This document is a Task Group Instruction (TGI) for cleaning, inspecting, repairing, and preserving the clean salt water ballast tank (9-98-1-W) on the USS Blue Ridge (LCC-19). The work is scheduled to take place between 7/21/2026 and 10/21/2027, with the specific task involving a comprehensive maintenance procedure for a 75,833-gallon ballast tank located in multiple ship compartments, including the Intel Storeroom and Chemical Warfare Defense Equipment Storeroom.

The instruction details extensive technical requirements, including a visual inspection of existing preservation coating, marking corroded or damaged areas, general cleaning at Level III, manhole cover installation, welding and repair of stripped bolting ring holes, and plate repairs. Special requirements include SURFMEPP cleanliness standards and working within a fire zone boundary that requires a non-flammable closure. The project involves multiple technical steps such as vee-out and weld repairs, base metal weld buildup, plate and stiffener replacements, and surface preservation, with specific measurements like repairing one linear foot of welds, 60 square inches of plate defects, 10 square feet of deteriorated plate, and 4 linear feet of defective stiffeners.

View the file

Other files

File Type Posted
N6264925RA0210004.pdf PDF
Exhibit (A) BLR_5C1_TYCOM1 CDRL_r.pdf PDF
TGI_3819P12341A01_c0v0.pdf PDF
TGI_3819P59302A01_c1v1.pdf PDF
TGI_3819P12357_T01_c0v0.pdf PDF
TGI_3819P14206A01_c0v2.pdf PDF
TGI_3819P12362A01_c0v0.pdf PDF
TGI_3819P14211A01_c0v0.pdf PDF
TGI_3819P12311A01_c0v0.pdf PDF
TGI_3819P12354A01_c2v2.pdf PDF
TGI_3819P14203_T04_c0v0.pdf PDF
TGI_3819P12310A01_c4v1.pdf PDF
TGI_3819P51404A01_c0v0.pdf PDF
TGI_3819P12357_A01_c0v0.pdf PDF
TGI_3819P12321A01_c1v1.pdf PDF
TGI_3819P12338A01_c0v0.pdf PDF
BLR_5C1_TYCOM1 CDRL.pdf PDF
TGI_3819P12337A01_c0v0.pdf PDF
TGI_3819P14215A01_c0v0.pdf PDF
TGI_3819P12304A01_c0v0.pdf PDF
TGI_3819P12355_A01_c1v0.pdf PDF
TGI_3819P12318A01_c2v3.pdf PDF
TGI_3819P14203_A01_c2v1.pdf PDF
TGI_3819P12388A01_c1v1.pdf PDF
TGI_3819P12393_A01_c0v0.pdf PDF
TGI_3819P12317A01_c0v0.pdf PDF
N6264925RA0210003.pdf PDF
TGI_3819P51405A01_c0v0.pdf PDF
TGI_3819P14210A01_c0v2.pdf PDF
TGI_3819P14206T03_c0v0.pdf PDF
TGI_3819P51402A01_c1v1.pdf PDF
TGI_3819P14214A01_c0v0.pdf PDF
TGI_3819P12336A01_c0v0.pdf PDF
TGI_3819P59302T01_c0v0.pdf PDF
TGI_3819P13506A01_c0v0.pdf PDF
TGI_3819P12387A01_c0v1.pdf PDF
TGI_3819P12305A01_c0v0.pdf PDF
TGI_3819P14206T01_c0v0.pdf PDF
TGI_3819P14213A01_c0v0.pdf PDF
TGI_3819P12316A01_c5v3.pdf PDF
TGI_3819P12340A01_c1v0.pdf PDF
TGI_3819P12312A01_c0v0.pdf PDF
TGI_3819P14203_T01_c0v0.pdf PDF
TGI_3819P14203_T03_c0v0.pdf PDF
TGI_3819P51401A01_c1v2.pdf PDF
TGI_3819P14206T02_c0v0.pdf PDF
TGI_3819P12339A01_c3v2.pdf PDF
TGI_3819P12320A01_c0v0.pdf PDF
TGI_3819P16729A02_c0v1.pdf PDF
TGI_3819P12335A01_c1v0.pdf PDF
Show 40 more

Latest 50 of 127 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

FOUO: Public availability to be determined under 5 USC 552

TASK GROUP INSTRUCTION

AIM REV 20.11.4.0 (OCTOBER 2020)

TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:

NO.: SW BLST TK 9-98-1-W AY A 0 0

SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE:

F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE CLEAN SALT WATER BALLAST (9-98-1-W)

PREPARING ACTIVITY:

PREPARED BY: CODE PHONE DATE

TOMOHIKO ANDO 231B. 315-243-4372 12-JAN-2024

APPROVED BY: CODE PHONE DATE

RYOUTA TAKAGI 231B. 315-243-4502 12-JAN-2024

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

REASON FOR WORK/NEED FOR CHANGE:

CHANGE INSTRUCTIONS:

SPECIAL REQUIREMENTS:

SURFMEPP

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III

This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

ACCEPTANCE OF COMPLETED WORK

PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:

REQUIRED:☐YES ☒NO

RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

TGI NO.: SW BLST TK 9-98-1-W AY A 0

FOUO

SHIP: LCC-19 CHG/VER: 0/0

LIST OF EFFECTIVE PAGES

SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.

1-5 J1-2 M-1

1. SCOPE/PURPOSE

1.1 Title: Clean Salt Water Ballast (9-98-1-W); clean, inspect, repair, and preserve

1.2 Location of Work:

1.2.1 Clean Salt Water Ballast (9-98-1-W)

1.2.2 Intel Storeroom (7-102-1-A)

1.2.3 Chemical Warfare Defense Equipment Storeroom (7-106-1-K)

1.3 Identification:

1.3.1 Quantity (One EA), Clean Salt Water Ballast

Tank No.: 9-98-1-W Capacity: 75,833 Gallons

1.3.2 Quantity (2 EA), Manhole Cover Plate(s) for 9-98-1-W

Manhole No.: 7-103-1 and 7-108-1 Size: 15 Inches x 23 Inches Material: Steel

1.3.3 Quantity (2 EA), Bolting Ring for Manhole Cover Plate(s) for 9-98-1-W Manhole No.: 7-103-1 and 7-108-1 Material: Steel

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Lead Hazard

1.6 Contractor work start date:

1.7 Contractor work completion date:

2. REFERENCES:

REF.

NO.

DOCUMENT

/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV CHG

NO.

COPY

REQ’D

(Y/N)

SOURCE

DOC

(Y/N)

PARA SEC PG CHP

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3 TM S9086-

CJ-STM-

010/CH-075

Fasteners 7 N

7/21/2026

10/21/2027

FOUO

SHIP: LCC-19 CHG/VER: 0/0

REF.

NO.

DOCUMENT

/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV CHG

NO.

COPY

REQ’D

(Y/N)

SOURCE

DOC

(Y/N)

PARA SEC PG CHP

4 DWG 100-

2491003

SHELL PLTG & STGR FRAME 51

1/2 -102 1/4 CL TO 4 TH DECK

G Y AL

L

5 DWG 100-

2491005

SHELL PLTG & STGR FRAME 102

1/4 STERN CL TO 4 TH DECK

F Y AL

6 DWG 114-

2491163

SHAFT ALLEY BHD F Y AL

7 DWG 101-

2491012

CVK & Shell Long AFT FR 51 1/2 L Y AL

8 DWG 103-

2491034

1ST & 2ND PLATF PLTG AFT

FR98

H Y AL

9 DWG 114-

2491158

TRANSV BHD FR 98 &109 K Y AL

10 DWG 101-

2491014

FLOORS FR 99-120 D Y SE

E N

OT

E

11 DWG 123-

4354697

CHT #1, 2, 3 & 4 FR 48 - 52 P/S &

FR 98 - 102 P/S

E Y SE

E N

OT

E

3. APPENDICES:

3.1 Appendix “J” TGI Job Summary Information Sheet

3.2 Appendix "M" TGI Material List

3.3 Appendix “D” Deficiency Form

4. GENERAL REQUIREMENTS:

4.1 Not Applicable.

5. PROCEDURE:

5.1 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1.

5.1.1 Accomplish a visual inspection of each tank listed in 1.3.1 for existing preservation coating.

5.1.1.1 Mark each corroded, damaged and/or deteriorated coating area in each tank.

5.1.1.2 Submit one legible copy, in hard copy or approved transferrable media, of a report with a sketch listing results of the requirements of 5.1.1.1 to the SUPERVISOR.

5.1.2 Accomplish the requirements of 009-107 of 2.1.

5.1.2.1 Ensure General Cleaning must be Level III.

5.1.3 Accomplish installation of each manhole cover for each tank listed in 1.3.1 in accordance with Figure 075-4-1 of 2.3.

5.2 Weld fill, drill, and tap a total of 10 each stripped manhole cover bolting ring holes for each tank listed in 1.3.1 as designated by the SUPERVISOR. See 5.8.5.

5.2.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.

FOUO

SHIP: LCC-19 CHG/VER: 0/0

5.3 Repair each tank listed in 1.3.1, based on the CCIMS assessment report as designated by the SUPERVISOR, using 2.4 through 2.11 for guidance. See 5.8.4 through 5.8.6.

5.3.1 Vee-out and weld a total of one linear foot of each deteriorated and damaged weld. Each area of repair must include deck, bulkhead, shell plating, and overhead.

5.3.2 Chip and grind each surface flush in way of each repair.

5.3.3 Base metal weld buildup a total of 60 square inches of each plate defect in the tank.

5.3.3.1 For bidding purposes the base metal weld buildup must be one quarter inch thick.

5.3.3.2 Surface must be ground to sound metal prior to base metal weld buildup.

5.3.3.3 Fill each local pit and groove with weld material prior to application of each principal build up layer.

5.3.3.4 Grind each surface of completed base weld metal buildup smooth if greater than 1/8 inch above plate surface.

5.3.4 Remove existing, fabricate and install new a total of 10 square feet of deteriorated plate.

5.3.5 Remove existing, fabricate and install new a total of 4 linear feet of defective stiffener.

5.3.6 Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns A, Lines One through 7.

5.3.6.1 Accomplish nondestructive testing in accordance with Line 11.

5.3.7 Accomplish the requirements of 009-25 of 2.1 for an air hose, water hose, or vacuum box test of each new insert weld seam. Allowable leakage: None.

5.4 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 17, for tank side surface and Table 3, Line(s) 25, for storeroom side surface of each cover plate listed in 1.3.2.

5.5 Accomplish the requirements of 009-32 of 2.1 for each bolting ring listed in 1.3.3.

5.6 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 17, for a total of 983 square feet of defective painted surfaces, for each tank listed in 1.3.1, as designated by the SUPERVISOR.

5.6.1 The preservation area must not exceed 10 square feet per one area.

5.7 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

5.8 Notes:

5.8.1 Planner: Code 231B T. Ando, 243-4372

5.8.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

5.8.3 This TGI meets the intent of DDG CSWT File Nos. 123-133, 123-142, and 123-143.

5.8.4 CCIMS assessment of each tank listed in 1.3.1 will be accomplished by SRF-JRMC (TGI No. 3819P12344I01), and the Project team will provide the assessment report with engineering evaluation under DL process for front loading structure repair.

FOUO

SHIP: LCC-19 CHG/VER: 0/0

5.8.5 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.

5.8.6 Materials for structure members relating to front loading repair will be provided in the future as a DL based on Contractor submitted condition report.

5.8.7 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.

5.8.8 WPC will copy the following pages in reference.

REF. 2.10: Pages 3, 4, 5, 6, 7, and 8 REF. 2.11: Pages One, 4, 5, 6, and 7

5.8.9 JCNs ER01-ZAK7, ER01-ZAW4, and ER01-ZAX2 are related to this TGI.

5.9 Government Furnished Material (GFM): None

5.10 SRF-JRMC will provide the following service work: (TGI No. 3819P12344S02).

5.10.1 [C740] Crane and crane rigging service.

5.10.2 [X99E] Utility service, electrical.

5.10.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.

5.10.4 [C106.1] Safety inspection for SRF-JRMC employees.

5.10.5 [C106.2] Gas free inspection for SRF-JRMC employees.

5.10.6 [C133] QA Inspection for (G) symbol(s).

5.10.7 [C135] QA inspection for (G) symbol(s).

5.10.8 [C250] Technical support.

FOUO

J-1

SHIP: LCC-19 CHG/VER: 0/0

APPENDIX "J"

TGI JOB SUMMARY INFORMATION SHEET

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

SW BLST TK 9-98-1-W AY A 0 0

CU PHASE TITLE:

F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE CLEAN SALT WATER BALLAST (9-98-1-W)

PRIMARY COMPONENT:

COMPONENT UNIT LIST (FOR ASSEMBLIES):

MANHOLE 7-108-1 HA MANHOLE 7-103-1 HA BLST 9-98-1-W TK

ATTACHMENT LIST:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA ,TAKEHIDE

JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:

3819P12344 A01

TOTAL MAT’L COST TOTAL DURATION:

CU PHASE DESCRIPTION:

The purpose of this TGI is to clean, inspect repair, and preserve clean salt water ballast (9-98-1-W).

Location of Work:

Clean Salt Water Ballast (9-98-1-W) Intel Storeroom (7-102-1-A) Chemical Warfare Defense Equipment Storeroom (7-106-1-K)

TASK NAME

SHOP TSD/WC TS CREW# MHRS

HIGH RAD

HOURS

RC

GRID#

5.1 LBR HRs, PNTR HRs 22 KE PC

5.2 SFTR HRs, WELD HRs, PNTR HRs, QA HRs 22 KE PC

5.3 SFTR HRs, WELD HRs, PNTR HRs, CARP HRs, QA HRs 22 KE PC

5.4 PNTR HRs, QA HRs 22 KE PC

5.5 PNTR HRs, RGRS HRs QA HRs 22 KE PC

5.6 PNTR HRs, QA HRs 22 KE PC

PNTR HRs, QA HRs 22 KE PC

Dewatering/Cleaning Work CFM for marine chemist, tank watch cost, gaskets, fasteners, and misc.

22 MQ CS

Structural Work CFM for fire watch and tank watch cost, MT inspection cost, lead sampling/analysis cost, air compressor rental cost and fuel oil cost for air hose test, and MISC such as electrode, gases, temporary closure and covering material, and other consumable.

22 MQ CS

Preservation Work CFM for all paints, thinner, grit including waste disposal cost, confined space watch cost, and MISC such as covering material, and other consumable.

22 MQ CS

FOUO

J-2

SHIP: LCC-19 CHG/VER: 0/0

TASK NAME

SHOP TSD/WC TS CREW# MHRS

HIGH RAD

HOURS

RC

GRID#

Process Funding Document. 10 CT OM 1 1 0

FOUO

M-1

SHIP: LCC-19 CHG/VER: 0/0

APPENDIX “M”

TGI MATERIAL LIST

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

SW BLST TK 9-98-1-W AY A 0 0

CU PHASE TITLE:

F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE CLEAN SALT WATER BALLAST (9-98-1-W)

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV

JOB ORDER: KEY OP:

3819P12344 A01

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

NOTES:

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR APPENDIX "D"

DEFICIENCY FORM

☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One)

2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

LCC-19 SW BLST TK 9-98-1-W AY A 0

4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:

3819P12344 A01

7. DESCRIPTION:

8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

9. CORRECTIVE ACTION:

10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

FOR NON-NUCLEAR USE ONLY

11. RFD/RFW REQ’D ☐ LAR REQ'D ☐

ILS MOD REQ’D ☐

SRD/PLAN REV REQ'D ☐

DWG NO.: _____________________ S/A NO.: ___________________

12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:

SATISFACTORY:

13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

YES ☐ NO ☐

14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE:

15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

_________:YES ☐ NO ☐

16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE (DR ONLY)

DL’s ISSUED

(DR ONLY)

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

LCC-19 SW BLST TK 9-98-1-W AY A 0

File details come from the government source that posted it. Updated .