SECTION F – 0200000
MANAGEMENT AND ADMINISTRATION
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable Title Dates of Submission Distribution Frequency
0200000 Management and Administration 0200000/2.2.1.2 N/A Request to Work
Outside Government’s Regular Working Hours
At least seven calendar days prior to requested day
KO, COR,
NRL Facilities Office
As specified
0200000/2.3.4 N/A Permits and Licenses Before work commences and as requested by the KO
KO, COR,
NRL Facilities Office
As specified
0200000/2.3.5 N/A Certificate of Insurance At least 15 calendar days after award
KO, COR,
NRL Facilities Office
As specified
0200000/2.6.1 N/A Safeguarding Information Compliance Checklist
POA&M
Upon completion of compliance
KO, COR,
NRL Facilities Office
As specified
0200000/2.6.1 N/A Cybersecurity Incident Notification
Immediately after incident
KO, COR,
NRL Facilities Office
As specified
0200000/2.6.4 N/A Work Status Update Within two hours of inquiry during normal working hours, by 0800 following work day for after hours
KO, COR,
NRL Facilities Office
As specified
0200000/2.6.5 N/A Notification of Difficulty in Scheduling Work
Immediately following identification of scheduling difficulty
KO, COR,
NRL Facilities Office
As specified
0200000/2.6.7 N/A Request for Authorization for Utility Service Interruption
At least 5 working days prior to the event
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.6.8.2
N/A Pipe Delimited Flat- File
By the end of each workday
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.6.8.2
N/A Sample Pipe Delimited Flat-File
Within 30 calendar days prior to contract start
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.6.8.2
N/A Asset and Specification Data
When an asset is repaired, replaced, installed, or otherwise affected
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.6.8.3
N/A List of personnel requiring access to
NAVFAC MAXIMO
At least 30 calendar days prior to contract start
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.6.9.1
N/A Quality Management (QM) Plan
At least 30 calendar days prior to contract start
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.6.9.1
N/A Revised Quality Management Plan
Within seven calendar days of changes
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.6.9.2
N/A Quality Inspection and Surveillance File
Within five calendar days of completion/ termination of the contract
KO, COR,
NRL Facilities Office
As specified
Spec Item
Form Attachment
Number Deliverable Title Dates of Submission Distribution Frequency
0200000/ 2.6.9.3
N/A Contractor Quality Inspection and Surveillance Report
First work day of each month.
KO, COR,
NRL Facilities Office
Monthly
0200000/ 2.6.10
N/A Property Management Plan
At least 45 calendar days prior to contract start
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.7.1
N/A List of Key Personnel and Qualifications
At least 30 calendar days prior to contract start
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.7.1
N/A Organizational Chart At least 30 calendar days prior to contract start
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.7.2.6
N/A Proof of Legal Residency
Prior to be admitted to site of work.
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.7.3
N/A Service Contract Reporting (SCR)
No later than 31 October, for labor executed during the period of performance during each Government fiscal year
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.8.1
N/A Employee List At least 15 calendar days prior to contract start, within seven calendar days of changes
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.8.8
N/A OF-306 Declaration for Federal Employment and Digital Fingerprints
Prior to commencement of work
KO, COR,
NRL Facilities Office
As required
0200000/ 2.8.9
N/A List of personnel requiring access to and the justification for their access to Government IT, OT, and FRCS
At least 15 calendar days prior to contract start and within seven calendar days of changes
KO, COR,
NRL Facilities Office
As required
0200000/ 2.9.2
N/A Accident Prevention Plan
At least 15 calendar days prior to contract start and within seven calendar days of changes
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.9.3
N/A Activity Hazard Analysis
Together with the Accident Prevention Plan and within seven calendar days of and changes
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.9.4
N/A Compliance Plans, Programs, and Procedures
Together with the Accident Prevention Plan and within seven calendar days of and changes
KO, COR,
NRL Facilities
Spec Item
Form Attachment
Number Deliverable Title Dates of Submission Distribution Frequency
0200000/ 2.9.4.7
N/A Control of Hazardous Energy (lockout/tagout)
At least 30 calendar days after annual inspection
KO, COR,
NRL Facilities Office
Annually
0200000/ 2.9.6
N/A NAVFAC Contractor Incident Reporting System (CIRS)
Within five calendar days of accident.
KO, COR,
NRL Facilities Office
Annually
0200000/ 2.9.6
N/A Weight Handling Equipment Accident Report
Within 15 working days of accident.
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.9.6
N/A Crane and Rigging Gear Near Miss Report
Within 15 working days of accident.
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.9.8
N/A On-Site Labor Report Monthly KO, COR, NRL Facilities Office
Fifth day of each month.
0200000/ 2.9.9
N/A OSHA Violations and Corrective Action Report
Within 48 hours after receiving a citation
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.9.10
N/A Safety Inspections and Monitoring Report
Within one day of request
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.9.11
N/A Safety Certifications Prior to start of work and as old certifications expire
KO, COR,
NRL Facilities Office
As specified
0200000/2.10 N/A EMS Goals and Policy Measurement Information
Within one day of request
KO, COR,
NRL Facilities Office
As required
0200000/ 2.10.1.1
N/A Water Conservation Plan
At least 15 calendar days prior to contract start
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.10.2
N/A Environmental Protection Plan
At least 15 calendar prior to contract start
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.10.2.1
N/A Sampling Plan Prior to each sampling event
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.10.2.1
N/A Sample, Test, and Laboratory Analysis Results
Within one day of request
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.10.2.2
N/A Class I ODS Report At least 5 calendar days after delivery of refrigerant to DLA-
DRMO
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.10.2.3
N/A Solid Waste Management and Recycling Reports
First work day of each month
KO, COR,
NRL Facilities Office
Monthly
2.10.2.3 J-0200000-
XX
Summary Solid Waste Management and Recycling Report
By October 10th KO, COR, NRL Facilities
Monthly
Spec Item
Form Attachment
Number Deliverable Title Dates of Submission Distribution Frequency
0200000/ 2.10.2.5
Waste Stream Determination
Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.
KO, COR,
NRL Facilities Office
Monthly
0200000/ 2.10.2.7
N/A Fuel and hazardous substance spill report
Within 48 hours of discovery
KO, COR,
NRL Facilities Office As specified
As required
0200000/ 2.10.2.8 N/A Emergency Planning and Community Right- To-Know Act (EPCRA) Report
At least 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material
KO, COR,
NRL Facilities
0200000/ 2.10.2.12
N/A Asbestos Containing Material Notification
Within 24 hours if ACM is encountered or suspected in the performance of work
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.10.2.13
N/A Hazardous Air Pollutants Semi-annual Reports
At intervals of 160 to 200 calendar days
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.10.3
N/A Sustainable Procurement and Practices Plan
At least 15 calendar days prior to contract start and within 15 calendar days after exercised option periods
KO, COR,
NRL Facilities Office, Installation Environmental Division, City, State, and EPA
As specified
0200000/ 2.10.3
N/A Sustainable Delivery of Services Report
Within five calendar days after each contract period
KO, COR,
NRL Facilities Office
Annual
0200000/ 2.10.3.2
N/A Recovered Material Certification
When a product containing recovered materials is equal to or better than the original and could be used
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.11
N/A Mission Critical/Mission Essential Personnel
At least 15 calendar days prior to contract start and within seven calendar days of changes
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.12
N/A Technical Library Table of Contents
At least 15 calendar days after contract start and within seven calendar days of changes
KO, COR,
NRL Facilities Office
As specified
0200000/ 2.14.1
N/A Recurring Work Proposal
Within five calendar days following receipt of request
KO, COR,
NRL Facilities
Spec Item
Form Attachment
Number Deliverable Title Dates of Submission Distribution Frequency
0200000/ 2.14.2
N/A Notification to the Government for Work Above the Recurring Work Limitations and detailed scope of work and detailed estimate
Within two hours of identification
KO, COR,
NRL Facilities Office
As specified
0200000/2.15.1.1 N/A Non-Recurring Work Quantities Ordered via FedMall
By the fifth day of the following month
KO, COR,
NRL Facilities Office
As specified
0200000/2.15.2.1 N/A Non-Recurring Work Proposals
Within two working days following receipt of request
KO, COR,
NRL Facilities Office
As required
0600000 Port Operations 0600000/2.2.1 N/A Certification, Training and Licensing At least 30 calendar days prior to contract start and upon request
KO, COR,
NRL Facilities
Office
As specified
0600000/3.5.1 N/A PM Program Plan At least 15 calendar days prior to contract start, then annually
KO, COR,
NRL Facilities
Office
As specified
1002000 Supply 1002000/2.2.1 N/A Certification, Training and Licensing At least 30 calendar days prior to contract start and upon request
KO, COR,
NRL Facilities
Office
As specified
10020003.3 N/A PM Program Plan At least 15 calendar
days prior to contract start, then annually
KO, COR,
NRL Facilities
Office
As specified
1002000/3.3 N/A Monthly PM Schedule and Unaccomplished PM Report
25th day of proceeding month
KO, COR,
NRL Facilities
Office
Monthly
1002000/3.4 N/A Standard Operating Procedure (SOP)
Within 30 calendar days following contract award and as changes occur.
KO, COR,
NRL Facilities
Office
Monthly
1501000 Facility Management 1501000/2.3.1 N/A System Access
Personnel Listing At least 30 calendar days prior to contract start
KO, COR,
NRL Facilities Office
As specified
1501000/3.1.1 N/A Inventory Report Within a year after contract start; then within 15 calendar days after exercised option periods
KO, COR,
NRL Facilities Office
As specified
1501000/3.1.1 N/A Summary of MAXIMO Asset Changes Report
Monthly KO, COR, NRL Facilities Office
As specified
1502000 Facility Investment 1502000/2.2.1 N/A Certification, Training and Licensing At least 30 calendar days prior to contract start and upon request
KO, COR,
NRL Facilities
Spec Item
Form Attachment
Number Deliverable Title Dates of Submission Distribution Frequency
1502000/3.1 N/A Monthly Summary of Competed and Unaccomplished Service Orders
The first workday of each month
KO, COR,
NRL Facilities Office
As specified
1502000/3.1 N/A Weekly Summary of Competed and Unaccomplished Service Orders
The first workday of each week
KO, COR,
NRL Facilities Office
As specified
1502000/3.2 N/A PM Program Plan At least 15 calendar days prior to contract start, then annually
KO, COR,
NRL Facilities Office
As specified
1502000/3.2 N/A Individual Equipment PM Program Work Schedule
At least 5 working days prior to the month scheduled, then monthly
KO, COR,
NRL Facilities Office
As specified
1502000/3.2.4.2 N/A Boiler Water Treatment Test Result Report
Within 5 days of completion of testing
KO, COR,
NRL Facilities Office
As specified
1502000/3.2.8.2 N/A HVAC Water Treatment Test Report
Within 5 days of completion of testing
KO, COR,
NRL Facilities Office
As specified
1502000/3.2.8.3 N/A Condenser Tube Inspection Program
At least 15 calendar days prior to contract start and as changes occur, then annually
KO, COR,
NRL Facilities Office
As specified
1502000/3.2.9 N/A Light Fixture Maintenance Program
At least 15 calendar days prior to contract start, then annually
KO, COR,
NRL Facilities Office
As specified
1502000/3.2.9 N/A Light Fixture Repair Report
The first workday of each month
KO, COR,
NRL Facilities Office
As specified
1502000/3.4 N/A Other Recurring Services Program Report
At least 15 calendar days prior to contract start and as changes occur, then annually
KO, COR,
NRL Facilities Office
As specified
1503020 Pest Control 1503020/2.2.1 N/A Documentation
Certification, Training, and Licensing
At least 30 calendar days prior to contract start and upon request
KO, COR,
NRL Facilities Office
As specified
1503020/2.3.1 N/A Required Business Licensing
At least 30 calendar days prior to contract start and upon request
KO, COR,
NRL Facilities Office
As specified
1503020/2.3.2 N/A Required Permits At least 30 calendar days prior to contract start and upon request
KO, COR,
NRL Facilities Office
As specified
1503020/2.3.4 N/A Ultra-Low Volume (ULV) Equipment Calibration and Droplet Analysis Report
At least 15 calendar days prior to the start of work; thereafter every 50 hours of ULV equipment use
KO, COR,
NRL Facilities
Spec Item
Form Attachment
Number Deliverable Title Dates of Submission Distribution Frequency
1503020/2.3.5 J-1503020-
Planned Pesticide Use Sheets including Pesticide Labels and Material Safety Data Sheets (MSDS)
With the Technical Proposal, 15 days prior to the start of work, Contractor’s Work Plan, at least five (5) business days in advance prior to anticipated use.
proposed changes in pesticide usage at least 5 calendar days in advance of pesticide use
KO, COR,
NRL Facilities Office
As specified
1503020/3 N/A Contractor's Work Plan
(CWP)
At least 15 calendar days prior to contract start
KO, COR,
NRL Facilities Office
As specified
1503020/3 N/A Report of Conditions Conducive to Pest Infestation
Within 1 working day after citing conditions
KO, COR,
NRL Facilities Office
As specified
1503020/3.2 N/A Summary of Competed Service Orders
The first workday of each month
KO, COR,
NRL Facilities Office
As specified
1503020/3.3 N/A Pest Management Record
Monthly, electronically once per month by the 15th of the following month
KO, COR,
NRL Facilities Office
As specified (Example:
July data must be submitted by August 15)
1503050 Grounds Maintenance and Landscaping 1503050/ 2.2.1 N/A Documentation
Certification, Training, and Licensing
At least 15 calendar days prior to contract start
KO, COR,
NRL Facilities Office
As specified
1503050/ 2.3.1.1 N/A Proof of Business Licensing
At least 15 calendar days prior to contract start
KO, COR,
NRL Facilities Office
As specified
1503050/ 2.3.2 N/A Required Permits At least 30 calendar days prior to contract start and upon request
KO, COR,
NRL Facilities Office
1503050/3 N/A
Organic Debris Recycling Weight Tickets
Monthly with invoice KO, COR, NRL Facilities Office
As specified
1503050/3 N/A SDS sheets and catalog cut sheets or samples for fertilizer and mulch
At least 15 calendar days prior to contract start and as soon as new material are added
KO, COR,
NRL Facilities Office
As specified
1503050/3 N/A Contractor’s Work Schedule
At least 15 calendar days after award/Every 3 months, during the first week of each season
KO, COR,
NRL Facilities
Spec Item
Form Attachment
Number Deliverable Title Dates of Submission Distribution Frequency
1503050/3.5 N/A Sediment Pond Maintenance Inspection Report
Within 5 days of completion of testing
KO, COR,
NRL Facilities Office
As specified
1503050/3.6 N/A Summary of Competed Service Orders
The first workday of each month
KO, COR,
NRL Facilities Office
As specified
1503060 Pavement Clearance 1503060/3.1 –
3.1.1 N/A Pavement Sweeping
Schedule 15 working days after award and 15 working days after the start of each option year
KO, COR,
NRL Facilities Office
As specified
1503060/3.2.1.1 N/A Snow and Ice Removal Plan
15 working days after award and 15 working days after the start of each option year
KO, COR,
NRL Facilities Office
As specified
1601000 Utility Management 1601000/2.2.1 N/A Documentation
Certification, Training, and Licensing
At least 15 calendar days prior to contract start
KO, COR,
NRL Facilities Office
As specified
1601000/3.1 N/A Summary of Competed Service Orders
The first workday of each month
KO, COR,
NRL Facilities
Office
As specified
1601000/3.3.1 N/A Inventory Report Within a year after contract start; then within 15 calendar days after exercised option periods
KO, COR,
NRL Facilities
Office
As specified
1602000 Electrical 1602000/2.2.1 N/A Documentation
Certification, Training, and Licensing
At least 15 calendar days prior to contract start
KO, COR,
NRL Facilities Office
As specified
1602000/3 N/A Critical Spare Parts Inventory
Quarterly KO, COR, NRL Facilities Office
As specified
1602000/3.1 N/A Testing Schedule At least 15 calendar days prior to contract start, then annually
KO, COR,
NRL Facilities Office
As specified
1602000/3.2 N/A IMP Program Plan At least 15 calendar days prior to contract start and as changes occur, then annually
KO, COR,
NRL Facilities Office
As specified
1604000 Wastewater 1604000/2.2.1 N/A Documentation
Certification, Training, and Licensing
At least 15 calendar days prior to contract start
KO, COR,
NRL Facilities Office
As specified
1604000/3 N/A Critical Spare Parts Inventory
Quarterly KO, COR, NRL Facilities Office
As specified
1604000/3.1 N/A PM Program Plan At least 15 calendar days prior to contract start, then annually
KO, COR,
NRL Facilities
Spec Item
Form Attachment
Number Deliverable Title Dates of Submission Distribution Frequency
1604000/3.1.1 N/A Pre-repair and Post-repair Reports on Manholes
3 days after the end of the month during which work is performed
KO, COR,
NRL Facilities Office
As specified
1604000/3.1.2 N/A Pre-repair and Post-repair Reports on Wet Wells
3 days after the end of the month during which work is performed
KO, COR,
NRL Facilities Office
As specified
1606000 Water 1606000/2.2.1 N/A Documentation
Certification, Training, and Licensing
At least 15 calendar days prior to contract start
KO, COR,
NRL Facilities Office
As specified
1606000/3 N/A Critical Spare Parts Inventory
Quarterly KO, COR, NRL Facilities Office
As specified
1606000/3.1 N/A PM Program Plan At least 15 calendar days prior to contract start, then annually
KO, COR,
NRL Facilities Office
As specified
1606000/3.1 N/A PM Monthly Report At least 5 working days prior to the month scheduled
KO, COR,
NRL Facilities Office
As specified
1606000/3.1 N/A Inspection, Testing, and Certification Program
Within 5 days of completion of testing
KO, COR,
NRL Facilities Office
As specified
1606000/3.1 N/A Inspection, Testing, and Certification Schedule
At least 15 calendar days after award, then annually
KO, COR,
NRL Facilities Office
As specified
1800000 Environmental 1800000/2.2.1 N/A Training Plan At least 15 calendar days prior to contract start
KO, COR,
NRL Facilities Office
As specified
1800000/2.2.1 N/A Documentation Certification, Training, and Licensing
At least 15 calendar days prior to contract start
KO, COR,
NRL Facilities Office
As specified
1800000/4.1.3 N/A Spill Documentation Within one (1) day after spill event
KO, COR,
NRL Facilities
Notes:
Note 1. All deliverables shall be in Microsoft Office (Word/Excel) electronic format unless otherwise specified.