ATT_5_-_PRST.pdf

PDF 20 KB Posted

Attached to
Payload Integration into Deep Submergence Systems, hardware and services Federal contract opportunity
Solicitation number
N66604-19-R-0284
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This synopsis announces a solicitation for Payload Integration into Deep Submergence Systems hardware and services. The Naval Undersea Warfare Center Division, Newport seeks to award multiple IDIQ contracts for up to five years to procure, fabricate, inspect, develop concepts, design, test, handle materials, install, remove, repair, and support software and hardware for Deep Submergence Systems within and outside the Scope of Certification. Services include ship checks, life cycle planning, and project tracking for cradles, stowage and handling equipment, and electronic control systems. The North American Industry Classification System code is 332510 with a size standard of 750 employees. The solicitation will be issued in January 2019 and evaluate factors for award. No incumbent contractors exist as this is a new requirement.

ATT 5 - PRST

View the file

Other files for this federal contract opportunity

Other files attached to Payload Integration into Deep Submergence Systems, hardware and services, newest first.
File Type Posted
DSS-SOC_JandA_Redacted.pdf PDF
DSS-SOC_RFP_Q&A_15_Apr.pdf PDF
DSS-SOC_RFP_Q&A_10_Apr.pdf PDF
DSS-SOC_RFP_Q&A_4_Apr.pdf PDF
DSS-SOC_RFP_Q&A_22_Mar.pdf PDF
Exhibit_A_-_CDRLs.pdf PDF
ATT_3_-_Appendix_D.pdf PDF
ATT_6_-_DD_254.pdf PDF
ATT_1_-_Appendix_B.pdf PDF
ATT_2_-_Appendix_C.pdf PDF
ATT_4_-_Appendix_E.pdf PDF
N6660419R0284.pdf PDF
ATT_7_-_Incidental_GFP.pdf PDF
DRAFT_SOW_Revised_-_DSS-SOC_(20190304).pdf PDF
Draft_SOW_(20181203).pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4.1.2 Technical Assessments (Non-

DSS-SOC)

Reports detailing technical assessments of existing system hardware, software, and reference documentation.

Assessments will include analyses of systems and recommendations for technical solutions as defined by delivery/task order.

Standard is met 90% of the time.

Government Review of

Deliverable Documents.

Feedback from NUWC customer.

4.1.4.1 Manufacture and Production

(DSS- SOC)

Prototype and production hardware to support integration of systems that will interface with or fall within DSS-SOC boundaries for dry deck shelters.

Manufacture and production includes verification of the form, fit and function of the hardware to include fit checks on material, verification of that the deliverables of all electrical, mechanical, software and human interface components meets the drawings and specifications, and on time delivery of products, as defined by delivery/task order.

Standard is met 100% of the time.

Government Review of OQE and conduct inspections.

Feedback from NUWC customer and NAVSEA.

Performance Standard

Reports including requirements analysis, risk management, system architecture, system safety, presentations for project milestones, interface development documents, presentations at technical design reviews and project milestones.

4.1.3 Design and Development (Non-

DSS-SOC)

Hardware and software deliverables. Drawings and models for hardware and CSCI

(Computer Software

Configuration Item) for software.

Design and development includes conceptual design, preliminary design, design evaluation, analysis of alternatives, performance analysis, design analysis, performance simulations, and detailed design in support of design reviews as defined by delivery/task order.

Standard is met 90% of the time.

Government Review of

Deliverable Documents.

Feedback from NUWC customer.

4.1.4.2 Manufacture and Production

(Non-DSS-SOC)

Prototype and production hardware to support integration of systems to support Payload

Integration into a dry deck shelter.

Manufacture and production includes verification of the form, fit and function of the hardware to include fit checks on material, verification of that the deliverables of all electrical, mechanical, software and human interface components meets the drawings and specifications, and on time delivery of products, as defined by delivery/task order.

Standard is met 100% of the time.

Government Review of OQE and conduct inspections.

Feedback from NUWC customer.

Performance

Requirements

Summary Table

SOW Section Performance Objective Acceptable Quality Level (AQL) Monitoring Method

4.1 Engineering Services

4.1.1 Systems Engineering (Non-

DSS-SOC)

System Engineering documents include requirements analysis, risks, system architectures, safety documentation, presentations, and

ICDs and will meet standards as defined by delivery/task order.

Standard is met 90% of the time.

Government Review of

Deliverable Documents.

Feedback from NUWC customer.

4.1.5 Technical Data Packages (Non-

DSS-SOC)

Temporary Alterations

(TEMPALTs), Ship Alterations

(SHIPALTs), Temporary

Modifications (TEMPMODs), Field Changes (FCs), and Carry-

On Hardware (COH) Technical

Data Packages (TDPs).

TDPs include all applicable technical data, such as drawings, associated lists, specifications, standards, performance requirements, QA provisions, and packaging details, as defined by delivery/task order.

Standard is met 90% of the time.

Government Review of

Deliverable Documents.

Feedback from NUWC customer.

4.2.1.1 Assembly, Integration and

Test (DSS-SOC)

Assembled DSS-SOC equipment. Test plans and procedures, test equipment or fixtures. test reports.

Assembly, Integration and Test includes evaluation and technical analysis of results, test report describing work performed, tests conducted, investigation completed and conclusions drawn from post-test analysis tasking as defined by delivery/task order.

Standard is met 100% of the time.

Government Review of

Deliverable Documents, OQE and conduct inspections.

Feedback from NUWC customer and NAVSEA.

Ship check, installation and removal includes Memorandums of

Understanding (MOUs) and

Memorandums of Agreement (MOAs), execution of ship checks installation and removals, capturing any non-conformance issues, and on-site support for emergent issues on submarines and shore sites, as defined by delivery/task order.

4.2 Installation, Test, and

Life Cycle Support

4.2.1.2 Assembly, Integration and

Test (Non-DSS-SOC)

Assembled systems to support

Payload Integration into a dry deck shelter. Test plans and procedures, test equipment or fixtures, test reports.

Assembly, Integration and Test includes evaluation and technical analysis of results, test report describing work performed, tests conducted, investigation completed and conclusions drawn from post-test analysis tasking as defined by delivery/task order.

Standard is met 100% of the time.

Government Review of

Deliverable Documents, OQE and conduct inspections.

Feedback from NUWC customer.

4.2.2.1 Ship Checks, Installation and

Removal (DSS- SOC)

Perform ship checks, installation and removal of hardware and for

Temporary Modifications

(TEMPMODs), Temporary

Alterations (TEMPALTs), Ship

Alterations (SHIPALTs), Engineering Changes, or (Field

Changes) FCs for systems that may interface with and fall within DSS-SOC boundaries for dry deck shelters.

Standard is met 100% of the time.

Government Review of documents, installations and removals onsite. Feedback from NUWC customer and

NAVSEA.

4.1.4.2 Manufacture and Production

(Non-DSS-SOC)

Prototype and production hardware to support integration of systems to support Payload

Integration into a dry deck shelter.

Manufacture and production includes verification of the form, fit and function of the hardware to include fit checks on material, verification of that the deliverables of all electrical, mechanical, software and human interface components meets the drawings and specifications, and on time delivery of products, as defined by delivery/task order.

Standard is met 100% of the time.

Government Review of OQE and conduct inspections.

Feedback from NUWC

4.1 Engineering Services

4.2.3.1 Life Cycle Support (DSS-

SOC)

Perform Lifecycle Support for

DSS-SOC hardware, perform controlled material handling, receipt inspection of Original

Equipment Manufacturer

(OEM) provided hardware for indoctrination to the DSS-SOC program, and perform maintenance inclusive of DSS-

SOC equipment and carry on hardware in accordance with

DSS-SOC procedures.

Lifecycle support includes recommendations for logistics products such as sparing, maintenance instructions and procedures, reliability centered maintenance analysis, training curriculum and materials, technical manuals, and procedure development, as defined by delivery/task order.

Standard is met 90% of the time.

Government Review of

Deliverable Documents, OQE and conduct inspections.

Feedback from NUWC customer and NAVSEA.

4.2.3.2 Life Cycle Support (Non-DSS-

SOC)

Perform Lifecycle Support for general hardware, receipt inspection provided hardware, and perform maintenance.

Lifecycle support includes recommendations for logistics products such as sparing, maintenance instructions and procedures, reliability centered maintenance analysis, training curriculum and materials, technical manuals, and procedure development, as defined by delivery/task order.

Standard is met 90% of the time.

Government Review of

Deliverable Documents, OQE and conduct inspections.

Feedback from NUWC customer.

Ship check, installation and removal includes Memorandums of

Understanding (MOUs) and

Memorandums of Agreement (MOAs), execution of ship checks installation and removals, capturing any non-conformance issues, and on-site support for emergent issues on submarines and shore sites, as defined by delivery/task order.

Program management, tracking and reporting includes tracking program work breakdown structure, master schedules, contract milestones, expenditures, progress reports, CDRLs and deliverables, generating program status reports meetings to provide summaries/minutes of the proceedings and developing presentations as defined by delivery/task order.

4.2 Installation, Test, and

Life Cycle Support

4.3 Project Management

4.2.2.2 Ship Checks, Installation and

Removal (Non-DSS-SOC)

Perform ship checks, installation and removal of hardware and software (if applicable) for Carry

On Hardware (COH), Temporary Alterations

(TEMPALTs), Ship Alternations

(SHIPALTs), or Engineering

Changes for systems to support

Payload Integration into a dry deck shelter.

Standard is met 90% of the time.

Government Review of documents, installations and removals onsite. Feedback from NUWC customer.

4.3.1 Project Activity and Status

Tracking and Reporting (Non-DSS-

SOC)

Manage, coordinate and track and report program activities.

Standard is met 90% of the time.

Government Review of

Deliverable Documents.

Feedback from NUWC