TGI_3819P14215A01_c0v0.pdf
PDF 238 KB Posted
- Attached to
- USS BLUE RIDGE (LCC-19) 5C1 DSRA TYCOM 1
- Solicitation number
- N6264925RA021
About this file
This is a Task Group Instruction (TGI) for the USS Blue Ridge, detailing a maintenance project to replace the peel and stick nonskid system in the Passage 7-72-2-L area. The work involves replacing approximately 13 square feet of deck plating on the second platform deck, including vertical surfaces up to 6 inches from the deck, located between Frames 72 and 74 on the port side. The project is scheduled for a contractor work period from 7/21/2026 to 10/21/2027, with specific requirements including conforming to MIL-PRF-24667, Type XI, Composition PS for the nonskid deck covering.
The SRF-JRMC (Ship Repair Facility - Japan Regional Maintenance Center) will provide supporting services including crane and rigging, utility services (electrical, low pressure air, water, and steam), safety inspections, gas-free inspections, and quality assurance inspections. The task involves painters, carpenters, and quality assurance personnel, with potential lead hazards noted. The project is part of the naval vessel maintenance program, with detailed specifications outlined in the accompanying sketch (Enclosure-01) showing the precise location and dimensions of the work area.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
20-AUG-2024 1015
20.14.12.0.8874 (April 2024) ICN: 3819P14215 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 7-72-2-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 64511
CU PHASE TITLE: *F/O - REPLACE PEEL AND STICK NONSKID SYSTEM IN 7-72-2-L
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
ES01NPJB
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
HAGA, MASAMICHI 231B 3152432513 06-APR-2024
APPROVED BY: CODE: PHONE: DATE:
NAKANO, SEIICHI 231B 3152434519 06-APR-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ES01-NPJB
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE 7-72-2-L 7 U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
142A0015
1 SCOPE/PURPOSE:
1.1 Title: Peel and Stick Nonskid System in 7-72-2-L; replace
1.2 Location of Work:
1.2.1 Passage (7-72-2-L)
1.3 Identification:
1.3.1 Quantity (13 SF), Second Platform Deck Plating in 7-72-2-L, Frames between 72 and 74, including vertical surface up to height of 6 inches from deck in and around peel and stick deck covering area, Port
Remarks: See Sketch Enclosure-01 for location detail
1.4 Security Classification: None.
TGI Short Form
20-AUG-2024 1015
20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14215 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 7-72-2-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 64511
CU PHASE TITLE: *F/O - REPLACE PEEL AND STICK NONSKID SYSTEM IN 7-72-2-L
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1.5 Initial Condition:
1.5.1 Potential Lead Hazard.
1.6 Contractor work start date: 7/21/2026
1.7 Contractor work completion date: 10/21/2027
2. PROCEDURE:
2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 2, Line(s) 25, for each area listed in 1.3.1.
2.1.1 Accomplish the requirements of 009-26 of Ref No. One, including Attachment G, for installation of new peel and stick nonskid deck covering. Application of peel and stick nonskid deck covering must conform to MIL-PRF-24667, Type XI, Composition PS.
2.2 Notes:
2.2.1 Planner: Code 231B M. Haga, 243-2513
2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.2.3 JCN ES01-NPJB is related to this TGI.
2.3 Government Furnished Material (GFM): None.
2.4 SRF-JRMC will provide the following service work: (TGI No. 3819P14215S02)
2.4.1 [C740] Crane and crane rigging service.
2.4.2 [X99E] Utility service, electrical.
2.4.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.4.6 [C133] QA inspection for (G) symbol(s).
20-AUG-2024 1015
20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14215 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 7-72-2-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 64511
CU PHASE TITLE: *F/O - REPLACE PEEL AND STICK NONSKID SYSTEM IN 7-72-2-L
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
2.1 PNTR HRs, CARP HRs, QA HRs 22/KE PC N
CFM for all paints, peel and stick nonskid, thinner, sampler/analyze lead, and misc such as covering materials, and other consumables.
22/MQ CS N
Process Funding Document. 10/CT OM N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 3819P14215A01-Sketch.pdf 07-MAR-2024 0000
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P14215 KEY OP: A01
Sketch
3819P14215A01 ENCLOSURE-01 Sheet 1 of 2
DETAIL 2-A
Sketch
3819P14215A01 ENCLOSURE-01 Sheet 2 of 2
DETAIL PLAN VIEW 2-A
PASSAGE 7-72-2-L
8”
24”
20”
FR 72 BHD 73.5
24”
FR 73
File details come from the government source that posted it. Updated .