| | Specification 1502000 | Facility Investment | | | | |
| A700 | Elevator Pit Maintenance | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to provide elevator pit maintenance to include but not limited to checking that the lights, stop switch, and GFI outlet are all functioning properly. Inspect for signs of leaks, issues with the travel cables or moisture accumulation in the pit that might be corrosive to the exposed elevator components located under the cab. Inspect elevator buffers for signs of corrosion and misalignment. Inspect sump pump and clean and repair as necessary for proper operation. Remove any debris in elevator pit. Complete all work within 3 working days or as specified in the order. | 2 | EA | | $0.00 |
| A701 | Chiller Rental (225 Ton) | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to rent 225 Ton chiller. Price per month to include delivery, installation, setup, removal, required cable and fittings, hose, single-point electrical connections, high-efficiency VFDs, and CFC-free refrigerants. Price per month to include delivery/removal of chiller to/from the site, installation, setup, required ancillary supplies, control panels, all connections to the facility, operation, and maintenance. Delivery within 72 hours of notification or as specified in the order. | 2 | MO | | $0.00 |
| A702 | Split System DX Unit Replacement - 1.5 Ton | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to replace split system DX 1.5 ton units. Includes removal of the old AC, supply and installation of the new AC, and all necessary materials, labor, transportation and testing to ensure new unit is operational. Complete all work within 3 working days or as specified in the order. | 1 | EA | | $0.00 |
| A703 | Split System DX unit replacement - 2 Ton | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to replace split system DX 2 ton units. Includes removal of the old AC, supply and installation of the new AC, and all necessary materials, labor, transportation and testing to ensure new unit is operational. Complete all work within 3 working days or as specified in the order. | 1 | EA | | $0.00 |
| A704 | Generator Rental (300KW) | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to provide general rental. Price per month to include delivery, setup, removal, required cables, distribution panels, and fuel tank. Includes connection to multiple faculties or equipment. Price per month to include delivery, setup, removal, required cables, distribution panels, all connections to the facility, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. All fuel will be provided by the Contractor at no cost to the Government. Delivery within 24 hours of notification or as specified in the order. | 2 | MO | | $0.00 |
| A705 | Repair Backflow Preventer: 6 Inch | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to repair and test failed 6 Inch backflow preventer, to include material, test report and testing form. Complete all work within 3 working days or as specified in the order. | 5 | EA | | $0.00 |
| A706 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 10 HP motor size, NEMA 1 | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 10 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order. | 4 | EA | | $0.00 |
| A707 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 15 HP motor size, NEMA 1 | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 15 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order. | 4 | EA | | $0.00 |
| A708 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 20 HP motor size, NEMA 1 | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 20 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order. | 4 | EA | | $0.00 |
| A709 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 25 HP motor size, NEMA 1 | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 25 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order. | 4 | EA | | $0.00 |
| A710 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 30 HP motor size, NEMA 1 | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 30 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order. | 4 | EA | | $0.00 |
| A711 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 40 HP motor size, NEMA 1 | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 40 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order. | 4 | EA | | $0.00 |
| A712 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 50 HP motor size, NEMA 1 | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 50 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order. | 4 | EA | | $0.00 |
| A713 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 60 HP motor size, NEMA 1 | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 60 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order. | 4 | EA | | $0.00 |
| A714 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 75 HP motor size, NEMA 1 | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 75 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order. | 4 | EA | | $0.00 |
| A715 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 100 HP motor size, NEMA 1 | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 100 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order. | 4 | EA | | $0.00 |
| A716 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 125 HP motor size, NEMA 1 | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required too remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 125 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order. | 4 | EA | | $0.00 |
| A717 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 150 HP motor size, NEMA 1 | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 150 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order. | 4 | EA | | $0.00 |
| A718 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 200 HP motor size, NEMA 1 | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 200 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Complete all work within 3 working days or as specified in the order. | 4 | EA | | $0.00 |
| A719 | CAT 5 Installation | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to install CAT 5 wiring and connections at specified locations. Complete all work within 3 working days or as specified in the order. | 5,000 | LF | | $0.00 |
| A720 | Non destructive pump testing | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform non-destructive pump testing. Results of testing shall be reported to within 4 hours of test. Complete all work within 3 working days or as specified in the order. | 4 | EA | | $0.00 |
| A721 | Duct Cleaning | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to clean and sanitize supply and return air ducts, including supply air diffusers, return air diffusers, grilles, all ducting components and ventilation system. Complete all work within 3 working days or as specified in the order. | 1,000 | LF | | $0.00 |
| A722 | Pressure Washing Service | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to provide pressure washing services. The Contractor shall provide miscellaneous pressure washings up to 5,000 SF of surface per order. Surfaces may be horizontal or vertical areas related to, attached to, or adjoining to facilities. The Contractor shall utilize high-pressure water equipment to clean exterior facility and adjoining surfaces as requested and to exclude windows surfaces. Pressure washing may require the use of man lift and other devices to perform work safely. This may require work after normal working hours to prevent disruption to operations. Complete all work within 3 working days or as specified in the order. | 20,000 | SF | | $0.00 |
| A723 | Carpet Replacement | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to install 2x2 carpet tiles for the areas designated in the task order. Carpet shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order (Commercial medium grade. Color may vary). Work shall include removal and proper disposal of old carpet (including any padding, residual glue, tack strips, etc.) and proper installation of new carpet per manufacturer's instructions. Work shall be ordered per square yard (SY), with a minimum of 10 SY. Complete all work within 3 working days or as specified in the order. | 4,000 | SY | | $0.00 |
| A724 | Furniture Move Incidental to Carpet Replacement | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to move furniture incidental to carpet replacement. Provide unit pricing such that each unit consists of five (5) pieces of furniture. A cubical shall be considered a single piece of furniture. Complete all work within 3 working days or as specified in the order. | 100 | EA | | $0.00 |
| A725 | Replace 4" Vinyl Cove Base | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to install 4” vinyl cove base for the areas designated in the task order. Cove base shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old cove base, patching or repair of any damaged wall surface, and proper installation of new cove base per manufacturer's instructions. Work shall be ordered with a minimum of 30 LF. Complete all work within 3 working days or as specified in the order. | 5,000 | LF | | $0.00 |
| A726 | Interior Painting | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform surface preparation, pre-painting, sanding, etching and finish painting of all interior surfaces specified. Surface preparation includes, but is not limited to wood, metal, sheetrock, concrete, and plaster. Related services shall include wall-papering, plastering, and dry-wall repair. The Contractor shall collect and dispose of all paint chips, dust, sand, and other waste paint materials resulting from any part of the painting process, IAW the Resource Conservation and Recovery Act and associated Federal, State, and local laws and regulations. All hazardous waste disposal shall be coordinated through the Government Representative. Note: some drywall and joint compounds may contain asbestos. Work shall be ordered and priced in increments up to 500 square feet (SF). Complete all work within 3 working days or as specified in the order. | 25,000 | SF | | $0.00 |
| A727 | Replace Suspended Ceiling Tile | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to replace 2’x2’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 16 ceiling tiles. Complete all work within 3 working days or as specified in the order. | 2,000 | EA | | $0.00 |
| A728 | Pavement Crack Filling | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to hot fill cracks in asphalt pavement and parking lots. Services to be performed per Annex 1502000 Spec Item 3.4.4. Complete all work within 10 working days or as specified in the order. | 6,000 | LF | | $0.00 |
| A729 | Pavement Seal Coating | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to seal coat asphalt pavement and parking lots. Services to be performed per Annex 1502000 Spec Item 3.4.4. Complete all work within 10 working days or as specified in the order. | 375,000 | SF | | $0.00 |
| A730 | Pavement Striping | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform pavement striping to pavement and parking lots. Services to be performed per Annex 1502000 Spec Item 3.4.4. Complete all work within 10 working days or as specified in the order. | 4,000 | LF | | $0.00 |
| A731 | Fence Repair | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to repair installation perimeter and interior fencing. Complete all work within 10 working days or as specified in the order. | 1,000 | SF | | $0.00 |
| A732 | Concrete Replacement | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to replace concrete surfaces. Includes breakup, removal, and disposal of old concrete, all preparation necessary for new concrete pour, and pouring and finishing of new concrete. Complete all work within 10 working days or as specified in the order. | 2,000 | SF | | $0.00 |
| A733 | Curbing Replacement | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to replace curbing. Includes breakup, removal, and disposal of old curbing, all preparation necessary for installation of new curbing, and installation of new curbing. Complete all work within 10 working days or as specified in the order. | 500 | LF | | $0.00 |
| A734-A745 | Reserved | | | | | |
| | Specification 1503010 | Custodial | | | | |
| A746 | Carpet and Rug Deep Cleaning | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to carpet and rug deep cleaning as specified per Spec Item, 3.1 Recurring Work. The Contractor shall deep clean carpets and rugs to ensure that floors are clean and sightly. Acceptable methods for deep cleaning include shampooing, chemical extraction, steam cleaning, and other similar deep cleaning processes. Complete all work within 3 working days or as specified in the order. | 400 | SF | | $0.00 |
| A747 | Interior Window Cleaning | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to clean interior window surfaces and adjacent areas to ensure that surfaces are clean as specified per Spec Item 3.1, Recurring Work. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order. | 200 | SF | | $0.00 |
| A748 | Exterior Ground Floor Window Cleaning | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to clean exterior ground floor window surfaces and adjacent areas to ensure that surfaces are clean as specified per Spec Item 3.1, Recurring Work. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order. | 400 | SF | | $0.00 |
| A749 | Exterior Second Floor Window Cleaning | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to clean exterior second floor window surfaces and adjacent areas to ensure that surfaces are clean as specified per Spec Item 3.1, Recurring Work. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order. | 200 | SF | | $0.00 |
| A750 | Restroom Cleaning and Servicing | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to clean and servicing restrooms as specified per Spec Item 3.1.3, Restroom Services. All restroom surfaces are cleaned, sanitized and deodorized. Restroom supplies are completely restocked and all dispensers are in working condition. After work is completed, restrooms are clean, sanitary and sightly. Complete all work within 3 working days or as specified in the order. | 400 | SF | | $0.00 |
| A751 | Damp Carpet Water Extraction | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to extract water from and completely dry carpeted flooring to ensure floor surface is completely dry. Complete all work within 3 working days or as specified in the order. | 200 | SF | | $0.00 |
| A752 | Hard Surfaced Flooring Water Extraction | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to extract water from and completely dry hard surfaced flooring to ensure floor surface is completely dry. Complete all work within 3 working days or as specified in the order. | 200 | SF | | $0.00 |
| A753-A775 | Reserved | | | | | |
| | Specification 1503020 | Pest Control | | | | |
| A776 | Nuisance Pest Control | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to conduct surveillance and control ants, cockroaches, silverfish, centipedes, millipedes, beetles, fleas, spiders, and/or stored product pests at the designated location(s) per the applicable General Requirements and Performance Standards for Nuisance Pests (Pest Groups 001, 003, 004, 005, 006) within time period of 3 working days to respond, 7 working days to obtain control, and 30 days to maintain control. | 30 | EA | | $0.00 |
| A777 | Disease Vector and Health Pest Control | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to conduct surveillance and control bed bugs, bees, wasps, hornets, and other stinging arthropods, filth flies, and/or ticks at the designated location(s) per the applicable General Requirements and Performance Standards for Disease Vector and Health Pests (Pest Groups 012, 014, 017) within time period of 1 working day to respond. | 30 | EA | | $0.00 |
| A778 | Vertebrate Pest Control | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to conduct surveillance and control commensal rodents, pest birds, feral dogs and cats, and snakes in and around designated location(s) per the applicable General Requirements and Performance Standards for Vertebrate Pests (Pest Groups 026, 028, 029) within time period of 1 working day to respond. | 30 | EA | | $0.00 |
| A779 | Prevent and Control Rodents In and Around Buildings and Structures | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to prevent and control rodents indoors or within 75 linear feet of the exterior walls of designated buildings and structures per General Requirements and Performance Standards for Vertebrate Pests (Pest Group 027). Service requires removal of dead animals. Time Period to Respond: Indoors: 1 day. Outdoors: 3 working days. | 24 | 1,000 SF | | $0.00 |
| A780 | Survey for Termite and Wood Destroying Organisms | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to survey for all termites species and other wood destroying organisms including fungal rots, carpenter ants, and wood boring beetles. Time Period to Respond: If swarm, immediately. Otherwise, 1 week. Complete work per time periods specified in J-1503020-02 Structure Damaging Pests - Pest Group 019. | 12 | 1,000 SF | | $0.00 |
| A781 | Subterranean Termite Control | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to control infestations of subterranean termites in accordance with J-1503020-06 (Termite Control Specifications.) | 10 | 100 LF | | $0.00 |
| A782 | Drywood Termite Control | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to prevent, manage, and control Drywood Termites in accordance with J-1503020-06 (Termite Control Specifications.) | 1 | 1000 LF | | $0.00 |
| A783 | Other Wood Destroying Organism Control | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to prevent, manage, and control non-termite wood destroying organisms including, but not limited to powder post beetles (Lyctids and Bostrichids), Anobiids (furniture and deathwatch beetles), old house borer, carpenter ants, and carpenter bees. Time Period to Respond: 10 working days. Complete work per time periods specified in J-1503020-01. | 3 | 1000 SF | | $0.00 |
| A784-A793 | Reserved | | | | | |
| | Specification 1503050 | Grounds Maintenance and Landscaping | | | | |
| A794 | Lawn Mowing and Trimming | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to mow and trim lawns. Grass shall be mowed at a height between 5 and 7 centimeters. Grass adjacent to fencing, poles, walls, valves, trees, signs, valve boxes and other similar objects shall be trimmed to match the height and appearance of surrounding grass. Prior to mowing or trimming, remove and appropriately dispose of debris that interferes with the mowing or trimming operation. After cutting, grass shall have a uniform height. Grass clippings and trimmings shall be removed from sidewalks and other paved areas the same day the grass is cut and disposed of off the activity. Complete all work within 3 working days or as specified in the order. | 100,000 | SY | | $0.00 |
| A795 | Vegetation Control | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform vegetation control. The Contractor shall control undesired vegetation to ensure areas are free of undesired vegetation. Remove unwanted vegetation from fence lines, fence fabric, brick walls, sidewalks, curbs, gutters, aggregate areas and paved surfaces including parking lots. All debris resulting from work shall be removed the same day and disposed of off the activity. Complete all work within 3 working days or as specified in the order. | 5,000 | SY | | $0.00 |
| A796 | Debris Removal | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform debris removal. The Contractor shall remove debris such as, but not limited to fallen leaves and other seasonal debris to present an overall neat appearance. All debris collected shall be removed the same day and disposed of off the activity. Complete all work within 3 working days or as specified in the order. | 5,000 | SY | | $0.00 |
| A797 | Plant Bed Maintenance | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform plant and plant bed maintenance. The Contractor shall maintain plants to ensure a healthy appearance and to ensure there is no interference with pedestrians, vehicular traffic, and building encroachment. Fertilize, edge, weed, and mulch plant beds as appropriate. All debris resulting from work shall be removed the same day and disposed of off the activity. Complete all work within 3 working days or as specified in the order. | 100 | SY | | $0.00 |
| A798 | Tree Maintenance | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform tree maintenance. The Contractor shall provide tree maintenance to ensure tree health and to prevent interference with pedestrian and vehicular traffic, and structure encroachment. Tree maintenance includes fertilization; pruning for health and safety, grass clearance, cleanup; removing dead, damaged or diseased wood, or structurally weak limbs and branches. Remove branches that extend over buildings or power lines, and endanger roofs, windows, or hang within 8 feet vertically of sidewalks, parking lots, and driveways. Pruning shall be accomplished by or under guidance of a certified arborist. Climbing devices that may cause damage to trees shall not be used. All debris resulting from work shall be removed the same day and disposed of off the activity. Complete all work within 3 working days or as specified in the order. | 10 | EA | | $0.00 |
| A799 | Tree and Stump Removal - Small up to 6" Tree and Stump Removal | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with same type of vegetation as surrounding area. Work shall be completed within 5 calendar days or as specified in the order. | 36 | EA | | $0.00 |
| A800 | Tree and Stump Removal - Medium 6.1" DBH up to 18" | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with same type of vegetation as surrounding area. Complete all work within 7 calendar days or as specified in the order. | 16 | EA | | $0.00 |
| A801 | Tree and Stump Removal - Large18.1" DBH up to 24" | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with same type of vegetation as surrounding area. Complete all work within 10 calendar days or as specified in the order. | 10 | EA | | $0.00 |
| A802 | Cliff Line Tree Maintenance - DBH up to 24" | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to top trees and prune or remove upward growing branches that extend above the topped height to provide an unobstructed horizontal sight line. Trees shall be topped at a level at least 20 feet below the cliff line. All debris resulting from work shall be removed the same day and disposed of off the activity. Complete all work within 10 calendar days or as specified in the order. | 40 | EA | | $0.00 |
| A803 | Shrub and Stump Removal | | | | | |
| Large 15-gallon and above, 48.1” and above Shrub and Stump Removal | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level. Complete all work within 5 calendar days or as specified in the order. | 16 | EA | | $0.00 | | |
| A804 | Underbrushing | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform underbrushing. All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Complete all work within 10 calendar days or as specified in the order. | 1,000 | SY | | $0.00 |
| A805 | Gravel filling | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to gravel filling. All gravel shall be less than 3/4 in. Complete all work within 6 working days or as specified in the order. | 1,000 | FT3 | | $0.00 |
| A806 | Ditch Cleaning | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform maintenance of roadside ditches to ensure they are free of debris and sediment and remain free flowing at all times. The Contractor shall clear and remove all debris from the ditches. Ditches shall remain free flowing at all times. All debris shall be collected and disposed of off station in accordance with Federal and State laws. Debris shall not be swept or forced into the existing storm drain catch basins. Complete all work within 3 working days or as specified in the order. | 2,000 | LF | | $0.00 |
| A807 | Storm Water Pipe Cleaning | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform storm water pipe cleaning. Services include completed cleaning of pipes and removal and disposal of all debris. Complete all work within 2 working days or as specified in the order. | 5,000 | LF | | $0.00 |
| A808-A819 | Reserved | | | | | |
| | Specification 1503060 | Pavement Clearance | | | | |
| A820 | Sweeping of Roads and Other Paved Surfaces | Provide labor, management, supervision, tools, material, and equipment required to perform pavement clearance. The Contractor shall sweep roads and other paved surfaces to ensure they are clear, improve the appearance and safety of paved surfaces, reduce maintenance costs by keeping the drainage systems clean and reduce pollutants entering the storm drain system. Areas include roads, parking areas, sidewalks, walkways, porch areas, entrance/canopy areas, external stairs/steps, recreational areas, bleachers, running track, and other similar areas. Complete all work within 3 working days or as specified in the order. | 1 | EA | | $0.00 |
| A821 | Provide Sand Barrels | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to provide and place sand barrels. The Contractor shall provide sand for barrels and spreading equipment. Work shall be completed within 2 calendar days of order. | 4 | EA | | $0.00 |
| A822-A829 | Reserved | | | | | |
| | Specification 1700000 | Transportation | | | | |
| A830 | Van Service - 9 Passenger | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to provide 9-passenger van, driver, fuel and all other expenses necessary to transport up to 9 passengers and equipment/supplies around the NRL CBD complex for the duration of daily normal working hours. Complete all work within 3 working days or as specified in the order. | 2 | DA EA | | $0.00 |
| A831-A837 | Reserved | | | | | |
| | Specification 1800000 | Environmental | | | | |
| A838 | OHS Spill Response Training/Drills | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to respond to spill response drills with complete spill response teams 24 hours per day 7 days per week 365 days per year. The spill response teams shall respond with all materials, tools and equipment required for an actual spill response. Teams shall be expected to be onsite for an eight (8) hour period. | 2 | EA | | $0.00 |
| A839 | Water Sampling and Analysis | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to perform water sampling and analysis. The Contractor shall provide environmental sampling, field testing, laboratory services and associated reporting required to support compliance oversight at the installation. The Contractor shall conduct on-site measurements, collect samples and analyze them for all the parameters specified in the order. Only certified laboratories that have appropriate credentials can perform testing. The Contractor shall comply with federal, state and local statutes and regulations, and with DoD and Navy policies, instructions and guidance. Respond within 5 working day from receipt of order. | 5 | EA | | $0.00 |
| A840 | Oil Water Separator Tank Cleaning | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to clean oil water separator tanks. Oil water separator tank(s) shall be cleaned and sanitized after removal of solids / liquids and ensure proper function. Waste shall be disposed of per current environmental protection regulations. Contractor shall submit safety plan to Contracting Officer for working within confined spaces prior to commencing work. Complete all work within 2 working days or as specified in the order. | 2 | EA | | $0.00 |
| A841-A845 | Reserved | | | | | |
| | Unit Priced Labor (UPL) Work | | | | | |
| A846 | Unit Priced Composite Skilled Labor | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to provide one composite skilled labor hour of work-in-place to be performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians. The composite labor hour rate should be an average of the various trades such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order. | 5,000 | HR | | $0.00 |
| A847 | Unit Priced Composite Unskilled Labor | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to one composite unskilled labor hour of work-in-place performed by minimally trained or untrained workers, including custodial and grounds maintenance workers, and common laborers per the scope and delivery schedule specified in the order. | 3,000 | HR | | $0.00 |
| A848 | Material and Equipment | Provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items required to provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | NTE | LS | (Estimated Maximum Material and Equipment Cost) | $100,000.00 |