Attachment B - Price Schedule - REVISED.pdf
PDF 131 KB Posted
- Solicitation number
- N6247026R0008
About this file
Price Schedule Summary
This is a Price Schedule for Project FX74 – NATO Strategic Airlift Hangar, a federal construction contract requiring detailed pricing across multiple line items. The contract is structured with one base contract line item (CLIN 0001) and five option items, with all prices expressed in either lump sum (EA) or unit price (M3) formats.
The base price (Line Item 1) encompasses the entire project scope, subdivided into 16 sub-line items: the primary hangar facility (1A), office and breakroom inhabited areas (1B), fire suppression system (1C), fire alarm systems (1D), telecommunications systems (1E), drinking fountains (1F), supporting site work (1G), parking lots beyond 87.5 M2 (1H), site fencing (1I), exterior shade structure (1J), landscaping (1K), site fire protection water supply (1L), site lighting (1M), drain detention system (1N), photovoltaic system (1O), and electric vehicle charging (1P). The contract includes three option items: Option Item No. 1 for excess contaminated soils removal at a unit price per 1,000 M3, Option Item No. 2 for unexpected large debris removal at a unit price for 258 M3, and Option Item No. 3 for Electronic Security Systems, Intrusion Detection System, and Closed Circuit TV System. Additionally, Option Item No. 4 covers Audio/Visual Systems, and Option Item No. 5 addresses Furniture, Fixtures, and Equipment (FF&E) with a government estimated price of $414,570.75 and a Hardware Allowance Rate (HAR) percent not to exceed 5%. All work must be completed in accordance with project drawings and specifications, with clear demarcation at the 1.5-meter line to distinguish between facility work and site work scopes.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
Provide line item prices, where indicated by blank underlines, for the following items:
Line Item
Description Quantity Unit Unit Price Sub-Total Total Price
1 BASE PRICE: Total Price for the entire work for Project FX74 – NATO Strategic Airlift Hangar in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
1 EA
1A Primary Facility – Hangar Subtotal of Base Price for the entire work for FX74 – Hangar complete to the 1.5-meter line outside of the structure in accordance with the drawings and specifications, but excluding work provided in another line item.
EA
1B Primary Facility – Office and Breakroom Inhabited Areas Subtotal of Base Price for the construction of Open Office (100), and Breakroom (101), complete to the 1.5-meter line outside of the structure in accordance with the drawings and specifications, but excluding work provided in
1C Primary Facility – Fire Suppression System Subtotal of Base Price for the construction of the automatic fire suppression system in accordance with the drawings and specifications, but excluding work provided in another line item and the redundant fire pump.
1D Primary Facility – Fire Alarm Systems Subtotal of Base Price for the construction of the fire alarm systems in accordance with the drawings and specifications, but excluding work provided in
1E Primary Facility – Telecommunications Systems Subtotal of Base Price for the construction of the telecommunications systems in accordance with the drawings and specifications, but excluding work provided in
1F Primary Facility – Drinking Fountains Subtotal of Base Price for the construction of drinking fountains in accordance with the drawings and specifications, but excluding work provided in another line item.
1G Supporting Site Work Subtotal of Base Price for the Subtotal of Base Price for the remainder of entire project site work, outside the facilities, utilities, and structures 1.5-meter line, for all of FX74, including but not limited to site preparation, grading, erosion and sediment control measures, fencing, landscaping, stormwater management, water, sanitary, and mechanical utilities, electrical and telecommunication distribution, and other incidental site improvements, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1 EA
1H Parking Lots Subtotal of Base price for parking lot area beyond 87.5 M2, encompassing all areas outside of the 1.5-meter line, for all of FX74, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1I Site Fencing Subtotal of Base Price for Site Fencing, encompassing all areas outside of the 1.5-meter line, for all of FX74, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1J Exterior Shade Structure
Exterior Shade Structure, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1K Landscaping Subtotal of Base Price for Landscaping, encompassing all areas outside of the 1.5-meter line, for all of FX74, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1L Site Fire Protection Water Supply Subtotal of Base Price for Site Fire Protection Water Supply, encompassing all areas outside of the 1.5-meter line, for all of FX74, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1M Site Lighting Subtotal of Base Price for Site Lighting, encompassing all areas outside of the 1.5-meter line, for all of FX74, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1N Drain Detention System Subtotal of Base Price for the Hangar Trench Drain Detention System, encompassing all areas outside of the 1.5-meter line, for all of FX74, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1O Photovoltaic System
Photovoltaic system, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1P Electric Vehicle Charging
Electric Vehicle Charging System, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
2 Option Item No. 1 - Contaminated Soils Unit Price for excess removal and disposal of contaminated soils complete in accordance with the drawings and specifications, but excluding work provided in another line item.
1000 M3
3 Option Item No. 2 - Unexpected Large Debris Unit Price for removal of unexpected large debris in accordance with the drawings and specifications, but excluding work provided in another line item.
258 M3
4 Option Item No. 3 -
ESS/IDS/CCTV
Price for Electronic Security Systems (ESS), Intrusion Detection System (IDS), and Closed Circuit TV System (CCTV) in accordance with the drawings and specifications, but excluding the work provided in another line item.
1 EA
5 Option Item No. 4 - A/V Price for Audio/Visual Systems in accordance with the drawings and specifications, but excluding the work provided in another line item.
1 EA
6 Option Item No. 5 - FF&E Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
Gov’t Estimated Price:
$414,570.75
HAR
Percent
(NTE
5%)
HAR Subtotal
Total FF&E Estimated Price
TOTAL PRICE FOR CLIN 0001:
OVERALL TOTAL PRICE FOR ALL CLINS:
File details come from the government source that posted it. Updated .