Repair Building Envelope and Interior Finishes, Building 298 WO # N40085-19-F-6882 Building 298, Cherry Point, North Carolina
PART 3 – Chapter 5 - Page 538
Stairway Entry – A-201
Space Characteristics
Function/adjacencies: Existing stair to remain, new corridor to elevator and both wings.
Dimension: 222 SF Minimum Ceiling Height: 8’-0”
Acoustics:
Access: Staff, Public Number of Occupants: 0 Other/Special Requirements: Color Scheme A
Uniformat Section Description Qty Size Specific Requirements
B202001 Exterior Windows 5 Replace existing windows, Contractor to field verify sizes and locations
B202004 Exterior Glazing 5 Insulated low “E” glazing, no ATFP reqts.
C102001 Interior Doors 2 (2) 3-0 x 7-0
Steel door and frame with full door glass vision panel
C101006 Glazed Storefront System
Aluminum and Glass Storefront System
12 LF
C102007 Door Hardware 2 Door Hardware Set 08
C103004 Identifying Devices
2 Permanent stairwell signs
C201090 Handrails, Guardrails
Replace/Refurbish guardrails and handrails at existing stairs
C3010 Wall Finish Impact Resistant GWB, existing CMU
C3010 Interior Painting SF All wall surfaces.
C3020 Floor Finish SF Epoxy resin corridor and stair landings, 2-piece rubber stair treads on stairs
C3020 Wall Base Finish LF Epoxy resin
C3030 Ceiling Finish SF Gypsum wall board
D4010 Fire Alarm and Detection Systems
A/R Per ESR
D4040 Sprinkler Systems Add sprinkler heads as required per ESR
D5020 Lighting A/R Surface mounted 2x4 LED troffer per ESR
D5020 Branch Wiring A/R Branch Circuits & Outlets per ESR
PART 3 – Chapter 5 - Page 539
Stairway Entry – A-201
Function/adjacencies: Existing stair to remain, new corridor to elevator and both wings.
Dimension: 222 SF Minimum Ceiling Height: 8’-0”
Acoustics:
Access: Staff, Public
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following items: none
PART 3 – Chapter 5 - Page 564
Future Tenant Janitor Closet – A-216
Function/adjacencies:
Dimensions: 55 SF Minimum Ceiling Height: N/A
Acoustics:
Access: Maintenance Staff
B202001 Exterior Windows 1 Replace existing windows. Contractor to field verify sizes and locations.
B202004 Exterior Glazing 1 Insulated – Low ‘E’ Glazing. No ATFP Requirements
C102001 Standard Interior Doors
1 3-0 x 7-0 Solid Core Wood doors and frames
C102007 Door Hardware 1 Hardware Set 09
C103004 Identifying Devices
1 Changeable nameplate
C3010 Wall Finish Impact Resistant GWB
C3010 Interior Painting SF GWB wall surfaces.
C302001 Porcelain Tile SF Porcelain tile Flooring
D201004 Floor Sink 1 Janitor Floor Sink per ESR
D3040 HVAC A/R
Provide ducted supply and exhaust per
ESR.
D4010 Fire Alarm and Detection Systems
A/R Per ESR
D4040 Sprinkler Systems Add sprinkler heads as required per ESR
D5020 Lighting A/R 1' X 4' LED Troffer per ESR
D5020 Branch Wiring A/R Branch Circuits & Outlets per ESR
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must
PART 3 – Chapter 5 - Page 558
Storage Room – B-212
Function/adjacencies: Storage
Existing Dimensions: 25 SF Minimum Ceiling Height: 8’-0”
Acoustics: Wall STC45/Door and Frame STC 42 Access: Maintenance Staff
Other/Special Requirements: Color Scheme B
C3010 Interior Painting SF GWB wall surfaces.
C102001 Standard Interior Doors
1 3-0 x 7-0 Solid Core Wood doors and frames
C102007 Door Hardware 1 Hardware Set 09
C3010 Wall Finish SF Impact Resistant GWB
C3010 Interior Painting SF GWB wall surfaces.
C3020 Floor Finish SF Porcelain tile Flooring
C3020 Wall Base Finish LF Rubber Base
C103004 Identifying Devices
1 Changeable nameplate
D4010 Fire Alarm and Detection Systems
A/R Per ESR
D4040 Sprinkler Systems Add sprinkler heads as required per ESR
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must
PART 3 – Chapter 5 - Page 559
FRCE Office Space – B-213
Function/adjacencies: Existing FRCE Office space to remain as currently configured
Existing Dimensions: 86 SF Minimum Ceiling Height: 8’-0”
Acoustics: Wall STC45/Door and Frame STC 42 Access: Public, Staff Number of Occupants:1
C3010 Interior Painting SF GWB wall surfaces.
C102001 Standard Interior Doors
1 3-0 x 7-0 Solid Core Wood doors and frames
C103004 Identifying Devices
1 Changeable nameplate
C102007 Door Hardware 1 Hardware Set 04
C3010 Wall Finish SF Impact Resistant GWB
C3010 Interior Painting SF GWB wall surfaces.
C3020 Floor Finish SF Carpet Tile
C3020 Wall Base Finish LF Rubber Base
C3030 Ceiling Finish SF 24”X24” Suspended Acoustical Ceiling Tiles, Tegular edge
C3030 Suspension Systems
Suspended exposed grid
D4010 Fire Alarm and Detection Systems
A/R Per ESR
D4040 Sprinkler Systems Add sprinkler heads as required per ESR
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following items: Standard work desk with task chair, two guest chairs
PART 3 – Chapter 5 - Page 560
FRCE Office Space – B-214
Function/adjacencies: Existing FRCE Office space to remain as currently configured
Existing Dimensions: 86 SF Minimum Ceiling Height: 8’-0”
Acoustics: Wall STC45/Door and Frame STC 42 Access: Public, Staff
C3010 Interior Painting SF GWB wall surfaces.
C102001 Standard Interior Doors
3-0 x 7-
Solid Core Wood doors and frames
C103004 Identifying Devices
1 Changeable nameplate
C102007 Door Hardware 1 Hardware Set 04
C3010 Wall Finish SF Impact Resistant GWB
C3010 Interior Painting SF GWB wall surfaces.
C3020 Floor Finish SF Carpet Tile
C3020 Wall Base Finish LF Rubber Base
C3030 Ceiling Finish SF 24”X24” Suspended Acoustical Ceiling Tiles, Tegular edge
C3030 Suspension Systems
Suspended exposed grid
D4010 Fire Alarm and Detection Systems
A/R Per ESR
D4040 Sprinkler Systems Add sprinkler heads as required per ESR
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must determine FF&E requirements based on in-depth interviews with Activity at Concept Design
PART 3 – Chapter 5 - Page 562
FRCE Office Space – B-215
Function/adjacencies: Existing FRCE Office space to remain as currently configured
Existing Dimensions: 92 SF Minimum Ceiling Height: 8’-0”
Acoustics: Wall STC45/Door and Frame STC 42 Access: Public, Staff
C3010 Interior Painting SF GWB wall surfaces.
C102001 Standard Interior Doors
3-0 x 7-
Solid Core Wood doors and frames
C103004 Identifying Devices
1 Changeable nameplate
C102007 Door Hardware 1 Hardware Set 04
C3010 Wall Finish SF Impact Resistant GWB
C3010 Interior Painting SF GWB wall surfaces.
C3020 Floor Finish SF Carpet Tile
C3020 Wall Base Finish LF Rubber Base
C3030 Ceiling Finish SF 24”X24” Suspended Acoustical Ceiling Tiles, Tegular edge
C3030 Suspension Systems
Suspended exposed grid
D4010 Fire Alarm and Detection Systems
A/R Per ESR
D4040 Sprinkler Systems Add sprinkler heads as required per ESR
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must determine FF&E requirements based on in-depth interviews with Activity at Concept Design
PART 3 – Chapter 5 - Page 564
FRCE Office Space – B-216
Function/adjacencies: Existing FRCE Office space to remain as currently configured
Existing Dimensions: 90 SF Minimum Ceiling Height: 8’-0”
Acoustics: Wall STC45/Door and Frame STC 42 Access: Public, Staff
C3010 Interior Painting SF GWB wall surfaces.
C102001 Standard Interior Doors
3-0 x 7-
Solid Core Wood doors and frames
C103004 Identifying Devices
1 Changeable nameplate
C102007 Door Hardware 1 Hardware Set 04
C3010 Wall Finish SF Impact Resistant GWB
C3010 Interior Painting SF GWB wall surfaces.
C3020 Floor Finish SF Carpet Tile
C3020 Wall Base Finish LF Rubber Base
C3030 Ceiling Finish SF 24”X24” Suspended Acoustical Ceiling Tiles, Tegular edge
C3030 Suspension Systems
Suspended exposed grid
D4010 Fire Alarm and Detection Systems
A/R Per ESR
D4040 Sprinkler Systems Add sprinkler heads as required per ESR
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must determine FF&E requirements based on in-depth interviews with Activity at Concept Design
PART 3 – Chapter 5 - Page 565
Corridor – B-217
Function/adjacencies: New Elevator Access
Existing Dimensions: 496 SF Minimum Ceiling Height: 8’-0”
Acoustics:
Access: Staff, Public
C102001 Interior Doors 2 3-0 x 7-0 Steel Doors with 24” x 24” Vision Panels, each door
C102007 Door Hardware 2 Hardware Set 08
C103004 Identifying Devices
Room name and Number sign
C3010 Wall Finish Impact Resistant GWB
C3010 Interior Painting SF All wall surfaces.
C3020 Floor Finish SF Epoxy Resin
C3020 Wall Base Finish LF Epoxy Resin
C3030 Ceiling Finish SF 24”X24” Suspended Acoustical Ceiling Tiles, Tegular edge
C3030 Suspension Systems
Suspended exposed grid
D4010 Fire Alarm and Detection Systems
A/R Per ESR
D4040 Sprinkler Systems Add sprinkler heads as required per ESR
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must