DLM Attachment L-5_Vol_4_ AFBL.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Depot Level Maintenance (DLM) Support Services FRCSW, North Island, CA
Solicitation number
N68520-21-R-0007
Issued by

About this file

This draft solicitation and related documents outline requirements for depot level maintenance support services at Fleet Readiness Center Southwest in North Island, California. The Navy seeks these services to support aircraft, aircraft engines, and components undergoing maintenance, repair, overhaul and modification. Key details include: the solicitation number N68520-21-R-0007; a single-award IDIQ contract structure with cost-plus-fixed-fee and cost reimbursable contract line items; a five-year ordering period from 2023 to 2028; incumbent contractor Aircraft Readiness Alliance; and a 100% small business 8(a) set-aside competitive procurement process. Interested offerors are invited to submit questions on the draft solicitation by December 22, 2021 to help ensure requirements are clear prior to formal solicitation planned for early 2022, with contract award targeted for early 2023.

View the file

Other files

File Type Posted
DLM Attachment 5 - Level Of Effort.pdf PDF
OT-22-20017 - Ground Operation Procedures.pdf PDF
DLM Attachment 10 - CBA Lemoore - 2018-2022.pdf PDF
DLM Attachment L-3_Vol_2_PP-1_.xlsx XLSX spreadsheet
DLM Attachment 18 - Data Item Transmittal Form.docx DOCX document
DLM Attachment 2 - Trade Specialties.docx DOCX document
DLM Attachment 20 - Applicable Wage Determination.docx DOCX document
DLM Attachment 1 - Work Task Guidance.xls XLS spreadsheet
DLM Attachment 9 - CBA FRCSW Center Barrel NAS North Island 2018-2021.pdf PDF
DLM Attachment 17 - TASK ORDER CLOSEOUT.docx DOCX document
Exhibit A - CDRLs (1 Dec 2021).docx DOCX document
DLM Attachment 3 - Trade Skills Training Plans and Outlines.docx DOCX document
N68520-21-R-0007.docx DOCX document
DLM Attachment 12 - CBA - NI Miramar Pendelton.pdf PDF
DLM Attachment 13 - CBA Cannon AFB.pdf PDF
DLM Attachment L-4_Vol_4_CS-1.xls XLS spreadsheet
DLM Attachment 4 - Trade Specialty Functional Req.xlsx XLSX spreadsheet
DLM Attachment 11 - CBA Yuma 12-15-2017 to 12-14-2022.pdf PDF
DLM Attachment 14 - CBA FRCNW -Whidbey Island.pdf PDF
DLM Attachment 6 - Key Personnel.docx DOCX document
DLM Attachment 7 - Minimum Tool Box Requirements.xlsx XLSX spreadsheet
DLM Attachment L-1_Vol_1_ES_Tables.xlsx XLSX spreadsheet
DLM Attachment 19 - OCI List.docx DOCX document
DLM Attachment 8 - DD 254 Security Classification.pdf PDF
DLM Attachment L-2_Vol_2_PPQ.docx DOCX document
DLM Attachment 15 - CBA North Island F-18 Center Barrel.pdf PDF
DLM Attachment 16 - Contractor Surveillance Plan (CSP).doc DOC document
DLM pre-solicitation attendance list.pdf PDF
FRCSW DLM FY22 Industry QA responses (13 Jan 22).pdf PDF
FRC SW DLM Pre-Prop Conf Brief final.pptx PPTX presentation
DLM Attachment L-1_Vol_1_ES_Tables.xlsx XLSX spreadsheet
DLM Attachment 8 - CBA - 2019 FRCSW Center Barrel CBA FE.pdf PDF
Exhibit A - CDRLs (1 Dec 2021).docx DOCX document
DLM Attachment L-3_Vol_2_PP-1_.xlsx XLSX spreadsheet
DLM Attachment 11 - Contractor Surveillance Plan (CSP).doc DOC document
DLM Attachment L-5_Vol_4_ AFBL.xlsx XLSX spreadsheet
DLM Attachment 3 - Trade Skills Training Plans and Outlines.docx DOCX document
DLM Attachment 7 - DD 254 Security Classification.pdf PDF
DLM Attachment L-2_Vol_2_PPQ.docx DOCX document
DLM Attachment 5 - Level Of Effort.xlsx XLSX spreadsheet
RFP Question Submittal Form - N68520-21-R-0007.xlsx XLSX spreadsheet
DLM Attachment 2 - Trade Specialties.docx DOCX document
DLM Attachment 4 - Trade Specialty Functional Req.xlsx XLSX spreadsheet
DLM Attachment 9 - CBA - North Island F-18 Center Barrel CBA 8-31-2018 to 8-31-2021.pdf PDF
DLM Attachment 15 - AWDs.pdf PDF
DLM Attachment 14 - OCI List.docx DOCX document
DLM Attachment L-4_Vol_4_CS-1.xls XLS spreadsheet
DLM Attachment 10 - CBA - Lemoore - 2018-2023.pdf PDF
draft - N68520-21-R-0007.docx DOCX document
DLM Attachment 1 - Work Task Guidance.xls XLS spreadsheet
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Instructions to Prime Contractors for completing Attachment L-5 Annual Fully Burdened Labor

RFP N68520-21-R-0007

COLUMN/AREACOLUMN HEADINGDESCRIPTION OF DATA UNDER THIS COLUMN HEADING
BOfferor NameEnter the Offeror (Prime's name or Subcontractor's name) in this field to distinguish between the companies
CProposed Labor Category (Furnished by Government)Enter the Proposed Labor Category, as recorded in the Prime or Subcontractor's accounting system, that correlates to each of the Government solication Labor Category on that row. Spell and format entry the same every time it is used on the template (for example, when it relates to the Prime Offeror's rates on one row and to a Subcontractor's rates on another row). If the Offeror determines that no personnel will be proposed to perform work defined by one of the Government Estimate Labor Categories listed, enter "NA".
DIndividual Designator*For each individual Contractor employee proposed, the contractor shall enter the corresponding Position Number as found on Attachment 5.
E-IProposed Annual Fully-Burdened Regular Labor and Overtime (OT) Labor, per Labor Catergory, per Labor Individual DesignatorEnter the Annual Fully-Burdened Labor proposed for the applicable performance period (e.g. Year_#) for personnel associated with the Proposed Labor Category and Individual Designator. Enter numbers only, in U.S. Dollar format $###.## rounded to the nearest cent. Annual Fully-Burdened Regular Labor and OT Labor shall include fringe, overhead, G&A, and fee on total cost, but should not include Fully-Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs. Annual Fully-Burdened Labor shall be the Fully-Burdened Labor Rate times the amount of hours proposed for the applicable performance period.

Prime Burdened Labor Rates

Offeror NameATTACHMENT 5Individual Designator*Proposed Annual Fully-Burdened Labor
Proposed Labor CategoryOrdering Year 1Ordering Year 2Ordering Year 3Ordering Year 4Ordering Year 56-mo extension
Aircraft Mechanic II
Aircraft Mechanic II (OT)
Electrician, Maintenance
Electrician, Maintenance (OT)
Sheet metal Mechanic
Sheet metal Mechanic (OT)
Logs & Records Clerk
Logs & Records Clerk (OT)
Supervisor (Lemoore)
Team Lead
Team Lead (OT)
AC Worker: Sand Blaster, Sheet metal, general
AC Worker: Sand Blaster, Sheet metal, general (OT)
Aircraft Rubber Equipment Repairer (Fuel Cell Mechanic)
Aircraft Rubber Equipment Repairer (Fuel Cell Mechanic) (OT)
Aircraft Painter
Aircraft Painter (OT)
Welder
Welder (OT)
Program Manager
Production Controller (material coordinator/expeditor)
Production Controller (material coordinator/expeditor) (OT)
Precision Measurement Equipment Calibrator - Instrument Mechanic
Precision Measurement Equipment Calibrator - Instrument Mechanic (OT)
Electronic Technician III
Electronic Technician III (OT)
Electronic Technician II
Electronic Technicial II (OT)
Pneudraulic Systems Mechanic
Pneudraulic Systems Mechanic (OT)
Aircraft Machinist (Machinist)
Aircraft Machinist (Machinist) (OT)
Administrative Assistant
Administrative Assistant (OT)
Aircraft Mechanic Helper (Aircraft Electroplate Helpter)
Aircraft Mechanic Helper (Aircraft Electroplate Helpter) (OT)
Quality Assurance Program Monitor/Quality Control Inspector

File details come from the government source that posted it. Updated .