AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
MILCON PROJECT P-91332 FAMILY HOUSING PHASE 4 AT VILLAGGIO AT VICENZA, ITALY
Please see Block 14 Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-May-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247023R0004
X 9B. DATED (SEE ITEM 11)
28-Mar-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-May-2023
CODE
COMNAVFACSYSCOM ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247023R0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005
The purpose of this amendment is to:
1. Respond to Pre-Proposal Inquiries (PPIs)
2. Specification Revisions
3. Drawing Revisions
4. Provide Attachments
1. Responses to PPIs
15. Inquiry: (Reference: Price Schedule) Kindly confirm that under CLIN0015, regarding the external works, only excavation and earthworks will be included under this CLIN.
Response: Please see the revised Attachment E – SCHEDULE B PRICE PROPOSAL FORM included with this amendment.
16. Inquiry: (Reference: Project Drawings) Please provide a drawing that indicates Phase 4 project access and available laydown areas now that Phases 2 and 3 have started and the project site has been separated from the Villagio educational campus. Will the temporary road currently in place remain until completion of Phases 2, 3 and 4?
Response: Please review Drawings C-005 for Construction access routes and suggested laydown areas and C-006 for traffic requirements. See specification section 01 14 00 WORK RESTRICTIONS, section 1.2 Special Scheduling Requirements for the enclave information. Propose in accordance with the solicitation.
2. Specification Revisions
Section 08 22 20 FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES, is deleted in its entirety and is replaced with Section 08 22 20 FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES dated 24 May 2023 and accompanies this amendment.
3. Drawing Revisions
The following drawings are revised as of 24 May 2023 and accompany this Amendment.
NAVFAC DWG NO. Title
14126593 (A-421) 3BR CORNER TH GROUND, FIRST AND SECOND FLOOR PLANS 3BR CORNER
TH PIANTA PIANO TERRA, PRIMO E SECONDO
14126717 (A-623) TOWNHOUSE BUILDINGS DOOR SCHEDULES TOWNHOUSE ABACO TELAIO
PORTA
14126719 (A-630) GFOQ BUILDING 20060 DOOR SCHEDULE SCHEMI DELLA PORTA GFOQ
EDIFICIO 20060
N6247023R0004
On NAVFAC Drawings 14127123 (EP111), 14127124 (EP112), 14127125 (EP113), 14127126 (EP114), 14127127 (EP115), 14127137 (EP301), 14127138 (EP302), 14127148 (EP410), 14127149 (EP411), 14127150
(EP420), 14127151 (EP421), 14127152 (EP422)
General Sheet Notes: Add note 9 “9. Replace fused type disconnect switches with non-fused type disconnect switches as follows: Where a fused disconnect serves a single piece of equipment on a dedicated circuit substitute the fused disconnect with a non-fused disconnect of a size rated for the number of poles, voltage and amperage of the equipment. Where a single circuit feeds multiple fused disconnects and pieces of equipment, the fused disconnects shall remain. These fused disconnects are to be fused per the manufactures maximum overcurrent protection recommendations.”
On NAVFAC Drawings 14127128 (EP121), 14127129 (EP122), 14127130 (EP123), 14127131 (EP124), 14127132 (EP125)
General Sheet Notes: Add note 10 “10. Replace fused type disconnect switches with non-fused type disconnect switches as follows: Where a fused disconnect serves a single piece of equipment on a dedicated circuit substitute the fused disconnect with a non-fused disconnect of a size rated for the number of poles, voltage and amperage of the equipment. Where a single circuit feeds multiple fused disconnects and pieces of equipment; the fused disconnects shall remain. These fused disconnects are to be fused per the manufactures maximum overcurrent protection recommendations.”
On NAVFAC Drawings 14127153 (EP430), 14127154 (EP431) General Notes This Sheet: Add note J “J. Replace fused type disconnect switches with non-fused type disconnect switches as follows: Where a fused disconnect serves a single piece of equipment on a dedicated circuit substitute the fused disconnect with a non-fused disconnect of a size rated for the number of poles, voltage and amperage of the equipment. Where a single circuit feeds multiple fused disconnects and pieces of equipment; the fused disconnects shall remain. These fused disconnects are to be fused per the manufactures maximum overcurrent protection recommendations.”
On NAVFAC Drawings 14127165 (EP494) General Sheet Notes: Add note 8 “8. Replace fused type disconnect switches with non-fused type disconnect switches as follows: Where a fused disconnect serves a single piece of equipment on a dedicated circuit substitute the fused disconnect with a non-fused disconnect of a size rated for the number of poles, voltage and amperage of the equipment. Where a single circuit feeds multiple fused disconnects and pieces of equipment; the fused disconnects shall remain. These fused disconnects are to be fused per the manufactures maximum overcurrent protection recommendations.”
4. Provide Attachments
• Revised Attachment E - Schedule B Price Proposal Form_24MAY2023
• Attachment AC_Amend0005_Spec
• Attachment AD_DWG_1of1_ARCH
(End of Summary of Changes)