Repair Building Envelope and Interior Finishes, Building 298 WO # N40085-19-F-6882 Building 298, Cherry Point, North Carolina
PART 3 - CHAPTER 6 - Page 675 07/07/2020
E20 FURNISHINGS
SYSTEM DESCRIPTION
Furnishings must include fixed furnishings as part of the Structural Interior Design (SID) and the design and documentation of the movable furnishings, the Furniture, Fixtures, and Equipment (FF&E) Package and Audio/Visual (A/V) Equipment Package.
The design and documentation of fixed furnishings identified above must be funded as part of the construction contract. The purchase and installation of the FF&E and A/V Packages must be funded separately as part of Collateral Equipment.
The movable furniture and furnishings (FF&E) for this facility may include, but are not limited to movable furniture systems, freestanding furniture, area/accent rugs, artwork, appliances, flat screen TVs (not connected to data), accessories, shop equipment, fire extinguishers, specialty equipment (specified by the Activity) and other miscellaneous items to support facility functions.
The Government FF&E budget on the Bid Schedule/Price Proposal Form is $1,985,877.46 and does NOT include the Contractor’s Handling and Administration Rate (HAR). This Government FF&E budget must not be altered by Contractors during the bid process.
Fixed furnishings (items that are fixed to the structure), such as specialty equipment, drying cages, weapon racks, lockers, fixed shelving, fixed display furnishings, marker boards, cork boards, motorized projection screens, blinds/shades, etc. are part of the construction contract.
The Audio Visual (AV) Equipment will be identified as a separate line item, priced separately from the FF&E and funded as a planned modification. The A/V Package must include shipping, freight, handling, installation, applicable state sales tax, and the Prime Contractor's A/V Handling and Administration Rate (HAR) percentage as applied to the final A/V total cost. Refer to Part 3 Section E10 of this RFP.
GENERAL SYSTEMS REQUIREMENTS
Design and provide fixed and movable furnishings for all areas as developed during Activity programming and as indicated in the Room Requirements (refer to Part 3 Section 5 of this RFP) and other portions of this RFP to provide a fully usable and complete facility. Design a complete FF&E package and A/V package and prepare supporting plans and procurement data.
The design, procurement, and installation of the A/V package must comply with all of the same requirements as those defined for the FF&E package in this specification section. FF&E and A/V items identified in this RFP are to be used as a guideline to assist in establishing the minimum facility requirements and do not relieve the Contractor's Interior Designer and CTS- D from developing a complete and accurate design package that incorporates ALL of the Activity’s FF&E and A/V requirements determined during the design process. Design per specific UFC (i.e. Youth center, BEQ, etc) and in conjunction with UFC 03-120-10, Interior Design.