Repair Building Envelope and Interior Finishes, Building 298
Solicitation number
N6247020R6003
Issued by

View the file

Other files

File Type Posted
Amnd 0006 20R6003 FINAL.pdf PDF
4483054.pdf PDF
4100802-4100805.pdf PDF
4100806.pdf PDF
4100795.pdf PDF
Amnd 0005 20R6003 FINAL.pdf PDF
Building298_Part3_Ch6_B10-Revised.pdf PDF
Building298_01 50 00.05 02-Revised.pdf PDF
Amnd 0004 20R6003 FINAL.pdf PDF
Building298_Part6_Ch1_E-101-Revised.pdf PDF
Building298_Part3_Ch6_G40-Revised2.pdf PDF
Building298_Part3_Ch6_C20-Revised.pdf PDF
Building298_Part3_Ch6_F20-Revised.pdf PDF
Building298_Part3_Ch6_B30-Revised.pdf PDF
Building298_Part3_Ch5_C-106-Revised.pdf PDF
Building298_Part3_Ch2-Revised.pdf PDF
Building298_Part2_Section01-33-29.05_HPSBChecklist2020ATTAINED.pdf PDF
Building298_Part3_Ch6_G40-Revised.pdf PDF
Amnd 0003 20R6003 FINAL.pdf PDF
Building298_Part3_Ch5_Revision.pdf PDF
Building298_Part2_Section01-33-29.05_HPSBChecklist2020GOALS.pdf PDF
Building298_Part3_Ch6_B20_Revision.pdf PDF
Building298_Part3_Ch3-Revised.pdf PDF
Building298_Part3_Ch6_D40-Revised.pdf PDF
Building298_Part3_Ch6_D30-Revised.pdf PDF
Building298_Part6_Ch1_ A-103.pdf PDF
Building298_Part4_D50-Revised.pdf PDF
Building298_Part3_Ch6_G20-Revised.pdf PDF
Building298_Part6_Ch8_BEAPCherryPoint.pdf PDF
Amnd 0002 20R6003 FINAL.pdf PDF
Amnd 0001 20R6003 FINAL.pdf PDF
RFP N6247020R6003.pdf PDF
Master PPI Form Template.xls XLS spreadsheet
6792343 - DESIGN BUILD PACKAGE.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Building Envelope and Interior Finishes, Building 298 WO # N40085-19-F-6882 Building 298, Cherry Point, North Carolina

PART 3 - CHAPTER 6 - Page 675 07/07/2020

E20 FURNISHINGS

SYSTEM DESCRIPTION

Furnishings must include fixed furnishings as part of the Structural Interior Design (SID) and the design and documentation of the movable furnishings, the Furniture, Fixtures, and Equipment (FF&E) Package and Audio/Visual (A/V) Equipment Package.

The design and documentation of fixed furnishings identified above must be funded as part of the construction contract. The purchase and installation of the FF&E and A/V Packages must be funded separately as part of Collateral Equipment.

The movable furniture and furnishings (FF&E) for this facility may include, but are not limited to movable furniture systems, freestanding furniture, area/accent rugs, artwork, appliances, flat screen TVs (not connected to data), accessories, shop equipment, fire extinguishers, specialty equipment (specified by the Activity) and other miscellaneous items to support facility functions.

The Government FF&E budget on the Bid Schedule/Price Proposal Form is $1,985,877.46 and does NOT include the Contractor’s Handling and Administration Rate (HAR). This Government FF&E budget must not be altered by Contractors during the bid process.

Fixed furnishings (items that are fixed to the structure), such as specialty equipment, drying cages, weapon racks, lockers, fixed shelving, fixed display furnishings, marker boards, cork boards, motorized projection screens, blinds/shades, etc. are part of the construction contract.

The Audio Visual (AV) Equipment will be identified as a separate line item, priced separately from the FF&E and funded as a planned modification. The A/V Package must include shipping, freight, handling, installation, applicable state sales tax, and the Prime Contractor's A/V Handling and Administration Rate (HAR) percentage as applied to the final A/V total cost. Refer to Part 3 Section E10 of this RFP.

GENERAL SYSTEMS REQUIREMENTS

Design and provide fixed and movable furnishings for all areas as developed during Activity programming and as indicated in the Room Requirements (refer to Part 3 Section 5 of this RFP) and other portions of this RFP to provide a fully usable and complete facility. Design a complete FF&E package and A/V package and prepare supporting plans and procurement data.

The design, procurement, and installation of the A/V package must comply with all of the same requirements as those defined for the FF&E package in this specification section. FF&E and A/V items identified in this RFP are to be used as a guideline to assist in establishing the minimum facility requirements and do not relieve the Contractor's Interior Designer and CTS- D from developing a complete and accurate design package that incorporates ALL of the Activity’s FF&E and A/V requirements determined during the design process. Design per specific UFC (i.e. Youth center, BEQ, etc) and in conjunction with UFC 03-120-10, Interior Design.