This document is an Amendment (Amendment 0003) to a federal solicitation for the Military Construction Project P1062 Dry Dock 3 Modernization at Norfolk Naval Shipyard in Portsmouth, Virginia. The amendment provides updates to project specifications, drawings, and contract requirements, including responses to Pre-Proposal Inquiries (PPIs) across multiple technical areas such as construction methods, safety considerations, utility systems, and small business participation.
Key changes include revisions to specification sections covering work restrictions, environmental controls, excavation procedures, crane rail installation, and pile testing requirements. The amendment also updates several contract drawings, adds appendices for reference documents and Norfolk Naval Shipyard instructions, and provides clarifications on project-specific details like groundwater dewatering, concrete placement sequencing, and small business subcontracting goals. The solicitation remains structured as a Design-Bid-Build contract with a total contract duration of 1,825 days, an assumed award date of January 12, 2026, and full site access expected by September 8, 2026.
View the file
Other files
Show 40 more
Latest 50 of 85 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Block 14 Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
140 1 43
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-May-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247024R0062
X 9B. DATED (SEE ITEM 11)
04-Mar-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-May-2025
CODE
COMNAVFACSYSCOM ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247024R0062
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0003
The purpose of this amendment is to:
1. Respond to PPIs.
2. Revise Specifications.
3. Revise Drawings.
4. Provide attachments.
5. Revise the Solicitation.
6. Add FAR Clause 52.216-4 Economic Price Adjustment-Material
1. PPI Responses
PPI
NO.
Reference Questions Government Response
Page Section Para
77 N/A 00 01 15 1.3.1 Specification Section 00 01 15, 1.3.1 identifies additional documents.
Please provide the referenced documents.
See Amendment detail below.
78 CU218 Sanitary Profile
SSFM-3
N/A Drawing CU218, Sanitary Profile SSFM-3 shows the force main tying into existing MH S249. Please provide MH S249 outlet pipe sizing in order to plan for groundwater treatment emergency discharge options.
Gravity sewer according to records is a 15" ductile iron pipe. Dewatering is not permitted to be discharged into the sanitary sewer system. Contractor responsible for providing treatment measures per the Contract specifications.
79 N/A 31 09 13 3.1.1 Specification section 31 09 13, 3.1.1 states "Based on the observed conditions, the Contractor's Specialty Engineer shall assess potential risks from construction vibrations and provide a recommendation of maximum peak particle velocity (PPV) threshold. PPVs at adjacent structures, equipment, and exposed pipelines/conduits shall not exceed
0.5 inches per second. The Contractor shall determine the construction methods required to protect the
Propose in accordance with the solicitation.
property based on the preconstruction survey and the safe vibration threshold." Please confirm proposers are to use 0.5 inches per second as the maximum PPV.
If the Contractor's Specialty Engineer's findings determine a PPV under 0.5 inches per second during the evaluation of existing conditions, this will be considered a change.
80 SC301 Note 3 N/A Note 3 on SC301 seemingly indicates that only floodwall above EL101 is delegated design and that the seal wall design is by MN&BM (and the details are provided on that sheet), please confirm.
See Amendment detail below.
81 SC301 Note 3 N/A Please confirm allowable leakage for temporary floodwall delegated design.
<50GPM per side? Must the wall be cast-in-place concrete?
See Amendment detail below.
82 SC301 Detail A1/A2
N/A Detail A1 of Sheet SC301 shows the North and South seal walls terminating into granite block. Detail A2 D&E dowels are seemingly only deep enough to catch the exterior granite facing and not the concrete structure behind. As the Appendix J photos show, the blocks are simply stacked, what prevents the hydrostatic pressure from shifting the blocks?
See Amendment detail below.
83 SC301 Detail A1/A2
N/A Detail A1 of Sheet SC301 shows the North and South seal walls terminating into granite block. Please clarify what would happen if the Detail A2 D&E dowels land in a joint between 2 blocks.
See Amendment detail below.
84 S- 903/S-
N/A N/A Note 12 states that all cofferdam sheet pile seams shall be seal welded.
Please confirm this is the intent.
Confirmed, the wet well cofferdam sheet pile seams must be seal welded.
85 12 14 70 00 3.4.3 Please provide the test loads required for testing the trolleys associated with the in-haul system.
See Amendment detail below.
86 12 14 70 00 3.4.3 Please provide the testing procedure for applying the test loads to the trolley.
See Amendment detail below.
Please confirm that a Project Labor Agreement isn't required for this project.
Confirmed; PLA is not required.
88 19 31 52 00 3.7.4b "Water that is tested and determined to meet discharge water quality standards may be discharged directly to the Elizabeth River." Please provide water quality standards that must be achieved.
Propose in accordance with the solicitation.
89 5 Attachm ent G Price Proposal
Line Item
Please confirm that the water discharged from the initial dewatering and subsequent testing operations of the Dry Dock 3 basin following cofferdam construction does not require treatment.
Comply with requirements of the project specifications, including Government and Contractor obtained permits.
90 74 or 79 & of 5
RFP &
Attachm ent G Price Proposal
252.2 36- 701 e
The RFP states "The work shall conform to the specifications and the contract drawings identified on the following index of drawings: Project WO# 1715740". The BID FORM Line Item 0001 states "BASE PRICE:
Total Price for the entire work for eProjects Work Order # 1806701....."
Please clarify which is correct and if we are missing any specs or drawings from the other WO#.
The correct WO# for the project is 1806701.
91 25 of &337 of 526
Appendi x D
N/A The executive summary states that the existing concrete has a compressive strength of 3189.7 psi. This is (1) standard deviation below the mean of compressive strength calculated on page 337 of 526. Therefore the average compressive strength of the existing concrete is more than 50% greater than the compressive strength stated in the executive summary. This difference greatly affects the production of concrete demolition.
Please confirm the 3189.7 psi stated is for design purposes and doesn't truly reflect the average compressive strength of the concrete.
The compressive strength cited in the executive summary was deteremined in accordance with ACI 214R "Guide to Evaluation of Strength Test Results of Concrete," as indicated on Page 337 of 526 of the report.
The ACI guidance was used to establish the design strength of existing concrete.
Bidders should assess the test data themselves to determine impact the tests results may have on their selected means and methods of construction.
92 5 31 23
00.00 22
1.5 i. "i. Limited space is available within the project limits for the storage of excavated and imported materials.
The Contractor shall assume excavated materials shall be stored on NNSY property, outside of the Controlled Industrial Area (CIA) limits prior to placement as backfill in excavations or hauling to a licensed, permitted disposal facility." Please confirm that all excavated soil must be hauled and stored at the stockpile area for testing, even if it is identified in the criteria for bidding as mandatory disposal.
Soil to be excavated and disposed of offsite must be sampleed and tested prior to removal from NNSY.
Materials may either be sampled from a stockpiles or in situ. See Amendment detail below. 0002.
93 15 01 57
19.00 22
1.7.1.
1.1
"The Contractor must expect that all excavated soils at the site are assumed to be impacted by contaminants (including but not limited to petroleum, PFAS, and metals) and considered characteristic non-hazardous solid waste. Any excavated soil that is not reused on-site must be disposed of at a RCRA Subtitle-D compliant, permitted landfill. All excavated soils designated for disposal at a permitted landfill must be documented within a waste characterization form and manifest as part of the waste determination documentation.
Characterization is required to be completed in accordance with Virginia Department of Environmental Quality (DEQ) Guidance Memo No. LPR-SW-02- 2012 (Solid Waste Special Waste Disposal Request).
Characteristics and constituents to be analyzed include ignitability, corrosivity, reactivity, toxicity based on TCLP (metals, VOCs, SVOCs, pesticides and herbicides) results, PCBs, BTEX, TOX, PFAS, and paint filter. Additionally, due to the presence of petroleum, TPH (GRO and DRO) samples must be collected every 250 cubic yards for offsite disposal. All other waste characterization samples must be collected for every 2,000 cubic yards."
94 N/A N/A N/A Are Crane Rail base plates, clips and anchor bolts to be galvanized?
Rail base plates, clips and related hardware are not galvanized. Anchor bolts are galvanized. See Amendment detail below.
95 SD-510 A1 N/A Detail A3 corresponds to Sheet SD-
405. Detail A1 on SD-510 is not shown on SD-404. Does any floodwall demolition exist on the North side of the drydock entrance?
Please advise.
On Sheet SD404 make note of the 12'-7" +/- dimension showing the limit of floodwall demolition. North of that point is the typical floodwall section shown on A1/SD510.
At the end of the project the floodwall will continue to the raised entrance of DD3 all set to EL 106.0
96 SC-301 C1, C3 N/A Graphic scale is incorrect and does not scale to known dimensions. Please verify.
See Amendment detail below.
97 SC-101 Sheet Notes
2 Please confirm if temporary floodwalls need to be designed, approved and stamped by a professional licensed engineer.
See Amendment detail below.
98 S601- S605
N/A N/A Pile schedule shows that there are 8 EA test piles total, 3 EA Type A (HP16 x 88) and 6 EA Type B (PP12.75x0.375). Bid Item 001H calls for 10 Test Piles. Please advise on the location of the 1 other remaining test pile.
One additional Dynamic Pile Load Test is included in the total on the Price Schedule as a contingency. Similarly some contingency is included in the HP16 and PP12.75 pile quantities on the Price Schedule.
99 S-502 A5 N/A Detail calls out for shear key to be spaced at 16' on center. Detail C1 on this sheet shows a closer spacing less than 2' on center. Please verify.
See Amendment detail below.
100 G-102 N/A N/A Please confirm that the only gate available for contractor access to the CIA is Gate F, located south of Dry Dock 8.
Gate F is the contractor entrance to the controlled industrial area during normal business hours on weekdays.
After hours on weekdays and on weekends or holidays other entrances will be used but there are limitations to the type of vehicles that can use those entrances. Larger vehicles such as tractor trailers, oversized loads, cranes, etc. can only access gate F during normal business hours on weekdays that are not holidays.
S-002
Material Specifica tions
4H
Please inform which specific "Concrete Members" qualify for a 50% Quantity Std Hook (?)
See S-001 General Note 1.
Sheet S-002 does not apply to wet well and pump house
Reference Typical Detail C1 Dwg S- 580 clearly identifying End of Member hooks.
construction. For the general dry dock construction, provide 50% standard hooks (90- or 180-degree ACI Std Hooks) at terminating ends, unless noted otherwise.
Sheet S-580 WET WELL 3
CONCRETE SECTIONS
AND DETAILS - 2 OF 4 is specific to the wet well and pump house construction (sheets sealed by Augusto L.
Collot).
Sheet S-002, Para 4H applies to generally dry dock sheets (sheets sealed by Roderick D.
Whitsel), but not to the wet well and pump house construction (sheets Sealed by Augusto L. Collot).
Please confirm Para 4H either with specific locations or disqualify & use Type Det C1.
102 39 03 31 30 3.4.8 This paragraph states that "SCC placement between diaphragm walls must be balanced about the longitudinal and transverse centerlines of DD3." Please define the term "balanced". If the dry dock is sensitive to these construction loads, the sequencing and limits of the SCC placements (also for the demolition and precast concrete placement) needs to be defined by the Designer of Record (DOR) and not the DBB construction contractor.
The bidding construction contractor is not privy to the necessary information in the bidding phase to properly develop a "balanced" plan without all of the design information known by the Designer of Record (DOR).
Per Section 03 31 30, Paragraph 3.4.8, the Contractor must submit a SCC Placement Plan detailing their proposed SCC placement sequence for approval. With respect to "balanced" placement, the intent is to NOT place all the SCC infill north of centerline, followed by all the SCC south of centerline.
A tolerance of 10% total weight (or volume) of SCC may be used to established balanced placement about the longitudinal and transverse centerlines. E.g. multiple 6 ft lifts may be added provided that the 10% tolerance is met.
The intent is to mitigate for potential differential settlement during the placement of SCC, which is increasing the total weight of the dry dock. The tolerance may be about transverse, and longitudinal centerlines. For example, if the total volume of SCC placed in 10,000 CY, tolerance is 1,000 CY, one may break up the dock into quadrants.
Place 600 CY in NW Quadrant, then 600 CY is SE Quadrant, then 600 CY in SW Quadrant, then 600 CY in NE Quadrant. The approx.
volume of SCC between diaphragms and below the utility trench is approx. 190 SF (A3/S-514) x 23 FT = 162 CY thus one could fill multiple quadrants with a single 6 ft lift or fill at least three "bins" to EL 90.0 before moving to next quadrant.
103 39 03 31 30 3.4.8 Does the engineer require the KTR to cast each 6' lift of SCC infill completely around the dry dock prior to casting the next 6' lift above it?
See the response to PPI 102.
104 39 & G-104 & S-
03 31 30 3.4.8 If the previous question is correct, and with Evolution 2C on G-104, the government requires north crane rail access on 01/15/29, does this mean the entire walls of the dry dock need to demolish and completely reconstructed prior to this date, since the inner crane rail runs on top of the utility tunnel cap per B1 on S-516?
Crane rails (including inspection and testing) and supporting substructure elements supporting the crane rail must be in place, to the limits indicated, to meet the evolution dates indicated on the drawings.
105 SB 111 N/A N/A Referencing Sheet SB111, it appears there should be a number of 12.75x0.375 piles for the crane beam transition area in accordance with Section B1 on Sheet S520. Please confirm
See Amendment detail below.
106 SB104 /
SB105
N/A N/A Sheets SB104 and SB105 have a reference to section A1/S-549. This appears to be an incorrect reference, please confirm
See Amendment detail below.
107 SB105 /
SB106
N/A N/A Sheet SB105 & SB106 have a reference for C1/SB401. This detail does not exist.
108 SC551 Sheet 187 of
C1- C2 Detail s
Details C1 and C2 indicate flat sheet piles are to be field welded to the king piles, presumably prior to driving the NZ19 pairs between the king piles.
This field weld is required on the retained soil side of the cofferdam where no access will be available once the sheets are installed. Is the intent that each king pile be fabricated with a welded flat sheet pile attached and these are driven together as a welded pair? Do these sheets extend the entire length of the king piles?
Please clarify the intent of the design and update the weld details if shop welding is intended/permissible.
See Amendment detail below.. The intent is each king pile is welded to the flat sheet piles prior to installation. Yes, the sheets are designed for the entire length of the king piles.
109 SC152,
SC551
Sheets 181, 187 of 641
A1 Coffe rdam Plan, A3 Coffe rdam Isome tric, C1- C2 Detail s
The cofferdam plan views, isometric views, and details C1 and C2 suggest each NZ19 sheeting pair (with the exception of S26 and S27), is enclosed with a narrow plate (or some other material) extending the full length of the sheet pile, however, no details for this plate or enclosure material are provided or called out.
This enclosure appears to be filled in with grout (or some other material), details for which are not provided or noted. Please provide clarification and additional details for this work.
No plate or grouting necessary. Concrete seen in sheet view is from the walls that will be formed and filling in the sheet piles.
110 Specifi cation Pg
3.3 3.3.1.
Paragraph 3.3.1.1 states dynamic pile testing must also be performed on production piles when directed by the Contracting Officer. Please confirm the cost associated with KO-directed PDA testing on production piles will be paid for as a Change to the contract.
The unit price bid item Dynamic Pile Load Test may be used for either test or production piles.
111 S-113 A1-S-
N/A Sheet S-113 References section A1/S-
409. Please provide sheet S-409
See Amendment detail below.
112 S-506, S-602
Sheets 258, 324 of 641
Pile Table Detail C1
The pile tip elevations provided on Sheet S-602 for the sump foundation piles correspond to a 2ft pile embedment into the sump foundation detailed on Sheet S-506, however, a 3'-0" pile embedment is called out on Detail C1 on Sheet S-506. Please clarify this discrepancy and provide a corrected pile table or revised sump foundation details.
113 Pg. 583 of 2993
Spec 01 75 00
1.7 -a.
Spec Section 01 75 00 - 1.7 states "Base bids on the following criteria:
a. The assumed uninterrupted groundwater flow rate through the system is 1,000 gallons per minute."
Please confirm that if the dewatering treatment need exceeds 1,000 GPM that any additional cost would be covered in a change order for this project.
Propose in accordance with the solicitation.
114 Pg.
2461 of
Spec 31 62 16.16
3.3.2.
a.
Spec Section 31 62 16.16 - 3.3.2.a.
states "Using the quick loading procedure (Procedure A), test to 200 percent of the design tensile capacity indicated on the drawings" in reference to the Compressive Load Tests. Please confirm this test should be performed based on the design compressive capacity, not tensile.
See Amendment detail below.
115 S-106 Sheet 205 of
Sectio n A1 S-566
There is a section call out to A1 S-566 on S-106. It does not appear that S- 566 is part of the initial plan set.
Please provide sheet S-566.
See Amendment detail below.
116 S-031 Sheet 125 of
Seque nce Note
Sequence Note 12 on S-031 states, "Sequence work such that grade beam demolition is spaced at least 50 ft apart at all times." Please clarify what the 50 ft dimension is in reference to -is this center-to-center of the grade beams, or between faces of demolition?
See the response to Amendment 0002, PPI No. 15
117 SB403 N/A N/A On sheet SB403, six anchors extend beyond the 24” max annular space shown on detail C3 of sheet S-501 between the sheet pile and existing dock wall.
Correct, extend anchor length to provide minimum embedment within existing concrete.
118 MS-
N/A N/A Please provide the basis of design for the Steam Expansion Joint shown on MS-504 per Detail A1.
Propose in accordance with
33 30 00 2.3 Please provide the basis of design for the Containment Basin Drain as noted in Spec. 33 30 00 - 2.3.
Propose in accordance with the solicitation.
120 MS-
N/A N/A Please provide the basis of design for the CA Expansion Device shown on MS-504 per Detail A1
121 MP-
N/A N/A On MP-451, Keynote 72 indicates to provide pump discharge pipes with diamond plate cover. It is not clear to what extent these diamond plates are to be provided for the Drainage Pipes. Is the intent to provide diamond plates at the area where all pipes come together as one unit or all areas where drainage pipes run along the floor? Please provide more specific detail of what is required at this location.
Propose in accordance with the solicitation. Provide diamond plate cover in all areas where the pump drainage pipes run along the floor to reduce tripping hazard for egress.
122 M-556 N/A N/A Please provide the basis of design for the Round Flap Gates shown on M- 556 per Detail A4.
Propose in accordance with the solicitation.
123 M-557 N/A N/A Please provide the basis of design for the Superflooding Inlet Grate shown on M-557 per Detail A3.
Propose in accordance with the solicitation.
124 S-517 N/A N/A Please provide the basis of design for the SS Scupper Drain shown on S-517 per Detail A4.
Propose in accordance with the solicitation.
125 SB403
& S-
N/A A1 & C1
Please confirm that HP16 x 88 Piles do not have a steel cap or any tension connector, or shear, or weldment attached at the pile cut off elevation of the pile
Propose in accordance with the solicitation. No tension connectors, shear lugs, or weldments are required for the HP16x88 piles.
126 S-506 N/A C1 Please confirm that a Construction Joint will be allowed between the sump intake floor pour and the sump intake wall pour. A joint is not shown on the drawing. Please provide details of keyway waterstop, etc. if required.
See Amendment detail below.
127 2 of 5 Attachm ent G
Line Item 0001I 0001J
Please clarify which test piles receive the static axial compressive load test and which receive the static axial tensile load test.
Propose in accordance with the solicitation. Static load test locations are noted with a 'C' for compression or 'T' for tension next to the HP test pile symbol on the SB1XX series drawings.
128 S-005 Cementit ious Grouted Floor Anchor/ Dowel Notes
Note
The drawings show numerous locations of #9 cementitious grouted dowels to be installed. Note 2 on S- 005 states that "Hole diameter must be at least 1:5 times the anchor diameter." So for a #9 dowel that has a diameter of 1.128", you are requiring the KTR to drill a 5.64" diameter hole at a minimum (most likely 6" diameter).
See Amendment 0002 PPI #11.
The #6 dowels would be a 4" diameter hole. Many of these are done on a vertical face and can’t be done with any standard handheld equipment other than a core drill. Please reconsider this requirement or let the KTR choose to use an alternate of epoxy in lieu cementitious grout, if desired
129 A-310 N/A A2 Note indicates 4" depth closed cell spray applied foam to the underside of the control room ceiling. Does this only apply to the control room?
Please clarify the limits of the spray applied foam.
The closed cell spray foam insulation is to be applied to the underside of the roof at all instances where roof drainsare located. This application is to ensure the depth of insulation provides R-30 minimum. The depth of the Sump Pan at the roof drain reduced the depth of the roof rigid insulation creating a need for spray type insulation below to increase the R value at these drains.
The extent of the 4" spray foam is to cover the extents of the Sump Pan (2'-0" on all sides of the roof drain center lines).
130 5 01 00 00 1.10e This paragraph states "The construction schedule must account for Shipyard curtailment during the last 10 calendar days of each year during which period construction work may proceed (with the exception of Government holidays). However, site access may be slowed and other activities requiring Government support may be delayed for a period equal to the duration of the curtailment." Please confirm this requirement.
Access to the work site is available during the curtailment but gate access for larger vehicles will not be available. Deliveries will have to be scheduled before or after the curtailment.
131 2 01 14
00.00 22
1.4a Under "Special Scheduling Requirements", this paragraph states "Work must be phased as indicated on the Phasing Plans contained in the Contract Drawings." Please identify these specific phasing plans. We only see "Sequence of Construction, Recommended Sequence of Construction, Proposed Sequence of Construction, and Sequence of Operation(s)".
See Sheet G-104
CONSTRUCTION
PHASING PLAN
132 3 01 14
00.00 22
1.4g This paragraph states "Portal crane access along the north side of Dry Dock 3 is required to support shipyard activities at Building M140 (M140 Enclosure) during the periods as indicated on the drawings. Crane rails in the indicated areas must be installed, certified, and maintained during the indicated periods.". When do these periods occur?
These periods are indicated on Sheet G-104
CONSTRUCTION
PHASING PLAN.
133 3 01 14
00.00 22
1.4h This paragraph states "Railroad access to Building M140 (M140 Enclosure) is required to support shipyard activities during the periods as indicated on the drawings. Railroad tracks to Building M140 must be installed, certified, and maintained during the indicated periods." Where are these periods indicated on the drawings?
These periods are indicated on Sheet G-104
CONSTRUCTION
PHASING PLAN.
134 15 01 14
00.00 22
1.6.1.
12a
This paragraph states that no cellular telephones with cameras are allowed in the CIA. Please confirm this is a prohibited item.
Cellular phones with cameras are permitted but the cameras cannot be used to take pictures without proper permission. No one is allowed to take a picture with a camera without a government issued camera pass.
135 5 01 30
00.00 22
1.11 This paragraph states that contractor
must mobilize within 60 calendar days of contract award. This conflicts with the RFP. Please confirm which is correct.
The RFP is correct with respect to the start of construction or demolition work on the dry dock 3 site which are to start the date established in the notice to proceed.
The contractor is required to have a complete team assigned to the project that is working on all administrative requirements for the project within 60 days of the award.
The entire QC staff are required to be working on this project within the first 60 days and they will be processing submittals and RFI documents in this time.
The project managers, field engineers, superintendents and SSHO are required to be assigned to the project in the first 60 days and they are expected to be working on their respective areas of responsibility. The contractor is required to start weekly QC meetings, coordination meetings, schedule reviews with the government as well as all other project coordination activities within the first 60 days.
Setting up of the field office and the laydown area outside of the controlled industrial area is expected to start in the first 60 days.
136 C-002 Demoliti on Notes
10 "Contractor must assume that all asphalt pavement has concrete base beneath it that must be demolished during pavement demolition. Refer to boring logs for available existing pavement composition and thickness information." The thickness information provided on the boring logs widely vary around the dry dock.
Can a thickness of asphalt & concrete for bidding purposes be provided?
Propose in accordance with the solicitation.
137 1 12 00
01.00 20
& BID
FORM
1.1 &
CLIN
Section 12 00 01.00 20, Paragraph 1.1 states "The Government will indicate the FF&E estimate in the FF&E Option Item in the Price Schedule based on the Concept FF&E Design."
Please provide the Government Estimated Price for CLIN 0002 - Option Item No. 1.
PPI previously addressed.
See Revised Price Proposal Form provided as part of Amendment 0002.
138 1 & 2 12 00
01.00 20
& BID
FORM
1.1 / 1.3.1
CLIN
Section 12 00 01.00 20, Paragraph 1.3.1a states "The Specialty CEQ Package will be identified as a separate Option Item, priced separately from the FF&E and funded as separate Option." Please provide the Government Estimated Price for CLIN 0003 - Option Item No. 2.
PPI previously addressed.
See Revised Price Proposal Form provided as part of Amendment 0002.
139 N/A 01 50 00.00 22?
N/A Please confirm that the contractor is not required to provide any office space nor an office trailer for government personnel.
Confirmed, office or trailer space is not required.
140 8 12 00
01.00 20
3.1.1.
Is the contractor required to hire the interior designer for the FF&E & CEQ packages (CLIN 0002 & CLIN 0003) in the base bid price (CLIN 0001)?
Include in CLIN 0002 & 0003 respectively.
141 S-562, S563, S-564
N/A N/A Is the In-Haul Rail Trolley specified in the specification a COTS. If so, please provide sources for competitive sources or a J&A (Justification and Approval)
No, the In-Haul Rail Trollies are not a commercial off-the-shelf item.
142 S-561 N/A N/A Is the In-Haul Rail weldment assemblies specified in the specification a COTS? If so, please provide sources for competitive sources or a J&A (Justification and Approval)
No, the In-Haul Rail weldment assemblies are not a commercial off-the-shelf item.
143 CS-111 A1 N/A Please confirm that the sheet keynote #1 & #2 shown outside of the LOD are duplicates and placed in this area in error.
See Amendment detail below..
144 CS-
111, CD-
111, SD-111
A2 N/A There are several conflicts in crane rail demolition & reconstruction in this area between the referenced drawing pages. It is unclear what section is to be demolished and what section is to be salvaged, as well as the beginning and end of these activities. Additionally, SD-111 depicts a section of crane rail to be demolished that is outside of the LOD depicted on the civil drawings. If this section is to be demolished, please confirm an extension of the LOD to include additional room for excavation, and please provide details on any utilities in this area that may be disturbed.
See Amendment detail below.
145 CS-201 STORM-
N/A Please provide material type and dimensions of storm drain pipe between Yard Drain 3915A & 3915, as this information is missing from the profile detail.
See Amendment 0002 PPI #69.
146 N/A BID
FORM
N/A What piles are for bid item 0001H? The CLIN for Dynamic Pile Load Tests covers both HP16 and PP12.75 piles.
147 N/A N/A N/A Please provide and/or confirm document order of precedence.
Refer to FAR 52.236-21 Specifications and Drawings for Construction
148 C-002 EC Notes 6A Note 6A states that "No more than 500 LF of trench may be open at one time." Please confirm that this does not apply to the open cut and demolition to EL 93.0 as shown on the drawings.
PPI previously addressed.
Amendment 0002, PPI Response 14.
149 S-113 N/A A1 Drawing S-113 has a callout for detail A1 on drawing S-409 but there is no drawing S-409 provided with the bid package. Please provide this drawing.
See Amendment detail below.
150 S-251 N/A A4 A4 on drawing S-251 states to provide #8 x 4'-0" dowels at 1'-4" OC.
Section C1 on drawing S-506 states to provide #9 x 3'-0" dowels at 8" OC in what appears to be the same area.
Please clarify the size, spacing, and embedment requirements for these dowels.
See Amendment detail below.
151 Price Proposa l Form
N/A 2 In reference to Line item 0001G on the price proposal form, are the six pipe piles for the generator platform included in the quantity of 37,000
VLF?
Yes, the quantity for PP12.75x0.375 steel piles on the Price Proposal Form includes the generator platform piles.
152 Price Proposa l Form
N/A 2 In reference to Line item 0001G on the price proposal form, is the 37,000 VLF inclusive of the additional length required for the test piles?
Yes, the quantity for PP12.75x0.375 steel piles on the Price Proposal Form includes additional length required for test piles.
153 SB-111 N/A A2 The isolated 22' sections of crane rail beam that are to be replaced in this area do not have any indicated piles.
The detail cut depicts B1 - S520, which is the typical pile supported crane rail beam. Please confirm that this section of crane rail is not pile supported with new 12.75x0.375 pipe piles.
See Amendment detail below.
154 S-163 N/A Keyn ote 80
Note refers to the fall protection davit crane and it belonging to the Collateral Equipment (CEQ) Package.
Please confirm that the cost of the davit crane is not to be included in the contractor's bid.
Confirmed, the equipment cost of the fall protection davit is included in the CEQ package line item and does not need to be accounted for elsewhere in the KTR's bid.
155 A-103 N/A Keyn ote 57
Note refers to the Rollastep self-leveling stair and work platform and it belonging to the Collateral Equipment (CEQ) Package. Please confirm that the cost of the Rollastep stair and platform is not to be included in the contractor's bid.
Confirmed, the equipment cost of the Rollastep self-leveling stair and work platform is included in the CEQ package line item and does not need to be accounted for elsewhere in KTR’s bid.
156 S-113 N/A N/A S-113 references S-409, A1. S-409 has not been provided. Please provide sheet.
See Amendment detail below.
157 12 of
RFP Facto r 2
Liquidated Damages seem excessive please reconsider amount.
158 S-525 N/A A1 Please confirm that the government will furnish, install, and perform all testing required for the capstans.
Confirmed. The Government is responsible for furnishing, installing, and testing of capstans.
159 S-525 N/A A1 Please confirm that the KTR is only responsible for the anchor bolts and the (2) anchor bolt templates for each of the government furnished capstans.
Confirmed. The KTR is responsible for furnishing (2) anchor bolt templates and all anchor bolts for the new capstan foundations.
160 CU-201 N/A Sheet Note #6
Please confirm this note is due to the inaccessibility of the area with compaction equipment.
Confirmed, the intent is to use controlled low strength material (flowable fill) as backfill in areas inaccessible to conventional compaction equipment.
161 S-002 N/A Demo lition Note
This note states to "Install indicated salvage concrete fender piles and hardware at Berth 16 and install new timber piles and hardware at Berth 15 after cofferdam has been removed".
No work is indicated to be performed on the drawings, please confirm
See Amendment 0002 PPI #52.
162 5 31 23
00.00 22
1.5c "Soil materials from the mass excavation area between the existing Dry Dock 3 utility tunnel and existing outer crane beam (and associated side slopes), from existing grade to EL
93.0 must be disposed of offsite." If the contractor determines that the excavation area to EL 93.0 needs to extend beyond the outer crane beam, would the additional soil need to be disposed of offsite, or can it be considered for reuse?
Yes, if the soil is suitable for compaction, it can be re-used.
163 N/A N/A N/A
164 S-005 N/A N/A Cementitious Floor Anchor / Dowel Note #3 states, "Annular space must be 1 inch". Please define this statement. Does this mean a #8 dowel would have to have a 3" diameter holed drilled? If so, that seems large for a grouted dowel.
See Amendment 0002 PPI #11.
165 S-106 N/A N/A Sheet references detail A1 on S-566.
S-566 has not been provided. Please provide.
41 22 23.19
Please provide multiple suppliers for supplying the monorail hoist system.
Propose in accordance with the solicitation.
167 E002 General Demo
Note
Please provide a point of contact for base fire alarm vendor.
The base does not have a proprietary alarm system from one alarm contractor.
168 E061 Generato r Permittin g
Note
Is there a cost to the contractor for the Generator permitting?
Yes, the contractor is required to perform the stack testing of the generator under load to demonstrate compliance with VADEQ requirements.
169 N/A 41 22 23.19
N/A Is it a requirement to have the new monorail crane system fabricated, installed, and tested by NAVFAC P- 307-certified personnel in accordance with Navy Crane standards, specifically but not limited to
NAVFACINST 11450.2A?
Confirm this requirement to test the monorail system to the P-307 guidelines.
170 01 14 00.00
N/A 1.6.1.
1.6.1.
12.a
Please confirm, per specification 01 14 00.00 22, 1.6.1.11 & 1.6.1.12.a, tech devices (smartphones, laptops, tablets, etc.) connected to cellular, wi-fi, or physical line networks are allowed within the CIA to assist with project execution, as long as the devices do not contain cameras.
Confirmed. All of these devices will need to obtain asset authorization memorandums from base security. Contracting officer’s representatives will provide guidance after award.
171 S-547 N/A Note
Sheet S-547 Note 2 states See Sheet S606 for manhole location tables.
S606 has not been provided. Please provide S606 or confirm the layout information for the manholes has been provided via the given sheets.
See Amendment 0002 PPI #2.
172 N/A N/A N/A Please provide the applicable wage determination and construction type for this solicitation.
See Amendment detail below.
173 13, 20 Solicitati on
N/A Can the Government provide editable versions of Attachments D, E, and F in MS Word format?
Propose in accordance with the solicitation.
174 57 of
Solicitati on
52.22 2-55
Paragraph 2(b)(8) of section 52.222- 55 Minimum Wages for Contactor Workers Under Executive Order 14026 requires contractor compliance with any applicable Federal or State prevailing wage law. Please provide the prevailing wage decision for this project.
175 59 Solicitati on
52.22 9-3
We request that FAR Clause 52.229-3 be incorporated into this project to provide tariff protection to the contractors bidding this project.
Please advise if this clause will be added for this purpose
FAR 52.229-3 is included in the solicitation. Section 00 70 00 - Conditions of the Contract.
176 21 Solicitati on
4.1 Due to the amount of documents
provided, the complexity of the work, and the quantity of subcontractors and suppliers required for this project, we request at least an additional 30 calendar days to submit the proposal.
Please consider moving the proposal submittal date to June 9, 2025 or beyond.
Another extension is not being considered at this time.
177 13 01 14
00.00 22
1.6.1.
This paragraph states that contractor personal vehicles must park off-base in Lot 43 (Burton's Point Road) and the contractor must provide bus service for its employees. Please confirm if this is the only parking lot available for all contractors associated with this project and it will be dedicated to project specific employees only? Due to the aggressive schedule associated with this project, will there be an overflow parking lot, if required? If so, please provide location.
Refer to response in Amendment #2 Question #17
178 15 01 14
00.00 22
1.6.1.
12a
This paragraph states that no cellular telephones with cameras are allowed in the CIA. Please confirm this is a prohibited item.
Cellular phones with cameras are permitted but the cameras cannot be used to take pictures without the proper permission. No one is allowed to take a picture with a camera without a government issued camera pass.
179 5 01 30
00.00 22
1.11 This paragraph states contractor must
mobilize within 60 calendar days of contract award. This is in conflict with the RFP. Please confirm which is correct.
The RFP is correct with respect to the start of construction or demolition work on the Dry Dock 3 site which are to start the date established in the notice to proceed. The contractor is required to have a complete team assigned to the project that is working on all administrative requirements for the project within 60 days of the award. The entire QC staff are required to be working on this project within the first 60 days and they will be processing submittals and
RFI documents in this time.
The project managers, field engineers, superintendents and SSHO are required to be assigned to the project in the first 60 days and they are expected to be working on their respective areas of responsibility. The contractor is required to start weekly QC meetings, coordination meetings, schedule reviews with the government as well as all other project coordination activities within the first 60 days. Setting up of the field office and the laydown area outside of the controlled industrial area is expected to start in the first 60 days.
180 15 01 33
00.00 22
1.10d This paragraph states to allow the government at least 20 working days for submittal review. Due to the aggressive schedule of this project, we ask that this review period be reduced to a maximum of 10 working days, or as close to that time frame as possible.
Propose in accordance with the solicitation.
181 15 01 33
00.00 22
1.10e This paragraph states to allow the government at least 30 working days for submittal review. Due to the aggressive schedule of this project, we ask that this review period be reduced to a maximum of 15 working days, or as close to that time frame as possible.
Propose in accordance with the solicitation.
182 15 1 33
00.00 22
1.10f This paragraph states to allow the Shipyard Security Office 90 calendar days for submittal review of security related work. Due to the aggressive schedule of this project, we ask that this review period be reduced to a maximum 20 working days, or as close to that time frame as possible.
Propose in accordance with the solicitation.
183 17 01 45
00.00 22
1.7.7 Please confirm that each submittal
must be reviewed by a registered architect or a professional engineer.
Please confirm this means all submittals produced for the project.
184 N/A BID
FORM
N/A Please provide a bid item for "Archaeological Discovery caused Downtime"
Propose in accordance with the solicitation.
185 N/A BID
FORM
N/A Are the quantities provided on the bidform considered "estimated quantities"?
Propose in accordance with the solicitation.
186 N/A SF 1442 N/A Can the contractor opt out of the "award fee"?
Propose in accordance with the solicitation.
187 G-104 Phasing Notes
Note
This note states "Where limited railroad access is required, NAVSEA only requires access during a two-week period with the indicated timeframe for each evolution." Please confirm that the KTR will control when the two week access will occur during the 3-4 month window (with scheduling coordination with the government, of course). If the KTR does not control this schedule, then the KTR will have to assume that the access is for the full 3-4 month duration, since it will be unknown.
Additionally, please confirm that the two-week period is two consecutive weeks.
The Government will dictate the consecutive two-week period with scheduling assistance from the contractor.
188 N/A N/A N/A Please provide the Davis bacon/wage scale applicable to this project.
See Amendment detail below.
189 N/A 34 11 00 1.4.1 What is the estimated turnaround time for contractor submittals to be returned from the Contracting Officer?
Refer to Section 01 33 00.00 22; 1.10 Scheduling
190 12 of
RFP Facto r 2
If the KTR shows that the project is going to take longer than the current allotted number of days in their submitted bid schedule, please confirm that Liquidated Damages will not begin until the Contractor's identified completion date.
The contractor will be required to produce a schedule that show them completing the project by the milestones identified in the solicitation. The government will not accept or approve a project schedule that goes beyond the completion dates identified in the solicitation.
191 N/A N/A N/A Liquidated Damages seem excessive please reconsider amount.
Propose in accordance with the solicitation.
192 S-525 N/A A1 Please confirm that the government will furnish, install, and perform all testing required for the capstans.
Confirmed. The Government is responsible for furnishing, installing, and testing of capstans.
193 N/A N/A N/A Due to numerous outstanding responses to PPIs submitted over the last 5 weeks, we are requesting the bid date be extended to July 2nd.
Another extension is not being considered at this time.
194 E002 General Demo
Note
Please provide a point of contact for base fire alarm vendor.
The base does not have a proprietary alarm system from one alarm contractor.
195 Page 6 of 79 & Attach ment G Price Propos al Form
Solicitati on
N/A Please confirm that Offeror's pricing submissions using Attachment G - Price Proposal should not include the Award Fee in the Offeror's Line Items.
Confirmed. Award Fee line items is informational and should not be priced by the contractors.
196 N/A 01 75 00 and 01 75 00.01
N/A Specification sections 01 75 00 and 01 75 00.01 discuss dewatering water treatment. Revised Price Proposal Form, Amendment 2, Bid Item 0001G is designated for the construction of the dewatering treatment system (excluding PFAS treatment). Revised Price Proposal Form, Amendment 2, Bid Item 0007
No additional information is required for the government to decide if PFAS treatment will be utilized for contractor bidding purposes. The decision to award or not award the option will be made prior to the assumed site access date
Option Item No. 6 is designated for construction of the additional construction dewatering treatment system for treatment of PFAS contaminated water. Please clarify what additional information is required for the government to decide if PFAS treatment will be utilized, and when this decision is intended to be made.
of July 2026.
197 N/A Solicitati on, 00 70
52.21 1-12
We respectfully request the Government’s justification for the stated liquidated damages of $244,190.95 per calendar day. In accordance with FAR 11.502(b), liquidated damages shall be used only when the Government may reasonably expect to suffer damages from late performance, and when such damages are difficult to accurately estimate or prove. To assess risk and submit a fully informed proposal, we request any documentation or explanation used to determine this value, including cost impact analysis, schedule sensitivity, or other relevant metrics.
Justification will not be provided. Propose in accordance with the solicitation.
2. Specification Revisions:
DOCUMENT 00 01 15 LIST OF DRAWINGS AND REFERENCE DOCUMENTS
DELETE Paragraph 1.3.1 and REPLACE with:
“1.3.1 Norfolk Naval Shipyard Instructions
These Norfolk Naval Shipyard Instructions (NNSI) are contained in APPENDIX K – NORFOLK NAVAL SHIPYARD INSTRUCTIONS (see attachment below) and are included in the contract to the extent referenced in the drawings and specifications.
P5090.2 VOL II CH. 15 Personal Protective Equipment P5090.2 VOL II CH. 25 Man-made Vitreous Fibers P5090.2 VOL II CH. 38 Non-Bulk Recovery Material Control P5090.2 VOL II CH. 40 Emergency and Hazardous Materials Discharge Contingency Plan P5090.2 VOL II CH. 41 Polychlorinated Biphenyls (PCB) Program P5090.2 VOL II CH. 45 Bulk Recovery Material Program P5090.2 VOL II CH. 52 Solid Waste Management P5090.2 VOL II CH. 58 Water Pollution Control Plan
P5090.2 VOL II CH. 63 Clean Air Act (CAA) Compliance”
SECTION 01 14 00 WORK RESTRICTIONS
1.5.1.3.1 Registration for DBIDS
DELETE the subparagraph “b.” and REPLACE with:
“b. Present a valid Real ID Act-compliant driver’s license or identification card, a passport, or another federally approved form of identification and a birth certificate.”
SECTION 01 57 19.00 22 TEMPORARY ENVIRONMENTAL CONTROLS
2.1.8.4 Excavation of Soils
DELETE the second subparagraph and REPLACE with:
“All excavated soils designated for disposal at a permitted landfill must be documented within a waste characterization form and manifest as part of the waste determination documentation. Characterization is required to be completed in accordance with Virginia Department of Environmental Quality (DEQ) Guidance Memo No. LPR- SW-02-2012 (Solid Waste Special Waste Disposal Request). Characteristics and constituents to be analyzed include ignitability, corrosivity, reactivity, toxicity based on TCLP (metals, VOCs, SVOCs, pesticides and herbicides) results, PCBs, BTEX, TOX, PFAS, and paint filter. Waste characterization samples must be collected and tested for every 2,000 cubic yards for offsite disposal. Additionally, due to the presence of petroleum, TPH (GRO and DRO) and total BTEX samples must be collected and tested every 250 cubic yards for offsite disposal. The permitted receiving facility may require additional analytical requirements not covered by Virginia DEQ guidance for their operational solid waste management facility permit requirements. Typically, the analytical parameters provided by the Virginia DEQ regulations will meet the requirements for the landfill's permit; however, this must be verified prior to sampling. All analysis must be completed by a Virginia Environmental Laboratory Accreditation Program (VELAP) accredited laboratory and all laboratory accreditations must be current and submitted to the Government for review and approval. All laboratory analysis report results must be submitted to the Government for review and approval.
This is the start of the file's text. The full file is on GovTribe.