Revised Attachment E - Schedule B Price Proposal Form_24MAY2023.pdf

PDF 353 KB Posted

Attached to
P91332, Phase 4 Family Housing at Villaggio, Vicenza, Italy
Solicitation number
N6247023R0004
Issued by

View the file

Other files

File Type Posted
N6247023R0004 Amend 0008.pdf PDF
N6247023R0004 Amend 0007.pdf PDF
Attachment AG_Amend0006_DWG_CIVIL.pdf PDF
N6247023R0004 Amend 0006.pdf PDF
Attachment AF_Amend0006_DWG_ELEC.pdf PDF
Attachment AH_Amend0006_DWG_LARCH.pdf PDF
Attachment AE_Amend0006_Spec.pdf PDF
Attachment AD_DWG_1of1_ARCH.pdf PDF
Attachment AC_Amend0005_Spec.pdf PDF
N6247023R0004 Amend 0005.pdf PDF
Attachment Z - Amend0004_DWG_10of12_PLUMB.pdf PDF
Attachment AB - Amend0004_DWG_12of12_TELECOM.pdf PDF
Attachment X - Amend0004_DWG_8of12_INT.pdf PDF
Attachment AA - Amend0004_DWG_11of12_ELEC.pdf PDF
Attachment Q - Amend0004_DWG_1of12_GEN.pdf PDF
Attachment Y - Amend0004_DWG_9of12_FPE.pdf PDF
Attachment W - Amend0004_DWG_7of12_ARCH02.pdf PDF
Attachment R - Amend0004_DWG_2of12_CIV01.pdf PDF
N6247023R0004 Amend 0004.pdf PDF
Attachment V - Amend0004_DWG_6of12_ARCH01.pdf PDF
Attachment T - Amend0004_DWG_4of12_LARCH.pdf PDF
Attachment P - Amend0004_Spec Changes.pdf PDF
Attachment U - Amend0004_DWG_5of12_STR.pdf PDF
Attachment S - Amend0004_DWG_3of12_CIV02.pdf PDF
N6247023R0004 Amend 0003.pdf PDF
Attachment O - Site Visit Roster.pdf PDF
N6247023R0004 Amend 0002.pdf PDF
N6247023R0004 Amend 0001.pdf PDF
Attachment H - DWG_24of42.pdf PDF
Attachment H - DWG_06of42.pdf PDF
Attachment K - HAZMAT Report.pdf PDF
Attachment H - DWG_34of42.pdf PDF
Attachment H - DWG_19of42.pdf PDF
Attachment H - DWG_01of42.pdf PDF
Attachment H - DWG_42of42.pdf PDF
Attachment H - DWG_32of42.pdf PDF
Attachment L - DWG Index.pdf PDF
Attachment H - DWG_29of42.pdf PDF
Attachment H - DWG_12of42.pdf PDF
Attachment H - DWG_14of42.pdf PDF
Attachment H - DWG_21of42.pdf PDF
Attachment H - DWG_30of42.pdf PDF
Attachment M - Anti-Mafia Self-Certification Form for Contracts between 150000 and 5382000.pdf PDF
Attachment I - UXO Report.pdf PDF
Attachment H - DWG_39of42.pdf PDF
Attachment H - DWG_18of42.pdf PDF
Attachment H - DWG_23of42.pdf PDF
Attachment H - DWG_35of42.pdf PDF
Attachment H - DWG_08of42.pdf PDF
Attachment H - DWG_10of42.pdf PDF
Show 40 more

Latest 50 of 85 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARMY FAMILY HOUSING P-91332

VICENZA, ITALY

DOCUMENT 00 22 13.00 20

SUPPLEMENTARY INSTRUCTIONS TO OFFERORS

02/14

REVISED 24 May 2023

PART 1 GENERAL

1.1 CONTRACT LINE ITEMS

The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.

Provide the Contract Line Item (CLIN) lump sum price for the following items:

CLIN 0001 - BASE PRICE. Price includes the following:

CLIN 0001AA. Price for the entire work to construct 30 Housing Units

GFOQ 20060; GFOQ 20070; Officer Housing Units(OH) 20180, 20170, 20160, and 20150; Apartment Buildings 22100, 22200, and 22300 - at Villaggio complete to the 1.5 meter line outside of the building, in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).

CLIN DESCRIPTION TOTAL PRICE FOR

CLIN 0001AA

0001AA Construction of 30 Housing Units

CLIN 0001AB: Price for the entire project Site Work at Villaggio, including demolition of existing structures and including site work outside the 1.5 meter line, in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).

0001AB

0001AB Site Work

CLIN 0001AC. Price for demolition and disposal of Sanitary

Sewer Piping that contains Asbestos. Asbestos Sanitary Sewer

Pipe was encountered during the Army Family Housing Phase 1 demolition in older sanitary sewer pipes ranging from 150 to 300

MM in diameter. Contractor to provide costs for removal and disposal of 200 Meters of ACM sanitary sewer pipe in the base bid. Contractor to provide a Unit price for removal and disposal of ACM Pipe. The Unit Price will be applied as an add or deduct to the CLIN for the total length of ACM Pipe removal and disposal. Contracting Officer must be notified of any ACM pipe encountered and total length documented. Sanitary Sewer pipe demolition contained in CLIN 0001AB, in accordance with drawings and specifications and in accordance with the following schedule:

CLIN ITEM UNIT UNIT PRICE

($/Meters)

NO. UNITS TOTAL PRICE FOR

CLIN 0001AC

(UNIT PRICE X

NO. UNITS)

0001AC Sanitary Sewer

Pipe

Containing

Asbestos

Linear

Meters

200 Liner

Meters

CLIN 0001 TOTAL [WHICH INCLUDES: 0001AA+0001AB+0001AC] = $__________

CLIN 0002 Option Item No. 1 - Price includes the following:

Price for entire work in connection with providing (furnishing and installation of) Rouladen Shading devices and deleting the In-Between

Glass Shading Devices for the 30 units included in CLIN 0001AA as indicated, in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).

CLIN 0002

0002 Delete Shading devices included in the Base Bid and Provide

(Furnish and Install) Rouladen

Shades where indicated

CLIN 0003 Option Item No. 2 - Price includes the following:

CLIN 0003 Price for the entire work to construct 10 Housing Units

Apartment Building 22400, - at Villaggio complete to the 1.5 meter line outside of the building, in accordance with the drawings and

CLIN 0003

0003 Construction of 10 Housing Units

CLIN 0004 Option Item No. 3 - Price includes the following:

Glass Shading Devices for the 10 units included in CLIN 0003 as indicated in accordance with the drawings and specifications and excludes all other contract line items (CLINs).

CLIN 0004

0004 Delete Shading devices in the

CLIN 0003 and Provide (Furnish and Install) Rouladen Shades where indicated

CLIN 0005 Option Item No. 4 - Price includes the following:

CLIN 0005AA. Price for the entire work to construct 8 Housing Units

Townhome Buildings 22540/22535/22530/22525/22520/22515/22510/22505 - at

Villaggio complete to the 1.5 meter line outside of the building, in accordance with the drawings and specifications, and excludes all other

CLIN 0005AA

0005AA Construction of 8 Housing Units

CLIN 0005AB. Price for providing all work (furnish and install) in connection with the Torino Neighborhood playground (refer to sheet LS411), in accordance with the drawings and specifications, and excludes all other

This CLIN 0005AB does not include: (1) Rough and Finish grading and (2) all site utilities including electrical power to each playground light pole; these items must be priced as part of the base CLIN 0001.

CLIN 0005AB

0005AB Torino Neighborhood playground

CLIN 0005 TOTAL [WHICH INCLUDES: 0005AA+0005AB] = $__________

CLIN 0006 Option Item No. 5 - Price includes the following:

Glass Shading Devices for the 8 units included in CLIN 0005 as indicated in accordance with the drawings and specifications and excludes all other

CLIN 0006

0006 Delete Shading devices included in the CLIN 0005 and Provide

CLIN 0007 Option Item No. 6 - Price includes the following:

CLIN 0007 Price for the entire work to construct 10 Housing Units

Apartment Buildings 21200, - at Villaggio complete to the 1.5 meter line

CLIN 0007

0007 Construction of 10 Housing Units

CLIN 0008 Option Item No. 7 - Price includes the following:

Glass Shading Devices for the 10 units, included in CLIN 0007 as indicated

CLIN 0008

0008 Delete Shading devices in the

CLIN 0007 and Provide (Furnish

CLIN 0009 Option Item No. 8 - Price includes the following:

CLIN 0009 Price for the entire work to construct 5 Housing Units Townhome

Buildings 21305, 21310, 21315, 21320,21325 - at Villaggio complete to the

1.5 meter line outside of the building, in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).

CLIN 0009

0009 Construction of 5 Housing Units

CLIN 0010 Option Item No. 9 - Price includes the following:

Glass Shading Devices for the 5 units included in CLIN 0009 as indicated

CLIN 0010

0010 Delete Shading devices in the

CLIN 0009 and Provide (Furnish

CLIN 0011 Option Item No. 10 - Price includes the following:

CLIN 0011 Price for the entire work to construct 7 Housing Units Townhome

Buildings 21405, 21410, 21415, 21420, 21415, 21430, 21435 - at Villaggio complete to the 1.5 meter line outside of the building, in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).

CLIN 0011

0011 Construction of 7 Housing Units

CLIN 0012 Option Item No. 11 - Price includes the following:

Glass Shading Devices for the 7 units included in CLIN 0011 as indicated

CLIN 0012

0012 Delete Shading devices included in the CLIN 0011 and Provide

CLIN 0013 Option Item No. 12 - Price includes the following:

CLIN 0013 Price for the entire work to construct 10 Housing Units

Apartment Building 21500 - at Villaggio complete to the 1.5 meter line

CLIN 0013

0013 Construction of 10 Housing Units

CLIN 0014 Option Item No. 13 - Price includes the following:

Glass Shading Devices for the 10 units included in CLIN 0013 as indicated

CLIN 0014

0014 Delete Shading devices in the

CLIN 0013 and Provide (Furnish

CLIN 0015 Option Item No. 14 - Price includes the following:

CLIN 0015AA. Price for the entire work to construct 13 Housing Units

Townhome Buildings 21165, 21160, 21155, 21150, 21145, 21140, 21135, 21130, 21125, 21120, 21115, 21110, 21105 - at Villaggio complete to the 1.5 meter line outside of the building, in accordance with the drawings and

CLIN 0015AA

0015AA Construction of 13 Housing Units

CLIN 0015AB. Price for providing all work (furnish and install) in connection with the PISA Neighborhood playground (refer to sheet LS412), This CLIN 0015AB does not include: (1) Rough and Finish grading and (2)

CLIN 0015AB

0015AB PISA Neighborhood playground

CLIN 0015 TOTAL [WHICH INCLUDES: 0015AA+0015AB] = $__________

CLIN 0016 Option Item No. 15 - Price includes the following:

Glass Shading Devices for the 13 units included in CLIN 0015 as indicated

CLIN 0016

0016 Delete Shading devices in the

CLIN 0013 and Provide (Furnish

CLIN 0017 Option Item No. 16 - Price includes the following:

CLIN 0017AA. Price for the entire work to construct 6 Officer Housing

Units 20190, 20185, 20175, 20165, 20155, 20145 - at Villaggio complete to the 1.5 meter line outside of the building, in accordance with the drawings and specifications, and excludes all other contract line items

(CLINs).

CLIN 0017AA

0017AA Construction of 6 Housing Units

CLIN 0017AB. Price for providing all work (furnish and install) in connection with the ROMA Neighborhood playground (refer to sheet LS403), This CLIN 0017AB does not include: (1) Rough and Finish grading and (2)

CLIN 0017AB

0017AB ROMA Neighborhood playground

CLIN 0017 TOTAL [WHICH INCLUDES: 0017AA+0017AB] = $__________

CLIN 0018 Option Item No. 17 - Price includes the following:

Glass Shading Devices for the 6 units included in CLIN 0017 as indicated

CLIN 0018

0018 Delete Shading devices in the

CLIN 0017 and Provide (Furnish

CLIN 0019 Option Item No. 18 - Price includes the following:

CLIN 0019. Price for the entire work to construct 8 Officer Housing Units

20110, 20120, 20130, 20140, 20105, 20115, 20125, 20135 - at Villaggio complete to the 1.5 meter line outside of the building, in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).

CLIN 0019

0019 Construction of 8 Housing Units

CLIN 0020 Option Item No. 19 - Price includes the following:

Glass Shading Devices for the 8 units included in CLIN 0019 as indicated

CLIN 0020

0020 Delete Shading devices in the

CLIN 0019 and Provide (Furnish

CLIN TOTAL [WHICH INCLUDES: CLINs 0001 through 0020] = $__________

1.2 GENERAL BID NOTES

a. Award will be made on the total sum of Contract Line Item[s] CLIN 0001 through CLIN 0020.

b. The Government intends to award a contract to a single contractor for CLIN 0001, with CLINs 0002 through CLIN 0020 as priced options.

The Government reserves the unilateral right to award CLINs 0002 through 0020 to the Contractor at the proposed price at the time of award or within 270 calendar days after issuance of the NOTICE TO

PROCEED. A firm fixed proposed price is required for ALL CLINs

(CLINs 0001 through 0020). No provision is made for economic price adjustment.

If all CLINS are exercised at the time of award, the contract completion date remains 800 calendar days after issuance of the

NOTICE TO PROCEED. The award of one or more options will NOT extend the contract completion date (regardless of the number of options awarded). Offerors not submitting pricing for all CLINs will be considered nonresponsive to the solicitation and will not be evaluated.

The award of one or more options will NOT extend the contract completion date (regardless of the number of options awarded).

Offerors not submitting pricing for all CLINs will be considered nonresponsive to the solicitation and will not be evaluated.

c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN

0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the

Option(s).

d. If CLINs 0002 through 0020 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.