About this file

This file contains a collection of engineering drawings for the Dry Dock 3 Modernization project at Norfolk Naval Shipyard in Portsmouth, Virginia. The comprehensive set of technical drawings spans multiple disciplines including civil, structural, mechanical, fire protection, and electrical engineering, covering detailed plans for demolition, site preparation, utility infrastructure, and facility reconstruction. Key drawing sets include civil demolition and site plans, mechanical utility layouts, structural modifications, fire protection systems, and electrical power distribution for the naval facility.

The drawings are part of Military Construction Project (MILCON) P1062, with design documents prepared for the Naval Facilities Engineering Command (NAVFAC) Atlantic. The project involves extensive modernization of Dry Dock 3, including demolition of existing infrastructure, installation of new utility systems, reconstruction of dock walls and floors, and upgrades to electrical and mechanical systems. The technical drawings are dated between August 2020 and January 2025, with the most recent revisions made in May 2025, indicating an ongoing design and preparation process for a complex naval infrastructure renovation project.

View the file

Other files

File Type Posted
N6247024R0062 0009.pdf PDF
Attachment AM - 1806701Amend0009-SPC-APPENDIX A2.pdf PDF
Attachment AL - 1806701Amend0009-DWG.pdf PDF
Attachment AL - 1806701Amend0008-SPC.pdf PDF
N6247024R0062 0008.pdf PDF
N6247024R0062 0007.pdf PDF
N6247024R0062 0006.pdf PDF
Attachment AK - Utility Bridge.pdf PDF
Attachment AJ - 1806701Amend0005-DWG.pdf PDF
Attachment D - Historical_Small_Business_Utilization (2).pdf PDF
Attachment E - Small_Business_Participation_Commitment_Document (1).pdf PDF
N6247024R0062 0005.pdf PDF
Attachment AG - 1806701Amend0004dwg.pdf PDF
Attachment AI - MIL-DTL-29229B.pdf PDF
N6247024R0062 - 0004.pdf PDF
Attachment AH - 18906701Amend0003-SPC-APPENDIX A2.pdf PDF
ATTACHMENT AF - DD3 EPA Schedule.pdf PDF
Attachment W - 1806701Amend0003-SPC-APPENDIX K.pdf PDF
Attachment Z - DD3 SID Package.pdf PDF
ATTACHMENT AD - Davis-Bacon Act WD VA20250209.pdf PDF
Attachment V - 1806701Amend0003-SPC-APPENDIX I.pdf PDF
ATTACHMENT AE - Award Fee Plan.pdf PDF
Attachment AA - Site Visit Photos.pdf PDF
Attachment X - 1806701Amend0003 - DWG.pdf PDF
Attachment Y - DD3 FFE Package.pdf PDF
N6247024R0062 0003.pdf PDF
Attachment U - 1806701Amend0003-SPC-APPENDIX A1.pdf PDF
ATTACHMENT AC - Davis-Bacon Act WD VA20250161.pdf PDF
ATTACHMENT AB - Davis-Bacon Act WD VA20250001.pdf PDF
Attachment Q - LANT JA HSQ Technologies_Redacted.pdf PDF
Attachment P - DD3 RFP Site Visit Handout.pdf PDF
Attachment R - LANT JA Limitorque_Redacted.pdf PDF
Revised Attachment G - Price Proposal Form Amend 0002.pdf PDF
N6247024R0062 0002.pdf PDF
Attachment S - 1806701Amend0002dwg.pdf PDF
Attachment O - Site Visit Log.pdf PDF
Attachment T - DD3 Record of Categorical Exclusion.pdf PDF
Attachment N - Directions to PWD_ROICC trailer.pdf PDF
Attachment K - 2025 RIOCC CVS SPONSOR NNSY TEMPLATE.xlsx XLSX spreadsheet
N6247024R0062 Amendment 0001.pdf PDF
Attachment L - 2025 RIOCC ODP DBIDS.xlsx XLSX spreadsheet
Attachment M - SECNAV 5512 exp 2027.pdf PDF
1806701-SPC-APPENDIX C.pdf PDF
1806701-SPC-APPENDIX G.pdf PDF
Attachment B - Past_Performance_Questionnaire (1).docx DOCX document
DON SAP Single Source (Schneider MX1XF) - ELS Redacted.pdf PDF
Attachment F - Individual_Small_Business_Subcontracting_Plan.pdf PDF
Attachment E - Small_Business_Participation_Commitment_Document (1).pdf PDF
1806701-DWG-12of15.pdf PDF
P1062 DD3 Modernization Complex Award Fee Plan.pdf PDF
Show 40 more

Latest 50 of 85 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IP

IP

IP

6" 8"

DEMOLISH CAPSTAN

(SEE STRUCTURAL)

DEMOLISH CAPSTAN

(SEE STRUCTURAL)

SEE NOTE 6

8" DI

6" DI

6" DI 6" 12" DI

COPING WALL

8"

8"

FROG #21

FROG #23

FROG #22

IP IP IP

TYP

END

END

IP

C4

CD501

2720 20

17 20 17

42 42 42

1 22

SHEET NOTES

1. SEE V-001 & V-002 FOR EXISTING CONDITIONS SURVEY LEGEND AND NOTES.

2. SEE C-001 AND C-002 FOR LEGEND, ABBREVIATIONS, AND GENERAL CIVIL

NOTES.

3. SEE C-002 THROUGH C-004 FOR EROSION CONTROL NOTES, AND DRAINAGE

NARRATIVE.

4. EXISTING PAVEMENT MARKINGS NOT SHOWN FOR CLARITY.

5. SEE ELECTRICAL DEMOLITION DRAWINGS FOR DEMOLITION OF

ELECTRICAL/TELECOMMUNICATIONS EQUIPMENT, CABLING, AND SYSTEMS.

6. SEE SD DRAWINGS FOR DEMOLITION IN DRY DOCK , UTILITY TUNNEL, AND

UNDERGROUND CRANE FOUNDATION.

7. BACKGROUND SHOWN IS A COMBINATION OF SURVEY AND HISTORICAL

RECORDS.

8. PROTECT EXISTING CAPSTAN FOUNDATIONS FOR THE DURATION OF THE

CONSTRUCTION.

FI

LE

N

AM

E:

Q

:\N

OR

\10

0-

\20 C

AD

D\

_A cti ve \_D

RY

DP

DD

3-

0-

RM

DD

3\D

RY

DP

DD

3-

0-

CD

5.d wg L

AY

OU

T

NA

ME

: C

IV

IL

DE

MO

LIT

IO

N

AN

D

ER

OS

IO

N

CO

NT

RO

L P

LA

N

- A

RE

A

PL

OT

TE

D:

T ue sd ay

, J un e 0 3, 9:3

9a m

US

ER

: n jon es

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 25 AUGUST 2020

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DRAWING SCALES SHOWN BASED ON 34" x 22" DRAWING

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

NA

VF

AC

A

TL

AN

TI

C

LA

FA

YE

TT

E

RI

VE

R

AN

NE

X

- N

OR

FO

LK

, V

A

NO

RF

O

LK

N

AV

AL

S

HI

PY

AR

D

PO

RT

SM

O

UT

H, V

IR

G

IN

IA

DR

Y

DO

CK

M

O

DE

RN

IZ

AT

IO

N

CAH/ELS

WILLIAM B. FORBES, PE

DSN

1806701

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

UNCLASSIFIED

MICHAEL A. WASSELL

NNSY CODE 900F.1

DIVISION HEAD

11/20/2024

WILLIAM B. FORBES, PE

NAVFAC ATLANTIC

ENGINEERING & DESIGN DIRECTOR

01/14/2025

0 20'10'

AR

EA

- C D1

AR

EA

- C D1

PLAN

NORTH

SCALE:1" = 10'

AREA 105 - CIVIL DEMOLITION AND EROSION CONTROL PLAN

102101 103 104 105 106

107 108 109

115 114

DRY DOCK 2

DRY DOCK 4

DRY DOCK 3

KEY PLAN

PLAN

NORTH

AREA 112 - CD112

1. DEMOLISH CONCRETE PAVEMENT, FULL DEPTH.

2. DEMOLISH ASPHALT PAVEMENT, FULL DEPTH. SAWCUT EXISTING

ASPHALT PAVEMENT AT PERIMETER WHERE ASPHALT PAVEMENT

DOES NOT MEET CONCRETE OR OTHER FINISHED EDGE NOT

REQUIRED TO BE DEMOLISHED. SEE DEMOLITION NOTES C-002.

4. DEMOLISH PIPE BOLLARD AND CONCRETE FOUNDATION.

5. DEMOLISH MONITORING WELL.

6. DEMOLISH CRANE RAIL, BASE PLATES, AND HARDWARE.

7. DEMOLISH CRANE RAIL FROG AND HARDWARE.

9. DEMOLISH RAILROAD TRACK, TIES, AND HARDWARE.

10. DEMOLISH SWITCH-SET INCLUDING LIDS, THROW SWITCH, SWITCH

RAILS, RAILS SPACERS, SWITCH BOX, AND HARDWARE.

17. DEMOLISH SALTWATER PIPING AND APPURTENANCES. SEE CALLOUT

FOR SIZE AND TYPE.

19. DEMOLISH STEAM PIPING. SEE CALLOUT FOR SIZE AND TYPE.

20. DEMOLISH STORM DRAIN PIPING. SEE CALLOUT FOR SIZE AND TYPE.

22. TEMPORARY PIPE CAP.

27. DEMOLISH STORM DRAIN INLET OR YARD DRAIN.

28. DEMOLISH WATER VALVE MANHOLE.

30. DEMOLISH VALVE, CONFIRM UTILITY HAS BEEN TAGGED AS

ABANDONED WITH OUTAGE COORDINATOR. ABANDON REMAINING

UTILITY AT EXTENT OF EXCAVATION.

36. DEMOLISH MOORING BOLLARD (SEE SD-508).

42. SEE MECHANICAL DEMOLITION DRAWINGS FOR UTILITIES WITHIN THE

EXISTING UTILITY TUNNEL.

SHEET KEYNOTES

JMW

NTJ MM JAG

14144784

CI

VI

L

DE

M

OL

IT

IO

N

AN

D

ER

OS

IO

N

CO

NT

RO

L

PL

AN

AR

EA

CD105

AS NOTED

DE

M

OL

IS

H

AB

AN

DO

N

UT

IL

IT

Y

VA

LV

ES

/2 8/

W

BE

CR

AN

E

RA

IL

D

EM

OL

IT

IO

N

LI

M

IT

S

/3 0/

W

BE

SW

SW

SW

SW

WV

METER

VAULT

NO.5

WATER

10"

6"

8"

SHEET NOTES

1. SEE V-001 & V-002 FOR EXISTING CONDITIONS SURVEY LEGEND AND NOTES.

2. SEE C-001 AND C-002 FOR LEGEND, ABBREVIATIONS, AND GENERAL CIVIL

NOTES.

3. SEE C-002 THROUGH C-004 FOR EROSION CONTROL NOTES, AND DRAINAGE

NARRATIVE.

4. EXISTING PAVEMENT MARKINGS NOT SHOWN FOR CLARITY.

5. SEE ELECTRICAL DEMOLITION DRAWINGS FOR DEMOLITION OF

ELECTRICAL/TELECOMMUNICATIONS EQUIPMENT, CABLING, AND SYSTEMS.

6. SEE SD DRAWINGS FOR DEMOLITION IN DRY DOCK , UTILITY TUNNEL, AND

UNDERGROUND CRANE FOUNDATION.

7. BACKGROUND SHOWN IS A COMBINATION OF SURVEY AND HISTORICAL

RECORDS.

8. PROTECT EXISTING CAPSTAN FOUNDATIONS FOR THE DURATION OF THE

CONSTRUCTION.

FI

LE

N

AM

E:

Q

:\N

OR

\10

0-

\20 C

AD

D\

_A cti ve \_D

RY

DP

DD

3-

0-

RM

DD

3\D

RY

DP

DD

3-

0-

CD

9.d wg L

AY

OU

T

NA

ME

: C

IV

IL

DE

MO

LIT

IO

N

AN

D

ER

OS

IO

N

CO

NT

RO

L P

LA

N

- A

RE

A

PL

OT

TE

D:

T ue sd ay

, J un e 0 3, 9:4

0a m

US

ER

: n jon es

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 25 AUGUST 2020

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DRAWING SCALES SHOWN BASED ON 34" x 22" DRAWING

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

NA

VF

AC

A

TL

AN

TI

C

LA

FA

YE

TT

E

RI

VE

R

AN

NE

X

- N

OR

FO

LK

, V

A

NO

RF

O

LK

N

AV

AL

S

HI

PY

AR

D

PO

RT

SM

O

UT

H, V

IR

G

IN

IA

DR

Y

DO

CK

M

O

DE

RN

IZ

AT

DSN

1806701

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

UNCLASSIFIED

MICHAEL A. WASSELL

NNSY CODE 900F.1

DIVISION HEAD

11/20/2024

WILLIAM B. FORBES, PE

NAVFAC ATLANTIC

ENGINEERING & DESIGN DIRECTOR

01/14/2025

0 20'10'

PLAN

NORTH

SCALE:1" = 10'

AREA 109 - CIVIL DEMOLITION AND EROSION CONTROL PLAN

102101 103 104 105 106

107 108 109

115 114

DRY DOCK 2

DRY DOCK 4

DRY DOCK 3

KEY PLAN

PLAN

NORTH

AR

EA

- C D1

AR

EA

- C D1

AREA 102 - CD102

2. DEMOLISH ASPHALT PAVEMENT, FULL DEPTH. SAWCUT EXISTING

ASPHALT PAVEMENT AT PERIMETER WHERE ASPHALT PAVEMENT

DOES NOT MEET CONCRETE OR OTHER FINISHED EDGE NOT

REQUIRED TO BE DEMOLISHED. SEE DEMOLITION NOTES C-00X

11. REMOVE RAILROAD TRACK. SALVAGE RAIL FOR REINSTALLATION.

12. NOT USED

15. DEMOLISH COMPRESSED AIR PIPING AND APPURTENANCES. SEE

CALLOUT FOR SIZE AND TYPE.

18. DEMOLISH SANITARY SEWER PIPING AND APPURTENANCES. SEE

CALLOUT FOR SIZE AND TYPE.

SHEET KEYNOTES

JMW

NTJ MM JAG

14144787

CI

VI

L

DE

M

OL

IT

IO

N

AN

D

ER

OS

IO

N

CO

NT

RO

L

PL

AN

AR

EA

CD109

AS NOTED

CR

AN

E

RA

IL

D

EM

OL

IT

IO

N

LI

M

IT

S

/3

0/

W

BE

DEMOLISH CAPSTAN

(SEE STRUCTURAL)

8"

6" DI

6" DI

30" C

8" DI

FROG #26

COPING WALL

FROG #27

FROG #28

FROG #29

IP

IP

IP

IP

SEE NOTE 6

TYP C4

CD501

42 42

ROUTE DUCT BANK

THROUGH EXISTING

OPENING IN CRANE BEAM,

SEE PROTECT FROG DURATION

OF CONSTRUCTION REMOVE

AND REINSTALL RAIL AS NEEDED.

END6

C4

CD501

A2

CU502

END

SHEET NOTES

1. SEE V-001 & V-002 FOR EXISTING CONDITIONS SURVEY LEGEND AND NOTES.

2. SEE C-001 AND C-002 FOR LEGEND, ABBREVIATIONS, AND GENERAL CIVIL

NOTES.

3. SEE C-002 THROUGH C-004 FOR EROSION CONTROL NOTES, AND DRAINAGE

NARRATIVE.

4. EXISTING PAVEMENT MARKINGS NOT SHOWN FOR CLARITY.

5. SEE ELECTRICAL DEMOLITION DRAWINGS FOR DEMOLITION OF

ELECTRICAL/TELECOMMUNICATIONS EQUIPMENT, CABLING, AND SYSTEMS.

6. SEE SD DRAWINGS FOR DEMOLITION IN DRY DOCK , UTILITY TUNNEL, AND

UNDERGROUND CRANE FOUNDATION.

7. BACKGROUND SHOWN IS A COMBINATION OF SURVEY AND HISTORICAL

RECORDS.

8. PROTECT EXISTING CAPSTAN FOUNDATIONS FOR THE DURATION OF THE

CONSTRUCTION.

FI

LE

N

AM

E:

Q

:\N

OR

\10

0-

\20 C

AD

D\

_A cti ve \_D

RY

DP

DD

3-

0-

RM

DD

3\D

RY

DP

DD

3-

0-

CD

0.d wg L

AY

OU

T

NA

ME

: C

IV

IL

DE

MO

LIT

IO

N

AN

D

ER

OS

IO

N

CO

NT

RO

L P

LA

N

- A

RE

A

PL

OT

TE

D:

T ue sd ay

, J un e 0 3, 9:4

0a m

US

ER

: n jon es

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 25 AUGUST 2020

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DRAWING SCALES SHOWN BASED ON 34" x 22" DRAWING

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

NA

VF

AC

A

TL

AN

TI

C

LA

FA

YE

TT

E

RI

VE

R

AN

NE

X

- N

OR

FO

LK

, V

A

NO

RF

O

LK

N

AV

AL

S

HI

PY

AR

D

PO

RT

SM

O

UT

H, V

IR

G

IN

IA

DR

Y

DO

CK

M

O

DE

RN

IZ

AT

DSN

1806701

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

UNCLASSIFIED

MICHAEL A. WASSELL

NNSY CODE 900F.1

DIVISION HEAD

11/20/2024

WILLIAM B. FORBES, PE

NAVFAC ATLANTIC

ENGINEERING & DESIGN DIRECTOR

01/14/2025

0 20'10'

PLAN

NORTH

SCALE:1" = 10'

AREA 110 - CIVIL DEMOLITION AND EROSION CONTROL PLAN

102101 103 104 105 106

107 108 109

115 114

DRY DOCK 2

DRY DOCK 4

DRY DOCK 3

KEY PLAN

PLAN

NORTH

AR

EA

- C D1

AR

EA

- C D1

AREA 103 - CD103

AREA 115 - CD115

1. DEMOLISH CONCRETE PAVEMENT, FULL DEPTH.

2. DEMOLISH ASPHALT PAVEMENT, FULL DEPTH. SAWCUT EXISTING ASPHALT

PAVEMENT AT PERIMETER WHERE ASPHALT PAVEMENT DOES NOT MEET

CONCRETE OR OTHER FINISHED EDGE NOT REQUIRED TO BE DEMOLISHED.

SEE DEMOLITION NOTES C-001.

6. DEMOLISH CRANE RAIL, BASE PLATES, AND HARDWARE.

7. DEMOLISH CRANE RAIL FROG AND HARDWARE.

8. REMOVE CRANE RAIL FROG AND SALVAGE FOR REINSTALLATION.

10. DEMOLISH SWITCH-SET INCLUDING LIDS, THROW SWITCH, SWITCH RAILS,

RAIL SPACERS, SWITCH BOX, AND HARDWARE.

11. REMOVE RAILROAD TRACK. SALVAGE RAIL FOR REINSTALLATION.

12. NOT USED.

16. DEMOLISH FRESHWATER PIPING AND APPURTENANCES. SEE CALLOUT FOR

SIZE AND TYPE.

18. DEMOLISH SANITARY SEWER PIPING AND APPURTENANCES. SEE CALLOUT

FOR SIZE AND TYPE.

20. DEMOLISH STORM DRAIN PIPING. SEE CALLOUT FOR SIZE AND TYPE.

21. DEMOLISH SUBMARINE FIREFIGHTING PIPING AND APPURTENANCES. SEE

CALLOUT FOR SIZE AND TYPE.

22. TEMPORARY PIPE CAP.

25. TEMPORARY BYPASS SYSTEM FOR 30" STORM DRAIN SYSTEM. BYPASS

SYSTEM MUST BE CAPABLE OF MAINTAINING FLOW UP TO 10,000 GPM AND

REMAIN IN PLACE FOR THE DURATION OF CONSTRUCTION. SEE CD113 FOR

BYPASS SYSTEM TIE IN LOCATION FOR THE TERMINATION OF THE BYPASS

SYSTEM.

42. SEE MECHANICAL DEMOLITION DRAWINGS FOR UTILITIES WITHIN THE

EXISTING UTILITY TUNNEL.

SHEET KEYNOTES

JMW

NTJ MM JAG

14144788

CI

VI

L

DE

M

OL

IT

IO

N

AN

D

ER

OS

IO

N

CO

NT

RO

L

PL

AN

AR

EA

CD110

AS NOTED

CR

AN

E

BE

AM

/R

AI

L

DE

M

OL

IT

IO

N

LI

M

IT

S

/0 4/

W

BE

TE

LE

CO

M A

T

EX

IS

TI

NG

C

RA

NE

B

EA

M

/3 0/

W

BE

CR

AN

E

RA

IL

D

EM

OL

IT

IO

N

LI

M

IT

S

/3

0/

W

BE

SEE NOTE 6

8" DI

6" DI8" DI

6" DI

6"

12" DI

8" DI

COPING WALL

FROG #30 FROG #31

TYP

IP

END

C4

CD501

6 9

PROTECT FROG DURATION

OF CONSTRUCTION REMOVE

AND REINSTALL RAIL AS NEEDED.

DEMOLISH STEAM

TUNNEL A2

CD501

SHEET NOTES

1. SEE V-001 & V-002 FOR EXISTING CONDITIONS SURVEY LEGEND AND NOTES.

2. SEE C-001 AND C-002 FOR LEGEND, ABBREVIATIONS, AND GENERAL CIVIL

NOTES.

3. SEE C-002 THROUGH C-004 FOR EROSION CONTROL NOTES, AND DRAINAGE

NARRATIVE.

4. EXISTING PAVEMENT MARKINGS NOT SHOWN FOR CLARITY.

5. SEE ELECTRICAL DEMOLITION DRAWINGS FOR DEMOLITION OF

ELECTRICAL/TELECOMMUNICATIONS EQUIPMENT, CABLING, AND SYSTEMS.

6. SEE SD DRAWINGS FOR DEMOLITION IN DRY DOCK , UTILITY TUNNEL, AND

UNDERGROUND CRANE FOUNDATION.

7. BACKGROUND SHOWN IS A COMBINATION OF SURVEY AND HISTORICAL

RECORDS.

8. PROTECT EXISTING CAPSTAN FOUNDATIONS FOR THE DURATION OF THE

CONSTRUCTION.

FI

LE

N

AM

E:

Q

:\N

OR

\10

0-

\20 C

AD

D\

_A cti ve \_D

RY

DP

DD

3-

0-

RM

DD

3\D

RY

DP

DD

3-

0-

CD

1.d wg L

AY

OU

T

NA

ME

: C

IV

IL

DE

MO

LIT

IO

N

AN

D

ER

OS

IO

N

CO

NT

RO

L P

LA

N

- A

RE

A

PL

OT

TE

D:

T ue sd ay

, J un e 0 3, 9:4

1a m

US

ER

: n jon es

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 25 AUGUST 2020

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DRAWING SCALES SHOWN BASED ON 34" x 22" DRAWING

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

NA

VF

AC

A

TL

AN

TI

C

LA

FA

YE

TT

E

RI

VE

R

AN

NE

X

- N

OR

FO

LK

, V

A

NO

RF

O

LK

N

AV

AL

S

HI

PY

AR

D

PO

RT

SM

O

UT

H, V

IR

G

IN

IA

DR

Y

DO

CK

M

O

DE

RN

IZ

AT

DSN

1806701

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

UNCLASSIFIED

MICHAEL A. WASSELL

NNSY CODE 900F.1

DIVISION HEAD

11/20/2024

WILLIAM B. FORBES, PE

NAVFAC ATLANTIC

ENGINEERING & DESIGN DIRECTOR

01/14/2025

0 20'10'

102101 103 104 105 106

107 108 109

115 114

DRY DOCK 2

DRY DOCK 4

DRY DOCK 3

KEY PLAN

PLAN

NORTH

AR

EA

- C D1

AR

EA

- C D1

AREA 104 - CD104

PLAN

NORTH

SCALE:1" = 10'

AREA 111 - CIVIL DEMOLITION AND EROSION CONTROL PLAN

AREA 115 - CD115

2. DEMOLISH ASPHALT PAVEMENT, FULL DEPTH. SAWCUT EXISTING

ASPHALT PAVEMENT AT PERIMETER WHERE ASPHALT PAVEMENT

DOES NOT MEET CONCRETE OR OTHER FINISHED EDGE NOT

REQUIRED TO BE DEMOLISHED. SEE DEMOLITION NOTES C-00X.

5. DEMOLISH MONITORING WELL.

6. DEMOLISH CRANE RAIL, BASE PLATES, AND HARDWARE.

9. DEMOLISH RAILROAD TRACK, TIES, AND HARDWARE.

11. REMOVE RAILROAD TRACK. SALVAGE RAIL FOR REINSTALLATION.

12. NOT USED.

15. DEMOLISH COMPRESSED AIR PIPING AND APPURTENANCES. SEE

CALLOUT FOR SIZE AND TYPE.

16. DEMOLISH FRESHWATER PIPING AND APPURTENANCES. SEE

CALLOUT FOR SIZE AND TYPE.

17. DEMOLISH SALTWATER PIPING AND APPURTENANCES. SEE CALLOUT

FOR SIZE AND TYPE.

19. DEMOLISH STEAM PIPING. SEE CALLOUT FOR SIZE AND TYPE.

21. DEMOLISH SUBMARINE FIREFIGHTING PIPING AND APPURTENANCES.

SEE CALLOUT FOR SIZE AND TYPE.

22. TEMPORARY PIPE CAP.

26. DEMOLISH FRESH WATER, AIR, AND SALT WATER PIPING IN UTILITY

TRENCH.

31. EXISTENCE OF STEAM LOOPS IS UNKNOWN, DEMOLISH LOOP AND

ANY SUPPORTING CONCRETE UTILITY TRENCH IF ENCOUNTERED.

33. SALVAGE MAGNETIC FLOW METER FOR REUSE.

34. DEMOLISH UTILITY LINE.

36. DEMOLISH MOORING BOLLARD (SEE SD-508).

42. SEE MECHANICAL DEMOLITION DRAWINGS FOR UTILITIES WITHIN THE

EXISTING UTILITY TUNNEL.

SHEET KEYNOTES

JMW

NTJ MM JAG

14144789

CI

VI

L

DE

M

OL

IT

IO

N

AN

D

ER

OS

IO

N

CO

NT

RO

L

PL

AN

AR

EA

CD111

AS NOTED

CR

AN

E

BE

AM

/R

AI

L

DE

M

OL

IT

IO

N

LI

M

IT

S

/0 4/

W

BE

CR

AN

E

DE

M

OL

IT

IO

N

LI

M

IT

S

/3

0/

SEE NOTE 6

18" C

18" C

18" C

COPING WALL

8" DI

IP

IP

TYP

IP

C4

CD501

36 36

42 42

SHEET NOTES

1. SEE V-001 & V-002 FOR EXISTING CONDITIONS SURVEY LEGEND AND NOTES.

2. SEE C-001 AND C-002 FOR LEGEND, ABBREVIATIONS, AND GENERAL CIVIL

NOTES.

3. SEE C-002 THROUGH C-004 FOR EROSION CONTROL NOTES, AND DRAINAGE

NARRATIVE.

4. EXISTING PAVEMENT MARKINGS NOT SHOWN FOR CLARITY.

5. SEE ELECTRICAL DEMOLITION DRAWINGS FOR DEMOLITION OF

ELECTRICAL/TELECOMMUNICATIONS EQUIPMENT, CABLING, AND SYSTEMS.

6. SEE SD DRAWINGS FOR DEMOLITION IN DRY DOCK , UTILITY TUNNEL, AND

UNDERGROUND CRANE FOUNDATION.

7. BACKGROUND SHOWN IS A COMBINATION OF SURVEY AND HISTORICAL

RECORDS.

8. PROTECT EXISTING CAPSTAN FOUNDATIONS FOR THE DURATION OF THE

CONSTRUCTION.

FI

LE

N

AM

E:

Q

:\N

OR

\10

0-

\20 C

AD

D\

_A cti ve \_D

RY

DP

DD

3-

0-

RM

DD

3\D

RY

DP

DD

3-

0-

CD

2.d wg L

AY

OU

T

NA

ME

: C

IV

IL

DE

MO

LIT

IO

N

AN

D

ER

OS

IO

N

CO

NT

RO

L P

LA

N

- A

RE

A

PL

OT

TE

D:

T ue sd ay

, J un e 0 3, 9:4

1a m

US

ER

: n jon es

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 25 AUGUST 2020

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DRAWING SCALES SHOWN BASED ON 34" x 22" DRAWING

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

NA

VF

AC

A

TL

AN

TI

C

LA

FA

YE

TT

E

RI

VE

R

AN

NE

X

- N

OR

FO

LK

, V

A

NO

RF

O

LK

N

AV

AL

S

HI

PY

AR

D

PO

RT

SM

O

UT

H, V

IR

G

IN

IA

DR

Y

DO

CK

M

O

DE

RN

IZ

AT

DSN

1806701

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

UNCLASSIFIED

MICHAEL A. WASSELL

NNSY CODE 900F.1

DIVISION HEAD

11/20/2024

WILLIAM B. FORBES, PE

NAVFAC ATLANTIC

ENGINEERING & DESIGN DIRECTOR

01/14/2025

0 20'10'

102101 103 104 105 106

107 108 109

115 114

112112

DRY DOCK 2

DRY DOCK 4

DRY DOCK 3

KEY PLAN

PLAN

NORTH

AR

EA

- C D1

AR

EA

- C D1

AREA 105 - CD105

PLAN

NORTH

SCALE:1" = 10'

AREA 112 - CIVIL DEMOLITION AND EROSION CONTROL PLAN

2. DEMOLISH ASPHALT PAVEMENT, FULL DEPTH. SAWCUT EXISTING

ASPHALT PAVEMENT AT PERIMETER WHERE ASPHALT PAVEMENT

DOES NOT MEET CONCRETE OR OTHER FINISHED EDGE NOT

REQUIRED TO BE DEMOLISHED. SEE DEMOLITION NOTES C-00X.

4. DEMOLISH PIPE BOLLARD AND CONCRETE FOUNDATION.

5. DEMOLISH MONITORING WELL.

6. DEMOLISH CRANE RAIL, BASE PLATES, AND HARDWARE.

9. DEMOLISH RAILROAD TRACK, TIES, AND HARDWARE.

16. DEMOLISH FRESHWATER PIPING AND APPURTENANCES. SEE

CALLOUT FOR SIZE AND TYPE.

20. DEMOLISH STORM DRAIN PIPING. SEE CALLOUT FOR SIZE AND TYPE.

22. TEMPORARY PIPECAP.

24. DEMOLISH FIRE HYDRANT.

27. DEMOLISH STORM DRAIN INLET OR YARD DRAIN.

28. DEMOLISH STORM DRAIN MANHOLE.

36. DEMOLISH MOORING BOLLARD (SEE SD-508).

42. SEE MECHANICAL DEMOLITION DRAWINGS FOR UTILITIES WITHIN THE

EXISTING UTILITY TUNNEL.

43. TEMPORARY BYPASS SYSTEM FOR 18" STORM DRAIN SYSTEM.

BYPASS SYSTEM MUST BE CAPABLE OF MAINTAINING FLOW UP TO

2,800 GPM AND REMAIN IN PLACE FOR THE DURATION OF

CONSTRUCTION. SEE CD113A FOR BYPASS SYSTEM TIE IN LOCATION

FOR THE TERMINATION OF THE BYPASS SYSTEM.

SHEET KEYNOTES

JMW

NTJ MM JAG

14144790

CI

VI

L

DE

M

OL

IT

IO

N

AN

D

ER

OS

IO

N

CO

NT

RO

L

PL

AN

AR

EA

CD112

AS NOTED

DE

M

OL

IT

IO

N

LI

M

IT

S

/3 0/

12" DI

TYPC4

CD50122

DEMOLISH

STEAM

TUNNEL

A2

CD501

SHEET NOTES

1. SEE V-001 & V-002 FOR EXISTING CONDITIONS SURVEY LEGEND AND NOTES.

2. SEE C-001 AND C-002 FOR LEGEND, ABBREVIATIONS, AND GENERAL CIVIL

NOTES.

3. SEE C-002 THROUGH C-004 FOR EROSION CONTROL NOTES, AND DRAINAGE

NARRATIVE.

4. EXISTING PAVEMENT MARKINGS NOT SHOWN FOR CLARITY.

5. SEE ELECTRICAL DEMOLITION DRAWINGS FOR DEMOLITION OF

ELECTRICAL/TELECOMMUNICATIONS EQUIPMENT, CABLING, AND SYSTEMS.

6. SEE SD DRAWINGS FOR DEMOLITION IN DRY DOCK , UTILITY TUNNEL, AND

UNDERGROUND CRANE FOUNDATION.

7. BACKGROUND SHOWN IS A COMBINATION OF SURVEY AND HISTORICAL

RECORDS.

8. PROTECT EXISTING CAPSTAN FOUNDATIONS FOR THE DURATION OF THE

CONSTRUCTION.

FI

LE

N

AM

E:

Q

:\N

OR

\10

0-

\20 C

AD

D\

_A cti ve \_D

RY

DP

DD

3-

0-

RM

DD

3\D

RY

DP

DD

3-

0-

CD

5.d wg L

AY

OU

T

NA

ME

: C

IV

IL

DE

MO

LIT

IO

N

AN

D

ER

OS

IO

N

CO

NT

RO

L P

LA

N

- A

RE

A

PL

OT

TE

D:

T ue sd ay

, J un e 0 3, 9:4

2a m

US

ER

: n jon es

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 25 AUGUST 2020

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DRAWING SCALES SHOWN BASED ON 34" x 22" DRAWING

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

NA

VF

AC

A

TL

AN

TI

C

LA

FA

YE

TT

E

RI

VE

R

AN

NE

X

- N

OR

FO

LK

, V

A

NO

RF

O

LK

N

AV

AL

S

HI

PY

AR

D

PO

RT

SM

O

UT

H, V

IR

G

IN

IA

DR

Y

DO

CK

M

O

DE

RN

IZ

AT

DSN

1806701

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

UNCLASSIFIED

MICHAEL A. WASSELL

NNSY CODE 900F.1

DIVISION HEAD

11/20/2024

WILLIAM B. FORBES, PE

NAVFAC ATLANTIC

ENGINEERING & DESIGN DIRECTOR

01/14/2025

0 20'10'

PLAN

NORTH

SCALE:1" = 10'

AREA 115 - CIVIL DEMOLITION AND EROSION CONTROL PLAN

102101 103 104 105 106

107 108 109

115 114

112115

DRY DOCK 2

DRY DOCK 4

DRY DOCK 3

KEY PLAN

PLAN

NORTH

AREA 110 - CD110 AREA 111 - CD111

2. DEMOLISH ASPHALT PAVEMENT, FULL DEPTH. SAWCUT EXISTING

ASPHALT PAVEMENT AT PERIMETER WHERE ASPHALT PAVEMENT

DOES NOT MEET CONCRETE OR OTHER FINISHED EDGE NOT

REQUIRED TO BE DEMOLISHED. SEE DEMOLITION NOTES C-00X.

4. DEMOLISH PIPE BOLLARD AND CONCRETE FOUNDATION.

12. NOT USED.

17. DEMOLISH SALTWATER PIPING AND APPURTENANCES. SEE CALL OUT

FOR SIZE AND TYPE.

22. TEMPORARY PIPE CAP.

31. EXISTENCE OF STEAM LOOPS IS UNKNOWN, DEMOLISH LOOP AND

ANY SUPPORTING CONCRETE UTILITY TRENCH IF ENCOUNTERED.

35. DEMOLISH STEAM PRESSURE REDUCING STATION. DEMOLISH ALL

APPURTENANCES, PIPE SUPPORTS, FITTING AND FOUNDATIONS.

SHEET KEYNOTES

JMW

NTJ MM JAG

14144792

CI

VI

L

DE

M

OL

IT

IO

N

AN

D

ER

OS

IO

N

CO

NT

RO

L

PL

AN

AR

EA

CD115

AS NOTED

CR

AN

E

RA

IL

D

EM

OL

IT

IO

N

LI

M

IT

S

/3

0/

W

BE

100.00

0.

100.50

100.50

100.00 100.50

100.50

101.00

0.

5%

0.5

2.4%

1.0

1.0% 1.3%

0.8

0+46

0+003+50

4+00

4+50 5+00

EMH-2031EMH-2032

EMH-2033

TMH-2032

TMH-2031FROG #21

C3

CS505

TR100.20

TR100.21

LP100.16

LP100.16

HP100.30

TR100.20

TR100.20

TR100.24

TR100.27

100.22±(MG)

LP100.16

HP100.30

LP100.16

HP100.29

TR100.30TR100.23

TR100.30

TR100.23

HP100.30

TW102.50

BW100.44

TW102.50

BW100.48

100.28±(MG)

100.19±(MG)

100.29

100.55

100.60

100.95

100.28

TR100.19

MG±

TR100.17

MG±

TR100.23

100.57

MOORING BOLLARD

SEE STRUCTURAL

CAPSTAN

SEE STRUCTURAL

CAPSTAN

SEE STRUCTURAL

MOORING BOLLARD

SEE STRUCTURAL

A1

CS504

B3

CS502 A2

CS503

A2

CS503

B1

CS502

TYP. 12

11 11

101.13±(MG) 101.95±(MG)

101.45±(MG)

100.77±(MG)

100.86±(MG)

100.88±(MG)

101.53±(MG)

101.03±(MG)

101.47±(MG)

TOP OF UTIL

100.54

100.50

END

3909 39133912

D577

CO3

CO4

15" SD (STORM-2)

8" SD (STORM-4)

18" SD (STORM-2) 18" SD (STORM-2)

6" S

D

15" SD (STORM-2) 18" SD (STORM-2)

FI

LE

N

AM

E:

Q

:\N

OR

\10

0-

\20 C

AD

D\

_A cti ve \_D

RY

DP

DD

3-

0-

RM

DD

3\D

RY

DP

DD

3-

0-

CS

5.d wg L

AY

OU

T

NA

ME

: C

IV

IL

SI

TE

P

LA

N

- A

RE

A

PL

OT

TE

D:

T ue sd ay

, J un e 0 3, 4:4

9p m

US

ER

: n jon es

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 25 AUGUST 2020

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DRAWING SCALES SHOWN BASED ON 34" x 22" DRAWING

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

NA

VF

AC

A

TL

AN

TI

C

LA

FA

YE

TT

E

RI

VE

R

AN

NE

X

- N

OR

FO

LK

, V

A

NO

RF

O

LK

N

AV

AL

S

HI

PY

AR

D

PO

RT

SM

O

UT

H, V

IR

G

IN

IA

DR

Y

DO

CK

M

O

DE

RN

IZ

AT

DSN

1806701

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

UNCLASSIFIED

MICHAEL A. WASSELL

NNSY CODE 900F.1

DIVISION HEAD

11/20/2024

WILLIAM B. FORBES, PE

NAVFAC ATLANTIC

ENGINEERING & DESIGN DIRECTOR

01/14/2025

0 20'10'

AR

EA

- C S1

SHEET NOTES

AR

EA

- C

S1

PLAN

NORTH

SCALE:1" = 10'

AREA 105 - CIVIL SITE PLAN

DRY DOCK 2

DRY DOCK 4

102101 103 104 105 106

107 108

115 114

109119

KEY PLAN

PLAN

NORTH

AREA 118 - CS118

AREA 112 - CS112

SHEET KEYNOTES

1. SEE V-001 THRU V-203 FOR EXISTING SURVEY LEGEND AND NOTES.

2. SEE C-001 AND C-002 FOR LEGEND, ABBREVIATIONS, AND GENERAL

CIVIL NOTES.

3. SEE C-002 THROUGH C-004 FOR EROSION CONTROL NOTES.

4. SEE CU SHEETS FOR UTILITY WORK IN THIS AREA.

5. SEE S- SHEETS FOR STRUCTURAL WORK IN THIS AREA.

6. SEE M- SHEETS FOR MECHANICAL WORK IN THIS AREA.

7. SEE E.- SHEETS FOR ELECTRICAL / TELECOM WORK IN THIS AREA.

2. ASPHALT PAVEMENT, MATCH GRADE OF EXISTING PAVEMENT AT

TIE IN LOCATIONS.

5. RAILROAD SLAB

8. CRANE RAIL SWITCH.

9. NEW CRANE RAIL FROG

10. CRANE RAIL.

11. YARD DRAIN. SEE CS201-CS202 SHEETS FOR STRUCTURE

INFORMATION.

12. STORM DRAIN PIPING. SEE CS201-CS202 SHEETS FOR PROFILES.

13. CONNECT TO EXISTING PIPE WITH MECHANICAL JOINT.

16. RAILROAD STOP.

21. 6" UNDERDRAIN.

22. NNSY CONTROL MONUMENT.

24. 4" DUCTILE IRON SWITCH DRAIN.

CLEAN OUT INVERT SCHEDULE

STRUCTURE NUMBER INVERT ELEVATION

CO 3 98.20

INLET 3911 97.78

CO 4 98.62

INLET 3913 98.60

JMW

NTJ MM JAG

14144798

CI

VI

L

SI

TE

P

LA

N

- A

RE

A

CS105

AS NOTED

CR

AN

E

RA

IL

R

EC

ON

ST

RU

CT

IO

N

LI

M

IT

S

/3

0/

W

BE

5/

CONC

RAMP

CO5

18" SD (STORM-2)

18" SD (STORM-2) 18" SD (STORM-2) 18" SD (STORM-2)

" S

D (S

TO

R

M -5

3915A

18" SD (STORM-2)

FROG #20 100.50

100.50

1.0

101.50

1.

100.50

0.

100.50

1.2%

1.

4%

1.4

1.4%

7+15 5+50

6+00 6+50

7+00

EMH-2030

TMH-2030

EXISTING

EMH-1031C

EXISTING

EMH-1306

N:3465297.20 E:12128923.89

HP100.30

LP100.16

TR100.30

TR100.30

TR100.30

TR100.20

MG±

TR100.21

MG±

LP100.16

100.30

TR100.30

TR100.30

TR100.30 100.30

TR100.30 100.55

102.50

102.50

106.00

100.50

106.00

106.00

106.00

100.50TW102.50

BW100.48

TW102.50

BW100.50

TW106.00

BW100.55

100.64±(MG)

100.58±(MG)

100.28

TR100.19

MG±

TR100.26

MG±

100.94±(MG)

100.71±(MG)

100.79±(MG)

101.18±(MG)

100.48±(MG)

101.13±(MG)

101.46±(MG)

100.29±(MG)

A2

CS503

A2

CS503

A1

CS504

C4

CS503

A2

CS503

1211 17

12 20

10 24

10 11

25 A4

CS506

100.27±(MG)

LP100.05

TYP

NEW OUTFALL

INVERT: 91.58

END

END

FI

LE

N

AM

E:

Q

:\N

OR

\10

0-

\20 C

AD

D\

_A cti ve \_D

RY

DP

DD

3-

0-

RM

DD

3\D

RY

DP

DD

3-

0-

CS

6.d wg L

AY

OU

T

NA

ME

: C

IV

IL

SI

TE

P

LA

N

- A

RE

A

PL

OT

TE

D:

T ue sd ay

, J un e 0 3, 4:4

9p m

US

ER

: n jon es

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 25 AUGUST 2020

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DRAWING SCALES SHOWN BASED ON 34" x 22" DRAWING

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

NA

VF

AC

A

TL

AN

TI

C

LA

FA

YE

TT

E

RI

VE

R

AN

NE

X

- N

OR

FO

LK

, V

A

NO

RF

O

LK

N

AV

AL

S

HI

PY

AR

D

PO

RT

SM

O

UT

H, V

IR

G

IN

IA

DR

Y

DO

CK

M

O

DE

RN

IZ

AT

DSN

1806701

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

UNCLASSIFIED

MICHAEL A. WASSELL

NNSY CODE 900F.1

DIVISION HEAD

11/20/2024

WILLIAM B. FORBES, PE

NAVFAC ATLANTIC

ENGINEERING & DESIGN DIRECTOR

01/14/2025

0 20'10'

AREA 113 - CS113

SHEET NOTES

AR

EA

- C

S1

PLAN

NORTH

SCALE:1" = 10'

AREA 106 - CIVIL SITE PLAN

KEY PLAN

PLAN

NORTH

SHEET KEYNOTES

1. SEE V-001 THRU V-203 FOR EXISTING SURVEY LEGEND AND NOTES.

2. SEE C-001 AND C-002 FOR LEGEND, ABBREVIATIONS, AND GENERAL

CIVIL NOTES.

3. SEE C-002 THROUGH C-004 FOR EROSION CONTROL NOTES.

4. SEE CU SHEETS FOR UTILITY WORK IN THIS AREA.

5. SEE S- SHEETS FOR STRUCTURAL WORK IN THIS AREA.

6. SEE M- SHEETS FOR MECHANICAL WORK IN THIS AREA.

7. SEE E.- SHEETS FOR ELECTRICAL / TELECOM WORK IN THIS AREA.

2. PROVIDE ASPHALT PAVEMENT, MATCH GRADE OF EXISTING

PAVEMENT AT TIE IN LOCATIONS.

8. CRANE RAIL SWITCH.

9. NEW CRANE RAIL FROG.

10. CRANE RAIL.

11. YARD DRAIN. SEE CS201-CS202 SHEETS FOR STRUCTURE

INFORMATION.

12. STORM DRAIN PIPING. SEE CS201-CS202 SHEETS FOR PROFILES.

13. CONNECT TO EXISTING PIPE WITH MECHANICAL JOINT.

17. STORM DRAIN VALVE VAULT.

20. CRANE RAIL STOP. SEE STRUCTURAL FOR DETAILS.

24. 4" DRAIN.

25. GUARD POST.

DRY DOCK 2

DRY DOCK 4

102101 103 104 105 106

107 108

115 114

109119

CLEAN OUT INVERT SCHEDULE

STRUCTURE NUMBER INVERT ELEVATION

CO 5 98.20

INLET 3914 97.60

JMW

NTJ MM JAG

14144799

CI

VI

L

SI

TE

P

LA

N

- A

RE

A

CS106

AS NOTED

CR

AN

E

RA

IL

R

EC

ON

ST

RU

CT

IO

N

LI

M

IT

S

/3

0/

W

BE

3896 30" SD (STORM-1)3896 30" SD (STORM-1)

100.50

101.00

0.

100.50

100.50

0.

2.

SWALE0+00 0+50 1+00

EMH-2036

TMH-2037

N:3465308.90 E:12128164.02

FROG #26

FROG #28

FROG #29

9.00'

7.71'

TYP

TYP

100.48±(MG)

100.47±(MG)

TW102.50

BW100.40

TW102.50

BW100.50

TR100.30

TR100.30

TR100.40

100.38±(MG)

TR100.30

TR100.30

TR100.30

TR100.31

MG±

TR100.34

MG±

TR100.30

TR100.30

100.34±(MG)

100.35±(MG)

100.36±(MG)

100.35±(MG)

100.36±(MG)

TR100.41

MG±

100.30

IE: 98.20

TW106.00

BW102.50

TW102.44

BW100.40

TW102.44

BW100.40

TW102.44

BW100.40

TW102.50

BW100.45

TW106.00

BW102.50

TW106.00

BW102.50

EXPANSION JOINT

EVERY 50'

TR100.74

MG±

A1

CS502

A1

CS503

A1

CS502

8 12

A1

CS501

14-INCH

HEAVY DUTY

A4

CS50625

LIMITS OF GRADING

LIMITS OF GRADING

END

END

CAPSTAN

SEE STRUCTURAL

FROG #27

FI

LE

N

AM

E:

Q

:\N

OR

\10

0-

\20 C

AD

D\

_A cti ve \_D

RY

DP

DD

3-

0-

RM

DD

3\D

RY

DP

DD

3-

0-

CS

0.d wg L

AY

OU

T

NA

ME

: C

IV

IL

SI

TE

P

LA

N

- A

RE

A

PL

OT

TE

D:

T ue sd ay

, J un e 0 3, 4:5

0p m

US

ER

: n jon es

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 25 AUGUST 2020

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DRAWING SCALES SHOWN BASED ON 34" x 22" DRAWING

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

NA

VF

AC

A

TL

AN

TI

C

LA

FA

YE

TT

E

RI

VE

R

AN

NE

X

- N

OR

FO

LK

, V

A

NO

RF

O

LK

N

AV

AL

S

HI

PY

AR

D

PO

RT

SM

O

UT

H, V

IR

G

IN

IA

DR

Y

DO

CK

M

O

DE

RN

IZ

AT

DSN

1806701

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

UNCLASSIFIED

MICHAEL A. WASSELL

NNSY CODE 900F.1

DIVISION HEAD

11/20/2024

WILLIAM B. FORBES, PE

NAVFAC ATLANTIC

ENGINEERING & DESIGN DIRECTOR

01/14/2025

0 20'10'

SHEET NOTES

PLAN

NORTH

SCALE:1" = 10'

AREA 110 - CIVIL SITE PLAN

DRY DOCK 2

DRY DOCK 4

102101 103 104 105 106

107 108

115 114

109119 110

KEY PLAN

PLAN

NORTH

AR

EA

- C S1

AR

EA

- C S1

AREA 103 - CS103

AREA 115 - CS115

SHEET KEYNOTES

1. SEE V-001 THRU V-203 FOR EXISTING SURVEY LEGEND AND NOTES.

2. SEE C-001 AND C-002 FOR LEGEND, ABBREVIATIONS, AND GENERAL

CIVIL NOTES.

3. SEE C-002 THROUGH C-004 FOR EROSION CONTROL NOTES.

4. SEE CU SHEETS FOR UTILITY WORK IN THIS AREA.

5. SEE S- SHEETS FOR STRUCTURAL WORK IN THIS AREA.

6. SEE M- SHEETS FOR MECHANICAL WORK IN THIS AREA.

7. SEE E.- SHEETS FOR ELECTRICAL / TELECOM WORK IN THIS AREA.

1. ASPHALT PAVEMENT REPAIR OVER INSTALLED UTILITY TRENCH.

2. ASPHALT PAVEMENT. MATCH GRADE OF EXISTING PAVEMENT AT

TIE IN LOCATIONS.

3. CONCRETE PAVEMENT. SEE PLAN FOR SECTION DEPTH. MATCH

GRADE OF EXISTING PAVEMENT AT TIE IN LOCATIONS.

6. STANDARD RAILROAD TRACK SYSTEM.

7. INSTALL SALVAGED FROG.

8. CRANE RAIL SWITCH.

9. NEW CRANE RAIL FROG.

10. CRANE RAIL.

12. STORM DRAIN PIPING. SEE CS201-CS202 SHEETS FOR PROFILES.

18. STORM MANHOLE. SEE CS201-CS202 SHEETS FOR STRUCTURE

INFO.

24. 4" DUCTILE IRON SWITCH DRAIN.

25. GUARD POST.

JMW

NTJ MM JAG

14144802

CI

VI

L

SI

TE

P

LA

N

- A

RE

A

CS110

AS NOTED

CR

AN

E

RA

IL

R

EC

ON

ST

RU

CT

IO

N

LI

M

IT

S

/3

0/

W

BE

30" SD (STORM-1)

MV

CAPSTAN

SEE STRUCTURAL

ST

A

+5

ST

A

+0

ST

A

+5

ST

A

+0

ST

A

+0

0 S76° 49' 05.49"E

CAPSTAN

SEE STRUCTURAL

30" SD (STORM-1)

MV

A1

CS503

18 A1

CS503

B3

CS502

23A3

CS502

A1

CS502

100.50

100.50

100.50

100.50

101.00

100.50

100.50

100.50

101.00

101.00

101.00

SWALE

SWALESWALESWALE

SWALE

1.0

1+50 2+00 2+50 3+00

EMH-2037

EXISTING

EMH-1526

TMH-2039

TMH-2038

TMH-2040

ST

AI

R WP#2

N:3465186.03 E:12128462.34

WP#1

N:3465152.62 E:12128448.94

FROG #30

FROG #31

GENERATORPLATFORMFFE: 108.0

TW102.50

BW100.50

TR100.30

TR100.30

TR100.74

MG±

TR100.30

TR100.30HP100.30LP100.18 LP100.18

101.14±(MG)

101.25±(MG)

100.93

100.60

100.54

100.26

TW102.50

BW100.50

TR100.40

100.60±(MG)

100.56

100.80

TR100.57

100.69±(MG)

101.00±(MG)

100.54±(MG)

100.53±(MG) 100.45±(MG)

100.73±(MG)

100.71±(MG)

100.54±(MG)

100.46±(MG) 100.49±(MG)

100.54±(MG)

TR100.47

MG±

100.43

100.71

LIMITS OF GRADING

A1

CS503

18 A1

CS503

B3

CS502

23A3

CS502

A1

CS502

PROTECT EXISTING

FIRE HYDRANT

TOP OF UTIL

100.40

100.39

TOP OF UTIL

100.54

100.57

END

FI

LE

N

AM

E:

Q

:\N

OR

\10

0-

\20 C

AD

D\

_A cti ve \_D

RY

DP

DD

3-

0-

RM

DD

3\D

RY

DP

DD

3-

0-

CS

1.d wg L

AY

OU

T

NA

ME

: C

IV

IL

SI

TE

P

LA

N

- A

RE

A

PL

OT

TE

D:

T ue sd ay

, J un e 0 3, 4:5

0p m

US

ER

: n jon es

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 25 AUGUST 2020

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DRAWING SCALES SHOWN BASED ON 34" x 22" DRAWING

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

NA

VF

AC

A

TL

AN

TI

C

LA

FA

YE

TT

E

RI

VE

R

AN

NE

X

- N

OR

FO

LK

, V

A

NO

RF

O

LK

N

AV

AL

S

HI

PY

AR

D

PO

RT

SM

O

UT

H, V

IR

G

IN

IA

DR

Y

DO

CK

M

O

DE

RN

IZ

AT

DSN

1806701

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

UNCLASSIFIED

MICHAEL A. WASSELL

NNSY CODE 900F.1

DIVISION HEAD

11/20/2024

WILLIAM B. FORBES, PE

NAVFAC ATLANTIC

ENGINEERING & DESIGN DIRECTOR

01/14/2025

0 20'10'

SHEET NOTES

KEY PLAN

PLAN

NORTH

AR

EA

- C S1

AR

EA

- C S1

AREA 104 - CS104

PLAN

NORTH

SCALE:1" = 10'

AREA 111 - CIVIL SITE PLAN

AREA 115 - CS115

SHEET KEYNOTES

1. SEE V-001 THRU V-203 FOR EXISTING SURVEY LEGEND AND NOTES.

2. SEE C-001 AND C-002 FOR LEGEND, ABBREVIATIONS, AND GENERAL

CIVIL NOTES.

3. SEE C-002 THROUGH C-004 FOR EROSION CONTROL NOTES.

4. SEE CU SHEETS FOR UTILITY WORK IN THIS AREA.

5. SEE S- SHEETS FOR STRUCTURAL WORK IN THIS AREA.

6. SEE M- SHEETS FOR MECHANICAL WORK IN THIS AREA.

7. SEE E.- SHEETS FOR ELECTRICAL / TELECOM WORK IN THIS AREA.

1. ASPHALT PAVEMENT REPAIR OVER INSTALLED UTILITY TRENCH.

2. ASPHALT PAVEMENT. MATCH GRADE OF EXISTING PAVEMENT AT TIE IN

LOCATIONS.

6. STANDARD RAILROAD TRACK SYSTEM.

10. CRANE RAIL.

12. STORM DRAIN PIPING. SEE CS201-CS202 SHEETS FOR PROFILES.

16. RAIL STOP.

18. STORM DRAIN MANHOLE. SEE CS201-CS202 SHEETS FOR STRUCTURE

INFO.

23. RAILROAD REPAIR SECTION AT SHALLOW UTILITY CROSSING.

DRY DOCK 2

DRY DOCK 4

102101 103 104 105 106

107 108

115 114

109119 111

JMW

NTJ MM JAG

14144803

CI

VI

L

SI

TE

P

LA

N

- A

RE

A

CS111

AS NOTED

CR

AN

E

BE

AM

/R

AI

L

RE

CO

NS

TR

UC

TI

ON

L

IM

IT

S 0

4/

/2

W

BE

CR

AN

E

RA

IL

R

EC

ON

ST

RU

CT

IO

N

LI

M

IT

S

/3

0/

W

BE

ST

A

+5

ST

A

+5

ST

A

+0

ST

A

+5

ST

A

+0

S76° 49' 05.49"E

SFF

FW FW FW FW FW FW FW FW FWFW

STM

SFF SFF SFF

SFF

SW SW SW

FW FW FW FW5+50 6+50

4+50

5+

0+50 1+50

0+00

0+07

0+ 000+

0+006+00 7+00 0+14

0+

0+07

0+

5+58

5+00

0+00

1+000+

0+

0+00

1+051+00

DRY DOCK 3

4"FW

6" SFF-1

8" FW-1

6"

SF

F4"

FW

6" SFF-1

8" FW-1

12" SW-2

" S

W -2

6"

SW 6"

SW

6"

SW

6" S

TM

-5

EXISTING

EMH-1031A

TMH-2032

EXISTING EMH-1302

EXISTING EMH-1301B

EMH-2032

EMH-2033

TYP

TYP

TYP

TYP

TYP

8" x 4" TEE

12" x 6" TEE

12" x 6" TEE

STRUCTURAL

FOUNDATION

UTILITY TRENCH

CRANE RAIL

RAILROAD

STRUCTURAL

FOUNDATION

CRANE RAIL

8" x 4" TEE 12" x 6" TEE

SW

NR

2A

SW

NR

2B

DD

FN

R4

8" FW-2

FW

NR

FW

NR

SF

F-

8" FW-1

12" SW-2

12" SW-4

C3

CU502 12

9TYP

SW-4

SW-2

TYP

6 STM-5

FW-2

CU501

C2

S-539

C1 UTILITY

TROUGH

FI

LE

N

AM

E:

Q

:\N

OR

\10

0-

\20 C

AD

D\

_A cti ve \_D

RY

DP

DD

3-

0-

RM

DD

3\D

RY

DP

DD

3-

0-

CU

5.d wg L

AY

OU

T

NA

ME

: C

IV

IL

UT

ILI

TI

ES

P

LA

N

- A

RE

A

PL

OT

TE

D:

M on da y, Ju ne

, 2

5 -

1:

pm U

SE

R:

nj on es

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 25 AUGUST 2020

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DRAWING SCALES SHOWN BASED ON 34" x 22" DRAWING

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

NA

VF

AC

A

TL

AN

TI

C

LA

FA

YE

TT

E

RI

VE

R

AN

NE

X

- N

OR

FO

LK

, V

A

NO

RF

O

LK

N

AV

AL

S

HI

PY

AR

D

PO

RT

SM

O

UT

H, V

IR

G

IN

IA

DR

Y

DO

CK

M

O

DE

RN

IZ

AT

DSN

1806701

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

UNCLASSIFIED

MICHAEL A. WASSELL

NNSY CODE 900F.1

DIVISION HEAD

11/20/2024

WILLIAM B. FORBES, PE

NAVFAC ATLANTIC

ENGINEERING & DESIGN DIRECTOR

01/14/2025

0 20'10'

AR

EA

- C U1

SHEET NOTES

AR

EA

- C

U1

PLAN

NORTH

SCALE:1" = 10'

AREA 105 - CIVIL UTILITIES PLAN

DRY DOCK 2

DRY DOCK 4

102101 103 104 105 106

107 108

115 114

109119

KEY PLAN

PLAN

NORTH

AREA 112 - CU112

SHEET KEYNOTES

1. CONNECT TO EXISTING WATER SYSTEM (FW)

3. CONNECT TO EXISTING SALT WATER SYSTEM (SW)

9. 45° BEND MATCH PIPE SIZE

10. 90° ELBOW MATCH PIPE SIZE

12. GATE VALVE AND VALVE BOX MATCH PIPE SIZE

14. SEE MECHANICAL DRAWINGS FOR CONTINUATION

15. PIPE SLEEVE

1. SEE V-001 THRU V-203 FOR EXISTING SURVEY LEGEND AND NOTES.

2. SEE C-001 AND C-002 FOR LEGEND, ABBREVIATIONS, AND GENERAL

CIVIL NOTES.

3. SEE C-004 FOR EROSION CONTROL NOTES.

4. SEE STRUCTURAL DRAWINGS FOR STRUCTURAL WORK INSIDE THE DRY

DOCK, MOORING DEVICES, AND OTHER ITEMS AS INDICATED.

5. SEE MECHANICAL DRAWINGS FOR UTILITY WORK IN THE UTILITY

TUNNELS AND DRY DOCK.

6. SEE ELECTRICAL DRAWINGS FOR WORK ON

POWER/TELECOMMUNICATIONS EQUIPMENT, CABLING, AND SYSTEMS.

7. UTILITY ROUTES ARE DRAWN FOR SCHEMATIC PURPOSES USING

STANDARD FITTINGS, CONTRACTOR IS RESPONSIBLE FOR LOCATING

THE EXISTING CONNECTIONS AND PROVIDING THE FITTINGS

NECESSARY FOR INSTALLING THE PROPOSED PATHS, SEE THE UTILITY

PROFILES FOR LOCATIONS OF VERTICAL OFFSETS.

8. THRUST BLOCKS NOT SHOWN FOR CLARITY. SEE C-002 UTILITY NOTES

FOR MECHANICALLY RESTRAINED JOINTS AND THRUST BLOCK

LOCATIONS.

23. PIPE CASING

8. 22.5° BEND MATCH PIPE SIZE

6. CONNECT TO EXISTING STEAM (STM)

19. STEAM PIPE SLEEVE

24. NOT USED

25. STEAM ANCHOR SEE MECHANICAL FOR DETAIL

JMW

NTJ NTJ JAG

14144817

CI

VI

L

UT

IL

IT

IE

S

PL

AN

AR

EA

CU105

AS NOTED

RE

ST

RA

IN

ED

JO

IN

TS

/3 0/

W

BE

(6" COMPOSITE STEAM PIPE SYSTEM)

EX

IS

TI

NG

S

TE

AM

P

IP

E

/3 0/

W

EOI

WV

WV

WV

ST

A

+5

ST

A

+0

ST

A

+5

ST

A

+0

S76° 49' 05.49"E

5/

S S

FM

CA CA

STM STM

FW FW FW

SSFM SSFM SSFM

FW

CO5FW

SW SW SW

0+00

0+

7+50

0+

0+

2+

0+64

-0+01

0+00

0+

0+00

7+

0+15

0+

0+67

0+00

0+72

0+00

2+

2+00

0+

0+00

DRY DOCK 3

8" FW-1

12" SW-2

12"

SW-2

4" STM-4

2.5" CA-6

4" SSFM-4

TYP

8"

FW-3

4"FW

8x6

TYP

TMH-2030

EXISTING

EMH-1031C

EXISTING

EMH-1306

EMH-2030

TYP

4 5 6

UTILITY TRENCH STRUCTURAL

FOUNDATION

CRANE RAIL

8" x 4" TEE

FLOODWALL

FOUNDATION

FW

NR

DD

FN

R5

FW

-1

FW

-3

ST

M

-4

SS

FM

-4

CA

-6

HYDRANT 4

TYPC3

CU50212

A1

CU50217

C2

CU50222

SW-2

FW-3

TYP9

TYP 10

12" x 4" TEE

TYP 8

6"

SW

CU501

C2TYP

FI

LE

N

AM

E:

Q

:\N

OR

\10

0-

\20 C

AD

D\

_A cti ve \_D

RY

DP

DD

3-

0-

RM

DD

3\D

RY

DP

DD

3-

0-

CU

6.d wg L

AY

OU

T

NA

ME

: C

IV

IL

UT

ILI

TI

ES

P

LA

N

- A

RE

A

PL

OT

TE

D:

M on da y, Ju ne

, 2

5 -

1:

pm U

SE

R:

nj on es

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 25 AUGUST 2020

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DRAWING SCALES SHOWN BASED ON 34" x 22" DRAWING

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

NA

VF

AC

A

TL

AN

TI

C

LA

FA

YE

TT

E

RI

VE

R

AN

NE

X

- N

OR

FO

LK

, V

A

NO

RF

O

LK

N

AV

AL

S

HI

PY

AR

D

PO

RT

SM

O

UT

H, V

IR

G

IN

IA

DR

Y

DO

CK

M

O

DE

RN

IZ

AT

DSN

1806701

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

UNCLASSIFIED

MICHAEL A. WASSELL

NNSY CODE 900F.1

DIVISION HEAD

11/20/2024

WILLIAM B. FORBES, PE

NAVFAC ATLANTIC

ENGINEERING & DESIGN DIRECTOR

01/14/2025

0 20'10'

AREA 113 - CU113

SHEET NOTES

AR

EA

- C

U1

PLAN

NORTH

SCALE:1" = 10'

AREA 106 - CIVIL UTILITIES PLAN

DRY DOCK 2

DRY DOCK 4

102101 103 104 105 106

107 108

115 114

109119

KEY PLAN

PLAN

NORTH

SHEET KEYNOTES

1. CONNECT TO EXISTING WATER SYSTEM (FW)

3. CONNECT TO EXISTING SALT WATER SYSTEM (SW)

4. CONNECT TO EXISTING COMPRESSED AIR SYSTEM (CA)

5. CONNECT TO EXISTING SANITARY SEWER SYSTEM(SSFM)

6. CONNECT TO EXISTING STEAM SYSTEM (STM)

8. 22.5° BEND MATCH PIPE SIZE

9. 45° BEND MATCH PIPE SIZE

10. 90° ELBOW MATCH PIPE SIZE

11. REDUCER

12. GATE VALVE AND VALVE BOX MATCH PIPE SIZE

14. SEE MECHANICAL DRAWINGS FOR CONTINUATION

1. SEE V-001 THRU V-203 FOR EXISTING SURVEY LEGEND AND NOTES.

2. SEE C-001 AND C-002 FOR LEGEND, ABBREVIATIONS, AND GENERAL

CIVIL NOTES.

3. SEE C-004 FOR EROSION CONTROL NOTES.

4. SEE STRUCTURAL DRAWINGS FOR STRUCTURAL WORK INSIDE THE DRY

DOCK, MOORING DEVICES, AND OTHER ITEMS AS INDICATED.

5. SEE MECHANICAL DRAWINGS FOR UTILITY WORK IN THE UTILITY

TUNNELS AND DRY DOCK.

6. SEE ELECTRICAL DRAWINGS FOR WORK ON

POWER/TELECOMMUNICATIONS EQUIPMENT, CABLING, AND SYSTEMS.

7. UTILITY ROUTES ARE DRAWN FOR SCHEMATIC PURPOSES USING

STANDARD FITTINGS, CONTRACTOR IS RESPONSIBLE FOR LOCATING

THE EXISTING CONNECTIONS AND PROVIDING THE FITTINGS

NECESSARY FOR INSTALLING THE PROPOSED PATHS, SEE THE UTILITY

PROFILES FOR LOCATIONS OF VERTICAL OFFSETS.

8. THRUST BLOCKS NOT SHOWN FOR CLARITY. SEE C-002 UTILITY NOTES

FOR MECHANICALLY RESTRAINED JOINTS AND THRUST BLOCK

LOCATIONS.

15. PIPE SLEEVE

17. FIRE HYDRANT ASSEMBLY

22. TAPPING SLEEVE

23. PIPE CASING

24. NOT USED

25. STEAM ANCHOR SEE MECHANICAL FOR DETAIL

JMW

NTJ NTJ JAG

14144818

CI

VI

L

UT

IL

IT

IE

S

PL

AN

AR

EA

CU106

AS NOTED

RE

ST

RA

IN

ED

JO

IN

TS

/3 0/

W

BE

2(4" COMPOSITE PIPE SYSTEM)

EX

IS

TI

NG

S

TE

AM

P

IP

E

/3 0/

DRY DOCK 6SUBSTRUCTURE

ST

A

+5

ST

A

+0

ST

A

+5

ST

A

+0

0 S76° 49' 05.49"E

STMSTM

STMSTMSTMSTM

SW

SW SW

S S

FM

SSFM SSFM SSFM SSFM SSFM SSFM SSFM SSFM SSFM SSFM

CA CA CA CA

S

TM

C A

C A

SW

CA

S S

FM

S

S

FM

S S

FM

D

D D

D D

SW

FW FW FW

FW

FW

FW

FW FW

FWFW

FW

FW

SW SW

0+

1+50

0+

1+50

1+50

4+50

0+

1+50

0+50

1+

11+50

0+51

0+00

1+71

0+00

1+00

0+52 0+00

0+48

0+00

1+75

0+00

1+00

1+82

4+68

0+29

0+00

1+67

0+00

1+00

1+82

0+001+00

12+37

+0

12+00

DRY DOCK 3

WETWELL PUMP HOUSE

FFE: 108.0 GENERATOR PLATFORM

FFE: 108.0

8" FW-6

3" S

TM

-1

3" C

A-

8" FW-7

12" SW-1

3" STM-1

3" CA-4

6" SSFM-1

12" SW-1

6" ASW-1 6" OWWO-1

10" EMP-1

6" S

SF

M

-1 8"

F W

-7

TYP

8" F

W -8

8" F

W -7

2"

SS

8x4

7' MI

N

TYP

TMH-2041

EMH-2049

EMH-2050

8" x 8" TEE

STRUCTURAL

FOUNDATION

SEE PLUMBING FOR

BUILDING SANITARY

SEWER CONNECTION

UTILITY TRENCH

CRANE RAIL

8" x 8" TEE

TYP14

STACK 10" OWWO

PIPES AS NEEDED

OWWO RISER

SEE MECHANICAL

TYP9

10TYP

TYP

8" FW-9

FW

-7

ST

M

-1

CA

-4

SS

FM

-1

SEE PLUMBING FOR

ROOF DRAIN

CONNECTION

TYP C3

CU502 12

SW-1

TYP

SEE WETWELL STRUCTURAL

FOR PILE CUT OFF ELEVATIONS

FW-7

STM-1

SSFM-1

CA-4

24.00'

30.00'

10" OWWO-1

FI

LE

N

AM

E:

Q

:\N

OR

\10

0-

\20 C

AD

D\

_A cti ve \_D

RY

DP

DD

3-

0-

RM

DD

3\D

RY

DP

DD

3-

0-

CU

3.d wg L

AY

OU

T

NA

ME

: C

IV

IL

UT

ILI

TI

ES

P

LA

N

- A

RE

A

PL

OT

TE

D:

M on da y, Ju ne

, 2

5 -

1:

pm U

SE

R:

nj on es

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 25 AUGUST 2020

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DRAWING SCALES SHOWN BASED ON 34" x 22" DRAWING

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

NA

VF

AC

A

TL

AN

TI

C

LA

FA

YE

TT

E

RI

VE

R

AN

NE

X

- N

OR

FO

LK

, V

A

NO

RF

O

LK

N

AV

AL

S

HI

PY

AR

D

PO

RT

SM

O

UT

H, V

IR

G

IN

IA

DR

Y

DO

CK

M

O

DE

RN

IZ

AT

DSN

1806701

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

UNCLASSIFIED

MICHAEL A. WASSELL

NNSY CODE 900F.1

DIVISION HEAD

11/20/2024

WILLIAM B. FORBES, PE

NAVFAC ATLANTIC

ENGINEERING & DESIGN DIRECTOR

01/14/2025

0 20'10'

SHEET NOTES

DRY DOCK 2

DRY DOCK 4

102101 103 104 105 106

107 108

115 114

109119

KEY PLAN

PLAN

NORTH

AR

EA

- C U1

AREA 106 - CU106

PLAN

NORTH

SCALE:1" = 10'

AREA 113 - CIVIL UTILITIES PLAN

SHEET KEYNOTES

7. 11.25° BEND MATCH PIPE SIZE

8. 22.5° BEND MATCH PIPE SIZE

9. 45° BEND MATCH PIPE SIZE

10. 90° ELBOW MATCH PIPE SIZE

12. GATE VALVE AND VALVE BOX MATCH PIPE SIZE

14. SEE MECHANICAL DRAWINGS FOR CONTINUATION

1. CONNECT TO EXISTING FRESH WATER SYSTEM (FW)

1. SEE V-001 THRU V-203 FOR EXISTING SURVEY LEGEND AND NOTES.

2. SEE C-001 AND C-002 FOR LEGEND, ABBREVIATIONS, AND GENERAL

CIVIL NOTES.

3. SEE C-004 FOR EROSION CONTROL NOTES.

4. SEE STRUCTURAL DRAWINGS FOR STRUCTURAL WORK INSIDE THE DRY

DOCK, MOORING DEVICES, AND OTHER ITEMS AS INDICATED.

5. SEE MECHANICAL DRAWINGS FOR UTILITY WORK IN THE UTILITY

TUNNELS AND DRY DOCK.

6. SEE ELECTRICAL DRAWINGS FOR WORK ON

POWER/TELECOMMUNICATIONS EQUIPMENT, CABLING, AND SYSTEMS.

7. UTILITY ROUTES ARE DRAWN FOR SCHEMATIC PURPOSES USING

STANDARD FITTINGS, CONTRACTOR IS RESPONSIBLE FOR LOCATING

THE EXISTING CONNECTIONS AND PROVIDING THE FITTINGS

NECESSARY FOR INSTALLING THE PROPOSED PATHS, SEE THE UTILITY

PROFILES FOR LOCATIONS OF VERTICAL OFFSETS.

8. THRUST BLOCKS NOT SHOWN FOR CLARITY. SEE C-002 UTILITY NOTES

FOR MECHANICALLY RESTRAINED JOINTS AND THRUST BLOCK

LOCATIONS.

11. REDUCER

3. CONNECT TO EXISTING SALT WATER SYSTEM (SW)

4. CONNECT TO EXISTING COMPRESSED AIR SYSTEM (CA)

5. CONNECT TO EXISTING SANITARY SEWER (SSFM)

6. CONNECT TO EXISTING STEAM SYSTEM (STM)

18. STEAM EXPANSION LOOP

24. NOT USED

25. STEAM ANCHOR SEE MECHANICAL FOR DETAIL.

JMW

NTJ NTJ JAG

14144823

CI

VI

L

UT

IL

IT

IE

S

PL

AN

AR

EA

CU113

AS NOTED

RE

ST

RA

IN

ED

JO

IN

TS

/3 0/

W

BE

(3" COMPOSITE STEAM PIPE SYSTEM) 2

EX

IS

TI

NG

S

TE

AM

P

IP

E

/3 0/

DRY DOCK 7SUBSTRUCTURE

1+

1+

1+

1+

STM

STM

STM

SW

SW

" S

W -3

TYP

6" S

TM

-2

SW-3

STM-2

CU502

A2

C3

CU50212

FI

LE

N

AM

E:

Q

:\N

OR

\10

0-

\20 C

AD

D\

_A cti ve \_D

RY

DP

DD

3-

0-

RM

DD

3\D

RY

DP

DD

3-

0-

CU

5.d wg L

AY

OU

T

NA

ME

: C

IV

IL

UT

ILI

TI

ES

P

LA

N

- A

RE

A

PL

OT

TE

D:

M on da y, Ju ne

, 2

5 -

1:

pm U

SE

R:

nj on es

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 25 AUGUST 2020

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DRAWING SCALES SHOWN BASED ON 34" x 22" DRAWING

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

NA

VF

AC

A

TL

AN

TI

C

LA

FA

YE

TT

E

RI

VE

R

AN

NE

X

- N

OR

FO

LK

, V

A

NO

RF

O

LK

N

AV

AL

S

HI

PY

AR

D

PO

RT

SM

O

UT

H, V

IR

G

IN

IA

DR

Y

DO

CK

M

O

DE

RN

IZ

AT

DSN

1806701

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

UNCLASSIFIED

MICHAEL A. WASSELL

NNSY CODE 900F.1

DIVISION HEAD

11/20/2024

WILLIAM B. FORBES, PE

NAVFAC ATLANTIC

ENGINEERING & DESIGN DIRECTOR

01/14/2025

0 20'10'

SHEET NOTES

KEYNOTES

PLAN

NORTH

SCALE:1" = 10'

AREA 115 - CIVIL UTILITIES PLAN

DRY DOCK 2

DRY DOCK 4

102101 103 104 105 106

107 108

115 114

109119

KEY PLAN

PLAN

NORTH

AREA 110 - CU110 AREA 111 - CU111

1. SEE V-001 THRU V-203 FOR EXISTING SURVEY LEGEND AND NOTES.

2. SEE C-001 AND C-002 FOR LEGEND, ABBREVIATIONS, AND GENERAL CIVIL

NOTES.

3. SEE C-004 FOR EROSION CONTROL NOTES.

4. SEE STRUCTURAL DRAWINGS FOR STRUCTURAL WORK INSIDE THE DRY

DOCK, MOORING DEVICES, AND OTHER ITEMS AS INDICATED.

5. SEE MECHANICAL DRAWINGS FOR UTILITY WORK IN THE UTILITY TUNNELS

AND DRY DOCK.

6. SEE ELECTRICAL DRAWINGS FOR WORK ON

POWER/TELECOMMUNICATIONS EQUIPMENT, CABLING, AND SYSTEMS.

7. UTILITY ROUTES ARE DRAWN FOR SCHEMATIC PURPOSES USING

STANDARD FITTINGS, CONTRACTOR IS RESPONSIBLE FOR LOCATING THE

EXISTING CONNECTIONS AND PROVIDING THE FITTINGS NECESSARY FOR

INSTALLING THE PROPOSED PATHS, SEE THE UTILITY PROFILES FOR

LOCATIONS OF VERTICAL OFFSETS.

8. THRUST BLOCKS NOT SHOWN FOR CLARITY. SEE C-002 UTILITY NOTES

FOR THRUST BLOCK LOCATIONS.

12. GATE VALVE AND VALVE BOX MATCH PIPE SIZE

6. CONNECT TO EXISTING STEAM (STM)

3. CONNECT TO EXISTING SALTWATER (SW)

25. STEAM ANCHOR SEE MECHANICAL FOR DETAIL

JMW

NTJ NTJ JAG

14144824

CI

VI

L

UT

IL

IT

IE

S

PL

AN

AR

EA

CU115

AS NOTED

RE

ST

RA

IN

ED

JO

IN

TS

/3 0/

W

BE

(6" COMPOSITE STEAM PIPE SYSTEM) 2

EX

IS

TI

NG

S

TE

AM

P

IP

E

/3 0/

85.0

90.0

95.0

100.0

105.0

110.0

2+50 2+85

FINISHED GRADE

10" SSFM

6" CA10" SSFM

6" CA 6" CA

10" SSFM

11.25° BEND

11.25° BEND

SEE MECHANICAL

FOR CONTINUATION

0.25%

STEAM ANCHOR

STATION

85.0

90.0

95.0

100.0

105.0

110.0

85.0

90.0

95.0

100.0

105.0

110.0

-0+25 0+00 0+50 1+00

FINISHED GRADE

EXISTING GRADE

DUCT BANK

18" STORM

2.5" STEAM

SEE MECHANICAL

FOR CONTINUATION CONNECT

TO EXISTING

0.25% MIN

STEAM ANCHOR

STEAM ANCHOR

85.0

90.0

95.0

100.0

105.0

110.0

85.0

90.0

95.0

100.0

105.0

110.0

-0+25 0+00 0+50 1+00 1+50

DUCT BANK

DUCT BANK

CONNECT

TO EXISTING

6" STEAM

FINISHED GRADE

12" SW

DUCT BANK

SEE MECHANICAL

FOR CONTINUATION

0.25% MIN0.25% MIN

HIGH POINT

ELEV:98.20'

PIPE SLEEVE

6" SFF

8" FW

15" STORM

PIPE SLEEVE

CRANE RAIL

CRANE RAIL RAIL SLAB CRANE RAIL

22.5° BEND

STEAM VAULT

WITH DRIP LEG

DRIP LEG

STEAM ANCHOR

RECONSTRUCT CONCRETE TIE BEAM

APPROXIMATE LOCATION

FI

LE

N

AM

E:

Q

:\N

OR

\10

0-

\20 C

AD

D\

_A cti ve \_D

RY

DP

DD

3-

0-

RM

DD

3\D

RY

DP

DD

3-

0-

CU

5.d wg L

AY

OU

T

NA

ME

: S

TE

AM

P

RO

FI

LE

S

- 2

P

LO

TT

ED

: M on da y, Ju ne

, 2

5 -

1:

pm U

SE

R:

nj on es

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 25 AUGUST 2020

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DRAWING SCALES SHOWN BASED ON 34" x 22" DRAWING

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

NA

VF

AC

A

TL

AN

TI

C

LA

FA

YE

TT

E

RI

VE

R

AN

NE

X

- N

OR

FO

LK

, V

A

NO

RF

O

LK

N

AV

AL

S

HI

PY

AR

D

PO

RT

SM

O

UT

H, V

IR

G

IN

IA

DR

Y

DO

CK

M

O

DE

RN

IZ

AT

DSN

1806701

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

UNCLASSIFIED

MICHAEL A. WASSELL

NNSY CODE 900F.1

DIVISION HEAD

11/20/2024

WILLIAM B. FORBES, PE

NAVFAC ATLANTIC

ENGINEERING & DESIGN DIRECTOR

01/14/2025

SCALE:

STEAM PROFILE - STM-3 (CONT'D)

CU103VERT: 1" = 5' HORZ: 1" = 10"

2+25 85.0

95.0

105.0

100.0

90.0

110.0

SCALE:

STEAM PROFILE - STM-4

CU106VERT: 1" = 5' HORZ: 1" = 10"

SCALE:

STEAM PROFILE - STM-5

CU104 - CU105VERT: 1" = 5' HORZ: 1" = 10"

M A

TC

H

L

IN

E

S E

E S

H E

E T

C U

1. SEE C-001 FOR CIVIL LEGEND AND ABBREVIATIONS.

2. SEE C-002 FOR CIVIL NOTES.

3. SEE "V" SHEETS FOR EXISTING CONDITION INFORMATION AND SURVEY

LEGEND AND NOTES.

4. SEE STRUCTURAL AND MECHANICAL DRAWINGS FOR PENETRATION

DETAILS THROUGH STRUCTURES.

5. VERTICAL OFFSETS SHOWN ARE APPROXIMATE, ADJUST BEND

LOCATIONS TO SUIT FIELD CONDITIONS.

6. WHERE PROPER COMPACTION IS NOT ACHIEVABLE, CONTROLLED LOW

STRENGTH MATERIAL MUST BE USED.

7. SEE MF AND MS SHEETS FOR UTILITY CONTINUATION IN UTILITY TRENCH.

8. UTILITY PROFILES INDICATE VERTICAL OFFSETS ONLY, SEE CU103-CU113

DRAWINGS FOR HORIZONTAL ALIGNMENT.

SHEET NOTES

JMW

NTJ WDF JAG

14144839

ST

EA

M P

RO

FI

LE

S

- 2

CU215

AS NOTED

4" STEAM

ST

EA

M

P

IP

E

SI

ZE

/3 0/

W

Mechanical | Electrical | Plumbing | Fire Protection 4456 Corporation Ln, Ste 320 Tel: (757) 502-8882

Virginia Beach, Virginia 23462 Fax: (757) 499-1757

ADVANCED

ENGINEERING

CONSULTANTS

S

TA

1 +

S

TA

1 +

S

TA

3 +

S

TA

2 +

S

TA

2 +

NUCLEAR BLDG

DATR

8 81

F W

D 3N

R

S T

A

1+

C A

D 3C

N R

S

T A

1+

S T

M D

3N R

S

T A

1+

C H

T D

3N R

S

T A

1+

C A

D 3C

N R

S

T A

2+

S W

D 3F

N R

S

T A

2+

S W

F E

E D

S T

A

2+

C1

MS303

C1

MS305

C1

MS404

C1

MS406

C1

MS403

A1

MS406

S W

F E

E D

S T

A

2+

F W

D 3N

R

S T

A

2+

C2

MS403

C2

MS404

C3

MS406

S T

A

1+

C A

, C H

T , S

T M

S P

R T

S T

A

1+

C A

, C H

T , S

T M

S P

R T

S T

A

1+

C A

, C H

T , S

T M

S P

R T

S T

A

1+

C A

, C H

T , S

T M

S P

R T

S T

A

1+

C A

, C H

T , S

T M

S P

R T

S T

A

5+

C A

, C H

T , S

T M

S P

R T

S T

A

3+

C A

, C H

T , S

T M

S P

R T

S T

A

3+

C A

, C H

T , S

T M

S P

R T

S T

A

2+

C A

, C H

T , S

T M

S P

R T

S T

A

2+

C A

, C H

T , S

T M

S P

R T

S T

A

2+

C A

, C H

T , S

T M

S P

R T

S T

A

2+

C A

, C H

T , S

T M

S P

R T

S T

A

2+

C A

, C H

T , S

T M

S P

R T

S T

A

2+

C A

, C H

T , S

T M

S P

R T

S T

A

2+

S W

S P

R T

S T

A

2+

S W

S P

R T

S T

A

2+

S W

S P

R T

S T

A

2+

S W

S P

R T

S T

A

2+

F W

S P

R T

S T

A

2+

C A

S P

R T

S T

A

1+

F W

S P

R T

S T

A

1+

C A

, C H

T , S

T M

S P

R T

C4

MS404

S T

A

2+

S W

S P

R T

S T

A

2+

S W

S P

R T

S T

A

1+

F W

S P

R T

A2

MS304

A4

MS304

S T

A

1+

C A

S P

R T

S T

A

2+

C A

S P

R T

S T

A

1+

F W

S P

R T

S T

A

1+

C A

S P

R T

S T

A

1+

S T

M S

P R

T

S T

A

2+

C H

T S

P R

T

S T

A

1+

C H

T S

P R

T

S T

A

2+

C A

S P

R T

S T

A

2+

F W

S P

R T

S T

A

2+

.7

F W

S P

R T

S T

A

2+

.9

S W

S P

R T

S T

A

2+

S W

S P

R T

C3

MS402

S T

A

2+

S W

S P

R T

STA 11+97.00

CHT SPRT

STA 11+97.00

CHT SPRT

S T

A

1+

.1

C H

T S

P R

T

S T

A

1+

.0

C H

T S

P R

T

PLAN

NORTH

KEY PLAN

DRY DOCK 2

102101

DRY DOCK 3

DRY DOCK 4

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V

FA

C A

T

LA

N T

IC

AS NOTED

P O

R T

S M

O U

T H

V

IR

G

IN

IA

N O

R F

O L K

N A

V A

L S

H

IP

Y A

R D

D R

Y D

O C

K

M O

D E

R N

IZ

A

TI

O

N

1806701

A P

P R

D A

T E

D E

S C

R

IP

T

IO

N S

Y M

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

P

LO

T T

E D

F

IL

E

N A

M E

DRAWING SCALES SHOWN BASED ON 34" x 22" DRAWING

JTW

CAH/ELS

DSN

LA

FA

Y E

TT

E

R

IV

E R

A N

N E

X

N O

R

FO

LK

, V

A

DATE

WILLIAM B. FORBES, PE

11/20/2024

MICHAEL A. WASSELL

NNSY CODE 900F.1

DIVISION HEAD

WILLIAM B. FORBES, PE

NAVFAC ATLANTIC

ENGINEERING & DESIGN DIRECTOR

01/14/2025

/3

/2

:4 :2

P

M C

U s e rs

\e ri n .c o x \R e v it L o ca lF ile s\ D

R Y

D P

D D

-1

-M

S -D

D E ri n C

V

E R

.r v t

MS104

M E

C H

A N

IC

A

L U

T

IL

IT

IE

S P

LA

N

A

R E

A

DMG

14145166

PJB EBC

NORTH

1. 4" FW PIPING. FOR CONTINUATION OF FW PIPING, REFER TO SHEET

CU104.

2. SW RISER, SEE DETAIL D1/MS501 FOR RISER REQUIREMENTS.

3. FW RISER, SEE D2/MS501 FOR RISER REQUIREMENTS.

4. CA COPING MANIFOLD, SEE A2/MS501 FOR RISER REQUIREMENTS.

5. CHT RISER, SEE B1/MS501 FOR RISER REQUIREMENTS.

6. STM RISER, SEE B2/MS501 FOR RISER REQUIREMENTS.

7. 4" CA PIPING DOWN TO DOCK FLOOR, FOR CONTINUATION REFER

TO SHEET MS204.

8. 6" SW PIPING. FOR CONTINUATION OF SW PIPING, REFER TO SHEET

CU104.

9. 6" CA PIPING. FOR CONTINUATION OF CA PIPING, REFER TO SHEET

CU104.

10. 3" STM PIPING. FOR CONTINUATION OF STM PIPING, REFER TO

SHEET CU104.

11. CONNECTION FEED TO DDF RISER. SEE SHEET MF104.

12. CA EXPANSION DEVICE - SEE DETAIL B1/MS504.

13. STM EXPANSION DEVICE - SEE DETAIL A1/MS504.

14. INSTALL #4 AWG WIRE IN ACCORDANCE TO ELECTRICAL

GROUNDING. SEE DETAIL A3/MS504.

0" 10' 20'

SCALE: 1" = 10'-0"

AREA 104 - MECHANICAL UTILITIES PLAN

SHEET NOTES

SHEET KEYNOTES

A R

E A

M

S

AREA 111 - MS111

A R

E A

M

S

1. REFER TO SHEET M-001 FOR LEGEND, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO MS204 FOR ELEVATION OF DRY DOCK WALL.

3. SINGLE LINE REPRESENTATING PIPING LOCATION SHOWN IN

UTILITY TRENCH FOR CLARITY. REFER TO THE SERIES MS300

DRAWINGS FOR THE FOR EXACT SYSTEMS AND LOCATION OF ALL

PIPING WITHIN UTILITY TRENCH.

4. FOR PIPE PENETRATIONS THROUGH TRENCH GRATING, REFER TO

TRENCH GRATING PENETRATION DETAIL ON STRUCTURAL

DRAWINGS.

5. REFER TO SERIES MS600 DRAWINGS FOR SUPPORT

REQUIREMENTS.

S

U P

P O

R

TS

S

T M

IN

S

U

LA

TI

O

N

/3 0/

P

JB

SEALSEALSEALSEAL

Virginia Beach, Virginia 23462 Fax: (757) 499-1757

ADVANCED

ENGINEERING

CONSULTANTS

S

TA

3 +

S

TA

5 +

S

TA

5 +

S

TA

4 +

S

TA

4 +

NUCLEAR BLDG 1475

C2

MS303

S W

F E

E D

S T

A

4+

1 1 9 9 C2

MS401

4 6

5 6

A2

MS401

F W

D 3N

R

S T

A

3+

C A

D 3C

N R

S

T A

3+

C H

T D

3N R

S

T A

3+

S W

D 3F

N R

S

T A

4+

C A

D 3C

N R

S

T A

4+

C H

T D

3N R

S

T A

5+

S T

M D

3N R

S

T A

5+

F W

D 3N

R

S T

A

4+

S W

F E

E D

S T

A

4+

S T

A

3+

C A

, C H

T , S

T M

S P

R T

S T

A

3+

C A

, C H

T , S

T M

S P

R T

S T

A

3+

C A

, C H

T , S

T M

S P

R T

S T

A

3+

C A

, C H

T , S

T M

S P

R T

S T

A

4+

C A

, C H

T , S

T M

S P

R T

S T

A

4+

C A

, C H

T , S

T M

S P

R T

S T

A

4+

C A

, C H

T , S

T M

S P

R T

S T

A

4+

F W

S P

R T

S T

A

4+

C A

, C H

T , S

T M

S P

R T

S T

A

4+

F W

S P

R T

S T

A

3+

F W

S P

R T

S T

A

4+

C A

, C H

T , S

T M

S P

R T

S T

A

4+

C A

, C H

T , S

T M

S P

R T

S T

A

4+

S W

S P

R T

S T

A

4+

S W

S P

R T

S T

A

4+

S W

S P

R T

S T

A

4+

S W

S P

R T

S T

A

4+

C A

, C H

T , S

T M

S P

R T

S T

A

5+

C A

, C H

T , S

T M

S P

R T

S T

A

5+

C A

, C H

T , S

T M

S P

R T

A1

MS404

C2

MS305

10 10

S T

A

3+

F W

S P

R T

S T

A

4+

C A

S P

R T

12 12 12

C3

MS407

S T

A

3+

C A

S P

R T

S T

A

3+

C A

S P

R T

13 14

S T

A

4+

S W

S P

R T

S T

A

4+

S W

S P

R T

S T

A

3+

C A

S P

R T

S T

A

4+

C A

S P

R T

S T

A

5+

C A

, C H

T , S

T M

S P

R T

S T

A

3+

F W

S P

R T

S T

A

3+

.7

F W

S P

R T

S T

A

3+

C H

T S

P R

T

S T

A

3+

C H

T S

P R

T

S T

A

3+

C A

S P

R T

S T

A

4+

F W

S P

R T

S T

A

4+

.6

F W

S P

R T

S T

A

4+

.0

S W

S P

R T

S T

A

4+

.8

S W

S P

R T

S T

A

4+

C A

S P

R T

S T

A

5+

C H

T S

P R

T

S T

A

5+

C H

T S

P R

T

S T

A

5+

S T

M S

P R

T

S T

A

3+

.5 C

H T

S P

R T

S T

A

5+

H P

C A

S P

R T

S T

A

5+

.5 N

S P

R T

S T

A

5+

T R

A S

P R

T S

T A

5+

H

P C

A N

T R

A S

P R

T

S T

A

5+

H P

C A

N T

R A

S P

R T

S T

A

3+

.0

C H

T S

P R

T

S T

A

3+

.1

C H

T S

P R

T

S T

A

5+

.0

C H

T S

P R

T S

T A

5+

.3

C

H T

S P

R T

PLAN

NORTH

KEY PLAN

DRY DOCK 2

102101

DRY DOCK 3

DRY DOCK 4

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V

FA

C A

T

LA

N T

IC

AS NOTED

P O

R T

S M

O U

T H

V

IR

G

IN

IA

N O

R F

O L K

N A

V A

L S

H

IP

Y A

R D

D R

Y D

O C

K

M O

D E

R N

IZ

A

TI

O

N

1806701

A P

P R

D A

T E

D E

S C

R

IP

T

IO

N S

Y M

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

P

LO

T T

E D

F

IL

E

N A

M E

DRAWING SCALES SHOWN BASED ON 34" x 22" DRAWING

JTW

CAH/ELS

DSN

LA

FA

Y E

TT

E

R

IV

E R

A N

N E

X

N O

R

FO

LK

, V

A

DATE

WILLIAM B. FORBES, PE

11/20/2024

MICHAEL A. WASSELL

NNSY CODE 900F.1

DIVISION HEAD

WILLIAM B. FORBES, PE

NAVFAC ATLANTIC

ENGINEERING & DESIGN DIRECTOR

01/14/2025

/3

/2

:4 :3

P

M C

U s e rs

\e ri n .c o x \R e v it L o ca lF ile s\ D

R Y

D P

D D

-1

-M

S -D

D E ri n C

V

E R

.r v t

MS105

M E

C H

A N

IC

A

L U

T

IL

IT

IE

S P

LA

N

A

R E

A

DMG

14145167

PJB EBC

NORTH

1. 4" FW PIPING. FOR CONTINUATION OF FW PIPING, REFER TO SHEET

CU105.

2. LOCATION OF REFUELING TUNNEL, REFER TO SHEET MS401 FOR

PLAN AND SECTION OF THE REFUELING TUNNEL.

3. SW RISER, SEE D1/MS501 FOR RISER REQUIREMENTS.

4. FW RISER, SEE D2/MS501 FOR RISER REQUIREMENTS.

5. CA COPING MANIFOLD, SEE A2/MS501 FOR RISER REQUIREMENTS.

6. CHT RISER, SEE B1/MS501 FOR RISER REQUIREMENTS.

7. STM RISER, SEE B2/MS501 FOR RISER REQUIREMENTS.

8. 4" CA PIPING DOWN TO DOCK FLOOR, FOR CONTINUATION REFER

TO SHEET MS205.

9. 6" SW…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .