This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge, specifically focusing on a Sewage System Tightness & Operational Test. The task is assigned the TGI number 59311-3-300KTR, with a project number of 19P and system number 59311. The instruction is dated 03-SEP-2024 and involves contractor, quality assurance (QA), and ship/force (S/F) work to accomplish and document the tightness and operational test in accordance with reference document TP 59311-3-300KTR. The document includes preparation details by Susa, Koutaro and approval by Higa, Riley, with the zone manager listed as Yaginuma, Takehide, and the work associated with job summary ID 593A1102.

View the file

Other files

File Type Posted
N6264925RA0210004.pdf PDF
Exhibit (A) BLR_5C1_TYCOM1 CDRL_r.pdf PDF
TGI_3819P12341A01_c0v0.pdf PDF
TGI_3819P59302A01_c1v1.pdf PDF
TGI_3819P12357_T01_c0v0.pdf PDF
TGI_3819P14206A01_c0v2.pdf PDF
TGI_3819P12362A01_c0v0.pdf PDF
TGI_3819P14211A01_c0v0.pdf PDF
TGI_3819P12311A01_c0v0.pdf PDF
TGI_3819P12354A01_c2v2.pdf PDF
TGI_3819P14203_T04_c0v0.pdf PDF
TGI_3819P12310A01_c4v1.pdf PDF
TGI_3819P51404A01_c0v0.pdf PDF
TGI_3819P12357_A01_c0v0.pdf PDF
TGI_3819P12321A01_c1v1.pdf PDF
TGI_3819P12338A01_c0v0.pdf PDF
BLR_5C1_TYCOM1 CDRL.pdf PDF
TGI_3819P12337A01_c0v0.pdf PDF
TGI_3819P14215A01_c0v0.pdf PDF
TGI_3819P12304A01_c0v0.pdf PDF
TGI_3819P12355_A01_c1v0.pdf PDF
TGI_3819P12318A01_c2v3.pdf PDF
TGI_3819P14203_A01_c2v1.pdf PDF
TGI_3819P12388A01_c1v1.pdf PDF
TGI_3819P12393_A01_c0v0.pdf PDF
TGI_3819P12317A01_c0v0.pdf PDF
N6264925RA0210003.pdf PDF
TGI_3819P51405A01_c0v0.pdf PDF
TGI_3819P14210A01_c0v2.pdf PDF
TGI_3819P14206T03_c0v0.pdf PDF
TGI_3819P51402A01_c1v1.pdf PDF
TGI_3819P14214A01_c0v0.pdf PDF
TGI_3819P12336A01_c0v0.pdf PDF
TGI_3819P13506A01_c0v0.pdf PDF
TGI_3819P12387A01_c0v1.pdf PDF
TGI_3819P12305A01_c0v0.pdf PDF
TGI_3819P14206T01_c0v0.pdf PDF
TGI_3819P14213A01_c0v0.pdf PDF
TGI_3819P12316A01_c5v3.pdf PDF
TGI_3819P12340A01_c1v0.pdf PDF
TGI_3819P12312A01_c0v0.pdf PDF
TGI_3819P14203_T01_c0v0.pdf PDF
TGI_3819P14203_T03_c0v0.pdf PDF
TGI_3819P51401A01_c1v2.pdf PDF
TGI_3819P14206T02_c0v0.pdf PDF
TGI_3819P12339A01_c3v2.pdf PDF
TGI_3819P12320A01_c0v0.pdf PDF
TGI_3819P16729A02_c0v1.pdf PDF
TGI_3819P12335A01_c1v0.pdf PDF
TGI_3819P14212A01_c0v0.pdf PDF
Show 40 more

Latest 50 of 127 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

03-SEP-2024 1405

20.14.15.0.8998 (August 2024) ICN: 3819P59302 KeyOp: T01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 59311-3-300KTR TT T 4 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 59311

CU PHASE TITLE: SEWAGE SYS (T & OP) - KTR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 2

ER013493 * ER013492

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

SUSA, KOUTARO 246.2 3152431107 05-AUG-2024

APPROVED BY: CODE: PHONE: DATE:

HIGA, RILEY 246.2 3152432291 19-AUG-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

ER01-3492 * ER01-3493

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

593A1102

Tightness & Operational Test for Sewage System - KTR.

TGI Short Form

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

03-SEP-2024 1405

20.14.15.0.8998 (August 2024) (Continued) ICN: 3819P59302 KeyOp: T01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 59311-3-300KTR TT T 4 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 59311

CU PHASE TITLE: SEWAGE SYS (T & OP) - KTR

FOUO Pg 2 of 2

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 TP 59311-3-300KTR SEWAGE SYS (T & OP) - KTR LAT Y

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

(V) Contractor work:

Accomplish/document the tightness & operational test in accordance with reference, TP 59311-3-300KTR.

22/KE PC N

(G) QA work:

Accomplish/document the tightness & operational test in accordance with reference, TP 59311-3-300KTR.

33/G1 QA N

(S) S/F work:

Accomplish/document the tightness & operational test in accordance with reference, TP 59311-3-300KTR.

/ ER01 N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P59302 KEY OP: T01