Amendment 0006 - Specifications.pdf
PDF 719 KB Posted
- Solicitation number
- N6247026R0008
About this file
This document contains two technical specification sections for aluminum doors and windows required for the FX74 NATO Strategic Airlift Hangar at Naval Station Rota, Spain, issued under NAVFAC Contract No. N6247020D0008, Work Order No. 1596719.
Section 08 11 16 – Aluminum Doors and Frames: The specification requires swing-type aluminum doors and frames meeting minimum antiterrorism performance standards for a controlled perimeter using Explosive Weight II at specified standoff distances. Doors must achieve blast performance equivalent to or better than ER1/ER2 classification per UNE-EN 13541, with minimum airblast loading parameters of 158 kilopascals (kPa) peak positive pressure and 462 kilopascal-millisecond (kPa-msec) peak positive phase impulse. Additional performance requirements include air infiltration not exceeding Class 4 (3m³/hm² at 100 Pa) per UNE-EN 1026/12207, water penetration Class 3A or better (0.15 kPa) per UNE-EN 1027, and thermal performance with U-factor of 2.7 W/m²·°C or less, SHGC of 0.23 or less, and LSG of 1.10 or greater per CTE HE. Materials must be aluminum alloy 6063-T5 with minimum 30 percent recycled content, stainless steel anchors, and high-performance organic coating per UNE-EN 12206-1 with minimum 40 microns dry film thickness. Submittals requiring government approval include shop drawings, product data, finish samples, design analysis, structural calculations for antiterrorism performance, and test reports for air infiltration, water penetration, and standard airblast testing by independent testing agencies. All blast design calculations must be performed by registered engineers with minimum 5 years' blast design experience.
Section 08 51 13 – Aluminum Windows: The specification requires prime aluminum windows complying with UNE-EN 14351-1 and meeting structural performance and antiterrorism requirements per UFC 4-010-01. Windows must withstand specified wind loading design pressures and incorporate blast-resistant design with glazing resistance greater than equivalent 3-second duration loading of 5650 Pascal and frame deflection limited to L/60 under 2X glazing resistance loading. Antiterrorism performance may be validated through computational design analysis, dynamic design analysis, or standard airblast testing (EN 13541) with minimum 158 kPa peak positive pressure and 462 kPa-msec impulse, achieving ER1 or better classification. Air infiltration must not exceed UNE-EN 12207 Class 4 per CTE DB-HE, water penetration must not exceed UNE-EN 12208 Class 9A per CTE DB-HS, and thermal performance requires U-factor of 2.7 W/m²·°C or less with SHGC of 0.23 or less and visual transmittance of 0.5 or greater. Sound attenuation minimum is STC 35 per ASTM E90 or Rw 33 dB per UNE-EN ISO 717-1. Windows must include minimum 20 percent recycled aluminum content and be furnished with hardware, weatherstripping, screens, and thermal-barrier construction where indicated. Manufacturer qualification requires minimum 10 years' documented experience, and government approval is required for shop drawings, product data, design analysis, structural calculations, and standard airblast test reports prepared by independent testing agencies.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO.
At the
PREPARED BY:
Architectural: Mechanical:
Civil: Electrical:
Structural:
APPROVED BY:
For Commander, NAVFAC:
Date:
Submitted By: Date:
nancy.wroten Line
FX74 NATO Strategic Airlift Hangar NAVSTA Rota, Spain
SECTION 08 11 16
ALUMINUM DOORS AND FRAMES
05/17, CHG 2: 11/18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
GOVERNMENT OF SPAIN-EDIFICATION TECHNICAL CODE (CTE)
CTE DB-SE-A (2007) Technical Building Code. Basic Document. Structural Safety - Steel
CTE HE (2022) Energy Efficiency
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 16933 (2007) Glass in building — Explosion-resistant security glazing — Test and classification for arena air-blast loading
ISO 16934 (2007) Glass in building — Explosion-resistant security glazing — Test and classification by shock-tube loading
SPANISH ASSOCIATION FOR STANDARDIZATION (UNE)
UNE-EN 485-2 (2017+A1:2019) Aluminium and aluminium alloys - Sheet, strip and plate - Part 2:
Mechanical properties
UNE-EN 755-2 (2016) Aluminium and aluminium alloys - Extruded rod/bar, tube and profiles - Part 2: Mechanical properties
UNE-EN 1026 (2017) Windows and doors - Air permeability - Test method
UNE-EN 1027 (2017) Windows and doors - Water tightness
- Test method
UNE-EN 13541 (2012) Glass in building - Security glazing - Testing and classification of resistance against explosion pressure
UNE-EN 10025-1 (2006) Hot rolled products of structural steels - Part 1: General technical delivery conditions
UNE-EN 12206-1 (2022) Paints and varnishes - Coating of aluminium and aluminium alloys for
SECTION 08 11 16 Page 1 architectural purposes - Part 1: Coatings prepared from thermosetting coating powder
UNE-EN 12207 (2017) Windows and doors - Air permeability - Classification
UNE 36080 (1990) AENOR-HOT ROLLED PRODUCTS OF
NON-ALLOY STRUCTURAL STEELS. TECHNICAL
DELIVERY CONDITIONS
1.2 PERFORMANCE REQUIREMENTS
1.2.1 Structural Calculations
1.2.1.1 Minimum Antiterrorism Performance
Provide doors, where scheduled, meeting the minimum antiterrorism performance as specified in the paragraphs below.
The blast loading must be calculated or tested using Explosive Weight II (as required for a controlled perimeter) at standoff distance indicated on the Drawings.
a. Dynamic Design Analysis Method
Glazed opening framing members, anchors, and glazing may be designed using a dynamic analysis to prove the glazed opening system will provide performance equivalent to or better than Hazard Level E/Minimal Hazard (MH) in accordance with ISO 16933 and UNE-EN 13541 .
b. Standard Airblast Test Method
Testing in accordance with ISO 16933 and ISO 16934 may be by shock tube or arena test. Perform the test on the entire proposed door assembly, which must include, but not be limited to, the glazing, its framing/support system, operating devices, and all anchorage devices.
Install door system anchorage that replicates the method of installation to be used for the project. Utilize the fasteners and anchorage methods used to attach the tested door assembly that are representative of the actual door installation. Demonstrate by calculation any deviations in actual installation of the connections or the connected elements from those tested to provide the damage level as indicated below.
The minimum airblast loading parameters for the test must be as follows: peak positive pressure of 158 kilopascals (kPa); and peak positive phase impulse of 462 kilopascal-millisecond (kPa-msec).
Door glazing performance must be equivalent to or better than ER1 or ER2 classification according to UNE-EN 13541 .
1.2.2 Air Infiltration
When tested in accordance with UNE-EN 1026 and UNE-EN 12207 air infiltration per door leaf must achieve a class 4: air permeability up to 3m3/hm2 at 100 Pa.
SECTION 08 11 16 Page 2
Kathleen.Shutika Cloud+
Kathleen.Shutika Cloud+
1.2.3 Water Penetration
When tested in accordance with UNE-EN 1027 , water penetration must be class 3A or better 0.15 kPa.
1.2.4 Thermal Transmittance, Solar Heat Gain, Visible Light Transmittance
Provide products in accordance with requirements established in CTE HE.
1.2.4.1 U-Factor
Provide exterior glazed assemblies, including aluminum entrances doors with greater than 50 percent glazed area, with a whole window U-factor of
2.7 W/m2.degrees C or less as determined in accordance with CTE HE.
1.2.4.2 Solar Heat Gain Coefficient (SHGC)
Provide exterior glazed assemblies, including aluminum entrances doors with greater than 50 percent glazed area, with a whole window SHGC of 0.23 or less as determined in accordance with CTE HE.
1.2.4.3 Light to Solar Gain (LSG)
Provide exterior glazed assemblies, including aluminum entrances doors with greater than 50 percent glazed area, with a whole window LSG of 1.10 or greater as determined in accordance with CTE HE.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
For Each Type of Door and Frame Assembly; G
SD-03 Product Data
For Each Type of Door and Frame Assembly; G
Recycled Content of Aluminum Material; S
SD-04 Samples
Finish Samples; G
SD-05 Design Data
Design Analysis; G
Structural Calculations for Deflection and Antiterrorism; G
SD-06 Test Reports
Air Infiltration; G
Water Penetration; G
SECTION 08 11 16 Page 3
Standard Airblast; G
SD-08 Manufacturer's Instructions
Installation of Each Type of Door and Frame Assembly; G
SD-10 Operation and Maintenance Data
Adjustments, Cleaning, and Maintenance; G
1.4 DELIVERY, STORAGE, AND HANDLING
Inspect materials delivered to the site for damage. Unload and store with minimum handling. Provide storage space in dry location with adequate ventilation, free from dust or water, and easily accessible for inspection and handling. Stack materials on non-absorptive strips or wood platforms. Do not cover doors and frames with tarps, polyethylene film, or similar coverings. Protect finished surfaces during shipping and handling using manufacturer's standard method. Do not apply coatings or lacquers to surfaces to which caulking and glazing compounds must adhere.
1.5 QUALITY CONTROL
1.5.1 Shop Drawing
Indicate elevations and sections for each type of door and frame assembly.
Show sizes and details of each assembly, frame construction, subframe attachment, thickness and gages of metal, details of door and frame construction, proposed method(s) of anchorage, glazing details, provisions for and location of hardware, method and materials for flashing and weatherstripping, miscellaneous trim, installation details, and other related items necessary for a complete representation of all components.
A qualified blast engineer must perform testing or calculations for door system design resistance to specified blast loads.
1.5.2 Finish Samples
Submit two color charts and two finish sample chips from manufacturer's standard color and finish options for each type of finish indicated.
1.5.3 Design Analysis
Submit design analysis with calculations showing that the design of each different size and type of door unit and its anchorage to the structure meets the minimum antiterrorism standards required by paragraph MINIMUM ANTITERRORISM PERFORMANCE, unless conformance is demonstrated by standard blast test results. Calculations verifying the performance of each door proposed for use, under the given loads, must be prepared and signed by a registered Professional Engineer. The door components and anchorage devices to the structure, as determined by the design analysis, must be reflected in the shop drawings.
1.5.4 Test Reports
Test door assembly including glazing for evaluation of hazards generated from airblast loading in accordance with ISO 16933 and ISO 16934 by an independent testing agency regularly engaged in blast testing.
SECTION 08 11 16 Page 4
Design Door assembly (including glazing) using a dynamic analysis to prove the performance equivalent to or better than ER1 or ER2 classification in accordance with UNE-EN 13541 for the peak positive pressure of 158 kilopascals (kPa); and peak positive phase impulse of 462 kilopascal-millisecond (kPa-msec). Use a triangular blast load using the applicable pressure and impulse identified above.
For minimum Antiterrorism doors, in lieu of a Design Analysis, submit results of standard blast testing, included in a test report, providing information in accordance with ISO 16933 and ISO 16934 , as prepared by the independent testing agency performing the test. The test results must demonstrate the ability of each door proposed for use to withstand the blast loading parameters and achieve the damage and hazard level rating specified.
Testing in accordance with ISO 16933 and ISO 16934 may be by shock tube or arena test. Perform the test on the entire proposed door assembly, which must include, but not be limited to, the glazing, its framing/support system, operating devices, and all anchorage devices. Install door system anchorage that replicates the method of installation to be used for the project. Utilize the fasteners and anchorage methods used to attach the tested door assembly that are representative of the actual door installation. Demonstrate by calculation any deviations in actual installation of the connections or the connected elements from those tested to provide the damage level as indicated below.
The minimum airblast loading parameters for the test must be as follows:
peak positive pressure of 158 kilopascals (kPa); and peak positive phase impulse of 462 kilopascal-millisecond (kPa-msec).
Door glazing performance must be equivalent to ER1 or ER2 classification according to UNE-EN 13541 .
1.5.5 Operation and Maintenance Data
Submit detailed instructions for installation, adjustments, cleaning, and maintenance of each type of assembly indicated.
1.6 QUALITY ASSURANCE
1.6.1 Engineer Qualifications for Blast Design
All blast design calculations must be performed by or under the direct supervision of a registered engineer with a minimum of 5 years' experience performing blast design. The engineering firm performing the blast design must be able to demonstrate experience on similar size projects using similar design methods to meet the requirements outlined in this specification.
PART 2 PRODUCTS
2.1 DOORS AND FRAMES
Provide swing-type aluminum doors and frames of size, design, and location indicated. Provide doors complete with frames, framing members, subframes, trim, and accessories.
SECTION 08 11 16 Page 5
Kathleen.Shutika Cloud+
Kathleen.Shutika Cloud+
Kathleen.Shutika Cloud+
Kathleen.Shutika
2.2 MATERIALS
2.2.1 Anchors
Stainless steel.
2.2.2 Weatherstripping
Continuous wool pile, silicone treated, or type recommended by door manufacturer.
2.2.3 Aluminum Alloy for Doors and Frames
UNE-EN 755-2 , Alloy 6063-T5 for extrusions. UNE-EN 485-2 ,, alloy and temper best suited for aluminum sheets and strips. Provide aluminum materials that include a minimum of 30 percent recycled content. Provide data indicating percentage of recycled content of aluminum material.
2.2.4 Fasteners
Hard aluminum or stainless steel.
2.2.5 Structural Steel
CTE DB-SE-A , UNE 36080 , and UNE-EN 10025-1 .
2.2.6 Aluminum Paint
Aluminum door manufacturer's standard aluminum paint.
2.3 FABRICATION
2.3.1 Aluminum Frames
Extruded aluminum shapes with contours approximately as indicated.
Provide removable glass stops and glazing beads for frames accommodating fixed glass. Use countersunk stainless steel Phillips screws for exposed fastenings, and space not more than 300 mm on center. Mill joints in frame members to a hairline fit, reinforce, and secure mechanically.
2.3.2 Aluminum Doors
Of type, size, and design indicated and minimum 45 mm thick. minimum wall thickness, 3 mm, except beads and trim, 1.25 mm. Door sizes shown are nominal; include standard clearances as follows: 2.5 mm at hinge and lock stiles, 3 mm between meeting stiles, 3 mm at top rails, 5 mm between bottom and threshold, and 17 mm between bottom and floor. Provide bevel single-acting doors 2 or 3 mm at lock, hinge, and meeting stile edges.
2.3.2.1 Full Glazed Stile and Rail Doors
Provide doors with medium stiles and rails as indicated. Fabricate from extruded aluminum hollow seamless tubes or from a combination of open-shaped members interlocked or welded together. Fasten top and bottom rail together by means of welding or by 10 or 13 mm diameter cadmium-plated tensioned steel tie rods. Provide an adjustable mechanism of jack screws or other methods in the top rail to allow for minor clearance adjustments after installation.
SECTION 08 11 16 Page 6
2.3.3 Welding and Fastening
Where possible, locate welds on unexposed surfaces. Dress welds on exposed surfaces smoothly. Select welding rods, filler wire, and flux to produce a uniform texture and color in finished work. Remove flux and spatter from surfaces immediately after welding. Exposed screws or bolts will be permitted only in inconspicuous locations, and must have countersunk heads. Weld concealed reinforcements for hardware in place.
2.3.4 Weatherstripping
Provide on stiles and rails of exterior doors. Fit into slots which are integral with doors or frames. Weatherstripping must be replaceable without special tools, and adjustable at meeting rails of pairs of doors.
During installation, verify doors swing freely and close positively.
Refer to paragraph AIR INFILTRATION for air leakage requirements and testing.
2.3.5 Anchors
On the backs of subframes, provide anchors of the sizes and shapes indicated for securing subframes to adjacent construction. Anchor transom bars at ends and mullions at head and sill. Where indicated, reinforce vertical mullions with structural steel members of sufficient length to extend up to the overhead framing and secure thereto. Place anchors near top and bottom of each jamb and at intermediate points not more than 635 mm apart.
2.3.6 Provisions for Hardware
Coordinate with Section 08 71 00 DOOR HARDWARE. Deliver hardware templates and hardware (except field-applied hardware) to the door manufacturer for use in fabrication of aluminum doors and frames. Cut, reinforce, drill, and tap doors and frames at the factory to receive template hardware. Provide doors to receive surface-applied hardware, except push plates, kick plates, and mop plates, with reinforcing only;
drill and tap in the field. Provide hardware reinforcements of stainless steel or steel with hot-dipped galvanized finish, and secure with stainless steel screws. Provide reinforcement in core of flush doors as required to receive locks, door closers, and other hardware.
2.3.7 Provisions for Glazing
Design glazing beads to receive thickness required for each glazed assembly. Coordinate requirements with Section 08 81 00 GLAZING.
2.3.8 Finishes
Provide exposed aluminum surfaces with factory finish of organic coating.
2.3.8.1 Organic Coating
Clean and prime exposed aluminum surfaces. Provide a high-performance finish in accordance with UNE-EN 12206-1 with total dry film thickness of minimum 40 microns. Finish color to be as indicated.
SECTION 08 11 16 Page 7
PART 3 EXECUTION
3.1 INSTALLATION
Plumb, square, level, and align frames and framing members to receive doors.
Anchor frames to adjacent construction as indicated and in accordance with manufacturer's printed instructions and the approved shop drawings.
Install anchorage that complies with applicable structural requirements.
Anchor bottom of each frame to rough floor construction with 2.4 mm thick minimum stainless steel angle clips secured to back of each jamb and to floor construction; use stainless steel bolts and expansion rivets for fastening clip anchors. Hang doors to produce clearances specified in paragraph ALUMINUM DOORS. After erection and glazing, adjust doors and hardware to operate properly.
3.2 PROTECTION FROM DISSIMILAR MATERIALS
3.2.1 Dissimilar Metals
Where aluminum surfaces come in contact with metals other than stainless steel, zinc, or small areas of white bronze, protect from direct contact to dissimilar metals.
3.2.1.1 Protection
Provide one of the following systems to protect surfaces in contact with dissimilar metals:
a. Paint the dissimilar metal with one coat of heavy-bodied bituminous paint.
b. Apply elastomeric sealant between aluminum and dissimilar metals in accordance with Section 07 92 00 JOINT SEALANTS.
c. Paint dissimilar metals with one coat of primer and one coat of aluminum paint.
d. Use a non-absorptive tape or gasket in permanently dry locations.
3.2.2 Drainage from Dissimilar Metals
In locations where drainage from dissimilar metals has direct contact with aluminum, provide protective paint to prevent aluminum discoloration.
3.2.3 Masonry and Concrete
Provide aluminum surfaces in contact with mortar, concrete, or other masonry materials with one coat of heavy-bodied bituminous paint.
3.2.4 Wood or Other Absorptive Materials
Provide aluminum surfaces in contact with absorptive materials subject to frequent moisture, and aluminum surfaces in contact with treated wood, with two coats of aluminum paint or one coat of heavy-bodied bituminous paint. In lieu of painting aluminum, paint the wood or other absorptive surface with two coats of aluminum paint and seal joints with elastomeric sealant.
SECTION 08 11 16 Page 8
3.3 SEALING AROUND ASSEMBLIES
Seal all penetrations of the air barrier by sealing around door openings as necessary to achieve compliance with air leakage requirements indicated in the requirements of Section 07 27 10 BUILDING AIR BARRIER SYSTEM and Section 01 91 19 BUILDING ENCLOSURE COMMISSIONING. Flash all doors with corrosion resistant flashing to prevent water intrusion.
3.4 CLEANING
Upon completion of installation, clean door and frame surfaces in accordance with door manufacturer's written recommended procedure. Do not use abrasive, caustic, or acid cleaning agents.
3.5 PROTECTION
Protect doors and frames from damage and from contamination by other materials such as cement mortar. Prior to completion and acceptance of the work, restore damaged doors and frames to original condition, or replace with new ones.
-- End of Section --
SECTION 08 11 16 Page 9
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 08 11 16 Page 10
SECTION 08 51 13
ALUMINUM WINDOWS
05/19
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM E90 (2023) Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements
ASTM E1332 (2016) Standard Classification for Rating Outdoor-Indoor Sound Attenuation
GOVERNMENT OF SPAIN-EDIFICATION TECHNICAL CODE (CTE)
CTE DB-HE (2019) Basic Document for Energy Saving
CTE DB-HS (2019) Basic Document for Health and Safety
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 1288-3 (2016) Glass in building — Determination of the bending strength of glass Part 3: Test with specimen supported at two points (four point bending)
ISO 16933 (2007) Glass in building — Explosion-resistant security glazing — Test and classification for arena air-blast loading
ISO/CD 16364 Corrosion of Metals and Alloys - Guidelines for Galvanic Corrosion Control
SPANISH ASSOCIATION FOR STANDARDIZATION (UNE)
UNE-EN 410 (2011) Glass in building - Determination of luminous and solar characteristics of glazing
UNE-EN 673 (2011) Glass in building - Determination of thermal transmittance (U value) - Calculation method
UNE-EN 1026 (2017) Windows and doors - Air permeability - Test method
UNE-EN 1027 (2017) Windows and doors - Water tightness
- Test method
SECTION 08 51 13 Page 1
UNE-EN 13126 (2022) Building hardware - Hardware for windows and door height windows - Requirements and test methods
UNE-EN 1396 (2023) Aluminium and aluminium alloys - Coil coated sheet and strip for general applications - Specifications
UNE EN 1435-1 (2013) Thermal insulating products for buildings. In-situ formed sprayed rigid polyurethane foam (PUR) products. Part 1:
Specification for the rigid foam spray system before installation
UNE-EN 12207 (2017) Windows and doors - Air permeability - Classification
UNE-EN 12208 (2000) Windows and doors - Watertightness
- Classification
UNE-EN 12210 (2017) Windows and doors - Resistance to wind load - Classification
UNE-EN 12211 (2017) Windows and doors - Resistance to wind load - Test method
UNE-EN 12373 (2002) Aluminium and aluminium alloys.
Anodizing.
UNE-EN 12365-1 (2004) Building hardware - Gasket and weatherstripping for doors, windows, shutters and curtain walling - Part 1:
Performance requirements and classification
UNE-EN 12365-2 (2004) Building hardware-Gasket and weatherstripping for doors, windows, shutters, and curtain walling- Part 2:
Linear compression force test methods
UNE-EN 13561 (2015) External blinds and awnings - Performance requirements including safety
UNE-EN 12206-1 (2022) Paints and varnishes - Coating of aluminium and aluminium alloys for architectural purposes - Part 1: Coatings prepared from thermosetting coating powder
UNE-EN 14351-1 (2006+A2:2017) Windows and doors - Product standard, performance characteristics - Part 1: Windows and external pedestrian doorsets
UNE-EN ISO 9227 (2023) Corrosion tests in artificial atmospheres - Salt spray tests (ISO 9227:2022)
UNE-EN ISO 717-1 (2013) Acoustics - Rating of sound insulation in buildings and of building
SECTION 08 51 13 Page 2 elements - Part 1: Airborne sound insulation (ISO 717-1:2013)
UNE-EN-ISO 10077-1 (2020) Thermal performance of windows, doors and shutters - Calculation of thermal transmittance - Part 1: General (ISO 10077-1:2017, Corrected version 2020-02)
UNE-EN ISO 10140-1 (2022) Acoustics - Laboratory measurement of sound insulation of building elements - Part 1: Application rules for specific products (ISO 10140-1:2021)
EUROPEAN STANDARDS (EN)
EN 13541 (2012) Glass in building - Security glazing - Testing and classification of resistance against explosion pressure
EN 16612 (2019) Glass in building - Determination of the lateral load resistance of glass panes by calculation
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 4-010-01 (2018; with Change 2, 2022) DoD Minimum Antiterrorism Standards for Buildings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Windows; G
Fabrication Drawings
SD-03 Product Data
Windows; G
Recycled Content of Aluminum Windows; S
Hardware; G
Fasteners; G
Window Performance; G
Thermal-Barrier Windows; G
Screens; G
SECTION 08 51 13 Page 3
Weatherstripping; G
Accessories; G
Adhesives
Thermal Performance; G
SD-04 Samples
Finish Sample
Window Sample
Window Mock-Ups; G
SD-05 Design Data
Structural Calculations for Deflection; G
Design Analysis; G
SD-06 Test Reports
Minimum Condensation Resistance Factor
Standard Airblast Test; G
SD-07 Certificates
Engineer's Qualifications
SD-10 Operation and Maintenance Data
Windows, Data Package 1; G
Submit in accordance with Section 01 78 23 OPERATION AND
MAINTENANCE DATA.
1.3 QUALITY ASSURANCE
1.3.1 Qualification of Manufacturer
Window manufacturer must specialize in designing and manufacturing the type of aluminum windows specified in this section, and have a minimum of 10 years of documented successful experience. Manufacturer must have the facilities capable of meeting contract requirements, single-source responsibility and warranty.
1.3.2 Shop Drawing Requirements
Take field measurements prior to preparation of drawings and fabrications. Provide drawings that indicate elevations of windows, full-size sections, thickness and gages of metal, fastenings, proposed method of anchoring, size and spacing of anchors, details of construction, method of glazing, details of operating hardware, mullion details, method and materials for weatherstripping, method of attaching screens, material and method of attaching subframes, stools, casings, sills, trim, installation details, and other related items.
SECTION 08 51 13 Page 4
1.3.3 Engineer's Qualifications for Blast Design
All blast design calculations must be performed by or under the direct supervision of a registered engineer with a minimum of 5 years experience performing blast design. The engineer performing the blast design must be able to demonstrate experience on similar size projects using similar design methods to meet the requirements outlined in this specification.
1.3.4 Sample Requirements
1.3.4.1 Finish Sample Requirements
Submit color chart of standard factory color coatings when factory-finish color coating is to be provided.
1.3.4.2 Window Sample Requirements
Submit one full-size window of each type proposed for use, complete with glazing, hardware, anchors, and other accessories. Where screens or weatherstripping is required, fit sample windows with such items that are to be used. After approval, install each sample in work, clearly identified, and record its location.
1.3.4.3 Mock-Ups
Before fabrication, full-size mock-up of one window unit complete with glasswill be required for review of window construction and quality of hardware operation.
1.3.5 Design Data Requirements
Submit calculations to substantiate compliance with deflection requirements and Antiterrorism Performance Requirements. A registered Professional Engineer must provide calculations. Calculations for windows with glazing must be be submitted with calculations for glazing sealed by a registered structural engineer.
Submit design analysis (Computational or Dynamic) with calculations showing that the design of each different size and type of aluminum window unit and its anchorage to the structure meets the requirements of paragraph ANTITERRORISM PERFORMANCE REQUIREMENTS. Calculations verifying the structural performance of each window, including glazing, proposed for use, under the given loads, must be prepared and signed by a registered professional engineer. Reflect the window components and anchorage devices to the structure, as determined by the design analysis, in the shop drawings.
1.3.6 Test Report Requirements
Submit test reports for each type of window attesting that identical windows have been tested and meet the requirements specified herein for conformance to UNE-EN-ISO 10077-1 , UNE-EN 12207 , UNE-EN 12208 , UNE-EN 12210 , UNE-EN 1026 , UNE-EN 1027 , and UNE-EN 12211 including test size, and minimum condensation resistance factor (CRF), and, for Antiterrorism windows, in lieu of a Design Analysis, results of a Standard Airblast Test.
For Antiterrorism windows, in lieu of a Design Analysis, results of airblast testing, whether by arena test or shock tube, must be included in a test report, providing information in accordance with EN 13541 , as
SECTION 08 51 13 Page 5 prepared by the independent testing agency performing the test. The test results must demonstrate the ability of each window proposed for use to withstand the airblast loading parameters and achieve the hazard level rating specified in paragraph STANDARD AIRBLAST TEST METHOD.
1.3.7 Certification
Certified test reports attesting that the prime window units meet the requirements of UNE EN 1435-1 , UNE-EN-ISO 10077-1 , UNE-EN 12207 and UNE-EN 12208 , including test size, will be acceptable in lieu of product labeling.
1.4 DELIVERY AND STORAGE
Deliver windows to project site in an undamaged condition. Use care in handling and hoisting windows during transportation and at the jobsite.
Store windows and components out of contact with the ground, under a weathertight covering, so as to prevent bending, warping, or otherwise damaging the windows. Repair damaged windows to an "as new" condition as approved. If windows can not be repaired, provide a new unit.
1.5 PERFORMANCE REQUIREMENTS
1.5.1 Wind Loading Design Pressure
Design window components, including mullions, hardware, and anchors, to withstand a wind-loading design pressure as indicated on the drawings and in accordance with UNE-EN 12210 .
1.5.2 Tests
Test windows proposed for use in accordance with UNE-EN 1026 , UNE-EN 1027 and UNE-EN 12211 for the particular type and quality window specified.
Perform tests by a nationally recognized independent testing laboratory equipped and capable of performing the required tests. Submit the results of the tests as certified laboratory reports required herein.
Minimum design load for a uniform-load structural test must be 2400 pascal.
1.6 DRAWINGS
Submit the Fabrication Drawings for aluminum window units showing complete window assembly including hardware, weatherstripping, and subframe assembly details.
1.7 WINDOW PERFORMANCE
Aluminum windows must meet the following performance requirements.
Perform testing requirements by an independent testing laboratory or agency.
1.7.1 Structural Performance
Structural test pressures on window units must be for positive load (inward) and negative load (outward). After testing, there will be no glass breakage, permanent damage to fasteners, hardware parts, support arms or actuating mechanisms or any other damage which could cause window to be inoperable. There must be no permanent deformation of any main
SECTION 08 51 13 Page 6 frame, sash or ventilator member in excess of the requirements established by UNE-EN 12210 for the window types and classification specified in this section.
Submit calculations and program results verifying the structural performance of each window frame and glazing proposed for use, under the given loads, prepared and signed by a registered Professional Engineer.
The engineer must accept responsibility for the design of each entire window assembly including fasteners, window frame, sealants, and glazing.
1.7.2 Antiterrorism Performance Requirements
Windows must meet the antiterrorism performance criteria as specified in the paragraphs below in accordance with UFC 4-010-01 . Conformance to the performance requirements must be validated by one of the following methods.
The blast loading must be calculated or tested using Explosive Weight II (as required for a controlled perimeter) at standoff distance indicated on the Drawings.
Submit design analysis with calculations and program results showing that the design of each different size and type of aluminum window unit and its anchorage to the structure meets the minimum antiterrorism standards required, unless conformance is demonstrated by Standard Airblast Test results. Calculations and program results verifying the performance of each window frame and glazing proposed for use, under the given blast loads, must be prepared and signed by a registered Professional Engineer.
The window components and anchorage devices to the structure, as determined by the design analysis, must be reflected in the shop drawings.
1.7.2.1 Computational Design Analysis Method
Design window assembly to the criteria listed herein. Include computational design analysis calculations verifying the structural performance of each window assembly proposed for use, under the given static equivalent loads.
Design window frames, mullions, sashes, and glazing to the criteria listed herein. Include computational design analysis calculations verifying the structural performance of each window system proposed for use, under the given static equivalent loads.
Glazing resistance must be greater than equivalent 3-second duration loading of 5650 Pascal. Glazing and frame construction in accordance with
EN 13541 .
Design Aluminum/Steel window framing members to restrict deflections of the edges of glazing they support to L/60 under two times (2X) the glazing resistance per the requirements of ISO 1288-3 and EN 16612 .
Anchor window frames to the supporting structure with anchors designed to resist two times (2X) the glazing resistance in accordance with EN 13541 and UNE-EN 14351-1 . Anchors shall be provided as recommended by the window manufacturer. Provide units and anchorage mechanism with sufficient strength for specified load conditions as per UFC criteria.
Fasteners, clips and other accesories shall be capable of delivering blast and rebound reactions to adjacent structure.
SECTION 08 51 13 Page 7
Kathleen.Shutika Cloud+
Kathleen.Shutika
1.7.2.2 Dynamic Design Analysis Method
Design window assembly using a dynamic analysis to prove the system will provide performance equivalent to or better than Class ER1 rating in accordance with EN 13541 for the peak positive pressure of 158 kilopascals (kPa) and peak positive phase impulse of 462 kilopascal-millisecond (kPa-msec). Use a triangular blast load using the applicable pressure and impulse indicated above. The allowable response limits of steel frame elements must be in accordance with EN 13541 .
1.7.2.3 Standard Airblast Test Method
As an alternative to the 'Computational Design Analysis Method' and 'Dynamic Design Analysis Method' indicated above, window assembly may be tested for evaluation of hazards generated from airblast loading in accordance with EN 13541 by an independent testing agency regularly engaged in blast testing. For proposed window systems that are of the same type as the tested system but of different size, the test results may be accepted provided the proposed window size is within the range from 25 percent smaller to 10 percent larger in area and aspect ratio of the original qualified tested glazing systems in accordance with EN 13541 .
Proposed window system/assembly of a size outside this range will require testing to evaluate their hazard rating or are certified by the 'Dynamic Design Analysis Method' indicated above. Testing may be by shock tube or arena test. Perform the test on the entire proposed window system/assembly, including, the glazing, its framing/support system, operating devices, and all anchorage devices. Window support system replicate anchorage of the window support system with the method of installation to be used for the project. The minimum airblast loading parameters for the test will be as follows: peak positive pressure of 158 kilopascals (kPa) and peak positive phase impulse of 462 kilopascal-millisecond (kPa-msec). The hazard rating for the proposed window systems, as determined by the rating criteria of EN 13541 , to provide performance equivalent to or better than Class ER1. Results of window systems previously tested by test protocols other than EN 13541 may be accepted provided the required loading, hazard level rating, and size limitations stated herein are met.
1.7.3 Air Infiltration
Air infiltration must not exceed the amount established by CTE DB-HE and UNE-EN 12207 Class 4, tested in accordance with UNE-EN 1026 for each window type.
1.7.4 Water Penetration
Water penetration must not exceed the amount established by CTE DB-HS and UNE-EN 12208 Class 9A tested in accordance with UNE-EN 1027 for each window type.
1.7.5 Thermal Performance
Windows (including frames and glass) will be independently tested and certified with a Solar Heat Gain Coefficient (SHGC) determined according to UNE-EN 410 procedures and a whole window U-factor determined in accordance with UNE-EN-ISO 10077-1 and UNE-EN 673 within the range indicated below according to the CTE DB-HE Climate Zone of the project location. Provide visual Transmittance (VT) of 0.5 or greater.
SECTION 08 51 13 Page 8
Kathleen.Shutika Cloud+
Kathleen.Shutika
1.7.5.1 South-Central Climate
Windows installed within Climate Zone A3 will have a U-Factor of 2.7 W/m 2.
degrees C or less and a SHGC of 0.23 or less.
1.7.6 Sound Attenuation
When tested in accordance with UNE-EN ISO 717-1 and UNE-EN ISO 10140-1 or the following below, provide a minimum Sound Transmission Class (STC) of 35 in accordance with ASTM E90, or Rw 33 dB when tested in accordance with UNE-EN ISO 10140-1 and as determined by UNE-EN ISO 717-1 or Outside-Indoor Transmission Class (OITC) of 25 in accordance with ASTM E1332 and as determined by UNE-EN ISO 717-1 with the window glazed with 13 mm air space between two pieces of 6 mm thick glass with the exterior lite monolithic and the interior lite laminated.
1.8 WARRANTY
Provide Manufacturer's standard performance guarantees or warranties that extend beyond a 1 year period.
PART 2 PRODUCTS
2.1 WINDOWS
Provide prime windows that comply with UNE-EN 14351-1 and the requirements specified herein. In addition to compliance with UNE-EN 14351-1 , window framing members for each individual light of glass must not deflect to the extent that deflection perpendicular to the glass light exceeds L/175 of the glass edge length when subjected to uniform loads at specified design pressures. Provide Structural calculations for deflection to substantiate compliance with deflection requirements. Provide windows of types, performance classes, performance grades, combinations, and sizes indicated or specified. Provide aluminum window frames with a minimum recycled content of 20 percent. Provide data identifying percentage of recycled content of aluminum windows. Design windows to accommodate hardware, glass, weatherstripping, screens, and accessories to be furnished. Each window must be a complete factory assembled unit with or without glass installed. Dimensions shown are minimum. Provide windows with insulating glass and thermal break necessary to comply with condensation requirements of UNE-EN-ISO 10077-1 and CTE DB-HE. Provide manufacturer's standard hardware fabricated from aluminum, stainless steel, carbon steel complying with UNE-EN ISO 9227 , or other corrosion-resistant material compatible with adjacent materials; designed to smoothly operate, tightly close, and securely lock windows, and sized to accommodate sash weight and dimensions.
2.1.1 Horizontal Sliding Windows (HS)
Type HS-CW-2875 Pa or better and as required to resist blast loads (Optional Performance Grade).
2.1.2 Glass and Glazing
Materials are specified in Section 08 81 00 GLAZING.
2.1.3 Sealing
Are specified in Section 07 92 00 JOINT SEALANTS.
SECTION 08 51 13 Page 9
2.1.4 Weatherstripping
UNE-EN 14351-1 and UNE-EN 12365-1 . Provide for all ventilating (operable) sash for all windows. Provide woven wool pile weatherstripping 5.3 millimeter thick, conforming to UNE-EN 12365-2 , or polypropylene multifilament fiber weatherstripping installed in an integral weatherstripping groove in the sash or frame, and flexible polyvinylchloride weatherstripping installed in the sill member.
2.2 FABRICATION
Fabrication of window units must comply with UNE-EN 14351-1 .
2.2.1 Provisions for Glazing
Design windows and rabbets suitable for glass thickness shown or specified.
For minimum antiterrorism windows, attach glazing to its supporting frame using structural silicone sealant or adhesive glazing tape in accordance with EN 13541 and ISO 16933 .
2.2.2 Fasteners
Use window manufacturer's standard for windows, trim, and accessories.
Self-tapping sheet-metal screws are not acceptable for material more than 2 mm thick.
2.2.3 Adhesives
Provide joint sealants as specified in Section 07 92 00 JOINT SEALANTS.
For interior application of joint sealants, comply with applicable regulations regarding reduced VOC's, and as specified in Section 07 92 00
JOINT SEALANTS.
2.2.4 Drips and Weep Holes
Provide continuous drips over heads of top ventilators. Where fixed windows adjoin ventilators, drips must be continuous across tops of fixed windows. Provide drips and weep holes as required to return water to the outside.
2.2.5 Accessories
Provide windows complete with necessary hardware, fastenings, clips, fins, anchors, glazing beads, and other appurtenances necessary for complete installation and proper operation. Furnish extruded aluminum subframe receptors and subsill with each window unit.
2.2.5.1 Hardware
UNE-EN 14351-1 and UNE-EN 13126 . The item, type, and functional characteristics must be the manufacturer's standard for the particular window type. Provide hardware of suitable design and of sufficient strength to perform the function for which it is used. Equip all operating ventilators with a lock or latching device which can be secured from the inside.
2.2.5.2 Fasteners
Provide concealed anchors of the type recommended by the window
SECTION 08 51 13 Page 10 manufacturer for the specific type of construction. Anchors and fasteners must be compatible with the window and the adjoining construction. Provide a minimum of three anchors for each jamb located approximately 150 mm from each end and at midpoint.
2.2.5.3 Window Anchors
Anchoring devices for installing windows must be made of stainless steel conforming to UNE-EN 14351-1 .
2.2.6 Finishes
Comply with UNE-EN 1396 and UNE-EN 12373 for applying and designating finishes. Exposed aluminum surfaces must be factory finished with an organic coating. Color must be as indicated. All windows must have the same finish.
2.2.6.1 Organic Coating
Clean and prime exposed aluminum surfaces. Provide a high-performance finish in accordance with UNE-EN 12206-1 with total dry film thickness of not less than 0.03 mm.
2.2.7 Screens
UNE-EN 13561 . Provide one insect screen for each operable exterior sash or ventilator. Design screens to be rewirable, easily removable from inside the building, and to permit easy access to operating hardware.
Manufacturers standard aluminum frame complying with UNE-EN 13561 .
Fabricate frames with mitered or coped joints or corner extrusion, concealed fasteners and removable PVC spline/anchors concealing edge of frame.
2.2.7.1 Insect Screen
Insect screen mesh to be Glass-fiber mesh, 18x16 of PVC-coated glass-fiber threads; woven and fused to form a fabric mesh in accordance with
UNE-EN 13561 .
2.3 THERMAL-BARRIER WINDOWS
Provide thermal-barrier windows, complete with accessories and fittings, where indicated.
Specify material and construction except as follows:
a. Aluminum alloy must be 6063-T6.
b. Frame construction, including operable sash, must be factory-assembled and factory-sealed inner and outer aluminum completely separated from metal-to-metal contact. Join assembly by a continuous, concealed, low conductance divider housed in an interlocking extrusion of the inner frame. Metal fasteners, straps, or anchors must not bridge the connection between the inner and outer frame.
SECTION 08 51 13 Page 11
PART 3 EXECUTION
3.1 SCHEDULE
Some metric measurements in this section are based on mathematical conversion of inch-pound measurements, and not on metric measurement commonly agreed to by the manufacturers or other parties. The inch-pound and metric measurements are as follows:
PRODUCTS INCH-POUND METRIC
Metal Casing 0.0625 inch 1.59 mm
Aluminum Tube (Diameter) 0.0625 inch 1.59 mm
1 inch 25 mm
3.2 INSTALLATION
3.2.1 Method of Installation
Install in accordance with the window manufacturer's printed instructions and details. Build in windows as the work progresses or install without forcing into prepared window openings. Set windows at proper elevation, location, and reveal; plumb, square, level, and in alignment; and brace, strut, and stay properly to prevent distortion and misalignment. Protect ventilators and operating parts against accumulation of dirt and building materials by keeping ventilators tightly closed and locked to frame. Bed screws or bolts in sill members, joints at mullions, contacts of windows with sills, built-in fins, and subframes in mastic sealant of a type recommended by the window manufacturer. Install and seal windows in a manner that will prevent entrance of water and wind and prevent the loss of conditioned air from the interior of the building. Flash and seal windows to thermal, vapor, and air barrier systems. Fasten insect screens securely in place.
Any materials that show visual evidence of biological growth due to the presence of moisture must not be installed on the building project.
3.2.2 Dissimilar Materials
Where aluminum surfaces are in contact with, or fastened to masonry, concrete, wood, or dissimilar metals, except stainless steel or zinc, protect the aluminum surface from dissimilar materials in accordnace with UNE-EN 14351-1 and ISO/CD 16364 . Do not coat surfaces in contact with sealants after installation with any type of protective material. Do not apply coatings or lacquers to surfaces to which caulking and glazing components must adhere.
3.2.3 Anchors and Fastenings
Make provision for securing units to each other, to masonry, and to other adjoining construction. Windows installed in masonry walls must have head and jamb members designed to recess into masonry wall not less than 11 mm.
SECTION 08 51 13 Page 12
3.2.4 Adjustments After Installation
After installation of windows and completion of glazing and field painting, adjust all ventilators and hardware to operate smoothly and to provide weathertight sealing when ventilators are closed and locked.
Lubricate hardware and operating parts as necessary. Verify that products are properly installed, connected, and adjusted.
3.3 CLEANING
Clean interior and exterior surfaces of window units of mortar, plaster, paint spattering spots, and other foreign matter to present a neat appearance, to prevent fouling of weathering surfaces and weather-stripping, and to prevent interference with the operation of hardware. Replace all stained, discolored, or abraded windows that cannot be restored to their original condition with new windows.
-- End of Section --
SECTION 08 51 13 Page 13
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 08 51 13 Page 14
| COVER PAGE |
| DIVISION 08 - OPENINGS |
| 08 11 16 - ALUMINUM DOORS AND FRAMES |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 PERFORMANCE REQUIREMENTS |
| 1.2.1 Structural Calculations |
| 1.2.1.1 Minimum Antiterrorism Performance |
| 1.2.2 Air Infiltration |
| 1.2.3 Water Penetration |
| 1.2.4 Thermal Transmittance, Solar Heat Gain, Visible Light Transmittance |
| 1.2.4.1 U-Factor |
| 1.2.4.2 Solar Heat Gain Coefficient SHGC |
| 1.2.4.3 Light to Solar Gain LSG |
| 1.3 SUBMITTALS |
| 1.4 DELIVERY, STORAGE, AND HANDLING |
| 1.5 QUALITY CONTROL |
| 1.5.1 Shop Drawing |
| 1.5.2 Finish Samples |
| 1.5.3 Design Analysis |
| 1.5.4 Test Reports |
| 1.5.5 Operation and Maintenance Data |
| 1.6 QUALITY ASSURANCE |
| 1.6.1 Engineer Qualifications for Blast Design |
| PART 2 PRODUCTS |
| 2.1 DOORS AND FRAMES |
| 2.2 MATERIALS |
| 2.2.1 Anchors |
| 2.2.2 Weatherstripping |
| 2.2.3 Aluminum Alloy for Doors and Frames |
| 2.2.4 Fasteners |
| 2.2.5 Structural Steel |
| 2.2.6 Aluminum Paint |
| 2.3 FABRICATION |
| 2.3.1 Aluminum Frames |
| 2.3.2 Aluminum Doors |
| 2.3.2.1 Full Glazed Stile and Rail Doors |
| 2.3.3 Welding and Fastening |
| 2.3.4 Weatherstripping |
| 2.3.5 Anchors |
| 2.3.6 Provisions for Hardware |
| 2.3.7 Provisions for Glazing |
| 2.3.8 Finishes |
| 2.3.8.1 Organic Coating |
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.2 PROTECTION FROM DISSIMILAR MATERIALS |
| 3.2.1 Dissimilar Metals |
| 3.2.1.1 Protection |
| 3.2.2 Drainage from Dissimilar Metals |
| 3.2.3 Masonry and Concrete |
| 3.2.4 Wood or Other Absorptive Materials |
| 3.3 SEALING AROUND ASSEMBLIES |
| 3.4 CLEANING |
| 3.5 PROTECTION |
| 08 51 13 - ALUMINUM WINDOWS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 QUALITY ASSURANCE |
| 1.3.1 Qualification of Manufacturer |
| 1.3.2 Shop Drawing Requirements |
| 1.3.3 Engineer's Qualifications for Blast Design |
| 1.3.4 Sample Requirements |
| 1.3.4.1 Finish Sample Requirements |
| 1.3.4.2 Window Sample Requirements |
| 1.3.4.3 Mock-Ups |
| 1.3.5 Design Data Requirements |
| 1.3.6 Test Report Requirements |
| 1.3.7 Certification |
| 1.4 DELIVERY AND STORAGE |
| 1.5 PERFORMANCE REQUIREMENTS |
| 1.5.1 Wind Loading Design Pressure |
| 1.5.2 Tests |
| 1.6 DRAWINGS |
| 1.7 WINDOW PERFORMANCE |
| 1.7.1 Structural Performance |
| 1.7.2 Antiterrorism Performance Requirements |
| 1.7.2.1 Computational Design Analysis Method |
| 1.7.2.2 Dynamic Design Analysis Method |
| 1.7.2.3 Standard Airblast Test Method |
| 1.7.3 Air Infiltration |
| 1.7.4 Water Penetration |
| 1.7.5 Thermal Performance |
| 1.7.5.1 South-Central Climate |
1.7.6 Sound Attenuation
1.8 WARRANTY
| PART 2 PRODUCTS |
| 2.1 WINDOWS |
| 2.1.1 Horizontal Sliding Windows HS |
| 2.1.2 Glass and Glazing |
| 2.1.3 Sealing |
| 2.1.4 Weatherstripping |
| 2.2 FABRICATION |
| 2.2.1 Provisions for Glazing |
| 2.2.2 Fasteners |
| 2.2.3 Adhesives |
| 2.2.4 Drips and Weep Holes |
| 2.2.5 Accessories |
| 2.2.5.1 Hardware |
| 2.2.5.2 Fasteners |
| 2.2.5.3 Window Anchors |
| 2.2.6 Finishes |
| 2.2.6.1 Organic Coating |
| 2.2.7 Screens |
| 2.2.7.1 Insect Screen |
2.3 THERMAL-BARRIER WINDOWS
| PART 3 EXECUTION |
| 3.1 SCHEDULE |
| 3.2 INSTALLATION |
| 3.2.1 Method of Installation |
| 3.2.2 Dissimilar Materials |
| 3.2.3 Anchors and Fastenings |
| 3.2.4 Adjustments After Installation |
3.3 CLEANING
| Com_Name: [NAVFAC ATLANTIC] |
| Work_Ord: 1596719 |
| Contr_No: N6247020D0008 |
| PROJ_TITLE: FX74 NATO Strategic Airlift Hangar |
Amendment 3
| PROJ_LOC: Naval Station Rota, Spain |
| STAT_PROJ: (Station Project #) |
| PREP_FIRM: AECOM-Baker NAVFAC Atlantic A-E Design JV |
10 South Jefferson Street, Suite 1600 Roanoke, VA 24011-1333
| AE_CONTR: N62470240F4007 |
| Arch_prep: Jason Dillaman |
| Civil_prep: Brandon Fombelle |
| Struc_prep: Wayne Airgood |
| Geot_prep: Fatma Ciloglu |
| Mech_prep: Dan Eiben |
| Elec_prep: Owen Milligan |
| Fire_prep: Owen Parkinson |
| Add_prep: John Goldcamp |
| Add_disc: Geotechnical |
| Add_disc2: Telecom: |
| Date_sub: 16 January 2026 |
| Date_sign: |
| Add_disc3: Fire Protection: |
| Contr_txt: NAVFAC CONTRACT NO. |