Building298_Part3_Ch3-Revised.pdf

PDF 266 KB Posted

Attached to
Repair Building Envelope and Interior Finishes, Building 298
Solicitation number
N6247020R6003
Issued by

View the file

Other files

File Type Posted
Building298-Part3-Ch6-E20-Revised.pdf PDF
Amnd 0006 20R6003 FINAL.pdf PDF
4483054.pdf PDF
4100802-4100805.pdf PDF
4100806.pdf PDF
4100795.pdf PDF
Amnd 0005 20R6003 FINAL.pdf PDF
Building298_Part3_Ch6_B10-Revised.pdf PDF
Building298_01 50 00.05 02-Revised.pdf PDF
Amnd 0004 20R6003 FINAL.pdf PDF
Building298_Part6_Ch1_E-101-Revised.pdf PDF
Building298_Part3_Ch6_G40-Revised2.pdf PDF
Building298_Part3_Ch6_C20-Revised.pdf PDF
Building298_Part3_Ch6_F20-Revised.pdf PDF
Building298_Part3_Ch6_B30-Revised.pdf PDF
Building298_Part3_Ch5_C-106-Revised.pdf PDF
Building298_Part3_Ch2-Revised.pdf PDF
Building298_Part2_Section01-33-29.05_HPSBChecklist2020ATTAINED.pdf PDF
Building298_Part3_Ch6_G40-Revised.pdf PDF
Amnd 0003 20R6003 FINAL.pdf PDF
Building298_Part3_Ch5_Revision.pdf PDF
Building298_Part2_Section01-33-29.05_HPSBChecklist2020GOALS.pdf PDF
Building298_Part3_Ch6_B20_Revision.pdf PDF
Building298_Part3_Ch6_D40-Revised.pdf PDF
Building298_Part3_Ch6_D30-Revised.pdf PDF
Building298_Part6_Ch1_ A-103.pdf PDF
Building298_Part4_D50-Revised.pdf PDF
Building298_Part3_Ch6_G20-Revised.pdf PDF
Building298_Part6_Ch8_BEAPCherryPoint.pdf PDF
Amnd 0002 20R6003 FINAL.pdf PDF
Amnd 0001 20R6003 FINAL.pdf PDF
RFP N6247020R6003.pdf PDF
Master PPI Form Template.xls XLS spreadsheet
6792343 - DESIGN BUILD PACKAGE.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Building Envelope and Interior Finishes, Building 298 WO # N40085-19-F-6882 Building 298, Cherry Point, North Carolina

Part 3 – CHAPTER 3 - Page 369 06/17/2020

CHAPTER 3.0 - SITE ANALYSIS

3.1 Existing Site Conditions

3.1.1 Development and Topography

Building 298 is an existing building located on the northwest side of E Street. The two-story building was constructed in 1942. It has housed many user groups and currently serves as an administration building with a library.

The site is developed with a small amount of elevation change across the site. Vehicle parking surrounds the building for the existing user groups with some parking shared with the adjacent gymnasium patrons.

3.1.2 Geotechnical / Soils

Soils consist of marine deposited sands and clays found within the major physiographic province of North Carolina called the Atlantic Coastal Plain. The geology has interbedded layers of varying mixtures of sands, silts, and clays.

3.1.3 Environmental

Currently there are no known prohibitive environmental conditions effecting the proposed repair and renovation of the building.

3.1.4 Vehicular Access

Vehicle access to the site is readily available along E Street. A paved perimeter road is also accessible from E Street with connectivity to Roosevelt Boulevard and F Street.

3.1.5 Pedestrian Access

Pedestrian access is available from any direction. Striped pedestrian crosswalks exist across E Street at two locations in front of the building. Sidewalks run along both sides of E Street.

3.2 Site Development Requirements

3.2.1 Site Civil

This project will repair and renovation to the existing parking area surrounding the building. Repair to include mill and overlay of asphalt, new striping, additional parking, new pedestrian pathways, and accessible parking.

Design Engineer shall maximize parking count for Building 298. Provide layout to maximize parking and provide safe and efficient routes.

Preparation of the site includes demolition of existing vegetation, pavement, and select structures.

No additional landscaping plantings will be provided as a part of this project. Sod shall be placed or restored consistent with the plans.

For additional information see Part 3 Chapter 6 – G20 “Site Preparation” and G-20 “Site Improvements”.

Repair Building Envelope and Interior Finishes, Building 298 WO # N40085-19-F-6882 Building 298, Cherry Point, North Carolina

Part 3 – CHAPTER 3 - Page 370 06/17/2020

Project will also include the development of a temporary modular trailer site. The site is bound by Woodside Drive, Jones Road, Crossland Drive, and Lenoir Road. Modular trailers are to be provided to temporarily house and park approximately 100 staff and 50 visitors per day. Parking area to be paved with asphalt for a 25-year life span.

Pedestrian accessible paths from the roadways and parking shall be provided to each modular trailer. Parking area shall incorporate site lighting for vehicles and pathways. Pavement sections shall be designed by the Engineer of Record for the project.

3.2.2 Utilities

Existing utilities that serve the building will be replaced with new service lines to the mains. Utilities will include fire line and post indicator valve (PIV) with control valve supervisory switch routed back to the building 298 fire access control panel, domestic water service, domestic sanitary sewer serve, gutters, underground roof drain leaders, and secondary electrical lines from transformer.

Temporary generators shall be provided to building 298 to prevent disruption of electrical service to occupied areas during construction.

New utility services shall be provided to the temporary modular trailers. Services shall include domestic water service, domestic sanitary sewer serve, electrical lines to/from a transformer and a communication duct bank from the existing MH E1001 near east side of Roosevelt Drive. Services shall be removed and capped at the respectful mains at the completion of the project. The asphalt parking shall remain at the completion of the project.

--End of Section--