This is Amendment 0004 to RFP N62470-26-R-0008 for the FX74 Strategic Airlift Hanger at Naval Station Rota, Spain, issued 13 March 2026. The amendment extends the proposal submission deadline from 26 March 2026 to 09 April 2026 at 2:00 PM Norfolk, VA local time. The government will not respond to pre-proposal inquiries submitted after 19 March 2026. The amendment provides responses to 66 pre-proposal inquiries (PPIs 6, 7, and 12-71) addressing technical clarifications on specifications, drawings, and design requirements. Key clarifications include: manufacturers using alternative UFGS methods for VLFD systems will not be considered; paragraph 2.7.3 regarding backup door operation will be removed from Section 08 34 16.20; substantially complete projects will not meet the requirement for projects "completed within the past ten (10) years"; contractors and subcontractors must collectively hold required Spanish classifications; the minimum clear height under VLFD mullions when open must be at least 10,600 mm; Class 1 self-retracting devices with a maximum arrest distance of 1067 mm (42 inches) are acceptable for fall protection; and various structural, architectural, and landscape drawing clarifications are provided regarding footing dimensions, insulation specifications, gutter requirements, and site features.

The amendment also provides revised Attachment B Price Schedule, new Attachment J (Chameleon Survey), and new Attachment K (NAVSTA Rota Protected Species Protocol). All contractors must conduct a chameleon survey prior to commencing work on the construction site. Third-Party Archaeologists must be included in proposals. The fire extinguisher cabinet is included in the base bid, while the fire extinguisher itself is part of the FF&E package. Government representatives will utilize existing office space within the installation; contractors are not required to provide field offices. For fall protection systems in Spain, contractors must be registered in the REA (Registro de Empresas Acreditadas), and U.S. state licensing is not applicable. All drawings and specifications have been updated to reflect these clarifications and corrections.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 0004

RFP NO: N62470-26-R-0008

FX74 Strategic Airlift Hanger, Naval Station Rota, Spain

Date Issued: 13 March 2026

The purpose of this amendment is to provide the following:

1. Respond to pre-proposal inquiries (PPIs).

2. Provide Attachment B Price Schedule – REVISED, Attachment J – Chameleon Survey and

Attachment K – NAVSTA Rota Protected Species Protocol

3. Provide Continuation Sheet

4. Extend the due date for proposal submission and revise Solicitation accordingly

5. The due date for proposal submission is extended to April 9, 2026

1. Response to PPIs 6, 7,12-71

6. Inquiry: In reviewing Attachment G, we note that it requires each contracting company and its subcontractors to be registered in the “Registro Oficial de Licitadores y Empresas Clasificadas del Sector Público” of the Spanish Ministry of Finance, with the corresponding classification applicable to the type of project to be performed. However, “Ley 9/2017, de 8 de noviembre, de Contratos del Sector Público”, expressly provides relevant provisions regarding the eligibility and classification requirements of companies from other Member States of the European Union or signatories to the Agreement on the European Economic Area: Article 67 affirms that non-Spanish companies from EU Member States or EEA signatory States possess full capacity to contract with the Spanish public sector, provided that, under the laws of their country of establishment, they are authorized to perform the relevant services. Article 78 establishes an explicit exemption from the requirement of classification for such non-Spanish entrepreneurs, regardless of whether they participate individually or as part of a consortium, while still requiring them to demonstrate the necessary solvency. Given that Attachment G does not provide an alternative mechanism, exemption pathway, or justification for EU-based non- Spanish entrepreneurs—as mandated by Articles 67 and 78 of Ley 9/2017—it appears to conflict with the legal framework governing public sector contracting in Spain. Could you please clarify whether Attachment G will be revised to ensure alignment with Ley 9/2017, particularly regarding the exemption from mandatory classification for non-Spanish entrepreneurs from EU or EEA Member States, and to confirm the acceptable means for such bidders to demonstrate compliance and solvency under the applicable legal provisions?

Response: Each contracting company and its subcontractors are solely responsible for assuring they comply with Spanish law regarding registration and classification.

7. Inquiry: Is the omission of the below paragraphs intended to preclude alternate VLFD manufacturers that comply with the UFGS performance basis, or 2. Will alternate manufacturers

N6247026R0008 Amendment 0004 that utilize these UFGS alternative methods be considered? Clarification will ensure proper bid preparation and help determine whether the VLFD scope is intended to remain competitive consistent with the UFGS framework.

Response: The UFGS 08 34 16.20 para 2.3.3.2 was purposely edited. Review the specification in its entirety and propose in accordance with the solicitation. Manufacturers utilizing these UFGS alternative methods will not be considered.

12. Inquiry: On pages 4 and 5 of the Solicitation, the numbering of Option Line Items 4, 5, and 6, and Option Items 4, 5, and 6, differs from the numbering on pages 27, 28, and 29 of the Attachment_E_FX74_Specifications. Please confirm which one is correct.

Response: Disregard option items in the Attachment_E_FX74_Specificitions. This spec section has been removed in Amendment 0001.

13. Inquiry: To maximize the Government’s ability to evaluate the most relevant and directly comparable aircraft hangar experience—and to promote robust competition—will the Government consider a project that is substantially complete at the time of RFP release as meeting the requirement for projects “completed within the past ten (10) years” under Factor 1?

For example, an Offeror is completing an aircraft hangar project with scope, operational constraints, and technical characteristics highly comparable to the solicited requirement. The project is approximately 90 percent physically complete, with the hangar structure and all principal building systems installed and fully functional. Remaining work would be limited to closeout, commissioning, and minor punch-list activities that do not affect the project’s overall size, complexity, or relevance. Accepting substantially complete projects that are deliverable, functional, and representative of an Offeror’s capabilities would support the Government’s objective evaluation of recent, directly comparable experience—particularly for large, complex aviation facilities. Please confirm whether substantially completed projects will be accepted under Factor 1, provided the Offeror submits appropriate documentation demonstrating substantial completion or percentage of completion.

Response: The solicitation requires "Projects submitted for the Offeror shall be completed within the past ten (10) years of the date of issuance of this RFP". The government does not intend to waiver from this requirement. The offeror, at their discretion, must determine if the project's completeness warrants the designation identified on Attachment D – Construction Experience Project Data Sheet.

14. Inquiry: Regarding the certificates of classification required for this project, would it be possible to accomplish the classification of a subcontractor? Would a letter of commitment between companies be necessary?

Response: Each contracting company and its subcontractors, collectively, shall be responsible for assuring, upon submission of a proposal, that they are registered with the classification applicable to the type of project to be performed. Offeror certifies (within Attachment G) that Offeror and its subcontractors, if any, collectively are so registered and among them hold the classifications required.

15. Inquiry: On Sheet E-603 it appears to show a Govt Furnished Generator and MTS Quick Connect Box. Please confirm that the VLF Door Main Control Panel will only require a set of contacts and PLC programming to recognize when the MTS is engaged to recognize the VLF Door is on Emergency Generator Power.

Response: VLF Door manufacturer must provide input contacts in their Hangar Door Panel to allow the MTS to communicate with the Hangar Door Panel, via closing a set of contacts when the MTS is placed in the generator input position. This will ensure compliance with Section

2.3.6.1 and Section 2.7.2 GEN power requirements per the UFGS 08 34 16.20.

16. Inquiry: Per the UFGS 08 34 16.20 Guide Specification Designer Notes state in Section

2.9.3 of the Guide Spec, not the project specific published specification, the following:

NOTE: At the time of this writing, only one manufacturer is believed to have a system capable of meeting this requirement. Prior to including this paragraph, designer will investigate and confirm if there are adequate door system manufacturers currently available that are able to provide this option and confirm if this option is justified/required for the facility. Coordinate and incorporate space, clearance, utility, infrastructure and other facility requirements with the contract documents. It does not appear that any VLF Door Manufacturer currently has the ability to provide a backup power source separate from the connection to a backup power source or emergency generator. We request that this section be removed as the ability to comply with this requirement does not exist.

Response: Paragraph 2.7.3 Backup Door Operation and associated requirements will be removed from Section 08 34 16.20.

17. Inquiry: The specifications in Section 28 31 76 state that the new mass notification equipment must be compatible with the existing WAVES installation-wide mass notification system. Could you confirm if the existing system's software and hardware specifications will be provided to ensure compatibility? Additionally, are there any specific integration tests required to verify compatibility?

Response: See Specification 28 31 76 regarding requirements for the new mass notification equipment. Connection to central monitoring station and installation-wide mass notification system must be confirmed during commissioning testing. Existing equipment utilizes the Eaton WAVES system. Integration testing will be required upon completion of installation to ensure the system properly communicates.

18. Inquiry: The specifications in Section 28 31 76 require the fire alarm system to integrate with the existing WAVES mass notification system, but do not specify the required software or hardware upgrades. Could you confirm if any additional software licenses or hardware components are required for integration?

Response: See specifications 28 31 76 regarding requirements for installation-wide mass notification software and hardware specifications coordinating with the installation. Existing equipment utilizes the Eaton WAVES system.

19. Inquiry: Drawing L-201 shows root barriers intersecting the hangar foundation in 2 separate areas. Confirm root barriers will extend to outside foundation walls, running along the outside perimeter of the hangar foundation where applicable.

Response: Refer to the enlarged plans for locations of root barriers - sheets L-102, L-103, L-202 and L-203.

20. Inquiry: Will the Government extend the due date for proposals 3 additional weeks after the release of the latest PPIs?

Response: Refer to Amendment 0003. Proposals were extended to 26 March 2026.

21. Inquiry: Attachment B Price Schedule: Line Item 5 is used for both Options 4 and Option 5.

Please correct the numbering.

Response: See Attachment B Price Schedule REVISED.

22. Inquiry: Attachment_F_FX74_DWGs_Volume 4of17, sheet CS101 Site Plan Keynotes. All reference numbers are missing.

Response: See updated sheet CS101.

23. Inquiry: Attachment_F_FX74_DWGs_Volume 1of17, sheet G-002 lists CG401 Enlarged Grading Plan, NAVFAC #14147008. Attachment_F_FX74_DWGs_Volum4of17, sheet CS101 Site Plan Keynotes does not include sheet CG401. Is there a sheet missing, or is the drawing list incorrect?

Response: See updated sheet CG401.

24. Inquiry: Attachment_E_FX74_Specifications, Section 01 57 19.00 22, page 6, paragraph C.

Archaeological Resource Measures: item 2. The last sentence states “Also, a government or 3rd Party archaeology monitor may be required to be on site during digging activities.” Are we to include a 3rd Party archaeology monitor in our proposal?

Response: Third Party Archeologist must be included in the proposal for this project.

25. Inquiry: Is the 3rd Party Archaeologist a part of the base bid proposal or will it be handled as a MOD if required?

Response: Third Party Archeologist must be included in the proposal for this project.

26. Inquiry: Attachment_F_FX74_DWGs_Volume 4of17, sheets C-101, C-102 & C-103 all indicate scale at 1:1000. The dimensions provided on sheet C-101 for the Contractors Laydown/Staging area are not on any scale. Provide corrected dimensions on sheet C-101 and scale for sheets C-101, C-102 & C-103.

Response: See updated sheets C-101, C-102 & C-103.

27. Inquiry: Attachment_F_FX74_DWGs_Volume 5of17; Sheet CP401 scale bar indicates 1:200 but detail A1 indicates 1:500. Based on dimensions provided the detail should be 1:200, confirm?

Response: See updated sheets CP401 and CP402.

28. Inquiry: Attachment_F_FX74_DWGs_Volume 7of17, sheets SB112. What are the Wall Footing sizes in column line K, between columns 1 and 5.2? The WF footings appear to scale small than the mirrored footings in the same column line on sheet SB114. Confirm the footing sizes and designations.

Response: Line K wall footings are: 1-2 is WF5, 2-3 is WF5, 3-4 is WF2, 4-5.2 is WF2. See updated sheet SB112.

29. Inquiry: Attachment_F_FX74_DWGs_Volume 7of17, sheets SB112, column lines K,2 calls for a F5 footing. The F5 footing is about half the size of the scaled footing in the drawing.

Which is correct, the F5 designation or the drawing?

Response: Footing F5 in the schedule on S-601 should be 4000x4000x800 with 15ø each way bottom. See updated sheet SB112.

30. Inquiry: Attachment_F_FX74_DWGs_Volume 7of17, sheets SB114, column lines K,12 calls for a F5 footing. The F5 footing is about half the size of the scaled footing in the drawing.

Which is correct, the F5 designation or the drawing?

Response: Footing F5 in the schedule on S-601 should be 4000x4000x800 with 15ø each way bottom. See updated sheet SB112.

31. Inquiry: Attachment_F_FX74_DWGs_Volume 7of17, sheets SB112 Keynotes 10 & 11 & SB114 Keynotes 7 & 8 indicate Jack Points for both a C5 and a C17. However there doesn’t appear to be any thickened slab, additional footings, or steel embed plates for these points. Is there additional work required for these points? If so, provide drawings, details and locations for said jack points.

Response: Slab type S-4 is designed for jack load. No thickening so additional reinforcing is required.

32. Inquiry: Sheet SB117 indicates special striping around the area for the jack points, however nothing special seems to be provided in these areas.

Response: Sheet SB-117 denotes the different slab types. The dark line shows the extents of the required striping. For detailed striping information refer to the interiors’ drawings.

33. Inquiry: Attachment_F_FX74_DWGs_Volume 7of17, sheet S-301 detail C1 (example):

indicates rigid insulation between the exterior CMU veneer and in their CMU wall.

Attachment_F_FX74_DWGs_Volum8of17, architectural drawings sheet A-510 detail A1, Keynote 7.25 “Rigid Insulation”. Attachment_E_FX74_Specifications, Section 07 21 13, Part 2 Products. None of these details or specifications define the thickness, type or R value of said insulation. Provide thickness(s), type(s), and R value(s) for wall board insulation in the air cavity of the CMU walls.

Response: Section 07 21 13, paragraphs 2.1 and 2.1.1 describe the type of insulation and the required minimum RSI-value. The cavity wall insulation is drawn 50 mm thick and was calculated to provide an RSI-value of 1.76.

34. Inquiry: Attachment_F_FX74_DWGs_Volume 7of17, sheet S-002, Foundations, F-3 implies all footings are to be over excavated and placed on Lean Concrete. However, the Footing Schedule on sheet S-601 (*) indicate footings with lean concrete fill per A3/S-509, which are footings F2 and F9. Confirm footings F2 and F9 are the only footings to be placed on Lean Concrete.

Response: All footings require over excavation and lean concrete fill. Footings F2 and F9 are additionally to have anchorage reinforcing into lean concrete fill per Detail A3/S-509.

35. Inquiry: Attachment_F_FX74_DWGs_Volume 7of17, sheet SF312, keynote 1 Vertical Bracing. Several sheets are tagged similarly, are we to assume the S-200 Series drawing frame elevations indicates all “vertical bracing” in the various column and or grid elevations?

Response: Correct. Vertical bracing at each grid line is to be as shown on the series S-200 drawings. Keynote 1 is denoting that there is a vertical bracing at the location noted.

36. Inquiry: Attachment_F_FX74_DWGs_Volume 7of17, sheet SF312, keynote 5 Truss.

Several sheets are tagged similarly, are we to assume the S-200 Series drawing frame elevations indicates what appears to be truss framing in the various columns and or grid elevations. No Truss Schedule with specific trusses and/or framing is provided. Confirm the column and grid elevations include the truss framing.

Response: Correct. Trusses at each grid line is to be as shown on the series S-200 drawings.

Keynote 5 denotes that there is a truss at the location noted.

37. Inquiry: Attachment_F_FX74_DWGs_Volume 7of17, sheet S-314, Detail A3. The overhang framing indicates two angles or bent plates with additional substructure framing. None of these are sized. Provide sizes of missing overhang framing members.

Response: Vertical angle frames are L75x75x8 occurring at each IPE200 roof beam location.

Horizontal continuous members are L100x100x10 (similar to overhang in Section C2/S-313).

See updated sheet S-314.

38. Inquiry: Attachment_E_FX74_Specifications, section 01 41 00 Summary of Work, paragraph 1.5.7 Unexploded Ordnance. Will the contractor be required to perform a full MEC/ESS survey prior to breaking ground?

Response: No MEC/ESS survey is required.

39. Inquiry: If the contractor is required to perform a full MEC/ESS survey prior to breaking ground, provide specifications for survey requirements.

Response: No MEC/ESS survey is required.

40. Inquiry: Attachment_E_FX74_Specifications, section 01 45 35 Special Inspections, paragraph 1.3.7 Special Inspector of Record (SIOR). Based on the title description and meeting requirements mentioned elsewhere, will the SIOR be required to be on site fulltime?

Response: The SIOR is required to be on site at the times and durations required to complete inspection work in coordination with the contractor when work items are ready to be inspected.

41. Inquiry: Attachment_E_FX74_Specifications, section 01 50 00 Temporary Construction Facilities and Controls, paragraph 3.6 Contractor’s Temporary Facilities. There is no mention of any field office for government representatives. Will the contractor be required to provide a field office for any government representative?

Response: No. Government representatives will utilize existing office space within the installation.

42. Inquiry: If contractor is required to provide a field office for any government representative, provide field office requirements, number of occupants, etc.

Response: No. Government representatives will utilize existing office space within the installation.

43. Inquiry: Attachment_E_FX74_Specifications, section 01 57 19.01 20 Supplemental Temporary Environmental Controls, 1.2.1 Spain, a. Naval Station (NS) Rota. Based on items 2, what type of special site surveys and/or studies will be required prior to mobilization to determine “protected species” are present and require special treatment or relocation.

Response: Chameleon Survey must be conducted prior to commencement of any work on the construction site. Refer to Attachment J - Chameleon Survey and Attachment K - NAVSTA Rota Protected Species Protocol.

44. Inquiry: Has a study been performed previously and available for review for the previous

PPI?

Response: Yes, Chameleon survey was completed during the design phase. Refer to Attachment J – Chameleon Survey and Attachment K – NAVSTA Rota Protected Species Protocol.

45. Inquiry: In Drawing T-401, wall elevation A2 shows item 1 _ Fire-rated plywood backboard noted. The drawing appears to indicate CMU materials. Please clarify that item 1 is to be installed over the illustrated CMU constructed wall.

Response: Item 1 – fire-rated plywood should be mounted to the CMU wall.

46. Inquiry: In Drawing T-401, item 2 was omitted from the notes. Please indicate the item.

Response: Item 2 should read: 304mm X 20mm CABLE RUNWAY. ESCALERA PARA CABLES DE 304mm X 20mm. See updated Sheet T-401.

47. Inquiry: Drawing TS101 indicates two (2) communication handholes/manholes. Drawings do not label types. Please indicate the types at each location.

Response: Both are type D manholes.

48. Inquiry: The structural, architectural and plumbing drawings: Sheets S-302 detail C3 and A- 508 detail A1 both reference the plumbing drawings. Plumbing drawing P-601 Floor Drain Schedule, TD-1 “Trench Drain” states to see structural. All three disciplines call out for a 300mm trench drain, but no details. What brand, loading, embed angle required, depths, or slopes. Provide details for the trench drain grating, embed angles, and associated information.

Response: The type of grating and associated load rating are indicated in the Floor Drain Schedule on Plumbing Drawing P-601. Grating must be bolt down type. Continuous, embedded trench edge angles are expected to be provided by the trench grating manufacturer. Trench drain inverts are indicated on the Plumbing Floor Plans.

49. Inquiry: Structural drawing S-004 “Structural Steel” notes S-19 Paint and Protection, note A said to paint structural steel. Note C states to not paint structural steel that is not fireproofed.

Architectural drawings floor plans A-111, A-112, A-113, A-114, & A-116 in Hangar 103, Keynote 7.104 states “Provide Minium 2-HR intumescent coating system and minimum 1-hr intumescent coating system on remaining structural framing in accordance with 07 81 00.”

Define which structural steel gets spray-on fireproofing and which get painted inside the hangar bay, provide specifics.

Response: Prime/paint steel in accordance with Section 09 90 00. Apply spray-applied fireproofing and spray-applied intumescent epoxy coating as indicated on drawings and as specified in Section 07 81 00. Refer to paragraph 1.2 for definitions of primary and secondary structural steel framing. Examples of secondary steel framing (steel that does not require fireproofing), not already noted, include, but are not limited to, the following items: angles used for cladding attachment (such as at the overhangs), ladders and associated platforms, catwalks and supporting elements, VLFD support steel.

50. Inquiry: Attachment_F_FX74_DWGs_Volume 8of17, architectural drawings sheet A-120 keynote 7.7X indicates a Box Gutter either 150mmX150mm, 200mmX200mm and

250mmX250mm dimensions. However, A-506, detail A1 is the largest blowup detail of the gutter profile with a slope, but no dimensions are provided. If the sloped profile is correct, where does the 250mm dimension apply at the wide top of the gutter or the base?

Response: The gutter dimensions noted on Sheet A-120 represent minimum calculated requirements. As such, the width dimension applies to the inside clearance at the bottom of the gutter where the cross section is narrowest. The minimum width also applies to the top of the gutter but should be provided in the way of clearance between the roof edge and the inside face of gutter. Hence the cross section shown in detail A1 on A-506. This profile is desired to prevent water from overshooting the gutters. A gutter system with a front face that extends above the roof edge, often seen with PEMB systems, would also be acceptable as long as the catchment area (the area below the roof edge) is sized to meet the minimum dimensions.

51. Inquiry: Attachment_F_FX74_DWGs_Volume 8of17, architectural drawings sheet A-506, details, C2 and B3 note 5.17 Metal Stud Framing. No size or profile provided. Provided size and type of metal stud required.

Response: Keynote 5.17 is for cold-formed, standard, C-shaped steel studs (UNE 36573) as specified in Section 05 40 00, 2.1 Steel Studs. The studs depicted in details C2 and B3 are 150 mm.

52. Inquiry: During review of the plans and specifications the only hoisting equipment identified was for the hangar door. Confirm no other hoists, overhead cranes, jib cranes, etc. are required for this project.

Response: Correct, there are no other hoists or cranes required for the project.

53. Inquiry: Architectural drawings Keynote 7.25 Rigid Insulation. This keynote appears in several locations for the rigid insulation in the CMU wall cavity. The drawings do not specify a thickness or R-value for said insulation. Specification section 07 21 13 Board and Block Insulation doesn’t provide any information either. Provide the thickness and R-value for the Rigid Insulation in the CMU wall cavity.

Response: Section 07 21 13, paragraph 2.1.1 Thermal Resistance provides the required minimum RSI-value of the cavity wall insulation. The cavity wall insulation is drawn 50 mm thick and was calculated to provide an RSI-value of 1.76.

54. Inquiry: Architectural drawings Keynote 7.44 “Continuous Polyiso Ridid Insulation with Thermal Resistance as specified". Specification 07 22 00 Roof and Deck Insulation. Neither the drawings nor the specifications note the R-value or the insulation thickness. Please provide the R-value, and if relevant, the insulation thickness.

Response: For the required RSI-value and thickness of the polyisocyanurate board insulation, refer to Section 07 22 00 paragraph 2.1.5 Insulation Thickness.

55. Inquiry: Architectural drawings A-503, keynote 7.41 Standing Seam Metal Roof.

Specification Section 07 41 13 Metal Roof Panels, 2.1.1 Steel Sheet Panels, paragraph c. (1) “…high T profile standing seam…mechanically crimped seams…” The profile shown on the drawings and specifications seem to be written around a specific system, i.e. brand. We can’t seem to locate this type of roof system, provide the basis of design for reference.

Response: Refer to Section 07 41 13 Metal Roof Panels, the standing seam roof system is not based on a specific manufacturer. The standard profile may have seams that are plus or minus

6.35 to 7.62 cm high with a coverage area that is plus or minus 40.64 cm. Due to the scale of the building, panels with taller seams and wider coverage are preferred.

56. Inquiry: Architectural drawings A-805 and A-806 indicate air barrier only in the restrooms and admin space of the building. Confirm the areas indicated on these two drawings are the only areas requiring any type of air barrier system.

Response: The air barrier must be contiguous and connected across all surfaces of the building envelope as indicated on the drawings. Sheets A-805 and A-806 indicate the areas where air barrier pressure testing, in accordance with Section 01 91 19, is required over and above specified inspection requirements.

57. Inquiry: Sheet S-601, which includes the foundations schedule, indicates dimensions for Foundation F5 of 2200 × 2200. However, on sheets SB112 and SB114, which show the foundation locations, the dimensions appear to be significantly larger, approximately 4000 × 4000. Please confirm which dimensions are correct.

Response: Footing F5 in the schedule on S-601 should be 4000x4000x800 with 15ø each way bottom. See updated Sheet S-601.

58. Inquiry: Sheet S-601, which includes the foundations schedule, indicates dimensions for Foundation F14 of 1700 × 1200. However, on sheet SB115, which show the foundation locations, the dimensions appear to be different, approximately 1500 × 1200. Please confirm which dimensions are correct.

Response: F14 in the schedule on S-601 should be 1500x1200X400, See updated Sheet S-601.

59. Inquiry: Attachment_F_FX74_DWGs_Volume 8of17, architectural drawings sheet A-120 keynote 7.7X indicates a Box Gutter either 150mmX150mm, 200mmX200mm and 250mmX250mm dimensions. However, A-506, detail A1 is the largest blowup detail of the gutter profile with a slope, but no dimensions are provided. If the 250mm dimension is applied to either the top or bottom of the gutter, what is the other dimension?

Response: The gutter dimensions noted on Sheet A-120 represent minimum calculated requirements. As such, the width dimension applies to the inside clearance at the bottom of the gutter where the cross section is narrowest. The minimum width also applies to the top of the gutter but should be provided in the way of clearance between the roof edge and the inside face of gutter. Hence the cross section shown in detail A1 on A-506. This profile is desired to prevent water from overshooting the gutters. A gutter system with a front face that extends above the roof edge, often seen with PEMB systems, would also be acceptable as long as the catchment area (the area below the roof edge) is sized to meet the minimum dimensions.

60. Inquiry: Attachment_F_FX74_DWGs_Volume 8of17, architectural drawings sheet A-120 keynote 7.7X indicates a Box Gutter either 150mmX150mm, 200mmX200mm and 250mmX250mm dimensions. However, A-506, detail A1 is the largest blowup detail of the gutter profile with a slope, but no dimensions are provided. b) Does the slope gutter detail apply, or is this a true square box gutter?

Response: The slope noted in the keynotes does not apply to the gutter’s cross-section; it indicates the uniform slope required to direct water to the downspouts (outlets) as described in Section 07 60 00 paragraph 3.1.10 Downspouts: “Adjust gutters to slope uniformly to outlets, with high points occurring midway between outlets.”

61. Inquiry: Interior drawing I-601, Schedule – Signage. The drawings show locations for signs 1-68. Signs 69-77 Mandatory No Smoking signs are not shown on the drawings. Are signs 69- 77 on the schedule to be included in the proposal?

Response: Refer to I-111 - I-116 for sign locations. These signs are located on the exterior of the building and are tagged on the plans. Yes, they are to be included in the proposal.

62. Inquiry: Interior Drawing IF111 Legend – Interior FF&E, item FE1 Fire Extinguisher. The fire extinguishers are shown on the architectural drawings and are assumed to be included in the base bid and not part of the FF&E package, confirm

Response: The fire extinguisher cabinet is included in the base bid. The fire extinguisher itself is included in the FF&E package.

63. Inquiry: The Fall Protection Contractor shall maintain contractor licensing as required by the state in which the project is performed. For this project, please confirm a US contractor’s license is required and which state this license should be in. Please confirm no other licensing is required.

Response: A company that installs fall-protection systems (anchors, lifelines, edge protection, etc.) on construction sites in Spain must be registered in the REA (Registro de Empresas Acreditadas). A [US] "state" license is not applicable.

64. Inquiry: This section states the SRLs need to limit freefall to 600mm (~24”). There are no manufacturers that meet this requirement. This is due to the 24" being a requirement for Class A devices of the ANSI Z359.14-2014 standard which is outdated. That standard has been superseded by the 2021 version of the standard, which replaced the Class A, B, and LE classification with Class 1 and 2. The Class A is where the 24" maximum arrest distance comes from but has been changed to Class 1 with a maximum arrest distance of 42" allowed. Please confirm Class 1 SRLs can be provided.

Response: Confirmed. Class 1 self-retracting devices, with a maximum arrest distance of 1067 mm (42 inches), must be provided.

65. Inquiry: Landscape drawing L-102. The upper left corner of the plans. The area between A4/L-503 and the match line for sheet L-102 indicates a concrete area with a bold black horizontal line bordered by trees on three sides. This area does not show up on the civil drawings, nor can we find any details on other landscape drawings. Provide information as to the concrete area, size, and what the bold black horizontal line indicates. Is said area the Bicycle Rack, detail A3/L502, confirm.

Response: Plan has been updated to refer this area to B4/L-503 Bicycle Rack Plan. Yes, the detail for the bike rack itself is shown in A3/L-502.

66. Inquiry: Landscape drawing L-102. The upper left corner of the plans. The area between A4/L-503 and the match line for sheet L-102 indicates a concrete area with a bold black horizontal line bordered by trees on three sides. This area does not show up on the civil drawings, nor can we find any details on other landscape drawings. Provide information as to the concrete area, size, and what the bold black horizontal line indicates. Is this the only bicycle rack?

Response: Plan has been updated to refer this area to B4/L-503 Bicycle Rack Plan. Yes, the detail for the bike rack itself is shown in A3/L-502.

67. Inquiry: Landscape drawing L-102. The match line sheet numbers are marked incorrectly.

Upper right indicates sheet L-102, and lower left reference L-100, there is no L-100 drawing.

Provide correct sheet numbers for reference.

Response: Match line number for the lower left corner of L-102 has been corrected to L-101.

68. Inquiry: Landscape drawings L-102 indicates specialty paving at the top of the sidewalk to the far right of the parking lot to match line Sheet L-102. There doesn’t appear to be a match line at B1/L-103. How far does the specialty paving extend in that area? Provide missing dimensions.

Response: This information has been added to B1/L-103. Also - Layout of this area is provided on the civil plans CH101 - with corners located and point tables on CH601 (no new drawings needed).

69. Inquiry: Landscape drawing L-103 detail A2 Outdoor Break Area. Provide dimensions for the specialty paving in that area.

Response: Layout of this area is provided on the civil plans CH101 - with corners located and point tables on CH601 (no new drawings needed).

70. Inquiry: Landscape drawing L-103 detail B1 indicates two (2) each flagpoles. Specification section 10 75 16 Ground Set Flagpoles, paragraph 2.3 Aluminum Flagpoles, item B indicates “three” flagpoles. Which count is correct?

Response: Refer to revised Specification section 10 75 16 subpart 2.3, item B.

71. Inquiry: The VLF Door Mullions extend down past the referenced Keynote 7 Dimensions (S-316 = 12200mm & S-317 = 12185mm) by 1200mm which would result in a Clear Height under the VLF Door Mullions in the OPEN POSITION of 11,000mm above finished floor. The drawings to not appear to call out a specific clear height requirement under the VLF Door mullions on the structural or architectural drawings. Can the DOR confirm the VLF Door Mullion Clear Height of 11,000mm above finished floor in the OPEN POSITION is acceptable?

Response: Minimum clear height under VLFD mullions shall not be less than 10,600 mm from finished floor elevation when in the open position.

2. Provide Attachments:

Attachment B Price Schedule – REVISED Attachment J – Chameleon Survey Attachment K – NAVSTA Rota Protected Species Protocol

3. Provide Continuation Sheet

4. Solicitation Revisions

CURRENT:

The Government does not intend to respond to any pre-proposal inquiries submitted less than 15 business days before the solicitation closing date in order to permit adequate time to reply to the inquiries.

REVISED:

The Government does not intend to respond to any pre-proposal inquiries submitted after 19 March 2026.

CURRENT:

ALL SUBMITTALS MUST BE RECEIVED AS SPECIFIED ABOVE PRIOR TO 2:00PM

Norfolk, VA local time, Thursday, 26 March 2026. LATE SUBMITTALS WILL NOT BE

CONSIDERED.

REVISED:

ALL SUBMITTALS MUST BE RECEIVED AS SPECIFIED ABOVE PRIOR TO 2:00PM

Norfolk, VA local time, Thursday, 09 April 2026. LATE SUBMITTALS WILL NOT BE

CONSIDERED.

File details come from the government source that posted it. Updated .