PPI Continuation Sheet_FX74.pdf
PDF 98 KB Posted
- Solicitation number
- N6247026R0008
About this file
This is a continuation sheet documenting amendments to contract specifications and engineering drawings for a federal construction project, primarily managed by NAVFAC (Naval Facilities Engineering Command).
The document details modifications across multiple specification sections and design drawings. Key specification updates include removal of backup door operation requirements for vertical lift fabric doors (Specification 08 34 16.20), updates to aluminum flagpole specifications (Specification 10 75 16), and revisions to fall protection licensing and equipment requirements (Specification 11 24 29). Numerous NAVFAC drawings have been revised to correct or enhance design documentation, including base maps and haul routes, staging plans, grading and drainage plans, paving plans, landscape enlargements, foundation plans and schedules, building elevations, electrical site details and single-line diagrams, and telecommunications plans. Notable drawing modifications include addition of missing grading contours, corrected scaling on multiple documents, addition of wall footing labels, revised foundation footing specifications, depiction of vertical lift fabric door mullions with minimum clearance heights, addition of fire barrier representations, electrical coordination updates between the manual transfer switch and hangar door control panel, and telecommunications cable runway documentation. Most revisions are cross-referenced to specific Preliminary Plan Issues (PPIs), though several updates to grading dimensions and wall footing thickness are not associated with a PPI designation.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Continuation Sheet
SPECIFICATION 08 34 16.20 VERTICAL LIFT FABRIC DOORS
Removed subpart 2.7.3 “Backup Door Operation”. (PPI 16)
SPECIFICATION 10 75 16 GROUND SET FLAGPOLES
Updated item B in subpart 2.3 “ALUMINUM FLAGPOLES”. (PPI 70)
SPECIFICATION 11 24 29 FALL PROTECTION
Updated licensing paragraph in subpart 1.4.2 “Qualifications”. (PPI 68)
Updated self-retracting lifelines and lanyards paragraph in subpart 2.6 “COMPONENTS”. (PPI 64)
NAVFAC DWG NO. 14146969 (C-100) BASE MAP AND HAUL ROUTE
Revised scaling (PPI 26).
NAVFAC DWG NO. 14146970 (C-101) PHASE 1 STAGING PLAN
Revised scaling (PPI 26).
NAVFAC DWG NO. 14146972 (C-103) PHASE 3 STAGING PLAN
Revised scaling (PPI 29).
NAVFAC DWG NO. 14146983 (CS101) SITE PLAN
Updated to provide keynote numbers (PPI 22).
NAVFAC DWG NO. 14146994 (CG100) GRADING PLAN
Revised to show proposed grading contours that were missing in original set. No PPI.
NAVFAC DWG NO. 14146995 (CG101) GRADING PLAN
NAVFAC DWG NO. 14146996 (CG102) GRADING PLAN
NAVFAC DWG NO. 14147015 (CG503) GRADING AND DRAINAGE DETAILS
Revised to show correct dimensions on A3/CG503. No PPI.
NAVFAC DWG NO. 14147008 (CG401) ENLARGED GRADING PLAN
CG401 was missing in original set, provided in this amendment. (PPI 23)
NAVFAC DWG NO. 14147038 (CP401) ENLARGED PAVING PLAN
Revised scale bar (PPI 27)
DWG NO. 14147039 (CP402) ENLARGED PAVING NAVFAC PLAN
Revised scale bar (PPI 27)
NAVFAC DWG NO. 14147066 (L-102) LANDSCAPE ENLARGEMENTS
Plan has been updated to refer this area to B4/L-503 Bicycle Rack Plan. (PPI 66) Match line number for the lower left corner of L-102 has been corrected to L-101. (PPI 67)
NAVFAC DWG NO. 14147067 (L-103) LANDSCAPE ENLARGEMENTS
Entry Terrace Plan B1 has been updated to show extents of specialty paving. (PPI 68, PPI 69)
NAVFAC DWG NO. 14147085 (SB112) FOUNDATION PLAN -AREA B
Plan A1: Added wall footing labels WF5 and WF2 to footings along grid line K. (PPI 30)
NAVFAC DWG NO. 14147130 (S-314) FRAMING SECTIONS
Section A3: Added Keynote tags 46 & 47 to soffit framing members. (PPI 37) Keynote Table: Added keynote items 46 & 47 descriptions. (PPI 37-)
NAVFAC DWG NO. 14147182 (S-601) FOUNDATION SCHEDULES
Footing Schedule: Revised footing F5 size and reinforcing. (PPI 28, 29, 57) Footing Schedule: Revised footing F14 size. (PPI 58) Wall Footing Schedule: Revised footing WF1 thickness. This update is not associated with a PPI.
NAVFAC DWG NO. 14147210 (A-202) COMPREHENSIVE BUILDING ELEVATIONS
Detail A1: Added depiction of Vertical Lift Fabric Door mullions in open position and noted the minimum clear height needed beneath them. (PPI 71)
NAVFAC DWG NO. 14147211 (A-203) COMPREHENSIVE BUILDING ELEVATIONS
Details A1 and B1: Added dashed line representing minimum height of fire barrier above low roof areas.
Also added keynote 7.170. This update is not associated with a PPI.
NAVFAC DWG NO. 14147451 (ES505) ELECTRICAL -SITE DETAILS
Removed steel casing around light pole concrete base and changed dimension length of concrete base from 7000mm to 5000mm (Detail B1). This update is not associated with a PPI.
NAVFAC DWG NO. 14147496 (E-603) ELECTRICAL SINGLE LINE DIAGRAM
Added a set of contacts to manual transfer switch MTS2 so that it can communicate with the hangar door control panel. (PPI 15)
NAVFAC DWG NO. 14147523 (T-401) TELECOMMUNICATIONS -ENLARGED PLANS
Added Keynote 2 to the drawing set to describe the cable runway within the telecom room. (PPI 46)
Continuation Sheet
File details come from the government source that posted it. Updated .