This is a Justification for Other Than Full and Open Competition (JOFOC) document for the inclusion of a brand name requirement in solicitation N62470-24-R-0062 for the Dry Dock 3 Modernization project at Norfolk Naval Shipyard. The document justifies the sole-source procurement of Schneider Electric Shunt Trip Breakers (MX1/XF) 48VDc at an estimated cost of $14,700.

The justification cites brand name specifications as the basis for limited competition, as the breakers are required to replace existing components in a Schneider Electric panel. The existing circuit breakers within Substation P1F are Schneider's Materpact type NW and NT breakers, which include Spring Charging Motors, Shunt Trip coils, and Closing coils. The 48VDC shunt trip coil is specified as a direct replacement for the currently installed 120VAC coil, requiring contractor rewiring to the 48VDC source compartment. The period of performance for the overall solicitation is January 2026 to May 2031.

View the file

Other files

File Type Posted
N6247024R0062 0009.pdf PDF
Attachment AM - 1806701Amend0009-SPC-APPENDIX A2.pdf PDF
Attachment AL - 1806701Amend0009-DWG.pdf PDF
Attachment AM - 1806701Amend0008-DWG.pdf PDF
Attachment AL - 1806701Amend0008-SPC.pdf PDF
N6247024R0062 0008.pdf PDF
N6247024R0062 0007.pdf PDF
N6247024R0062 0006.pdf PDF
Attachment AK - Utility Bridge.pdf PDF
Attachment AJ - 1806701Amend0005-DWG.pdf PDF
Attachment D - Historical_Small_Business_Utilization (2).pdf PDF
Attachment E - Small_Business_Participation_Commitment_Document (1).pdf PDF
N6247024R0062 0005.pdf PDF
Attachment AG - 1806701Amend0004dwg.pdf PDF
Attachment AI - MIL-DTL-29229B.pdf PDF
N6247024R0062 - 0004.pdf PDF
Attachment AH - 18906701Amend0003-SPC-APPENDIX A2.pdf PDF
ATTACHMENT AF - DD3 EPA Schedule.pdf PDF
Attachment W - 1806701Amend0003-SPC-APPENDIX K.pdf PDF
Attachment Z - DD3 SID Package.pdf PDF
ATTACHMENT AD - Davis-Bacon Act WD VA20250209.pdf PDF
Attachment V - 1806701Amend0003-SPC-APPENDIX I.pdf PDF
ATTACHMENT AE - Award Fee Plan.pdf PDF
Attachment AA - Site Visit Photos.pdf PDF
Attachment X - 1806701Amend0003 - DWG.pdf PDF
Attachment Y - DD3 FFE Package.pdf PDF
N6247024R0062 0003.pdf PDF
Attachment U - 1806701Amend0003-SPC-APPENDIX A1.pdf PDF
ATTACHMENT AC - Davis-Bacon Act WD VA20250161.pdf PDF
ATTACHMENT AB - Davis-Bacon Act WD VA20250001.pdf PDF
Attachment Q - LANT JA HSQ Technologies_Redacted.pdf PDF
Attachment P - DD3 RFP Site Visit Handout.pdf PDF
Attachment R - LANT JA Limitorque_Redacted.pdf PDF
Revised Attachment G - Price Proposal Form Amend 0002.pdf PDF
N6247024R0062 0002.pdf PDF
Attachment S - 1806701Amend0002dwg.pdf PDF
Attachment O - Site Visit Log.pdf PDF
Attachment T - DD3 Record of Categorical Exclusion.pdf PDF
Attachment N - Directions to PWD_ROICC trailer.pdf PDF
Attachment K - 2025 RIOCC CVS SPONSOR NNSY TEMPLATE.xlsx XLSX spreadsheet
N6247024R0062 Amendment 0001.pdf PDF
Attachment L - 2025 RIOCC ODP DBIDS.xlsx XLSX spreadsheet
Attachment M - SECNAV 5512 exp 2027.pdf PDF
1806701-SPC-APPENDIX C.pdf PDF
1806701-SPC-APPENDIX G.pdf PDF
Attachment B - Past_Performance_Questionnaire (1).docx DOCX document
Attachment F - Individual_Small_Business_Subcontracting_Plan.pdf PDF
Attachment E - Small_Business_Participation_Commitment_Document (1).pdf PDF
1806701-DWG-12of15.pdf PDF
P1062 DD3 Modernization Complex Award Fee Plan.pdf PDF
Show 40 more

Latest 50 of 85 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUG 2018

SUBJ: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN

ACQUISITION UNDER THE SIMPLIFIED ACQUISITION THRESHOLD

I. BACKGROUND:

1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

This Justification and Approval seeks to require inclusion of a brand name in the solicitation N62470-24-R-0062 MILCON P1062 DBB, Dry Dock 3 Modernization. The specific items being requested is Schneider Electric Shunt Trip Breakers (MX1/XF) 48VDc. The breakers are required to replace breakers in an existing Schneider Electric panel and are necessary as they are a physically dimensioned direct replacement. Authority to name Schneider Electric as a required source is necessary because the products meets the solicitation’s specific needs. The units are being procured under the referenced solicitation which has a period of performance of Jan 2026 to May 2031. The unit’s estimated cost is $14,700.

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN

COMPETITION IS BASED ON THE FOLLOWING:

A. ONLY ONE RESPONSIBLE SOURCE (select all that apply):

1. RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.

2. EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.

3. OTHER REASONS. Other reason not identified above. Provide details on mission impact if requirement is not solicited from only one source.

B. _X_ BRAND NAME. Item required must be a brand name product, or feature of a product, particular to one manufacturer.

The existing circuit breakers within Substation P1F are Schneider’s Materpact type NW and NT breakers. Both breaker types are electrically operated. All NW and NT breakers within P1F include Spring Charging Motors, Shunt Trip coils, and Closing coils, which are isolated components from one another. Schneider allows these components to be the same voltage or all different voltages, including DC voltages. A 48VDC shunt trip coil is offered as a direct replacement to the 120VAC coil currently installed in each of the breakers. The shunt trip coils are field serviceable and will require a contractor to rewire them to the 48VDC source compartment.

C. UNUSUAL AND COMPELLING URGENCY. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals.

Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:

1. Date on which the requirement was first identified:

2. Required delivery date/period of performance:

3. Explanation of why delivery/commencement of services by the date mentioned above is required:

4. If appropriate, include any additional pertinent information.

IV. CERTIFICATIONS/APPROVALS:

Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.

Contracting Officer Approval

I certify that this Justification is accurate and complete to the best of my knowledge and belief.

SUBJ: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER THE SIMPLIFIED ACQUISITION THRESHOLD
II. DESCRIPTION OF ITEM OR SERVICE:
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED ON THE FOLLOWING:
Contracting Officer Approval