View the file

Other files

File Type Posted
N6247022R0007 NRL-CBD Amend 0005.pdf PDF
N6247022R0007 NRL-CBD Amend 0004.pdf PDF
J-0200000-13 ELINS NRL Amendment 0004.xlsx XLSX spreadsheet
J-1502000-06 PM Service Matrix - Amendment 0003.xlsx XLSX spreadsheet
J-0200000-13 ELINS NRL Amendment 0003.xlsx XLSX spreadsheet
J-1501000-05 Asset Inventories - Amendment 0003.xlsx XLSX spreadsheet
J-0200000-02-02 Wage Determination No. 2015-4281 Rev. 12272022.pdf PDF
J-0600000 Port Operations - Amendment 0003.pdf PDF
J-1502000 Facility Investment Amendment 0003.pdf PDF
J-1503060 Pavement Clearance - Amendment 0003.pdf PDF
J-1503050 Grounds Maint and Landscaping - Amendment 0003.pdf PDF
J-1502000-16.a Interior and Exterior Lighting Systems Amendment 0003.xlsx XLSX spreadsheet
J-1502000-03 NRL Facilities Description - Amendment 0003.xlsx XLSX spreadsheet
J-1503010-04 CBD Custodial Inventory - Amendment 0003.xlsx XLSX spreadsheet
Attachment F - Section F Deliverables (Amendment 0003).pdf PDF
J-1502000-14.a HVAC and Refrigeration Systems - Amendment 003.xlsx XLSX spreadsheet
J-1002000 Supply Services - Amendment 0003.pdf PDF
N6247022R0007 NRL-CBD Amend 0003.pdf PDF
J-1604000 Wastewater - Amendment 0003.pdf PDF
J-1700000 Transportation NRL Chesa BOSC Amend 0003.pdf PDF
J-0600000-04.a Assets List - Amendment 0003.xlsx XLSX spreadsheet
N6247022R0007 NRL-CBD Amend 0002.pdf PDF
J-1503010-05 CBD Custodial Floor Plans (Amendment 0001).pdf PDF
J-3 Section B Supplies or Services and Prices (Amendment 0001).pdf PDF
J-1503050-03.a Site Maps - CBD Grounds Map (Amendment 0001).pdf PDF
N6247022R0007 NRL-CBD Amend 0001.pdf PDF
J-9 Pre Proposal Conference NRL-CBD.pptx PPTX presentation
J-8 Pre-Proposal Site Visit Sign-In Sheet.pdf PDF
J-1700000 Transportation NRL Chesa BOSC (Amendment 0001).pdf PDF
J-1503050 Grounds Maint and Landscaping (Amendment 0001).pdf PDF
J-1503060 Pavement Clearance NRL.pdf PDF
J-1501000-05 Asset Inventories NRL.xlsx XLSX spreadsheet
J-1601000-07 Specification Attributes.xlsx XLSX spreadsheet
J-1503020 Pest Control NRL.pdf PDF
N6247022R0007 NRL-CBD Solicitation.pdf PDF
J-1502000-03 NRL Facilities Description.xlsx XLSX spreadsheet
J-5 Post-Award Limitations on Subcontracting Report-Deviation-Sept 2021.doc DOC document
J-1501000 Facility Management NRL.pdf PDF
J-2 Corporate Experience Project Data Sheet.pdf PDF
J-0200000 Management and Administration NRL.pdf PDF
J-1502000-06 PM Service Matrix.xlsx XLSX spreadsheet
J-0600000 Port Operations NRL.pdf PDF
J-0200000-13 Exhibit Line Item Numbers (ELINs).xlsx XLSX spreadsheet
J-1501000-03 NRL CBD Site Maps.pdf PDF
J-1601000 Utilities Management NRL.pdf PDF
Attachment F - Section F Deliverables.pdf PDF
J-3 Section B Supplies or Services and Prices.pdf PDF
J-1503010-04 CBD Custodial Inventory.xlsx XLSX spreadsheet
J-1800000 Environmental NRL.pdf PDF
J-1606000 Water NRL.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELINs-Base Period-RW

ATTACHMENT J-0200000-13
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N62470-22-R-0007 - NRL CBD BOS
EXHIBIT A - BASE PERIOD - RECURRING WORK
CLIN 0001
Line Item 0001 Recurring Work Price - Base Period
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 THROUGH A011
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
A001Specification 1501000 Facility Management, Spec Item 3
A001AAInfrastructure Condition Assessment Program (ICAP), Spec item 3.112MO$0.00
Specification 1501000 Facility Management Subtotal:$0.00
A002Specification 1502000 Facility Investment
Service Orders, Spec Item 3.1
A002AAEmergency Service Orders, Spec Item 3.1.112MO$0.00
A002ABUrgent Service Orders, Spec item 3.1.212MO$0.00
A002ACRoutine Service Orders, Spec Item 3.1.312MO$0.00
Preventive Maintenance (PM) Program, Spec Item 3.2
A002ADAuxiliary Generators, Spec Item 3.2.112MO$0.00
A002AERoll Up Doors, Spec Item 3.2.212MO$0.00
A002AFBackflow Prevention Devices, Spec Item 3.2.312MO$0.00
A002AGBoilers and UPVs Equipment and Systems, Spec Item 3.2.412MO$0.00
A002AHCathodic Protection Systems, Spec Item 3.2.512MO$0.00
A002AJCompressed Air Systems, Spec Item 3.2.612MO$0.00
A002AKFire Protection Systems, Spec Item 3.2.712MO$0.00
A002ALHVAC and Refrigerations Systems, Spec Item 3.2.812MO$0.00
A002AMInterior and Exterior Lighting Systems, Spec Item 3.2.912MO$0.00
Other Recurring Services, Spec Item 3.3
A002ANRoof Drains, Scuppers and Gutter Systems, Spec Item 3.3.112MO$0.00
A002APExhust Hoods and Ducts, Spec Item 3.3.212MO$0.00
A002AQSolar Panel Cleaning, Spec Item 3.3.312MO$0.00
A002AREntry Gates (Motorized and Manual)s, Spec Item 3.3.412MO$0.00
A002ASVertical Transportation Equipment (VTE) and Systems, Spec Item 3.3.512MO$0.00
Specification 1502000 Facility Investment Subtotal:$0.00
A003Specification 1503010 Custodial, Spec Item 3
A003AAScheduled Custodial Services, Spec Item 3.112MO$0.00
A003ABCustodial Service Orders, Spec Item 3.212MO$0.00
Specification 1503010 Custodial Subtotal:$0.00
A004Specification 1503020 Pest Control, Spec Item 3
A004AAScheduled Pest Control, Spec Item 3.112MO$0.00
A004ABPest Control Service Orders, Spec Item 3.212MO$0.00
A004ACPest Management Reporting, Spec Item 3.312MO$0.00
Specification 1503020 Pest Control Subtotal:$0.00
A005Specification 1503050 Grounds Maintenance and Landscaping, Spec Item 3
A005AAImproved Grounds, Spec item 3.112MO$0.00
A005ABOperational Areas, Spec Item 3.212MO$0.00
A005ACStorm Drain Systems, Spec Item 3.312MO$0.00
A005ADCliff Maintenance, Spec. Item 3.412MO$0.00
A005AESediment Pond Maintenance, Spec Item 3.512MO$0.00
A005AFDam Face Vegetation Control, Spec Item 3.612MO$0.00
A005AGGround Maintenance Service Orders, Spec Item 3.712MO$0.00
Specification 1503050 Grounds Maintenance and Landscaping Subtotal:$0.00
A006Specification 1503060 Pavement Clearance, Spec Item 3
A005AAPavement Sweeping Services, Spec Item 3.112MO$0.00
A005ABSnow and Ice Removal Services, Spec Itme 3.212MO$0.00
Specification 1503060 Pavement Clearance Subtotal:$0.00
A007Specification 1601000 Utility Management, Spec Item 3
A005AAUtility Service Orders, Spec Item 3.112MO$0.00
A005ABUtility Infrastructrue Condition Assessment (UICAP) Support, Spec Item 3.212MO$0.00
Specification 1601000 Utility Management Subtotal:$0.00
A008Specification 1602000 Electrical, Spec Item 3
A008AATest and Operate Stand-by Electrical Power Generators, Spec Item 3.112MO$0.00
A008ABIntegrated Maintenance Program, Spec Item 3.212MO$0.00
Specification 1602000 Electrical Subtotal:$0.00
A009Specification 1604000 Wastewater, Spec Item 3
A0099AAPreventive Maintenance Program, Spec Item 3.112MO$0.00
Specification 1604000 Wastewater Subtotal:$0.00
A010Specification 1606000 Water, Spec Item 3
A010AAPreventive Maintenance Program, Spec Item 3.112MO$0.00
A010ABInspection, Testing, and Certification Program, Spec Item 3.212MO$0.00
Specification 1606000 Water Subtotal:$0.00
A011Specification 0600000 Port Operations, Spec Item 3
A011AASupport Craft Maintenance, Spec Item 3.112MO$0.00
Specification 0600000 Port Operations Subtotal:$0.00
A012Specification 1002000 Supply Services, Spec Item 3
A012AAPOL Services12MO$0.00
A012ABUsed Oil Collection Services12MO$0.00
A012ACPreventive Maintenance (PM)12MO$0.00
A012ADMail Services12MO$0.00
A012AEMaterial Movement, Cargo Loading and Unloading Services12MO$0.00
Specification 1002000 Supply Services Subtotal:$0.00

TOTAL FOR LINE ITEM 0001 - BASE PERIOD - RECURRING WORK: $0.00

ELINs-Base Period-NRW

ATTACHMENT J-0200000-13
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N62470-22-R-0007 - NRL CBD BOS
EXHIBIT A - BASE PERIOD - NON-RECURRING WORK
CLIN 0002
Line Item 0002 Recurring Work Price - Base Period
PROVIDE PRICES TO PERFORM NON-RECURRING WORK SERVICES - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, AND TO PRICE ADDITIONS AND DELITIONS TO THE RECURRING WORK REQUIREMENTS - IN ACCORDANCE WITH ANNEX 0200000, SPEC ITEM 2.14.1, RECURRING WORK PREPARATION OF PROPOSAL
ELINs A700 THROUGH A848
ELINShort DescriptionLong DescriptionEstimated QuantityUnit of IssueUnit PriceExtended Price
UNIT PRICED TASK (UPT) WORK
Specification 1502000Facility Investment
A700Elevator Pit MaintenanceProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to provide elevator pit maintenance to include but not limited to checking that the lights, stop switch, and GFI outlet are all functioning properly. Inspect for signs of leaks, issues with the travel cables or moisture accumulation in the pit that might be corrosive to the exposed elevator components located under the cab. Inspect elevator buffers for signs of corrosion and misalignment. Inspect sump pump and clean and repair as necessary for proper operation. Remove any debris in elevator pit. Complete all work within 3 working days or as specified in the order.2EA$0.00
A701Chiller Rental (225 Ton)Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to rent 225 Ton chiller. Price per month to include delivery, installation, setup, removal, required cable and fittings, hose, single-point electrical connections, high-efficiency VFDs, and CFC-free refrigerants. Price per month to include delivery/removal of chiller to/from the site, installation, setup, required ancillary supplies, control panels, all connections to the facility, operation, and maintenance. Delivery within 72 hours of notification or as specified in the order.2MO$0.00
A702Split System DX Unit Replacement - 1.5 TonProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to replace split system DX 1.5 ton units. Includes removal of the old AC, supply and installation of the new AC, and all necessary materials, labor, transportation and testing to ensure new unit is operational. Complete all work within 3 working days or as specified in the order.1EA$0.00
A703Split System DX unit replacement - 2 TonProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to replace split system DX 2 ton units. Includes removal of the old AC, supply and installation of the new AC, and all necessary materials, labor, transportation and testing to ensure new unit is operational. Complete all work within 3 working days or as specified in the order.1EA$0.00
A704Generator Rental (300KW)Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to provide general rental. Price per month to include delivery, setup, removal, required cables, distribution panels, and fuel tank. Includes connection to multiple faculties or equipment. Price per month to include delivery, setup, removal, required cables, distribution panels, all connections to the facility, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. All fuel will be provided by the Contractor at no cost to the Government. Delivery within 24 hours of notification or as specified in the order.2MO$0.00
A705Repair Backflow Preventer: 6 InchProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to repair and test failed 6 Inch backflow preventer, to include material, test report and testing form. Complete all work within 3 working days or as specified in the order.5EA$0.00
A706Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 10 HP motor size, NEMA 1Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 10 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order.4EA$0.00
A707Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 15 HP motor size, NEMA 1Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 15 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order.4EA$0.00
A708Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 20 HP motor size, NEMA 1Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 20 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order.4EA$0.00
A709Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 25 HP motor size, NEMA 1Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 25 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order.4EA$0.00
A710Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 30 HP motor size, NEMA 1Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 30 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order.4EA$0.00
A711Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 40 HP motor size, NEMA 1Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 40 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order.4EA$0.00
A712Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 50 HP motor size, NEMA 1Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 50 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order.4EA$0.00
A713Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 60 HP motor size, NEMA 1Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 60 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order.4EA$0.00
A714Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 75 HP motor size, NEMA 1Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 75 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order.4EA$0.00
A715Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 100 HP motor size, NEMA 1Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 100 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order.4EA$0.00
A716Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 125 HP motor size, NEMA 1Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required too remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 125 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order.4EA$0.00
A717Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 150 HP motor size, NEMA 1Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 150 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order.4EA$0.00
A718Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 200 HP motor size, NEMA 1Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 200 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order.4EA$0.00
A719CAT 5 InstallationProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to install CAT 5 wiring and connections at specified locations. Complete all work within 3 working days or as specified in the order.5,000LF$0.00
A720Non destructive pump testingProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform non-destructive pump testing. Results of testing shall be reported to within 4 hours of test. Complete all work within 3 working days or as specified in the order.4EA$0.00
A721Duct CleaningProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to clean and sanitize supply and return air ducts, including supply air diffusers, return air diffusers, grilles, all ducting components and ventilation system. Complete all work within 3 working days or as specified in the order.1,000LF$0.00
A722Pressure Washing ServiceProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to provide pressure washing services. The Contractor shall provide miscellaneous pressure washings up to 5,000 SF of surface per order. Surfaces may be horizontal or vertical areas related to, attached to, or adjoining to facilities. The Contractor shall utilize high-pressure water equipment to clean exterior facility and adjoining surfaces as requested and to exclude windows surfaces. Pressure washing may require the use of man lift and other devices to perform work safely. This may require work after normal working hours to prevent disruption to operations. Complete all work within 3 working days or as specified in the order.20,000SF$0.00
A723Carpet ReplacementProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to install 2x2 carpet tiles for the areas designated in the task order. Carpet shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old carpet (including any padding, residual glue, tack strips, etc.) and proper installation of new carpet per manufacturer's instructions. Work shall be ordered per square yard (SY), with a minimum of 10 SY. Complete all work within 3 working days or as specified in the order.4,000SY$0.00
A724Furniture Move Incidental to Carpet ReplacementProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to move furniture incidental to carpet replacement. Provide unit pricing such that each unit consists of five (5) pieces of furniture. A cubical shall be considered a single piece of furniture. Complete all work within 3 working days or as specified in the order.100EA$0.00
A725Replace 4" Vinyl Cove BaseProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to install 4” vinyl cove base for the areas designated in the task order. Cove base shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old cove base, patching or repair of any damaged wall surface, and proper installation of new cove base per manufacturer's instructions. Work shall be ordered with a minimum of 30 LF. Complete all work within 3 working days or as specified in the order.5,000LF$0.00
A726Interior PaintingProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform surface preparation, pre-painting, sanding, etching and finish painting of all interior surfaces specified. Surface preparation includes, but is not limited to wood, metal, sheetrock, concrete, and plaster. Related services shall include wall-papering, plastering, and dry-wall repair. The Contractor shall collect and dispose of all paint chips, dust, sand, and other waste paint materials resulting from any part of the painting process, IAW the Resource Conservation and Recovery Act and associated Federal, State, and local laws and regulations. All hazardous waste disposal shall be coordinated through the Government Representative. Note: some drywall and joint compounds may contain asbestos. Work shall be ordered and priced in increments up to 500 square feet (SF). Complete all work within 3 working days or as specified in the order.25,000SF$0.00
A727Replace Suspended Ceiling TileProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to replace 2’x2’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 16 ceiling tiles. Complete all work within 3 working days or as specified in the order.2,000EA$0.00
A728Pavement Crack FillingProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to hot fill cracks in asphalt pavement and parking lots. Services to be performed per Annex 1502000 Spec Item 3.4.4. Complete all work within 10 working days or as specified in the order.6,000LF$0.00
A729Pavement Seal CoatingProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to seal coat asphalt pavement and parking lots. Services to be performed per Annex 1502000 Spec Item 3.4.4. Complete all work within 10 working days or as specified in the order.375,000SF$0.00
A730Pavement StripingProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform pavement striping to pavement and parking lots. Services to be performed per Annex 1502000 Spec Item 3.4.4. Complete all work within 10 working days or as specified in the order.4,000LF$0.00
A731Fence RepairProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to repair installation perimeter and interior fencing. Complete all work within 10 working days or as specified in the order.1,000SF$0.00
A732Concrete ReplacementProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to replace concrete surfaces. Includes breakup, removal, and disposal of old concrete, all preparation necessary for new concrete pour, and pouring and finishing of new concrete. Complete all work within 10 working days or as specified in the order.2,000SF$0.00
A733Curbing ReplacementProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to replace curbing. Includes breakup, removal, and disposal of old curbing, all preparation necessary for installation of new curbing, and installation of new curbing. Complete all work within 10 working days or as specified in the order.500LF$0.00
A734-A745Reserved
Specification 1503010Custodial
A746Carpet and Rug Deep CleaningProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to carpet and rug deep cleaning as specified per Spec Item, 3.1 Recurring Work. The Contractor shall deep clean carpets and rugs to ensure that floors are clean and sightly. Acceptable methods for deep cleaning include shampooing, chemical extraction, steam cleaning, and other similar deep cleaning processes. Complete all work within 3 working days or as specified in the order.400SF$0.00
A747Interior Window CleaningProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to clean interior window surfaces and adjacent areas to ensure that surfaces are clean as specified per Spec Item 3.1, Recurring Work. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order.200SF$0.00
A748Exterior Ground Floor Window CleaningProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to clean exterior ground floor window surfaces and adjacent areas to ensure that surfaces are clean as specified per Spec Item 3.1, Recurring Work. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order.400SF$0.00
A749Exterior Second Floor Window CleaningProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to clean exterior second floor window surfaces and adjacent areas to ensure that surfaces are clean as specified per Spec Item 3.1, Recurring Work. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order.200SF$0.00
A750Restroom Cleaning and ServicingProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to clean and servicing restrooms as specified per Spec Item 3.1.3, Restroom Services. All restroom surfaces are cleaned, sanitized and deodorized. Restroom supplies are completely restocked and all dispensers are in working condition. After work is completed, restrooms are clean, sanitary and sightly. Complete all work within 3 working days or as specified in the order.400SF$0.00
A751Damp Carpet Water ExtractionProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to extract water from and completely dry carpeted flooring to ensure floor surface is completely dry. Complete all work within 3 working days or as specified in the order.200SF$0.00
A752Hard Surfaced Flooring Water ExtractionProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to extract water from and completely dry hard surfaced flooring to ensure floor surface is completely dry. Complete all work within 3 working days or as specified in the order.200SF$0.00
A753-A775Reserved
Specification 1503020Pest Control
A776Nuisance Pest ControlProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to conduct surveillance and control ants, cockroaches, silverfish, centipedes, millipedes, beetles, fleas, spiders, and/or stored product pests at the designated location(s) per the applicable General Requirements and Performance Standards for Nuisance Pests (Pest Groups 001, 003, 004, 005, 006) within time period of 3 working days to respond, 7 working days to obtain control, and 30 days to maintain control.30EA$0.00
A777Disease Vector and Health Pest ControlProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to conduct surveillance and control bed bugs, bees, wasps, hornets, and other stinging arthropods, filth flies, and/or ticks at the designated location(s) per the applicable General Requirements and Performance Standards for Disease Vector and Health Pests (Pest Groups 012, 014, 017) within time period of 1 working day to respond.30EA$0.00
A778Vertebrate Pest ControlProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to conduct surveillance and control commensal rodents, pest birds, feral dogs and cats, and snakes in and around designated location(s) per the applicable General Requirements and Performance Standards for Vertebrate Pests (Pest Groups 026, 028, 029) within time period of 1 working day to respond.30EA$0.00
A779Prevent and Control Rodents In and Around Buildings and StructuresProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to prevent and control rodents indoors or within 75 linear feet of the exterior walls of designated buildings and structures per General Requirements and Performance Standards for Vertebrate Pests (Pest Group 027). Service requires removal of dead animals. Time Period to Respond: Indoors: 1 day. Outdoors: 3 working days.241,000 SF$0.00
A780Survey for Termite and Wood Destroying OrganismsProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to survey for all termites species and other wood destroying organisms including fungal rots, carpenter ants, and wood boring beetles. Time Period to Respond: If swarm, immediately. Otherwise, 1 week. Complete work per time periods specified in J-1503020-02 Structure Damaging Pests - Pest Group 019.121,000 SF$0.00
A781Subterranean Termite ControlProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to control infestations of subterranean termites in accordance with J-1503020-06 (Termite Control Specifications.)10100 LF$0.00
A782Drywood Termite ControlProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to prevent, manage, and control Drywood Termites in accordance with J-1503020-06 (Termite Control Specifications.)11000 LF$0.00
A783Other Wood Destroying Organism ControlProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to prevent, manage, and control non-termite wood destroying organisms including, but not limited to powder post beetles (Lyctids and Bostrichids), Anobiids (furniture and deathwatch beetles), old house borer, carpenter ants, and carpenter bees. Time Period to Respond: 10 working days. Complete work per time periods specified in J-1503020-01.31000 SF$0.00
A784-A793Reserved
Specification 1503050Grounds Maintenance and Landscaping
A794Lawn Mowing and TrimmingProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to mow and trim lawns. Grass shall be mowed at a height between 5 and 7 centimeters. Grass adjacent to fencing, poles, walls, valves, trees, signs, valve boxes and other similar objects shall be trimmed to match the height and appearance of surrounding grass. Prior to mowing or trimming, remove and appropriately dispose of debris that interferes with the mowing or trimming operation. After cutting, grass shall have a uniform height. Grass clippings and trimmings shall be removed from sidewalks and other paved areas the same day the grass is cut and disposed of off the activity. Complete all work within 3 working days or as specified in the order.100,000SY$0.00
A795Vegetation ControlProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform vegetation control. The Contractor shall control undesired vegetation to ensure areas are free of undesired vegetation. Remove unwanted vegetation from fence lines, fence fabric, brick walls, sidewalks, curbs, gutters, aggregate areas and paved surfaces including parking lots. All debris resulting from work shall be removed the same day and disposed of off the activity. Complete all work within 3 working days or as specified in the order.5,000SY$0.00
A796Debris RemovalProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform debris removal. The Contractor shall remove debris such as, but not limited to fallen leaves and other seasonal debris to present an overall neat appearance. All debris collected shall be removed the same day and disposed of off the activity. Complete all work within 3 working days or as specified in the order.5,000SY$0.00
A797Plant Bed MaintenanceProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform plant and plant bed maintenance. The Contractor shall maintain plants to ensure a healthy appearance and to ensure there is no interference with pedestrians, vehicular traffic, and building encroachment. Fertilize, edge, weed, and mulch plant beds as appropriate. All debris resulting from work shall be removed the same day and disposed of off the activity. Complete all work within 3 working days or as specified in the order.100SY$0.00
A798Tree MaintenanceProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform tree maintenance. The Contractor shall provide tree maintenance to ensure tree health and to prevent interference with pedestrian and vehicular traffic, and structure encroachment. Tree maintenance includes fertilization; pruning for health and safety, grass clearance, cleanup; removing dead, damaged or diseased wood, or structurally weak limbs and branches. Remove branches that extend over buildings or power lines, and endanger roofs, windows, or hang within 8 feet vertically of sidewalks, parking lots, and driveways. Pruning shall be accomplished by or under guidance of a certified arborist. Climbing devices that may cause damage to trees shall not be used. All debris resulting from work shall be removed the same day and disposed of off the activity. Complete all work within 3 working days or as specified in the order.10EA$0.00
A799Tree and Stump Removal - Small up to 6" Tree and Stump RemovalProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with same type of vegetation as surrounding area. Work shall be completed within 5 calendar days or as specified in the order.36EA$0.00
A800Tree and Stump Removal - Medium 6.1" DBH up to 18"Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with same type of vegetation as surrounding area. Complete all work within 7 calendar days or as specified in the order.16EA$0.00
A801Tree and Stump Removal - Large18.1" DBH up to 24"Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with same type of vegetation as surrounding area. Complete all work within 10 calendar days or as specified in the order.10EA$0.00
A802Cliff Line Tree Maintenance - DBH up to 24"Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to top trees and prune or remove upward growing branches that extend above the topped height to provide an unobstructed horizontal sight line. Trees shall be topped at a level at least 20 feet below the cliff line. All debris resulting from work shall be removed the same day and disposed of off the activity. Complete all work within 10 calendar days or as specified in the order.40EA$0.00
A803Shrub and Stump Removal
Large 15-gallon and above, 48.1” and above Shrub and Stump RemovalProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level. Complete all work within 5 calendar days or as specified in the order.16EA$0.00
A804UnderbrushingProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform underbrushing. All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Complete all work within 10 calendar days or as specified in the order.1,000SY$0.00
A805Gravel fillingProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to gravel filling. All gravel shall be less than 3/4 in. Complete all work within 6 working days or as specified in the order.1,000FT3$0.00
A806Ditch CleaningProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform maintenance of roadside ditches to ensure they are free of debris and sediment and remain free flowing at all times. The Contractor shall clear and remove all debris from the ditches. Ditches shall remain free flowing at all times. All debris shall be collected and disposed of off station in accordance with Federal and State laws. Debris shall not be swept or forced into the existing storm drain catch basins. Complete all work within 3 working days or as specified in the order.2,000LF$0.00
A807Storm Water Pipe CleaningProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform storm water pipe cleaning. Services include completed cleaning of pipes and removal and disposal of all debris. Complete all work within 2 working days or as specified in the order.5,000LF$0.00
A808-A819Reserved
Specification 1503060Pavement Clearance
A820Sweeping of Roads and Other Paved SurfacesProvide labor, management, supervision, tools, material, and equipment required to perform pavement clearance. The Contractor shall sweep roads and other paved surfaces to ensure they are clear, improve the appearance and safety of paved surfaces, reduce maintenance costs by keeping the drainage systems clean and reduce pollutants entering the storm drain system. Areas include roads, parking areas, sidewalks, walkways, porch areas, entrance/canopy areas, external stairs/steps, recreational areas, bleachers, running track, and other similar areas. Complete all work within 3 working days or as specified in the order.1EA$0.00
A821Provide Sand BarrelsProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to provide and place sand barrels. The Contractor shall provide sand for barrels and spreading equipment. Work shall be completed within 2 calendar days of order.4EA$0.00
A822-A829Reserved
Specification 1700000Transportation
A830Van Service - 9 PassengerProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to provide 9-passenger van, driver, fuel and all other expenses necessary to transport up to 9 passengers and equipment/supplies around the NRL CBD complex for the duration of daily normal working hours. Complete all work within 3 working days or as specified in the order.2EA$0.00
A831-A837Reserved
Specification 1800000Environmental
A838OHS Spill Response Training/DrillsProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to respond to spill response drills with complete spill response teams 24 hours per day 7 days per week 365 days per year. The spill response teams shall respond with all materials, tools and equipment required for an actual spill response. Teams shall be expected to be onsite for an eight (8) hour period.2EA$0.00
A839Water Sampling and AnalysisProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform water sampling and analysis. The Contractor shall provide environmental sampling, field testing, laboratory services and associated reporting required to support compliance oversight at the installation. The Contractor shall conduct on-site measurements, collect samples and analyze them for all the parameters specified in the order. Only certified laboratories that have appropriate credentials can perform testing. The Contractor shall comply with federal, state and local statutes and regulations, and with DoD and Navy policies, instructions and guidance. Respond within 5 working day from receipt of order.5EA$0.00
A840Oil Water Separator Tank CleaningProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to clean oil water separator tanks. Oil water separator tank(s) shall be cleaned and sanitized after removal of solids / liquids and ensure proper function. Waste shall be disposed of per current environmental protection regulations. Contractor shall submit safety plan to Contracting Officer for working within confined spaces prior to commencing work. Complete all work within 2 working days or as specified in the order.2EA$0.00
A841-A845Reserved
Unit Priced Labor (UPL) Work
A846Unit Priced Composite Skilled LaborProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to provide one composite skilled labor hour of work-in-place to be performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians. The composite labor hour rate should be an average of the various trades such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order.5,000HR$0.00
A847Unit Priced Composite Unskilled LaborProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to one composite unskilled labor hour of work-in-place performed by minimally trained or untrained workers, including custodial and grounds maintenance workers, and common laborers per the scope and delivery schedule specified in the order.3,000HR$0.00
A848Material and EquipmentProvide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.NTELS(Estimated Maximum Material and Equipment Cost)$100,000.00

TOTAL FOR LINE ITEM 0002 - BASE PERIOD - NON-RECURRING WORK: TOTAL NON-RECURRING PRICE BASE YEAR $100,000.00

ELINs-1st Opt-RW

ATTACHMENT J-0200000-13
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N62470-22-R-0007 - NRL CBD BOS
EXHIBIT B - FIRST OPTION PERIOD - RECURRING WORK
CLIN 0003