Repair Building Envelope and Interior Finishes, Building 298 WO # N40085-19-F-6882 Building 298, Cherry Point, North Carolina
Part 3 – CHAPTER 3 - Page 369 06/17/2020
CHAPTER 3.0 - SITE ANALYSIS
3.1 Existing Site Conditions
3.1.1 Development and Topography
Building 298 is an existing building located on the northwest side of E Street. The two-story building was constructed in 1942. It has housed many user groups and currently serves as an administration building with a library.
The site is developed with a small amount of elevation change across the site. Vehicle parking surrounds the building for the existing user groups with some parking shared with the adjacent gymnasium patrons.
3.1.2 Geotechnical / Soils
Soils consist of marine deposited sands and clays found within the major physiographic province of North Carolina called the Atlantic Coastal Plain. The geology has interbedded layers of varying mixtures of sands, silts, and clays.
3.1.3 Environmental
Currently there are no known prohibitive environmental conditions effecting the proposed repair and renovation of the building.
3.1.4 Vehicular Access
Vehicle access to the site is readily available along E Street. A paved perimeter road is also accessible from E Street with connectivity to Roosevelt Boulevard and F Street.
3.1.5 Pedestrian Access
Pedestrian access is available from any direction. Striped pedestrian crosswalks exist across E Street at two locations in front of the building. Sidewalks run along both sides of E Street.
3.2 Site Development Requirements
3.2.1 Site Civil
This project will repair and renovation to the existing parking area surrounding the building. Repair to include mill and overlay of asphalt, new striping, additional parking, new pedestrian pathways, and accessible parking.
Design Engineer shall maximize parking count for Building 298. Provide layout to maximize parking and provide safe and efficient routes.
Preparation of the site includes demolition of existing vegetation, pavement, and select structures.
No additional landscaping plantings will be provided as a part of this project. Sod shall be placed or restored consistent with the plans.
For additional information see Part 3 Chapter 6 – G20 “Site Preparation” and G-20 “Site Improvements”.
Repair Building Envelope and Interior Finishes, Building 298 WO # N40085-19-F-6882 Building 298, Cherry Point, North Carolina
Part 3 – CHAPTER 3 - Page 370 06/17/2020
Project will also include the development of a temporary modular trailer site. The site is bound by Woodside Drive, Jones Road, Crossland Drive, and Lenoir Road. Modular trailers are to be provided to temporarily house and park approximately 100 staff and 50 visitors per day. Parking area to be paved with asphalt for a 25-year life span.
Pedestrian accessible paths from the roadways and parking shall be provided to each modular trailer. Parking area shall incorporate site lighting for vehicles and pathways. Pavement sections shall be designed by the Engineer of Record for the project.
3.2.2 Utilities
Existing utilities that serve the building will be replaced with new service lines to the mains. Utilities will include fire line and post indicator valve (PIV) with control valve supervisory switch routed back to the building 298 fire access control panel, domestic water service, domestic sanitary sewer serve, gutters, underground roof drain leaders, and secondary electrical lines from transformer.
Temporary generators shall be provided to building 298 to prevent disruption of electrical service to occupied areas during construction.
New utility services shall be provided to the temporary modular trailers. Services shall include domestic water service, domestic sanitary sewer serve, electrical lines to/from a transformer and a communication duct bank from the existing MH E1001 near east side of Roosevelt Drive. Services shall be removed and capped at the respectful mains at the completion of the project. The asphalt parking shall remain at the completion of the project.
--End of Section--