ATT_5_-_PRST.pdf
PDF 20 KB Posted
- Attached to
- Payload Integration into Deep Submergence Systems, hardware and services Federal contract opportunity
- Solicitation number
- N66604-19-R-0284
About this file
This synopsis announces a solicitation for Payload Integration into Deep Submergence Systems hardware and services. The Naval Undersea Warfare Center Division, Newport seeks to award multiple IDIQ contracts for up to five years to procure, fabricate, inspect, develop concepts, design, test, handle materials, install, remove, repair, and support software and hardware for Deep Submergence Systems within and outside the Scope of Certification. Services include ship checks, life cycle planning, and project tracking for cradles, stowage and handling equipment, and electronic control systems. The North American Industry Classification System code is 332510 with a size standard of 750 employees. The solicitation will be issued in January 2019 and evaluate factors for award. No incumbent contractors exist as this is a new requirement.
ATT 5 - PRST
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DSS-SOC_JandA_Redacted.pdf | ||
| DSS-SOC_RFP_Q&A_15_Apr.pdf | ||
| DSS-SOC_RFP_Q&A_10_Apr.pdf | ||
| DSS-SOC_RFP_Q&A_4_Apr.pdf | ||
| DSS-SOC_RFP_Q&A_22_Mar.pdf | ||
| Exhibit_A_-_CDRLs.pdf | ||
| ATT_3_-_Appendix_D.pdf | ||
| ATT_6_-_DD_254.pdf | ||
| ATT_1_-_Appendix_B.pdf | ||
| ATT_2_-_Appendix_C.pdf | ||
| ATT_4_-_Appendix_E.pdf | ||
| N6660419R0284.pdf | ||
| ATT_7_-_Incidental_GFP.pdf | ||
| DRAFT_SOW_Revised_-_DSS-SOC_(20190304).pdf | ||
| Draft_SOW_(20181203).pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4.1.2 Technical Assessments (Non-
DSS-SOC)
Reports detailing technical assessments of existing system hardware, software, and reference documentation.
Assessments will include analyses of systems and recommendations for technical solutions as defined by delivery/task order.
Standard is met 90% of the time.
Government Review of
Deliverable Documents.
Feedback from NUWC customer.
4.1.4.1 Manufacture and Production
(DSS- SOC)
Prototype and production hardware to support integration of systems that will interface with or fall within DSS-SOC boundaries for dry deck shelters.
Manufacture and production includes verification of the form, fit and function of the hardware to include fit checks on material, verification of that the deliverables of all electrical, mechanical, software and human interface components meets the drawings and specifications, and on time delivery of products, as defined by delivery/task order.
Standard is met 100% of the time.
Government Review of OQE and conduct inspections.
Feedback from NUWC customer and NAVSEA.
Performance Standard
Reports including requirements analysis, risk management, system architecture, system safety, presentations for project milestones, interface development documents, presentations at technical design reviews and project milestones.
4.1.3 Design and Development (Non-
DSS-SOC)
Hardware and software deliverables. Drawings and models for hardware and CSCI
(Computer Software
Configuration Item) for software.
Design and development includes conceptual design, preliminary design, design evaluation, analysis of alternatives, performance analysis, design analysis, performance simulations, and detailed design in support of design reviews as defined by delivery/task order.
Standard is met 90% of the time.
Government Review of
Deliverable Documents.
Feedback from NUWC customer.
4.1.4.2 Manufacture and Production
(Non-DSS-SOC)
Prototype and production hardware to support integration of systems to support Payload
Integration into a dry deck shelter.
Manufacture and production includes verification of the form, fit and function of the hardware to include fit checks on material, verification of that the deliverables of all electrical, mechanical, software and human interface components meets the drawings and specifications, and on time delivery of products, as defined by delivery/task order.
Standard is met 100% of the time.
Government Review of OQE and conduct inspections.
Feedback from NUWC customer.
Performance
Requirements
Summary Table
SOW Section Performance Objective Acceptable Quality Level (AQL) Monitoring Method
4.1 Engineering Services
4.1.1 Systems Engineering (Non-
DSS-SOC)
System Engineering documents include requirements analysis, risks, system architectures, safety documentation, presentations, and
ICDs and will meet standards as defined by delivery/task order.
Standard is met 90% of the time.
Government Review of
Deliverable Documents.
Feedback from NUWC customer.
4.1.5 Technical Data Packages (Non-
DSS-SOC)
Temporary Alterations
(TEMPALTs), Ship Alterations
(SHIPALTs), Temporary
Modifications (TEMPMODs), Field Changes (FCs), and Carry-
On Hardware (COH) Technical
Data Packages (TDPs).
TDPs include all applicable technical data, such as drawings, associated lists, specifications, standards, performance requirements, QA provisions, and packaging details, as defined by delivery/task order.
Standard is met 90% of the time.
Government Review of
Deliverable Documents.
Feedback from NUWC customer.
4.2.1.1 Assembly, Integration and
Test (DSS-SOC)
Assembled DSS-SOC equipment. Test plans and procedures, test equipment or fixtures. test reports.
Assembly, Integration and Test includes evaluation and technical analysis of results, test report describing work performed, tests conducted, investigation completed and conclusions drawn from post-test analysis tasking as defined by delivery/task order.
Standard is met 100% of the time.
Government Review of
Deliverable Documents, OQE and conduct inspections.
Feedback from NUWC customer and NAVSEA.
Ship check, installation and removal includes Memorandums of
Understanding (MOUs) and
Memorandums of Agreement (MOAs), execution of ship checks installation and removals, capturing any non-conformance issues, and on-site support for emergent issues on submarines and shore sites, as defined by delivery/task order.
4.2 Installation, Test, and
Life Cycle Support
4.2.1.2 Assembly, Integration and
Test (Non-DSS-SOC)
Assembled systems to support
Payload Integration into a dry deck shelter. Test plans and procedures, test equipment or fixtures, test reports.
Assembly, Integration and Test includes evaluation and technical analysis of results, test report describing work performed, tests conducted, investigation completed and conclusions drawn from post-test analysis tasking as defined by delivery/task order.
Standard is met 100% of the time.
Government Review of
Deliverable Documents, OQE and conduct inspections.
Feedback from NUWC customer.
4.2.2.1 Ship Checks, Installation and
Removal (DSS- SOC)
Perform ship checks, installation and removal of hardware and for
Temporary Modifications
(TEMPMODs), Temporary
Alterations (TEMPALTs), Ship
Alterations (SHIPALTs), Engineering Changes, or (Field
Changes) FCs for systems that may interface with and fall within DSS-SOC boundaries for dry deck shelters.
Standard is met 100% of the time.
Government Review of documents, installations and removals onsite. Feedback from NUWC customer and
NAVSEA.
4.1.4.2 Manufacture and Production
(Non-DSS-SOC)
Prototype and production hardware to support integration of systems to support Payload
Integration into a dry deck shelter.
Manufacture and production includes verification of the form, fit and function of the hardware to include fit checks on material, verification of that the deliverables of all electrical, mechanical, software and human interface components meets the drawings and specifications, and on time delivery of products, as defined by delivery/task order.
Standard is met 100% of the time.
Government Review of OQE and conduct inspections.
Feedback from NUWC
4.1 Engineering Services
4.2.3.1 Life Cycle Support (DSS-
SOC)
Perform Lifecycle Support for
DSS-SOC hardware, perform controlled material handling, receipt inspection of Original
Equipment Manufacturer
(OEM) provided hardware for indoctrination to the DSS-SOC program, and perform maintenance inclusive of DSS-
SOC equipment and carry on hardware in accordance with
DSS-SOC procedures.
Lifecycle support includes recommendations for logistics products such as sparing, maintenance instructions and procedures, reliability centered maintenance analysis, training curriculum and materials, technical manuals, and procedure development, as defined by delivery/task order.
Standard is met 90% of the time.
Government Review of
Deliverable Documents, OQE and conduct inspections.
Feedback from NUWC customer and NAVSEA.
4.2.3.2 Life Cycle Support (Non-DSS-
SOC)
Perform Lifecycle Support for general hardware, receipt inspection provided hardware, and perform maintenance.
Lifecycle support includes recommendations for logistics products such as sparing, maintenance instructions and procedures, reliability centered maintenance analysis, training curriculum and materials, technical manuals, and procedure development, as defined by delivery/task order.
Standard is met 90% of the time.
Government Review of
Deliverable Documents, OQE and conduct inspections.
Feedback from NUWC customer.
Ship check, installation and removal includes Memorandums of
Understanding (MOUs) and
Memorandums of Agreement (MOAs), execution of ship checks installation and removals, capturing any non-conformance issues, and on-site support for emergent issues on submarines and shore sites, as defined by delivery/task order.
Program management, tracking and reporting includes tracking program work breakdown structure, master schedules, contract milestones, expenditures, progress reports, CDRLs and deliverables, generating program status reports meetings to provide summaries/minutes of the proceedings and developing presentations as defined by delivery/task order.
4.2 Installation, Test, and
Life Cycle Support
4.3 Project Management
4.2.2.2 Ship Checks, Installation and
Removal (Non-DSS-SOC)
Perform ship checks, installation and removal of hardware and software (if applicable) for Carry
On Hardware (COH), Temporary Alterations
(TEMPALTs), Ship Alternations
(SHIPALTs), or Engineering
Changes for systems to support
Payload Integration into a dry deck shelter.
Standard is met 90% of the time.
Government Review of documents, installations and removals onsite. Feedback from NUWC customer.
4.3.1 Project Activity and Status
Tracking and Reporting (Non-DSS-
SOC)
Manage, coordinate and track and report program activities.
Standard is met 90% of the time.
Government Review of
Deliverable Documents.
Feedback from NUWC
File details come from the government source that posted it. Updated .