/ 3.1 N/A Service Call
Summary Report
First work day of each month
KO/COR 2 Monthly/ Electronic
1604000 / 3.2 & 3.3
N/A Standard Operation Procedures
Within 30 days after contract start and within five days of any changes
KO and Onsite
2 Once and any time after an update in change of requirements/
Electronic
1604000/ 3.2 & 3.3
N/A Unscheduled Outage Report
Within one business day of the outage.
KO/COR 2 As needed/ Electronic
1604000 /
3.2.1 & 3.3.1
N/A Laboratory Analysis of Wastewater Effluent
Within 2 days of discovery when found non-compliant. 4 days after the end of the month if compliant
KO/COR 2 Monthly or within 2 days if found Non-compliant/
Electronic
1604000/3.2.2 & 3.3.2
N/A Schedule of Operator Attendance
Within 2 days of Request
KO/COR 2 As requested/ Electronic
1604000 /
3.2.3 & 3.3.3
N/A Operating Records Report, Wastewater Treatment Report
3rd work day of each month
KO/COR 2 Monthly/ Electronic
1604000 / 3.4 N/A Integrated Maintenance Program (IMP)
30 calendar days after contract award and
KO/COR 2 Annually/ Electronic
N69450-13-R-7999 Section F
Spec Item
Form Attachment
Number Deliverable
Title Date (s) of Submission
Distribution
Frequency/ Media Original
Copies (including original) one business day after any changes 1604000 / 3.4 N/A Monthly IMP schedule Five work days prior to the beginning of each month.
KO/COR 2 Monthly/ Electronic
1604000 / 3.4 N/A Weekly Unaccomplished maintenance report
0800 each Monday
KO/COR 2 Weekly / Electronic
1604000 / 3.4 N/A Repair status report
Five work days prior to the beginning of each month.
KO/COR 2 Monthly/ Electronic
1604000 / 3.4 N/A Monthly Summary of maintenance and repair accomplished under the IMP report
Five work days prior to the beginning of each month.
KO/COR 2 Monthly/ Electronic
1604000 / 3.4 N/A Corrosion Control Plan
30 calendar days after contract award and one business day after any changes
KO/COR 2 Annually/ Electronic
1604000 / 3.5 N/A Other Recurring Services Program
30 calendar days after contract award and one business day after any changes
KO/COR 2 Annually/ Electronic
1604000 / 3.5 N/A Other Recurring Services Program Summary Report
Five work days prior to the beginning of each month.
KO/COR 2 Monthly/ Electronic
1604000 / 3.5.2
N/A Bilge and Oily Waste Removal Report
2 business days after each service
KO/COR 2 As Needed/ Electronic
1604000 / 3.5.3
N/A Pier Side Sewer Removal Report
2 business days after each service
KO/COR 2 As Needed/
1606000 - Water
Annex / Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency/ Media Original
Copies (including original)
1606000/
Within 30 days after award and as required
KO/COR 2 Once for initial submittal, then as requested /
Electronic 1606000/
2.3.2.1 N/A Scheduled Outage
Plan/ Service Disruption Plan
Within 15 days prior to contract start
KO/COR 2 Once for initial submittal, then as requested /
Electronic 1606000/ 3 N/A Critical Spare
Parts Inventory 30 days after award and within five days of any changes
KO/COR 2 Once for initial. And any time after an update in change of requirements / Electronic
1606000/ 3.1
N/A Service Call Summary Report
First work day of each month
KO/COR 2 Monthly/ Electronic
1606000/ 3.2 N/A Notification of Unsafe Conditions
Within 24 hours of occurrence
KO/COR 2 ea per occurrence
As Specified/
1606000/ 3.2 N/A Standard
Operating Procedures
Within 30 days after contract start and within five days of any changes
KO/COR 2 Once and any time after an update in change of requirements/ Electronic
1606000/ 3.2 N/A Unscheduled Outage Report
Within one business day of the outage.
KO/COR 2 As needed/ Electronic
1606000/ 3.2.1
N/A Independent Laboratory Analyses Report
As specified KO/COR 2 As specified /
1606000/ 3.2.3
N/A Operating Records, Logs, and Reports
3rd work day of each month.
KO/COR 2 Monthly/ Electronic
1606000 / 3.3 N/A Integrated Maintenance Program (IMP)
30 calendar days after contract award and one business day after any changes
KO/COR 2 Annually and any time a change is made to the schedule
1606000 / 3.3 N/A Monthly IMP Five work days KO/COR 2 Monthly/
N69450-13-R-7999 Section F
Annex / Spec
Form
Deliverable Title Date (s) of
Distribution Frequency/ schedule prior to the beginning of each month.
Electronic
1606000 / 3.3 N/A Weekly Unaccomplished Maintenance Report
0800 each Monday
KO/COR 2 Weekly/ Electronic
1606000 / 3.3 N/A Repair status report
Five work days prior to the beginning of each month.
KO/COR 2 Monthly/ Electronic
1606000 / 3.3 N/A Monthly Summary of maintenance and repair accomplished under the IMP report
Five work days prior to the beginning of each month.
KO/COR 2 Monthly/ Electronic
1606000 / 3.3 N/A Corrosion Control Plan
30 calendar days after contract award and one business day after any changes
KO/COR 2 Annually/ Electronic
1606000 / 3.4 N/A Other Recurring Services Program Summary Report
30 calendar days after contract award and one business day after any changes
KO/COR 2 Annually/ Electronic
1606000 / 3.4.1
N/A Monthly meter reading report
Per Government’s billing cycle
1700000 – Base Support Vehicles and Equipment
Spec Item
Form Attachment
Number Report Title Date (s) of Submission
Distribution Frequency/
Media Original No. of
Copies 1700000/
Within 30 days after award or as requested by the
KO
KO 2 Once for initial submittal, then as requested / Electronic
1700000/
Resumes of Key Personnel
Within 30 days after award or as requested by the
KO
KO 1 Once for initial submittal, then as requested or change of personnel / Electronic
1700000/ 2.3.1.9
N/A Temporary Suspension of Downtime Accumulation
Within two hours of notice to the Contractor that the material delays will cause the downtime standard to be missed.
KO 2 As required/ Electronic
1700000/ 3.1.2
N/A C-Pool VSO Completion Report
0900 Tuesday of each week
KO 2 Weekly/ Electronic
1700000/ 3.1.2
N/A VSO Completion Report
By the 25th day of the preceding month
KO 2 Monthly/ Electronic
1700000/ 3.2.2
N/A C-Pool Vehicle Assignment Report
Every Morning by 0900
KO 2 Daily/ Electronic
1700000/ 3.2.2
N/A C-Pool Utilization Report
0900 Tuesday of each week
KO 2 Weekly/ Electronic
1700000/ 3.2.3
N/A Vehicle Washing Completion Report
By the 25th day of the preceding month
KO 2 Monthly/ Electronic
1700000/ 3.3
N/A Critical Spare Parts List
Within 30 days after award
KO 2 Once for initial submittal, then as requested / Electronic
3.3.1.2 N/A Schedule for Testing
and Certification
Annually and as required after repairs
KO 2 As required/ Electronic
3.3.1.2 N/A Testing and
Certification Qualifications
Prior to start of contract, annually and, prior to a new employee starting work.
KO 2 As required/ Electronic
1700000/ 3.3.3
N/A Preventive Maintenance Schedule
By the 25th day of the preceding month
KO 2 Monthly/ Electronic
N69450-13-R-7999 Section F
Spec Item
Form Attachment
Number Report Title Date (s) of Submission
Distribution Frequency/
Media Original No. of
Copies 1700000/ 3.3.5
N/A MTV Preventive Maintenance Schedule
By the 25th day of the preceding month
KO 2 Monthly/
| 0200000 F Management and Administration |
| 1401000 F Family Housing |
| 1502000 F Facility Investment |
| 1502000B F Facility Investment (BUMED) Amendment 0002 |
| 1503010 F Custodial |
| 1503020 F Pest Control |
| 1503030 F Integrated Solid Waste Management |
| 1503040 F Other |
| 1503050 F Grounds Maint & Landscaping |
| 1602000 F Electrical |
| 1604000 F Wastewater |
| 1606000 F Water |
| 1700000 F BSVE Amendment 0002 |
File details come from the government source that posted it. Updated .