Repair Building Envelope and Interior Finishes, Building 298
Solicitation number
N6247020R6003
Issued by

View the file

Other files

File Type Posted
Building298-Part3-Ch6-E20-Revised.pdf PDF
Amnd 0006 20R6003 FINAL.pdf PDF
4483054.pdf PDF
4100802-4100805.pdf PDF
4100806.pdf PDF
4100795.pdf PDF
Amnd 0005 20R6003 FINAL.pdf PDF
Building298_Part3_Ch6_B10-Revised.pdf PDF
Building298_01 50 00.05 02-Revised.pdf PDF
Amnd 0004 20R6003 FINAL.pdf PDF
Building298_Part6_Ch1_E-101-Revised.pdf PDF
Building298_Part3_Ch6_G40-Revised2.pdf PDF
Building298_Part3_Ch6_C20-Revised.pdf PDF
Building298_Part3_Ch6_F20-Revised.pdf PDF
Building298_Part3_Ch6_B30-Revised.pdf PDF
Building298_Part3_Ch5_C-106-Revised.pdf PDF
Building298_Part3_Ch2-Revised.pdf PDF
Building298_Part2_Section01-33-29.05_HPSBChecklist2020ATTAINED.pdf PDF
Building298_Part3_Ch6_G40-Revised.pdf PDF
Amnd 0003 20R6003 FINAL.pdf PDF
Building298_Part2_Section01-33-29.05_HPSBChecklist2020GOALS.pdf PDF
Building298_Part3_Ch6_B20_Revision.pdf PDF
Building298_Part3_Ch3-Revised.pdf PDF
Building298_Part3_Ch6_D40-Revised.pdf PDF
Building298_Part3_Ch6_D30-Revised.pdf PDF
Building298_Part6_Ch1_ A-103.pdf PDF
Building298_Part4_D50-Revised.pdf PDF
Building298_Part3_Ch6_G20-Revised.pdf PDF
Building298_Part6_Ch8_BEAPCherryPoint.pdf PDF
Amnd 0002 20R6003 FINAL.pdf PDF
Amnd 0001 20R6003 FINAL.pdf PDF
RFP N6247020R6003.pdf PDF
Master PPI Form Template.xls XLS spreadsheet
6792343 - DESIGN BUILD PACKAGE.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Building Envelope and Interior Finishes, Building 298 WO # N40085-19-F-6882 Building 298, Cherry Point, North Carolina

PART 3 – Chapter 5 - Page 538

Stairway Entry – A-201

Space Characteristics

Function/adjacencies: Existing stair to remain, new corridor to elevator and both wings.

Dimension: 222 SF Minimum Ceiling Height: 8’-0”

Acoustics:

Access: Staff, Public Number of Occupants: 0 Other/Special Requirements: Color Scheme A

Uniformat Section Description Qty Size Specific Requirements

B202001 Exterior Windows 5 Replace existing windows, Contractor to field verify sizes and locations

B202004 Exterior Glazing 5 Insulated low “E” glazing, no ATFP reqts.

C102001 Interior Doors 2 (2) 3-0 x 7-0

Steel door and frame with full door glass vision panel

C101006 Glazed Storefront System

Aluminum and Glass Storefront System

12 LF

C102007 Door Hardware 2 Door Hardware Set 08

C103004 Identifying Devices

2 Permanent stairwell signs

C201090 Handrails, Guardrails

Replace/Refurbish guardrails and handrails at existing stairs

C3010 Wall Finish Impact Resistant GWB, existing CMU

C3010 Interior Painting SF All wall surfaces.

C3020 Floor Finish SF Epoxy resin corridor and stair landings, 2-piece rubber stair treads on stairs

C3020 Wall Base Finish LF Epoxy resin

C3030 Ceiling Finish SF Gypsum wall board

D4010 Fire Alarm and Detection Systems

A/R Per ESR

D4040 Sprinkler Systems Add sprinkler heads as required per ESR

D5020 Lighting A/R Surface mounted 2x4 LED troffer per ESR

D5020 Branch Wiring A/R Branch Circuits & Outlets per ESR

PART 3 – Chapter 5 - Page 539

Stairway Entry – A-201

Function/adjacencies: Existing stair to remain, new corridor to elevator and both wings.

Dimension: 222 SF Minimum Ceiling Height: 8’-0”

Acoustics:

Access: Staff, Public

FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following items: none

PART 3 – Chapter 5 - Page 564

Future Tenant Janitor Closet – A-216

Function/adjacencies:

Dimensions: 55 SF Minimum Ceiling Height: N/A

Acoustics:

Access: Maintenance Staff

B202001 Exterior Windows 1 Replace existing windows. Contractor to field verify sizes and locations.

B202004 Exterior Glazing 1 Insulated – Low ‘E’ Glazing. No ATFP Requirements

C102001 Standard Interior Doors

1 3-0 x 7-0 Solid Core Wood doors and frames

C102007 Door Hardware 1 Hardware Set 09

C103004 Identifying Devices

1 Changeable nameplate

C3010 Wall Finish Impact Resistant GWB

C3010 Interior Painting SF GWB wall surfaces.

C302001 Porcelain Tile SF Porcelain tile Flooring

D201004 Floor Sink 1 Janitor Floor Sink per ESR

D3040 HVAC A/R

Provide ducted supply and exhaust per

ESR.

D4010 Fire Alarm and Detection Systems

A/R Per ESR

D4040 Sprinkler Systems Add sprinkler heads as required per ESR

D5020 Lighting A/R 1' X 4' LED Troffer per ESR

D5020 Branch Wiring A/R Branch Circuits & Outlets per ESR

FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must

PART 3 – Chapter 5 - Page 558

Storage Room – B-212

Function/adjacencies: Storage

Existing Dimensions: 25 SF Minimum Ceiling Height: 8’-0”

Acoustics: Wall STC45/Door and Frame STC 42 Access: Maintenance Staff

Other/Special Requirements: Color Scheme B

C3010 Interior Painting SF GWB wall surfaces.

C102001 Standard Interior Doors

1 3-0 x 7-0 Solid Core Wood doors and frames

C102007 Door Hardware 1 Hardware Set 09

C3010 Wall Finish SF Impact Resistant GWB

C3010 Interior Painting SF GWB wall surfaces.

C3020 Floor Finish SF Porcelain tile Flooring

C3020 Wall Base Finish LF Rubber Base

C103004 Identifying Devices

1 Changeable nameplate

D4010 Fire Alarm and Detection Systems

A/R Per ESR

D4040 Sprinkler Systems Add sprinkler heads as required per ESR

FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must

PART 3 – Chapter 5 - Page 559

FRCE Office Space – B-213

Function/adjacencies: Existing FRCE Office space to remain as currently configured

Existing Dimensions: 86 SF Minimum Ceiling Height: 8’-0”

Acoustics: Wall STC45/Door and Frame STC 42 Access: Public, Staff Number of Occupants:1

C3010 Interior Painting SF GWB wall surfaces.

C102001 Standard Interior Doors

1 3-0 x 7-0 Solid Core Wood doors and frames

C103004 Identifying Devices

1 Changeable nameplate

C102007 Door Hardware 1 Hardware Set 04

C3010 Wall Finish SF Impact Resistant GWB

C3010 Interior Painting SF GWB wall surfaces.

C3020 Floor Finish SF Carpet Tile

C3020 Wall Base Finish LF Rubber Base

C3030 Ceiling Finish SF 24”X24” Suspended Acoustical Ceiling Tiles, Tegular edge

C3030 Suspension Systems

Suspended exposed grid

D4010 Fire Alarm and Detection Systems

A/R Per ESR

D4040 Sprinkler Systems Add sprinkler heads as required per ESR

FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following items: Standard work desk with task chair, two guest chairs

PART 3 – Chapter 5 - Page 560

FRCE Office Space – B-214

Function/adjacencies: Existing FRCE Office space to remain as currently configured

Existing Dimensions: 86 SF Minimum Ceiling Height: 8’-0”

Acoustics: Wall STC45/Door and Frame STC 42 Access: Public, Staff

C3010 Interior Painting SF GWB wall surfaces.

C102001 Standard Interior Doors

3-0 x 7-

Solid Core Wood doors and frames

C103004 Identifying Devices

1 Changeable nameplate

C102007 Door Hardware 1 Hardware Set 04

C3010 Wall Finish SF Impact Resistant GWB

C3010 Interior Painting SF GWB wall surfaces.

C3020 Floor Finish SF Carpet Tile

C3020 Wall Base Finish LF Rubber Base

C3030 Ceiling Finish SF 24”X24” Suspended Acoustical Ceiling Tiles, Tegular edge

C3030 Suspension Systems

Suspended exposed grid

D4010 Fire Alarm and Detection Systems

A/R Per ESR

D4040 Sprinkler Systems Add sprinkler heads as required per ESR

FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must determine FF&E requirements based on in-depth interviews with Activity at Concept Design

PART 3 – Chapter 5 - Page 562

FRCE Office Space – B-215

Function/adjacencies: Existing FRCE Office space to remain as currently configured

Existing Dimensions: 92 SF Minimum Ceiling Height: 8’-0”

Acoustics: Wall STC45/Door and Frame STC 42 Access: Public, Staff

C3010 Interior Painting SF GWB wall surfaces.

C102001 Standard Interior Doors

3-0 x 7-

Solid Core Wood doors and frames

C103004 Identifying Devices

1 Changeable nameplate

C102007 Door Hardware 1 Hardware Set 04

C3010 Wall Finish SF Impact Resistant GWB

C3010 Interior Painting SF GWB wall surfaces.

C3020 Floor Finish SF Carpet Tile

C3020 Wall Base Finish LF Rubber Base

C3030 Ceiling Finish SF 24”X24” Suspended Acoustical Ceiling Tiles, Tegular edge

C3030 Suspension Systems

Suspended exposed grid

D4010 Fire Alarm and Detection Systems

A/R Per ESR

D4040 Sprinkler Systems Add sprinkler heads as required per ESR

FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must determine FF&E requirements based on in-depth interviews with Activity at Concept Design

PART 3 – Chapter 5 - Page 564

FRCE Office Space – B-216

Function/adjacencies: Existing FRCE Office space to remain as currently configured

Existing Dimensions: 90 SF Minimum Ceiling Height: 8’-0”

Acoustics: Wall STC45/Door and Frame STC 42 Access: Public, Staff

C3010 Interior Painting SF GWB wall surfaces.

C102001 Standard Interior Doors

3-0 x 7-

Solid Core Wood doors and frames

C103004 Identifying Devices

1 Changeable nameplate

C102007 Door Hardware 1 Hardware Set 04

C3010 Wall Finish SF Impact Resistant GWB

C3010 Interior Painting SF GWB wall surfaces.

C3020 Floor Finish SF Carpet Tile

C3020 Wall Base Finish LF Rubber Base

C3030 Ceiling Finish SF 24”X24” Suspended Acoustical Ceiling Tiles, Tegular edge

C3030 Suspension Systems

Suspended exposed grid

D4010 Fire Alarm and Detection Systems

A/R Per ESR

D4040 Sprinkler Systems Add sprinkler heads as required per ESR

FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must determine FF&E requirements based on in-depth interviews with Activity at Concept Design

PART 3 – Chapter 5 - Page 565

Corridor – B-217

Function/adjacencies: New Elevator Access

Existing Dimensions: 496 SF Minimum Ceiling Height: 8’-0”

Acoustics:

Access: Staff, Public

C102001 Interior Doors 2 3-0 x 7-0 Steel Doors with 24” x 24” Vision Panels, each door

C102007 Door Hardware 2 Hardware Set 08

C103004 Identifying Devices

Room name and Number sign

C3010 Wall Finish Impact Resistant GWB

C3010 Interior Painting SF All wall surfaces.

C3020 Floor Finish SF Epoxy Resin

C3020 Wall Base Finish LF Epoxy Resin

C3030 Ceiling Finish SF 24”X24” Suspended Acoustical Ceiling Tiles, Tegular edge

C3030 Suspension Systems

Suspended exposed grid

D4010 Fire Alarm and Detection Systems

A/R Per ESR

D4040 Sprinkler Systems Add sprinkler heads as required per ESR

FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must

File details come from the government source that posted it. Updated .