N6660419R0284.pdf

PDF 719 KB Posted

Attached to
Payload Integration into Deep Submergence Systems, hardware and services Federal contract opportunity
Solicitation number
N66604-19-R-0284
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This synopsis announces a solicitation for hardware fabrication and services to support payload integration into deep submergence systems. The Naval Undersea Warfare Center Division, Newport, RI seeks proposals for procurement, fabrication, inspection, ship checks, design work, testing, installation and removal of both DSS-SOC and non-DSS-SOC items. The resultant contracts will have CPFF, cost reimbursement and FFP CLINs, and are anticipated to be five-year multiple-award IDIQ contracts. Offerors must be registered in SAM to be eligible for award. The RFP is expected to release in January 2019 and will include evaluation factors. Questions shall be directed only to the identified point of contact. This notice does not constitute a promise or commitment to contract by the Government.

Solicitation/RFP

View the file

Other files for this federal contract opportunity

Other files attached to Payload Integration into Deep Submergence Systems, hardware and services, newest first.
File Type Posted
DSS-SOC_JandA_Redacted.pdf PDF
DSS-SOC_RFP_Q&A_15_Apr.pdf PDF
DSS-SOC_RFP_Q&A_10_Apr.pdf PDF
DSS-SOC_RFP_Q&A_4_Apr.pdf PDF
DSS-SOC_RFP_Q&A_22_Mar.pdf PDF
Exhibit_A_-_CDRLs.pdf PDF
ATT_7_-_Incidental_GFP.pdf PDF
ATT_5_-_PRST.pdf PDF
ATT_2_-_Appendix_C.pdf PDF
ATT_4_-_Appendix_E.pdf PDF
ATT_3_-_Appendix_D.pdf PDF
ATT_6_-_DD_254.pdf PDF
ATT_1_-_Appendix_B.pdf PDF
DRAFT_SOW_Revised_-_DSS-SOC_(20190304).pdf PDF
Draft_SOW_(20181203).pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local time

X

A X B X C X D

EX

X

G F 71 - 86

87 - 98 X H 99 - 103

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-C9 1 103

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N66604 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

SEE SECTION L

conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 6

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

7 - 24 25 - 27

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

28 - 29 30 - 32

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 33 - 41 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 42 - 51 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

52 - 69

PART II - CONTRACT CLAUSES

NAVAL UNDERSEA WARFARE CENTER

JULI CHYTKA, CODE 0221

CONTRACTS DEPARTMENT

1176 HOWELL STREET, BLDG. 1258

NEWPORT RI 02841-1708

401-832-2914

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

14 Mar 2019

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N6660419R0284

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot

HARDWARE / MATERIAL - DSS-SOC

CPFF

Hardware, supplies, materials in accordance with (IAW) the Statement of Work (SOW) (see Section C), as specified by issuance of individual orders, with an ordering period from date of contract award through 60 months after date of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

PSC CD: 5342

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

0002 1 Job

SERVICES - DSS-SOC

CPFF

Services IAW the SOW (see Section C), as specified by issuance of individual orders, with an ordering period from date of contract award through 60 months after date of award.

PSC CD: K019

0003 1 Lot

HARDWARE / MATERIAL - NON-DSS-SOC

CPFF

Hardware, supplies, materials IAW the SOW (see Section C), as specified by issuance of individual orders, with an ordering period from date of contract award through 60 months after date of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0004 1 Job

SERVICES - NON-DSS-SOC

CPFF

Services IAW the SOW (see Section C), as specified by issuance of individual orders, with an ordering period from date of contract award through 60 months after date of award.

0005 1 Lot

OTHER DIRECT COSTS - TRAVEL ONLY

COST

Other Direct Costs (ODCs) TRAVEL ONLY, in support of Services CLIN 0002 and CLIN 0004, with an ordering period from date of contract award through 60 months after date of award. Note: THIS CLIN IS NON-FEE BEARING.

0006 1 Lot

DATA

FFP

Data IAW Contract Data Requirements List (CDRLs), DD Form 1423, Exhibit A

Not Separately Priced

NET AMT

0007 1 Job

POST AWARD KICK-OFF MEETING

FFP

Post Award Kick-Off Meeting IAW NOTE C1 (see Section C).

NOTE: The Government's minimum obligation will be satisfied with a $1,000 Firm Fixed Priced Order to participate in a Post Award Kick-Off Meeting.

NET AMT

CLAUSES INCORPORATED BY FULL TEXT

HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

HQ B-2-0007 LIMITATION OF COST OR LIMITATION OF FUNDS LANGUAGE

The clause entitled "LIMITATION OF COST" (FAR 52.232-20) or "LIMITATION OF FUNDS" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.

HQ B-2-0014 PAYMENTS OF FEE(S) (COMPLETION) (NAVSEA) (MAY 1993)

(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, "fixed fee" in cost-plus-fixed fee type contracts for completion and phase type contracts.

(b) The Government shall make payments to the Contractor, subject to and in accordance with the clause in this contract entitled "FIXED FEE" (FAR 52.216-8) or "INCENTIVE FEE", (FAR 52.216-10), as applicable. Such payments shall be equal to TO BE FILLED IN AT AWARD percent ( TO BE FILLED IN AT AWARD ) of the allowable cost of each invoice submitted by and payable to the Contractor pursuant to the clause of this contract entitled "ALLOWABLE COST AND PAYMENT" (FAR 52.216-7), subject to the withholding terms and conditions of the "FIXED FEE" or "INCENTIVE FEE" clause, as applicable (percentage of fee is based on fee dollars divided by estimated cost dollars, including facilities capital cost of money). Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract.

(c) In the event of discontinuance of the work under this contract, or any specified phase of the contract, in accordance with the clause of this contract entitled "LIMITATION OF FUNDS" (FAR 52.232-22) or "LIMITATION OF COST" (FAR 52.232-20), as applicable, the fee shall be equitably adjusted by mutual agreement to reflect the diminution of work. If the adjusted fee is less than the sum of all fee payments made to the Contractor under this contract, the Contractor shall repay the excess amount to the Government. If the adjusted fee exceeds all payments made to the Contractor under this contract, the Contractor shall be paid the additional amount, subject to the availability of funds. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract at the time of the discontinuance of work.

(d) Fee(s) withheld pursuant to the terms and conditions of this contract shall not be paid until the contract has been modified to reduce the fee(s) in accordance with paragraph (c) above, or until the Procuring Contracting Officer has advised the paying office in writing that no fee adjustment is required.

- Applicable to CLINs 0001, 0002, 0003, and 0004

HQ B-2-0015 PAYMENTS OF FEE(S) (LEVEL OF EFFORT – ALTERNATE 1) (NAVSEA) (MAY 2010)

(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts for level of effort type contracts.

(b) The Government shall make payments to the Contractor, subject to and in accordance with the clause in this contract entitled "FIXED FEE" (FAR 52.216-8) or "INCENTIVE FEE", (FAR 52.216-10), as applicable. Such payments shall be submitted by and payable to the Contractor pursuant to the clause of this contract entitled "ALLOWABLE COST AND PAYMENT" (FAR 52.216-7), subject to the withholding terms and conditions of the "FIXED FEE" or "INCENTIVE FEE" clause, as applicable, and shall be paid at the hourly rate(s) specified above per man-hour performed and invoiced. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract.

- Applicable to CLINs 0002 and 0004

HQ B-2-0020 TRAVEL COSTS - ALTERNATE I (NAVSEA) (APR 2015)

(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its actual travel costs in accordance with FAR 31.205-46. The costs to be reimbursed shall be those costs determined to be allowable, allocable and reasonable by the Procuring Contracting Officer, Administrative Contracting Officer or their duly authorized representative, as advised by DCAA.

(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.

(c) Relocation costs and travel costs incidental to relocation are allowable to the extent provided in FAR 31.205-35;

however, Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incidental to relocation.

(d) The Contractor shall not be reimbursed for the following daily local travel costs:

(i) travel at U.S. Military Installations where Government transportation is available,

(ii) travel performed for personal convenience/errands, including commuting to and from work, and

(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's or employee's convenience.

- Applicable to CLIN 0005

Section C - Descriptions and Specifications

NOTE C1

POST AWARD CONFERENCE

Upon award of the Multiple Award Contract (MAC), all awardees shall be required to participate in the Post Award Conference (PAC) kickoff meeting. The details of the PAC will be finalized at time of award, but the Contractors can expect it to occur in Newport, RI within 60 days after MAC award. Any travel incurred for the PAC is not an authorized cost, is solely the responsibility of the Contractor, and will not be reimbursed or paid by the Government under any circumstance. The conference will establish work level points of contact; determine the order administration strategy, and roles and responsibilities.

- Applicable to CLIN 0007

STATEMENT OF WORK

1.0 BACKGROUND

The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) provides research, development, test and evaluation, engineering, analysis and assessment, as well as fleet support capabilities for submarines, autonomous underwater systems, and offensive and defensive undersea weapon systems, and stewards existing and emerging technologies in support of undersea warfare.

NUWCDIVNPT is responsible for the full spectrum of engineering and research efforts pertaining to the design, development, acquisition, and operational readiness support of submarine payload launch/recovery systems, and integration of payloads. This includes the new use of ocean interfaces for the launch and recovery of payloads such as the Dry Deck Shelter (DDS) that are assisted by diver operations.

A recognized knowledge base for submarine payload integration, NUWCDIVNPT’s primary duties include concept development; design and prototyping of new hardware and software; evaluation of new or upgraded systems; modernization; acquiring and fielding of new systems; life cycle engineering support; fleet training development and implementation; conducting payload integration of new or existing payloads; and providing technical leadership and management of all system interfaces.

NUWCDIVNPT Code 40 serves as Technical Direction Agent and In-Service Engineering Agent for integration of payloads with submarine ocean interfaces.

This new procurement requirement is specifically dedicated to the rapid development, fielding, and in-service support solution sets.

2.0 SCOPE

The contractor shall fabricate and receipt inspect hardware, perform ship checks, develop concepts, conduct design activities, develop, test, perform controlled material handling, perform installation activities, perform removal activities on Deep Submergence Systems – Scope of Certification (DSS- SOC) items, perform repairs and develop life cycle support plans for software and hardware which includes cradles, stowage and handling equipment, and electronic control systems. The contractor shall develop Technical Data Packages (TDPs) in support of DSS-SOC Temporary Modifications (TEMPMODs), Field Changes (FCs), Carry-On Hardware (COH), Temporary Alterations (TEMPALTs), and Ship Alterations (SHIPALTs).

Materiel solution sets sought by sponsors for demonstration and fielding will be defined as a function of capability gaps identified and emerging technology maturity. This procurement includes hardware, software, and services. The services required are defined in this SOW and are consistent with those executed throughout the scope of concept exploration, prototype design and development process, and low rate production including: Engineering Analyses, Systems Engineering, Simulation and Modeling, Material Fabrication, Test and Evaluation, Platform Installation and Operational Evaluation, Documentation, Life Cycle Support, and Project Management.

DSS-SOC work is defined in the System Certification Procedures and Criteria Manual for Deep Submergence Systems (P9290) as “…any action that actually or potentially changes (including disassembly) the approved configuration of any part within the DSS-SOC Certification Boundary… This includes initial fabrication and assembly of components and systems (by the construction contractor), and any repair or modification made (by any activity) to a component after original receipt inspection by the authorized activity.” This also includes “any testing or inspections required to establish, maintain, or re-establish DSS-SOC certification.” DSS-SOC work requires prior approval via Naval Sea Systems Command (NAVSEA) Notice (Note) 5000 for performance. Non-DSS-SOC tasks are defined as those which are required as part of a system that is performing DSS-SOC missions, but does not directly contact the DDS. Non-DSS-SOC tasks do not require approval via NAVSEA Note 5000 for the purposes of this contract. This statement of work (SOW) delineates DSS-SOC and non-DSS-SOC tasking.

2.1 SPONSORS

Anticipated Project Sponsors:

2.1.1 Strategic Capabilities Office (SCO)

2.1.2 Secretary of the Navy (SECNAV)

2.1.3 Office of the Chief of Naval Operations (OPNAV)

2.1.4 Naval Sea Systems Command (NAVSEA)

2.1.5 Naval Air Systems Command (NAVAIR)

2.1.6 Office of Naval Research (ONR)

2.1.7 Defense Advanced Research Projects Agency (DARPA)

2.1.8 Fleet

2.1.9 NAVSEA Warfare Centers

2.2 NUWCDIVNPT DEPARTMENTS

Authorized users include the NUWCDIVNPT Platform and Payload Integration Department, Code 40, and the Undersea Weapons and Defensive Systems Department, Code 85.

2.3 FUNDING TYPES

Funding types to be utilized under this contract include:

2.3.1 Operation and Maintenance, Navy (O&MN)

2.3.2 Shipbuilding and Conversion, Navy (SCN)

2.3.3 Other Procurement, Navy (OPN)

2.3.4 Research, Development, Test & Evaluation (RDT&E)

2.3.5 Research, Development, Test & Evaluation, Defense Agencies (RDDA)

2.3.6 NUWCDIVNPT Service Cost Center funds (SCC)

2.3.7 Navy Working Capital Funds – (other than NUWCDIVNPT)

2.4 WORK LOCATIONS

Anticipated locations include:

2.4.1 NUWCDIVNPT

2.4.2 Contractor’s facility (or facilities)

2.4.3 Submarine bases, shipyards, and laboratories at the following locations:

- Norfolk, VA

- Washington, DC

- Groton, CT

- New London, CT

- Newport, RI

- Kings Bay, GA

- Pearl Harbor, HI

- Bangor, WA

- Guam

- Diego Garcia

- San Diego, CA

3.0 APPLICABLE DOCUMENTS

The contractor shall perform the tasking required in Section 4.0 in accordance with the below Applicable Documents. Additional applicable documents may be provided at the delivery order (DO) and task order (TO) level as required.

Index Document Name Revision Applicable SOW Tasks

3.1 ANSI/ISO/ASQ 9001:2015 - Quality Management Systems – Requirements

2015 4.1, 4.2

3.2 NAVSEA SS800-AG-MAN-010/P-9290 - System Certification Procedures and Criteria Manual for Deep Submergence Systems

Revision 1, Change 3 4.1, 4.2

3.3 SECNAV Manual 5510.36 - Department of the Navy Information Security Program Manual

June 2006 4.1, 4.2

3.4 DODI 8500.01 Department of Defense Instruction, Cybersecurity

14 March 2014 4.1.1, 4.1.2, 4.1.3, 4.1.5, 4.2.1, 4.2.3

3.5 DODI 8510.01 Risk Management Framework (RMF) for DOD Information Technology, 12 Mar 14

12 March 2014 4.1.1, 4.1.2, 4.1.3, 4.1.5, 4.2.1, 4.2.3

3.6 Joint Software Systems Safety Engineering Handbook

Version 1.0 of 27 August 2010

4.2.1, 4.1.2, 4.1.3, 4.1.4, 4.2.2, 4.2.3

3.7 IEEE Standard 12207 - Systems and Software Engineering, Software life cycle processes, IEEE Computer Society

4.2.1, 4.1.2, 4.1.3, 4.1.4, 4.2.2, 4.2.3

3.8 COMUSFLTFORCOMINST 4790.3 - Joint Fleet Maintenance Manual (JFMM)

Revision C, Change 6 4.1, 4.2

3.9 NAVSEA Drawing Number 7329690 – Dry Deck Shelter Program Manual

Revision B 4.1.4.1, 4.2.1.1, 4.2.2.1, 4.2.3.1

3.10 NAVSEA Instruction 4720.23A Deep Submergence Systems Temporary Modifications

16 September 2016 4.1.1, 4.1.5, 4.2.2, 4.2.3

3.11 NAVSEA Instruction 9590.1A Carry-On Hardware Authorizations for Special Operations Forces- Related Deep Submergence Systems and Submarines

14 March 2005 4.1.1, 4.1.5, 4.2.2, 4.2.3

4.0 REQUIREMENTS

The contractor shall perform the tasks in SOW Section 4.0 in accordance with DOs, TOs, and Section

3.0 Applicable Documents, using Government Furnished Information (GFI) listed in Section 6.

Tasking specific to DSS-SOC work, for which NAVSEA Notice 5000 authorization is mandatory, is found in SOW sections 4.1.4.1, 4.2.1.1, 4.2.2.1, and 4.2.3.1. For this work:

The minimum quality requirements for procurement, modification, repair, or overhaul of Deep Submergence Systems – Scope of Certification MCD-A Material is provided in SOW; Appendix B. The contractor shall comply with the requirements established in SOW; Appendix B. Additional operational/technical specifications are identified in the SOW paragraphs.

Submergence Systems – Scope of Certification MCD-B Material (with no Government Source Inspection (GSI) requirements) is provided in SOW; Appendix C. The contractor shall comply with the requirements established in SOW; Appendix C. Additional operational/technical specifications are identified in the SOW paragraphs.

Submergence Systems – Scope of Certification MCD-B Material (Requiring Testing, OQE, and GSI) is provided in SOW; Appendix D. The contractor shall comply with the requirements established in SOW;

Appendix D. Additional operational/technical specifications are identified in the SOW paragraphs.

Submergence Systems – Scope of Certification MCD-C Material is provided in SOW; Appendix E. The contractor shall comply with the requirements established in SOW; Appendix E. Additional operational/technical specifications are identified in the SOW paragraphs.

4.1 ENGINEERING SERVICES

4.1.1 SYSTEMS ENGINEERING (Non-DSS-SOC)

The Contractor shall provide systems engineering services inclusive of requirements analysis, risk management, system architecture, system safety, interface development, and documentation collection and review in support of project technical design review events at project milestones, such as the System

3.12 NAVSEA S9070-AA-MME-010/SSN/SSBN - Technical

Requirements Manual for Temporary Submarine Alterations

Third Revision, ACN 5 4.1.1, 4.1.5, 4.2.2, 4.2.3

3.13 NAVSEA Technical Specification 9090-310 - Alterations

to Ships Accomplished by Alteration Installation Teams

12 February 2015 4.1.1, 4.1.5, 4.2.2, 4.2.3

3.14 NAVSEA Notice 5000 – Activities Qualified to Perform

Submarine Safety, Fly-By-Wire Ship Control Systems, and Deep Submergence Systems – Scope of Certification Work

25 January 2019 4.1.4.1, 4.2.1.1, 4.2.2.1, 4.2.3.1

3.15 NAVSEA S9592-B3-MAN-010 – Dry Deck Shelter Scope

of Certification Notebook

Vol 1: Rev 2 ACN4/F Vol 2: Rev 1 Change A

4.1.4.1, 4.2.1.1, 4.2.2.1, 4.2.3.1

3.16 NAVSEAINST 4350.2C, Contract Work Onboard

Nuclear-Powered Submarines

05 June 2013 4.1.1, 4.1.5, 4.2.2, 4.2.3

3.17 NAVSEAINST 4720.14D, Temporary Alterations to

Active Fleet Submarines

04 March 2014 4.1.1, 4.1.5, 4.2.2, 4.2.3

Requirements Review (SRR), Preliminary Design Review (PDR), Critical Design Review (CDR), and Test Readiness Review (TRR). The contractor shall develop and present systems engineering technical documentation in support of the technical design reviews and project milestones.

The contractor shall provide recommendations for requirements and perform requirements analysis for functional requirements allocation of hardware and software configuration items.

The contractor shall provide recommendations for risk management including identification of risks, planning, assessment, analysis, monitoring, reporting, and proposed risk mitigation strategies for system engineering technical solutions.

The contractor shall perform interface development, including components interfacing with the DSS-SOC boundary and boundary infrastructure services (space, power, cooling, cable plant and other interfaces), and system safety. The contractor shall provide interface development documents for hardware and software. The contractor shall provide recommendations to interface specifications for hardware and software. The contractor shall provide recommendations to software specifications.

Deliverables:

‐ CDRL A001: DI-IPSC-81432A, System/Subsystem Design Description ‐ CDRL A002: DI-IPSC-81433A, Software Requirements Specification ‐ CDRL A003: DI-MGMT-81809, Risk Management Status Report ‐ CDRL A004: DI-SAFT-80101C, System Safety Hazard Analysis Report ‐ CDRL A005: DI-IPSC-81436A, Interface Design Description ‐ CDRL A006: DI-SESS-81632, Interface Specification ‐ CDRL A007: DI-IPSC-81441A, Software Product Specification

4.1.2 TECHNICAL ASSESSMENTS (Non-DSS-SOC)

The Contractor shall provide technical assessments of existing system hardware, software, and documentation. The contractor shall include analyses of systems that may interface with or fall within DSS- SOC boundaries for DDSs and provide recommendations for technical solutions if any issues are discovered during assessment by delivering technical reports. Travel by the contractor to onsite locations may be required to perform technical assessments of existing hardware and software. The contractor shall provide travel reports containing technical deficiencies, issues, and provide recommended solutions for Government final determination.

Deliverables:

‐ CDRL A008: DI-MISC-80508B, Technical Report - Study/Services ‐ CDRL A009: DI-MISC-81943, Travel Report

4.1.3 DESIGN AND DEVELOPMENT (Non-DSS-SOC)

The Contractor shall design and develop new hardware and software and modify existing hardware and software for a new purpose to support integration of systems that may interface with or fall within DSS-SOC boundaries for DDSs. Design and development includes conceptual design, preliminary design, design evaluation, analysis of alternatives, performance analysis, design analysis, performance simulations, and detailed design in support of milestone design reviews such as PDR and CDR. Any design work shall include the development of drawings and models for hardware and Computer Software Configuration Item (CSCI) for software. The contractor shall present design work at applicable design reviews such as PDR and CDR. The contractor shall provide the resultant designs to the Government for final evaluation.

The contractor shall deliver TDPs. The contractor shall deliver Engineering Change Proposals (ECPs), Notice of Revision (NOR) documents, and Specification of Change Notices (SCNs) in support of any changes made to designs upon delivery and Government acceptance. The contractor shall develop Quality Assurance Provisions as required when designs are ready for manufacture and production.

Deliverables:

‐ CDRL A00A: DI-GDRQ-80650, Design Data Calculation Package

‐ CDRL A00B: DI-IPSC-81427B, Software Development Plan ‐ CDRL A00C: DI-SESS-81001E, Conceptual Design Drawings/Models ‐ CDRL A00D: DI-SESS-81002F, Developmental Design Drawings/Models and Associated Lists ‐ CDRL A00E: DI-SESS-81003E, Commercial Drawings/Models and Associated Lists ‐ CDRL A00F: DI-SESS-81000E, Product Drawings/Models and Associated Lists ‐ CDRL A00G: DI-ADMN-81373, Presentation Material ‐ CDRL A00H: DI-SESS-80776A, Technical Data Package ‐ CDRL A00J: DI-SESS-80639D, Engineering Change Proposal ‐ CDRL A00K: DI-SESS-80642D, Notice of Revision ‐ CDRL A00L: DI-SESS-80643D, Specification Change Notice ‐ CDRL A00M: DI-CMAN-80789A, Quality Assurance Provisions

4.1.4 MANUFACTURE AND PRODUCTION

4.1.4.1 Manufacture and Production (DSS-SOC)

The Contractor shall provide prototype and production hardware to support integration of systems that fall within DDS DSS-SOC boundaries. The contractor shall verify form, fit, and function of hardware by performing fit checks on material. Using SOW Section 6.0 GFI, the contractor shall test the deliverables of all created electrical, mechanical, software, and human interface components to verify they meet drawings and specifications.

The Contractor shall deliver prototype and production hardware and associated documentation, inclusive of Certificates of Compliance (CoCs), Requests for Variance (RFVs), and Request for Waivers (RFWs).

Deliverables:

‐ CDRL A00N: DI-MISC-80678, Certification/Data Report ‐ CDRL A00P: DI-MISC-81356A, Certificate of Compliance ‐ CDRL A00Q: DI-SESS-80640D, Request for Variance ‐ CDRL A00R: DI-SESS-81732, Request for Waivers

4.1.4.2 Manufacture and Production (Non-DSS-SOC)

The Contractor shall provide prototype and production hardware to support integration of systems to support Payload Integration into a DDS, but falls outside of the DSS-SOC boundary. The contractor shall verify form, fit, and function of hardware by performing fit checks on material. Using SOW Section

6.0 GFI, the contractor shall test the deliverables of all created electrical, mechanical, software, and human interface components to verify they meet drawings and specifications.

The Contractor shall deliver prototype and production hardware and associated documentation, inclusive of CoCs, RFVs, and RFWs.

Deliverables:

‐ CDRL A00N: DI-MISC-80678, Certification/Data Report ‐ CDRL A00P: DI-MISC-81356A, Certificate of Compliance

4.1.5 TECHNICAL DATA PACKAGES (Non-DSS-SOC)

The Contractor shall develop TEMPALTs, SHIPALTs, TEMPMODs, FCs, and COH TDPs. The contractor shall submit TDP documentation to the Government for approval. The contractor shall participate in Government Review Meetings to address comments during adjudication and TDP updates.

Deliverable:

‐ CDRL A00H: DI-SESS-80776A, Technical Data Package

4.2 INSTALLATION, TEST, AND LIFE CYCLE SUPPORT

4.2.1 ASSEMBLY, INTEGRATION and TEST

4.2.1.1 Assembly, Integration and Test (DSS-SOC)

The Contractor shall assemble individual components and integrate assemblies, subsystems, and systems to create DSS-SOC equipment. Using SOW Section 6.0 GFI, the Contractor shall develop procedures, test plans, or certification tests for hardware or software. The contractor shall design, analyze, and furnish test equipment or test fixtures. The contractor shall be responsible for all aspects of testing. The contractor shall provide evaluation and technical analysis of test results for systems that fall within DSS- SOC boundaries for DDSs. Testing may include component level testing, system level testing, ship board testing, and land based testing of DSS-SOC systems.

The contractor shall prepare and deliver test reports describing work performed, tests conducted, investigation completed, and conclusions drawn from post-test analysis tasking.

Deliverables:

‐ CDRL A00S: DI-NDTI-80566A, Test Plan ‐ CDRL A00T: DI-IPSC-81438A, Software Test Plan ‐ CDRL A00U: DI-NDTI-80603A, Test Procedure ‐ CDRL A00V: DI-IPSC-81440A, Software Test Report ‐ CDRL A00W: DI-SESS-81704, Test Plans/Test Procedures ‐ CDRL A00X: DI-NDTI-80809B, Test/Inspection Report ‐ CDRL A00Y: DI-QCIC-81891, Acceptance Test Report

4.2.1.2 Assembly, Integration and Test (Non-DSS-SOC)

The Contractor shall assemble individual components and integrate assemblies, subsystems, and systems to support Payload Integration into a DDS. Using SOW Section 6.0 GFI, the Contractor shall develop procedures, test plans, or certification tests for hardware or software. The contractor shall design, analyze, and furnish test equipment or test fixtures. The contractor shall be responsible for all aspects of testing. The contractor shall provide evaluation and technical analysis of test results for systems that support Payload Integration into a DDS, but falls outside of the DSS-SOC boundary. Testing may include component level testing, system level testing, ship board testing, and land based testing.

The contractor shall prepare and deliver test reports describing work performed, tests conducted, investigation completed, and conclusions drawn from post-test analysis tasking.

Deliverables:

‐ CDRL A00S: DI-NDTI-80566A, Test Plan ‐ CDRL A00T: DI-IPSC-81438A, Software Test Plan ‐ CDRL A00U: DI-NDTI-80603A, Test Procedure ‐ CDRL A00V: DI-IPSC-81440A, Software Test Report ‐ CDRL A00W: DI-SESS-81704, Test Plans/Test Procedures ‐ CDRL A00X: DI-NDTI-80809B, Test/Inspection Report ‐ CDRL A00Y: DI-QCIC-81891, Acceptance Test Report

4.2.2. SHIP CHECKS, INSTALLATION, AND REMOVAL

4.2.2.1 Ship Checks, Installation, and Removal (DSS-SOC)

The Contractor shall perform ship checks, installations, and removals of hardware and software for TEMPMODs, TEMPALTs, SHIPALTs, Engineering Changes, or FCs for systems that fall within DSS-SOC boundaries for DDS. Installations and removals shall be performed by the contractor in laboratories, shore sites, DDSs, or onboard Submarine Platforms. Upon completion of hardware and software removal, the contractor shall restore laboratories, shore sites, DDSs, or onboard Submarine Platforms to pre-existing conditions. The Contractor shall draft Memorandums of Understanding (MOUs) and Memorandums of Agreement (MOAs) in support of ship checks, installation, and removals.

The contractor shall develop and maintain Departure from Specification (DFS) documentation and waivers to capture any non-conformance issues between approved TEMPALT, TEMPMOD, SHIPALT, Engineering Change or FC packages, and the installed conditions.

The Contractor shall provide on-site support for repairs and troubleshooting of hardware or software on submarines and shore sites of TEMPMODs, TEMPALTs, SHIPALTs, Engineering Changes, or FCs for systems that interface with or fall within DSS-SOC boundaries for DDSs. The contractor shall provide recommendations to the Government for documentation changes based on repair and troubleshooting.

The contractor shall deliver trip reports and generate technical reports.

Deliverables:

‐ CDRL A008: DI-MISC-80508B, Technical Report - Study/Services ‐ CDRL A009: DI-MISC-81943, Travel Report

4.2.2.2 Ship Checks, Installation, and Removal (Non-DSS-SOC)

The Contractor shall perform ship checks, installations, and removals of hardware and software for COH, TEMPALTs, SHIPALTs, or Engineering Changes for systems to support Payload Integration into a DDS, but falls outside of the DSS-SOC boundary. Installations and removals shall be performed by the contractor in laboratories, shore sites, DDSs, or onboard Submarine Platforms. Upon completion of hardware and software removal, the contractor shall restore laboratories, shore sites, DDSs, or onboard Submarine Platforms to preexisting conditions. The Contractor shall draft MOUs and MOAs in support of ship checks, installation, and removals.

The contractor shall develop and maintain DFS documentation to capture any non-conformance issues between approved TEMPALT, SHIPALT, Engineering Change or COH packages, and the installed conditions.

The Contractor shall provide on-site support for repairs and troubleshooting of hardware or software on submarines and shore sites of COH, TEMPALTs, SHIPALTs, or Engineering Changes, for systems that support Payload Integration into a DDS, but falls outside of the DSS-SOC boundary. The contractor shall provide recommendations to the Government for documentation changes based on repair and troubleshooting.

The contractor shall deliver trip reports and generate technical reports.

Deliverables:

‐ CDRL A008: DI-MISC-80508B, Technical Report - Study/Services ‐ CDRL A009: DI-MISC-81943, Travel Report

4.2.3 LIFE CYCLE SUPPORT

4.2.3.1 Life Cycle Support (DSS-SOC)

The Contractor shall perform DSS-SOC controlled material handling, receipt, and inspection of Original Equipment Manufacturer (OEM) provided hardware in accordance with Applicable Document 3.15 for indoctrination to the DSS-SOC program, and perform maintenance inclusive of DSS-SOC equipment and COH in accordance with DSS- SOC procedures. The contractor shall provide required documentation such as Failure Modes, Effects and Criticality Analysis Reports, Reliability and Maintainability Block Diagrams and Mathematical Models reports, and Reliability and Maintainability Prediction reports. The contractor shall provide logistics products such as sparing recommendations, Engineering Data for Provisioning, maintenance instructions and procedures for Planned Maintenance System (PMS) Maintenance Requirement Cards (MRCs) and PMS Maintenance Index Pages (MIPs), reliability centered maintenance analysis, training materials, technical manuals, and procedure development for land and sea based DSS-SOC equipment including Maintenance Support Plans and Software User Manuals.

Deliverables:

‐ CDRL A00Z: DI-SESS-81495A, Failure Modes, Effects, And Criticality Analysis Report ‐ CDRL A010: DI-SESS-81496A, Block Diagrams and Mathematical Models Report

‐ CDRL A011: DI-SESS-81497A, Reliability and Maintainability Predictions Report ‐ CDRL A012: DI-PSSS-80134B, Common Repairable Item Identification Listing ‐ CDRL A013: DI-SESS-81874, Engineering Data for Provisioning ‐ CDRL A014: DI-PSSS-80991B, Planned Maintenance System Maintenance Requirement Card ‐ CDRL A015: DI-PSSS-80992B, Planned Maintenance System Maintenance Index Page ‐ CDRL A016: DI-ILSS-80111A, Reliability-Centered Maintenance Analysis Data ‐ CDRL A017: DI-ILSS-80872, Training Materials ‐ CDRL A018: DI-TMSS-81675A, Equipment Technical Manual (Sanitized) ‐ CDRL A019: DI-ILSS-81225, Maintenance Support Plan ‐ CDRL A020: DI-IPSC-81443A, Software User Manual

4.2.3.2 Life Cycle Support (Non-DSS-SOC)

The Contractor shall perform general receipt and inspection of provided hardware, and perform maintenance on equipment to support Payload Integration into a DDS, but falls outside of the DSS-SOC boundary and COH, and provide required documentation such as Failure Modes, Effects and Criticality Analysis Reports, Reliability and Maintainability Block Diagrams and Mathematical Models reports, and Reliability and Maintainability Prediction reports. The contractor shall provide logistics products such as sparing recommendations, Engineering Data for Provisioning, maintenance instructions and procedures for Planned Maintenance System (PMS) Maintenance Requirement Cards (MRCs) and Planned Maintenance System (PMS) Maintenance Index Pages (MIPs), reliability centered maintenance analysis, training materials, technical manuals, and procedure development for land and sea based equipment that interfaces with the DSS-SOC boundary including Maintenance Support Plans and Software User Manuals.

Deliverables:

‐ CDRL A00Z: DI-SESS-81495A, Failure Modes, Effects, And Criticality Analysis Report ‐ CDRL A010: DI-SESS-81496A, Block Diagrams and Mathematical Models Report ‐ CDRL A011: DI-SESS-81497A, Reliability and Maintainability Predictions Report ‐ CDRL A012: DI-PSSS-80134B, Common Repairable Item Identification Listing ‐ CDRL A013: DI-SESS-81874, Engineering Data for Provisioning ‐ CDRL A014: DI-PSSS-80991B, Planned Maintenance System Maintenance Requirement Card ‐ CDRL A015: DI-PSSS-80992B, Planned Maintenance System Maintenance Index Page ‐ CDRL A016: DI-ILSS-80111A, Reliability-Centered Maintenance Analysis Data ‐ CDRL A017: DI-ILSS-80872, Training Materials ‐ CDRL A018: DI-TMSS-81675A, Equipment Technical Manual (Sanitized) ‐ CDRL A019: DI-ILSS-81225, Maintenance Support Plan ‐ CDRL A020: DI-IPSC-81443A, Software User Manual

4.3 PROJECT MANAGEMENT

4.3.1 PROJECT ACTIVITY, STATUS TRACKING, AND REPORTING (Non-DSS-SOC) The contractor shall coordinate and track project activities. The contractor shall track project elements which include project expenditures, work breakdown structure, master schedules, contract milestones, progress reports, CDRLs and deliverables. The contractor shall generate project status reports. The contractor shall attend technical and working group meetings to provide summaries and minutes of the proceedings. The contractor shall develop presentations for progress and milestone meetings.

Deliverables:

‐ CDRL A00G: DI-ADMN-81373, Presentation Material ‐ CDRL A021: DI-FNCL-80331A, Funds and Man-Hours Expenditure Report ‐ CDRL A022: DI-MGMT-80227, Contractor's Progress, Status and Management Report ‐ CDRL A023: DI-MGMT-80368A, Status Report ‐ CDRL A024: DI-ADMN-81505, Report, Record of Meeting/Minutes

5.0 MONTHLY PROGRESS REPORTS

For all assigned tasks, the contractor shall prepare a contractor’s Status Report that indicates the progress of work, status of the project(s), and existing or potential problem areas. The contractor shall submit the Contract Status Report during the same timeframe as each invoice submitted in the Wide Area Work Flow (WAWF) Module of the Procurement Integrated Enterprise Environment (PIEE).

Deliverable:

‐ CDRL A025: DI-MGMT-81991, Contract Status Report

6.0 GOVERNMENT FURNISHED INFORMATION (GFI)

The following GFI is made available under this contract:

Index Title Applicable SOW Sections(s)/Task(s)

6.1 System Performance Requirements All Sections

6.2 Schedules – Program, Project, Task, Delivery, Event, Test & Travel Schedules, (at facilities, at-sea and dockside), Meeting Minutes and Action Items

All Sections

6.3 Test Results & Test Data 4.1, 4.1.3, 4.1.4, 4.2.1, 4.2.2, 4.2.3

6.4 Computer Software and Firmware 4.2.1, 4.1.2, 4.1.3, 4.1.4, 4.2.2, 4.2.3

6.5 Project and System Specifications All Sections

6.6

Engineering Change Proposals (ECP), Engineering Change Instructions (ECI), ECP effort estimate forms, ECP review comments, Engineering Change Requests (ECR), Specification Change Notices (SCN), Notices of Revision (NORs), & Conversion Requirements

All Sections

6.7

Program, Project and System Documentation may include:

All Sections

Critical Item Development Specifications (CIDS)

Equipment Design Documentation

Prime Item and Development Specification (PIDS)

Project Plans and Guidance

Project and System Drawings

Project Specifications and Proposals

Interface Documentation

System/Segment Specifications

System/Segment Design Documents

Integration Plans

Software Modification Plan

Document Review Comments

Test Plans & Procedures

6.8 Ship Design/Installation Plans & Documents All Sections

6.9

Technical Data Packages may include:

All Sections

TEMPALT Technical Data Packages

SHIPALT Technical Data Packages

TEMPMOD Technical Data Packages

FC Technical Data Packages

COH Technical Data Packages

6.10 Installation Drawings All Sections

6.11 Environmental Data 4.1.5, 4.2.1

6.12 Installation & Checkout Plans and Procedures 4.2.2, 4.2.3

6.13 Paper Logs and Test Director Notebooks 4.1.1, 4.1.2, 4.1.3, 4.2.1, 4.2.3

6.14 Testing & Data Analysis Tools 4.1.1, 4.1.2, 4.1.3, 4.1.4, 4.2.1, 4.2.3

6.15 Hardware Drawing Packages All Sections

6.16 Engineering Drawings All Sections

6.17 Document Comment Forms All Sections

7.0 QUALITY SURVEILLANCE & PERFORMANCE STANDARDS

The Government will conduct quality surveillance via various methods including formal and informal meetings, review of technical reports, review of monthly progress reports, and review of deliverables.

Contractor performance will be evaluated in the areas of technical quality, cost control, schedule/timeliness, management, utilization of small business, and regulatory compliance as follows:

Technical Quality: The government will evaluate technical quality using the criteria defined in the Performance Requirements Summary Table (PRST) (SOW Attachment 5);

Cost Control: The government will evaluate the contractor’s effectiveness in forecasting, managing, and controlling actual costs in comparison to negotiated costs;

Schedule/Timeliness: The government will evaluate the contractor’s ability to meet negotiated milestones and delivery schedules;

Management: The government will evaluate the contractor’s ability to integrate and coordinate all activities needed to execute the contract/order;

Utilization of Small Business: The government will evaluate the contractor’s compliance with the Small Business Subcontracting Plan and any small business subcontracting goals contained in the contract/order;

Regulatory Compliance: The government will evaluate the contractor’s compliance with the terms and conditions of the contract/order relating to applicable regulations and codes.

8.0 EXCEPTION FROM INFORMATION and COMMUNICATION TECHNOLOGY

ACCESSIBILITY REQUIREMENTS

The Government has determined that this procurement is an exception to the Information and Communication Technology (ICT) Accessibility Standards (36 C.F.R. § 1194.3 - Chapter 2 E202 General Exceptions of Section 50 Refresh). Notwithstanding that an exception exists, the Contractor may furnish items or services provided under this contract that comply with the ICT Accessibility Standards (36 C.F.R. § 1194-Chapters/WCAG to Section 508 Refresh).

9.0 SOW ATTACHMENTS

9.1 SOW Attachment 1: Critical Programs Material and Services Procurement – Standard Operating Procedure (SOP 002), Revision (B); Appendix B – Minimum Standard Quality Contract Requirements for Procurement, Modification, Repair or Overhaul of Material, Deep Submergence Systems – Scope of Certification (DSS-SOC), MCD-A SMICs D5 & D6.

9.2 SOW Attachment 2: Critical Programs Material and Services Procurement – Standard Operating Procedure (SOP 002), Revision (B); Appendix C – Minimum Standard Quality Contract Requirements for Procurement, Modification, Repair or Overhaul of Material, Deep Submergence Systems – Scope of Certification (DSS-SOC), MCD-B SMICs D0 & D4 – No GSI Requirements.

9.3 SOW Attachment 3: Critical Programs Material and Services Procurement – Standard Operating Procedure (SOP 002), Revision (B); Appendix D – Minimum Standard Quality Contract Requirements for Procurement, Modification, Repair or Overhaul of Material, Deep Submergence Systems – Scope of Certification (DSS-SOC), MCD-B SMICs D0 & D4 – Requiring Testing, OQE, and GSI.

9.4 SOW Attachment 4: Critical Programs Material and Services Procurement – Standard Operating

6.18 Preliminary list of equipment/system drawings, installation, and interface requirements

All Sections

6.19 Waivers & Departure From Specifications (DFS) 4.1.1, 4.1.4, 4.1.5, 4.2.2

6.20 Certificate of Conformance (COC), Certificate of Test (COT) 4.1.1, 4.1.4, 4.1.5, 4.2.2

Procedure (SOP 002), Revision (B); Appendix E – Minimum Standard Quality Contract Requirements for Procurement, Modification, Repair or Overhaul of Material, Deep Submergence Systems – Scope of Certification (DSS-SOC), MCD-C SMICs D7 & D8.

9.5 SOW Attachment 5: Performance Requirements Summary Table (PRST).

ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING (ECMRA)

The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:

(1) W, Lease/Rental of Equipment;

(2) X, Lease/Rental of Facilities;

(3) Y, Construction of Structures and Facilities;

(4) D, Automatic Data Processing and Telecommunications, IT and Telecom- Telecommunications Transmission (D304) and Internet (D322) ONLY;

(5) S, Utilities ONLY;

(6) V, Freight and Shipping ONLY.

The contractor is required to completely fill in all required data fields using the following web address https://www.ecmra.mil/.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://www.ecmra.mil.

HQ C-1-0001 ITEM(S) - DATA REQUIREMENTS (NAVSEA) (SEP 1992)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit A , attached hereto.

HQ C-2-0002 ACCESS TO PROPRIETARY DATA OR COMPUTER SOFTWARE(NAVSEA) (JUN 1994)

(a) Performance under this contract may require that the Contractor have access to technical data, computer software, or other sensitive data of another party who asserts that such data or software is proprietary. If access to such data or software is required or to be provided, the Contractor shall enter into a written agreement with such party prior to gaining access to such data or software. The agreement shall address, at a minimum, (1) access to, and use of, the proprietary data or software exclusively for the purposes of performance of the work required by this contract, and (2) safeguards to protect such data or software from unauthorized use or disclosure for so long as the data or software remains proprietary. In addition, the agreement shall not impose any limitation upon the

Government or its employees with respect to such data or software. A copy of the executed agreement shall be provided to the Contracting Officer. The Government may unilaterally modify the contract to list those third parties with which the Contractor has agreement(s).

(b) The Contractor agrees to: (1) indoctrinate its personnel who will have access to the data or software as to the restrictions under which access is granted; (2) not disclose the data or software to another party or other Contractor personnel except as authorized by the Contracting Officer; (3) not engage in any other action, venture, or employment wherein this information will be used, other than under this contract, in any manner inconsistent with the spirit and intent of this requirement; (4) not disclose the data or software to any other party, including, but not limited to, joint venturer, affiliate, successor, or assign of the Contractor; and (5) reproduce the restrictive stamp, marking, or legend on each use of the data or software whether in whole or in part.

(c) The restrictions on use and disclosure of the data and software described above also apply to such information received from the Government through any means to which the Contractor has access in the performance of this contract that contains proprietary or other restrictive markings.

(d) The Contractor agrees that it will promptly notify the Contracting Officer of any attempt by an individual, company, or Government representative not directly involved in the effort to be performed under this contract to gain access to such proprietary information. Such notification shall include the name and organization of the individual, company, or Government representative seeking access to such information.

(e) The Contractor shall include this requirement in subcontracts of any tier which involve access to information covered by paragraph (a), substituting…

This is the start of the file's text. The full file is on GovTribe.