DLM Attachment L-2_Vol_2_PPQ.docx

DOCX document 22 KB Posted

Attached to
Depot Level Maintenance (DLM) Support Services FRCSW, North Island, CA
Solicitation number
N68520-21-R-0007
Issued by

About this file

This draft solicitation and related federal contract opportunity document outline requirements for Depot Level Maintenance support services at Fleet Readiness Center Southwest in North Island, California. The Navy is seeking these services to augment its government workforce for aircraft, aircraft engines, components, and material undergoing maintenance, repair, overhaul and manufacturing. The anticipated single-award IDIQ contract would have cost-plus-fixed-fee and cost reimbursable contract line items, with a five-year ordering period. Industry is asked to provide feedback on the draft solicitation by December 22, 2021. The formal solicitation is planned for the first quarter of fiscal year 2022, with contract award targeted for the first quarter of fiscal year 2023. The requirement is designated as 100% set-aside for 8(a) small businesses. The incumbent contractor is Aircraft Readiness Alliance, LLC under contract N68936-17-C-0081.

View the file

Other files

File Type Posted
DLM Attachment 5 - Level Of Effort.pdf PDF
OT-22-20017 - Ground Operation Procedures.pdf PDF
DLM Attachment 10 - CBA Lemoore - 2018-2022.pdf PDF
DLM Attachment L-3_Vol_2_PP-1_.xlsx XLSX spreadsheet
DLM Attachment 18 - Data Item Transmittal Form.docx DOCX document
DLM Attachment 2 - Trade Specialties.docx DOCX document
DLM Attachment 20 - Applicable Wage Determination.docx DOCX document
DLM Attachment 1 - Work Task Guidance.xls XLS spreadsheet
DLM Attachment 9 - CBA FRCSW Center Barrel NAS North Island 2018-2021.pdf PDF
DLM Attachment 17 - TASK ORDER CLOSEOUT.docx DOCX document
Exhibit A - CDRLs (1 Dec 2021).docx DOCX document
DLM Attachment 3 - Trade Skills Training Plans and Outlines.docx DOCX document
N68520-21-R-0007.docx DOCX document
DLM Attachment 12 - CBA - NI Miramar Pendelton.pdf PDF
DLM Attachment 13 - CBA Cannon AFB.pdf PDF
DLM Attachment L-5_Vol_4_ AFBL.xlsx XLSX spreadsheet
DLM Attachment L-4_Vol_4_CS-1.xls XLS spreadsheet
DLM Attachment 4 - Trade Specialty Functional Req.xlsx XLSX spreadsheet
DLM Attachment 11 - CBA Yuma 12-15-2017 to 12-14-2022.pdf PDF
DLM Attachment 14 - CBA FRCNW -Whidbey Island.pdf PDF
DLM Attachment 6 - Key Personnel.docx DOCX document
DLM Attachment 7 - Minimum Tool Box Requirements.xlsx XLSX spreadsheet
DLM Attachment L-1_Vol_1_ES_Tables.xlsx XLSX spreadsheet
DLM Attachment 19 - OCI List.docx DOCX document
DLM Attachment 8 - DD 254 Security Classification.pdf PDF
DLM Attachment L-2_Vol_2_PPQ.docx DOCX document
DLM Attachment 15 - CBA North Island F-18 Center Barrel.pdf PDF
DLM Attachment 16 - Contractor Surveillance Plan (CSP).doc DOC document
DLM pre-solicitation attendance list.pdf PDF
FRCSW DLM FY22 Industry QA responses (13 Jan 22).pdf PDF
FRC SW DLM Pre-Prop Conf Brief final.pptx PPTX presentation
DLM Attachment L-1_Vol_1_ES_Tables.xlsx XLSX spreadsheet
DLM Attachment 8 - CBA - 2019 FRCSW Center Barrel CBA FE.pdf PDF
Exhibit A - CDRLs (1 Dec 2021).docx DOCX document
DLM Attachment L-3_Vol_2_PP-1_.xlsx XLSX spreadsheet
DLM Attachment 11 - Contractor Surveillance Plan (CSP).doc DOC document
DLM Attachment L-5_Vol_4_ AFBL.xlsx XLSX spreadsheet
DLM Attachment 3 - Trade Skills Training Plans and Outlines.docx DOCX document
DLM Attachment 7 - DD 254 Security Classification.pdf PDF
DLM Attachment 5 - Level Of Effort.xlsx XLSX spreadsheet
RFP Question Submittal Form - N68520-21-R-0007.xlsx XLSX spreadsheet
DLM Attachment 2 - Trade Specialties.docx DOCX document
DLM Attachment 4 - Trade Specialty Functional Req.xlsx XLSX spreadsheet
DLM Attachment 9 - CBA - North Island F-18 Center Barrel CBA 8-31-2018 to 8-31-2021.pdf PDF
DLM Attachment 15 - AWDs.pdf PDF
DLM Attachment 14 - OCI List.docx DOCX document
DLM Attachment L-4_Vol_4_CS-1.xls XLS spreadsheet
DLM Attachment 10 - CBA - Lemoore - 2018-2023.pdf PDF
draft - N68520-21-R-0007.docx DOCX document
DLM Attachment 1 - Work Task Guidance.xls XLS spreadsheet
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION L – VOLUME 2

PAST PERFORMANCE QUESTIONNAIRE

Within 2 weeks from receipt of this questionnaire return this form to Ms. Brandi Firestien, at brandi.j.firestien.civ@us.navy.mil.

1. CONTRACTOR IDENTIFICATION

a. Contractor: _______________________

b. Program Title: _____________________

c. Contract Number: __________________

d. Type of Contract: ____________Percent Complete: ____________
e. Award Fee (if applicable): _________Percent of Award Fee Received: _________

Note: Whether identified or not, if you have any knowledge of other contracts for the identified contractor, you are requested to complete a questionnaire for each contract or subcontract similar to this acquisition.

2. RESPONDENT IDENTIFICATION

a. Name: ________________________________________________

b. Agency: _______________________________________________

c. Position: _______________________________________________

d. Relation to Program: _____________________________________

e. Phone/Fax Number/Email Address: _________________________

f. Date Questionnaire Completed: ____________________________

3. PROGRAM CHARACTERISTICS

3a. Please provide a short description of the subject contract.

3b. Please check those activities, which are applicable to your program

a. COMNAVAIRFORINST 4790.2 (series) Maintenance _________

b. Aircraft Maintenance _________

c. Aircraft subsystem, equipment or component Maintenance _________

d. Commercial Aviation Maintenance _________

e. Depot Level Maintenance _________

f. Airframe Modifications _________

g. Deploying and Managing Personnel under the Service Contract Act _________

h. Working at a Government site _________

i. Performing or managing at multiple sites _________

j. Servicing multiple type/model/series Aircraft _________

k. Aircraft Heavy Maintenance to include major aircraft repairs/inspections, engine, propeller and aircraft component overhaul, repair and configuration tracking. ________

l. Performing aviation maintenance as the Prime Contractor _________

m. Configuration Management of Aircraft and Aircraft Components. __________

n. Flight/Industrial Safety/Quality Assurance Management and Oversight of Field and Heavy Maintenance activities. ____________

o. Aircraft Strip and Paint _________

p. Support Equipment Maintenance _________

q. Aviation Life Support Systems Maintenance and Issue _________

r. Manufacture of items and component parts otherwise not available _________

s. In-service repair and all other categories of aircraft Depot Level Maintenance _________

t. Levels of Maintenance other than DLM _________

4. PERFORMANCE LEVELS

4.1 PERFORMANCE GRADES (Use these grades to provide the overall rating where requested below).

Exceptional - Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory - Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal - Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory - Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

4.2 QUESTIONS

4.2.1. TECHNICAL AND QUALITY PERFORMANCE

a. What kind of technical performance problems or strengths were experienced by the contractor?

b. What was the cause of these technical problems or strengths?

c. To what extent have corrective actions been taken to correct problem(s) identified above and to what extent have the corrective actions been effective? Describe the progress made to date. Also explain to what extent the corrective actions addressed the root cause of the problem(s) and led to systemic improvement such that similar problems would not reoccur.

d. Overall, the contractor's technical performance is rated ________________________.

|_|Exceptional |_|Very Good |_|Satisfactory |_|Marginal |_|Unsatisfactory

4.2.2 MANAGEMENT

4.2.2.1 MANAGEMENT RESPONSIVENSS

What was the contractor’s record of timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals (especially responses to change orders, engineering change proposals, or other undefinitized contract actions), the contractor's history of reasonable and cooperative behavior, effective business relations, and customer satisfaction?

4.2.2.2 SUBCONTRACT MANAGEMENT

What was the contractor’s success with timely award and management of subcontracts, including whether the contractor met or exceeded small business, small disadvantaged business, small business HUBZone, veteran-owned small business, service disabled veteran owned small business, women-owned small business participation and subcontracting goals?

4.2.2.3 PROGRAM MANAGEMENT AND OTHER MANAGEMENT

a. To what extent does the contractor discharge their responsibility for integration and coordination of all activity needed to execute the contract; identify and apply resources required to meet schedule requirements; assign responsibilities for tasks/actions required by contract; and communicate appropriate information to affected program elements in a timely manner?

b. What were the contractor’s risk management practices, especially the ability to identify risks and formulate and implement risk mitigation plans?

c. If applicable, identify and provide information on any other areas that are unique to the contract, or that cannot be captured elsewhere under the Management Assessment.

4.2.2.4 Overall Management Assessment

Overall, the contractor's management performance is rated____________________.

|_|Exceptional |_|Very Good |_|Satisfactory |_|Marginal |_|Unsatisfactory

4.2.5. OTHER. Is there any other information regarding this acquisition that you think would be helpful to our evaluation? If so please explain. Examples of additional information that could be helpful to our evaluation include information on (1) problems or strengths with regard to key personnel and (2) the kind of business relationship problems or strengths with regard to management of subcontracts, cooperation with business partners/customers, customer satisfaction, etc.

4.3 SUMMARY: If you had the option, knowing what you know today, would you (pick one), 1) definitely would not, 2) probably would not, 3) might, 4) might not, 5) probably would, 6) definitely would award this contract to this contractor, given the choice? Please explain.

Signature _____________________________________________ Date _____________ Please note that electronic signatures are acceptable. An e-mail from the originator of this document will suffice. Signatures (electronic or hand written) verify that the signatory completed this form and agrees with the information contained within it.

File details come from the government source that posted it. Updated .