ARMY FAMILY HOUSING P-91332
VICENZA, ITALY
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14
REVISED 24 May 2023
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 - BASE PRICE. Price includes the following:
CLIN 0001AA. Price for the entire work to construct 30 Housing Units
GFOQ 20060; GFOQ 20070; Officer Housing Units(OH) 20180, 20170, 20160, and 20150; Apartment Buildings 22100, 22200, and 22300 - at Villaggio complete to the 1.5 meter line outside of the building, in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).
CLIN DESCRIPTION TOTAL PRICE FOR
CLIN 0001AA
0001AA Construction of 30 Housing Units
CLIN 0001AB: Price for the entire project Site Work at Villaggio, including demolition of existing structures and including site work outside the 1.5 meter line, in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).
0001AB
0001AB Site Work
CLIN 0001AC. Price for demolition and disposal of Sanitary
Sewer Piping that contains Asbestos. Asbestos Sanitary Sewer
Pipe was encountered during the Army Family Housing Phase 1 demolition in older sanitary sewer pipes ranging from 150 to 300
MM in diameter. Contractor to provide costs for removal and disposal of 200 Meters of ACM sanitary sewer pipe in the base bid. Contractor to provide a Unit price for removal and disposal of ACM Pipe. The Unit Price will be applied as an add or deduct to the CLIN for the total length of ACM Pipe removal and disposal. Contracting Officer must be notified of any ACM pipe encountered and total length documented. Sanitary Sewer pipe demolition contained in CLIN 0001AB, in accordance with drawings and specifications and in accordance with the following schedule:
CLIN ITEM UNIT UNIT PRICE
($/Meters)
NO. UNITS TOTAL PRICE FOR
CLIN 0001AC
(UNIT PRICE X
NO. UNITS)
0001AC Sanitary Sewer
Pipe
Containing
Asbestos
Linear
Meters
200 Liner
Meters
CLIN 0001 TOTAL [WHICH INCLUDES: 0001AA+0001AB+0001AC] = $__________
CLIN 0002 Option Item No. 1 - Price includes the following:
Price for entire work in connection with providing (furnishing and installation of) Rouladen Shading devices and deleting the In-Between
Glass Shading Devices for the 30 units included in CLIN 0001AA as indicated, in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).
CLIN 0002
0002 Delete Shading devices included in the Base Bid and Provide
(Furnish and Install) Rouladen
Shades where indicated
CLIN 0003 Option Item No. 2 - Price includes the following:
CLIN 0003 Price for the entire work to construct 10 Housing Units
Apartment Building 22400, - at Villaggio complete to the 1.5 meter line outside of the building, in accordance with the drawings and
CLIN 0003
0003 Construction of 10 Housing Units
CLIN 0004 Option Item No. 3 - Price includes the following:
Glass Shading Devices for the 10 units included in CLIN 0003 as indicated in accordance with the drawings and specifications and excludes all other contract line items (CLINs).
CLIN 0004
0004 Delete Shading devices in the
CLIN 0003 and Provide (Furnish and Install) Rouladen Shades where indicated
CLIN 0005 Option Item No. 4 - Price includes the following:
CLIN 0005AA. Price for the entire work to construct 8 Housing Units
Townhome Buildings 22540/22535/22530/22525/22520/22515/22510/22505 - at
Villaggio complete to the 1.5 meter line outside of the building, in accordance with the drawings and specifications, and excludes all other
CLIN 0005AA
0005AA Construction of 8 Housing Units
CLIN 0005AB. Price for providing all work (furnish and install) in connection with the Torino Neighborhood playground (refer to sheet LS411), in accordance with the drawings and specifications, and excludes all other
This CLIN 0005AB does not include: (1) Rough and Finish grading and (2) all site utilities including electrical power to each playground light pole; these items must be priced as part of the base CLIN 0001.
CLIN 0005AB
0005AB Torino Neighborhood playground
CLIN 0005 TOTAL [WHICH INCLUDES: 0005AA+0005AB] = $__________
CLIN 0006 Option Item No. 5 - Price includes the following:
Glass Shading Devices for the 8 units included in CLIN 0005 as indicated in accordance with the drawings and specifications and excludes all other
CLIN 0006
0006 Delete Shading devices included in the CLIN 0005 and Provide
CLIN 0007 Option Item No. 6 - Price includes the following:
CLIN 0007 Price for the entire work to construct 10 Housing Units
Apartment Buildings 21200, - at Villaggio complete to the 1.5 meter line
CLIN 0007
0007 Construction of 10 Housing Units
CLIN 0008 Option Item No. 7 - Price includes the following:
Glass Shading Devices for the 10 units, included in CLIN 0007 as indicated
CLIN 0008
0008 Delete Shading devices in the
CLIN 0007 and Provide (Furnish
CLIN 0009 Option Item No. 8 - Price includes the following:
CLIN 0009 Price for the entire work to construct 5 Housing Units Townhome
Buildings 21305, 21310, 21315, 21320,21325 - at Villaggio complete to the
1.5 meter line outside of the building, in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).
CLIN 0009
0009 Construction of 5 Housing Units
CLIN 0010 Option Item No. 9 - Price includes the following:
Glass Shading Devices for the 5 units included in CLIN 0009 as indicated
CLIN 0010
0010 Delete Shading devices in the
CLIN 0009 and Provide (Furnish
CLIN 0011 Option Item No. 10 - Price includes the following:
CLIN 0011 Price for the entire work to construct 7 Housing Units Townhome
Buildings 21405, 21410, 21415, 21420, 21415, 21430, 21435 - at Villaggio complete to the 1.5 meter line outside of the building, in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).
CLIN 0011
0011 Construction of 7 Housing Units
CLIN 0012 Option Item No. 11 - Price includes the following:
Glass Shading Devices for the 7 units included in CLIN 0011 as indicated
CLIN 0012
0012 Delete Shading devices included in the CLIN 0011 and Provide
CLIN 0013 Option Item No. 12 - Price includes the following:
CLIN 0013 Price for the entire work to construct 10 Housing Units
Apartment Building 21500 - at Villaggio complete to the 1.5 meter line
CLIN 0013
0013 Construction of 10 Housing Units
CLIN 0014 Option Item No. 13 - Price includes the following:
Glass Shading Devices for the 10 units included in CLIN 0013 as indicated
CLIN 0014
0014 Delete Shading devices in the
CLIN 0013 and Provide (Furnish
CLIN 0015 Option Item No. 14 - Price includes the following:
CLIN 0015AA. Price for the entire work to construct 13 Housing Units
Townhome Buildings 21165, 21160, 21155, 21150, 21145, 21140, 21135, 21130, 21125, 21120, 21115, 21110, 21105 - at Villaggio complete to the 1.5 meter line outside of the building, in accordance with the drawings and
CLIN 0015AA
0015AA Construction of 13 Housing Units
CLIN 0015AB. Price for providing all work (furnish and install) in connection with the PISA Neighborhood playground (refer to sheet LS412), This CLIN 0015AB does not include: (1) Rough and Finish grading and (2)
CLIN 0015AB
0015AB PISA Neighborhood playground
CLIN 0015 TOTAL [WHICH INCLUDES: 0015AA+0015AB] = $__________
CLIN 0016 Option Item No. 15 - Price includes the following:
Glass Shading Devices for the 13 units included in CLIN 0015 as indicated
CLIN 0016
0016 Delete Shading devices in the
CLIN 0013 and Provide (Furnish
CLIN 0017 Option Item No. 16 - Price includes the following:
CLIN 0017AA. Price for the entire work to construct 6 Officer Housing
Units 20190, 20185, 20175, 20165, 20155, 20145 - at Villaggio complete to the 1.5 meter line outside of the building, in accordance with the drawings and specifications, and excludes all other contract line items
(CLINs).
CLIN 0017AA
0017AA Construction of 6 Housing Units
CLIN 0017AB. Price for providing all work (furnish and install) in connection with the ROMA Neighborhood playground (refer to sheet LS403), This CLIN 0017AB does not include: (1) Rough and Finish grading and (2)
CLIN 0017AB
0017AB ROMA Neighborhood playground
CLIN 0017 TOTAL [WHICH INCLUDES: 0017AA+0017AB] = $__________
CLIN 0018 Option Item No. 17 - Price includes the following:
Glass Shading Devices for the 6 units included in CLIN 0017 as indicated
CLIN 0018
0018 Delete Shading devices in the
CLIN 0017 and Provide (Furnish
CLIN 0019 Option Item No. 18 - Price includes the following:
CLIN 0019. Price for the entire work to construct 8 Officer Housing Units
20110, 20120, 20130, 20140, 20105, 20115, 20125, 20135 - at Villaggio complete to the 1.5 meter line outside of the building, in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).
CLIN 0019
0019 Construction of 8 Housing Units
CLIN 0020 Option Item No. 19 - Price includes the following:
Glass Shading Devices for the 8 units included in CLIN 0019 as indicated
CLIN 0020
0020 Delete Shading devices in the
CLIN 0019 and Provide (Furnish
CLIN TOTAL [WHICH INCLUDES: CLINs 0001 through 0020] = $__________
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Item[s] CLIN 0001 through CLIN 0020.
b. The Government intends to award a contract to a single contractor for CLIN 0001, with CLINs 0002 through CLIN 0020 as priced options.
The Government reserves the unilateral right to award CLINs 0002 through 0020 to the Contractor at the proposed price at the time of award or within 270 calendar days after issuance of the NOTICE TO
PROCEED. A firm fixed proposed price is required for ALL CLINs
(CLINs 0001 through 0020). No provision is made for economic price adjustment.
If all CLINS are exercised at the time of award, the contract completion date remains 800 calendar days after issuance of the
NOTICE TO PROCEED. The award of one or more options will NOT extend the contract completion date (regardless of the number of options awarded). Offerors not submitting pricing for all CLINs will be considered nonresponsive to the solicitation and will not be evaluated.
The award of one or more options will NOT extend the contract completion date (regardless of the number of options awarded).
Offerors not submitting pricing for all CLINs will be considered nonresponsive to the solicitation and will not be evaluated.
c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN
0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the
Option(s).
d. If CLINs 0002 through 0020 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.