Repair Building Envelope and Interior Finishes, Building 298
Solicitation number
N6247020R6003
Issued by

View the file

Other files

File Type Posted
Building298-Part3-Ch6-E20-Revised.pdf PDF
Amnd 0006 20R6003 FINAL.pdf PDF
4483054.pdf PDF
4100802-4100805.pdf PDF
4100806.pdf PDF
4100795.pdf PDF
Amnd 0005 20R6003 FINAL.pdf PDF
Building298_Part3_Ch6_B10-Revised.pdf PDF
Building298_01 50 00.05 02-Revised.pdf PDF
Amnd 0004 20R6003 FINAL.pdf PDF
Building298_Part6_Ch1_E-101-Revised.pdf PDF
Building298_Part3_Ch6_G40-Revised2.pdf PDF
Building298_Part3_Ch6_C20-Revised.pdf PDF
Building298_Part3_Ch6_F20-Revised.pdf PDF
Building298_Part3_Ch6_B30-Revised.pdf PDF
Building298_Part3_Ch5_C-106-Revised.pdf PDF
Building298_Part3_Ch2-Revised.pdf PDF
Building298_Part2_Section01-33-29.05_HPSBChecklist2020ATTAINED.pdf PDF
Building298_Part3_Ch6_G40-Revised.pdf PDF
Amnd 0003 20R6003 FINAL.pdf PDF
Building298_Part3_Ch5_Revision.pdf PDF
Building298_Part2_Section01-33-29.05_HPSBChecklist2020GOALS.pdf PDF
Building298_Part3_Ch6_B20_Revision.pdf PDF
Building298_Part3_Ch3-Revised.pdf PDF
Building298_Part3_Ch6_D30-Revised.pdf PDF
Building298_Part6_Ch1_ A-103.pdf PDF
Building298_Part4_D50-Revised.pdf PDF
Building298_Part3_Ch6_G20-Revised.pdf PDF
Building298_Part6_Ch8_BEAPCherryPoint.pdf PDF
Amnd 0002 20R6003 FINAL.pdf PDF
Amnd 0001 20R6003 FINAL.pdf PDF
RFP N6247020R6003.pdf PDF
Master PPI Form Template.xls XLS spreadsheet
6792343 - DESIGN BUILD PACKAGE.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Building Envelope and Interior Finishes, Building 298 WO # N40085-19-F-6882 Building 298, Cherry Point, North Carolina

PART 3 - CHAPTER 6 - Page 665 06/17/2020

D40 FIRE PROTECTION

Refer to Part 4 Section D40 for performance requirements of the building elements included in the fire protection systems.

SYSTEM DESCRIPTION

Provide an integrated fire alarm and mass notification system and modify existing suppression system capable of notifying building occupants and controlling any fire that may start inside the facility.

GENERAL SYSTEM REQUIREMENTS

Provide working space around all equipment. Provide concrete pads under all equipment. Provide all required fittings, connections and accessories required for a complete and usable system. Install equipment in accordance with the criteria of PTS section D40 and the manufacturer’s recommendations. Where the word "should" is used in the manufacturer's recommendations, substitute the word "must".

All Design Documents, (i.e. Building Code/Life Safety Analysis, plans, specifications, and calculations) developed for Section D40 must be prepared by, or under the supervision of the design/build contractor's Qualified Fire Protection Engineer, the Fire Protection Designer of Record

(FPDOR).

Installation drawings, shop drawings or working plans, calculations, other required pre-construction documentation and as-built drawings must be prepared by, or under the direct supervision of a National Institute for Certification in Engineering Technologies (NICET) engineering technician as specified below. NICET engineering technicians must hold a current certification as an engineering technician in the field of Fire Protection Engineering Technology with minimum Level III certification in the appropriate subfield.

Provide training for the active systems consisting of three (3) eight (8)-hour sessions to accommodate all shifts of the base fire department and allow for rescheduling for unforeseen fire department responses.

D4010 FIRE ALARM AND DETECTION SYSTEMS

Provide an integrated fire alarm, and mass notification system capable of notifying building occupants inside the facility. Provide a complete, electrically supervised, addressable intelligent, manual and automatic, annunciated fire alarm and detection system throughout the facility.

Provide a voice evacuation type system that also serves as a mass notification system. Provide integrated systems capable of notifying building occupants by means of tones, strobes, textural messaging, prerecorded, and live voice announcements. The fire reporting portion of the system must be compatible with the existing base fire reporting system.

Provide a complete and useable fire alarm system including manual stations, system smoke detectors, duct smoke detectors, heat detectors, audio/visual alarms, electrical supervision of all sprinkler system alarm and supervisory devices.

Provide a fire alarm control panel capable of handling a minimum of 500 individually identified sensors within the main control panel. Provide Class B Notification Appliance Circuits, Class B Signaling Line Circuits, PART 3 - CHAPTER 6 - Page 666 06/17/2020 and Class B Initiation Device Circuits. Provide back-up amplifiers for combination fire alarm/mass notification systems.

FACP must be compatible and operable with the existing fire alarm supervising station equipment. Existing basewide fire alarm reporting system is a fiber network based reporting system utilizing Bosch communicators and Bosch d6600 receiver with microkey automation software.

The secondary means of transmission is over telephone lines. Provide all equipment and labor, including a new Bosch communicator, required to maintain the connection of the fire alarm and detection system to the base's fire department.

Bosch communicator must not be located within the fire alarm control panel but must be located in a dedicated panel. Communicators must be powered by the building fire alarm system and the power connection monitored by the fire alarm system. Include power requirements of the module in the fire alarm system battery and current draw calculations. Module panel must be keyed the same as the fire alarm system equipment.

DACT must be maintained and configured to transmit signals in contact ID format.

Signals transmitted over the primary and secondary means of transmission must be point specific with each address and condition indicated at the fire alarm panel transmitted separately. All fire alarms, supervisory alarms, and trouble conditions must be transmitted to the fire department.

Connection to the fire alarm reporting system and programming of the Bosch communicator and head end equipment must be coordinated with the Fire Alarm Reporting System (FARS) administrator. Contact the Facility System Services Office (FSSO) at email: chpt.facsso.omb@usmc.mil. Technician making software changes must be microkey trained/certified. Provide proof of training/certification to FASSO upon request. All fire alarm panel points must be programmed as individual points at the head end. The government Ranking Officer In Charge of Construction (ROICC) is responsible for providing point information to be monitored by the government's receiving equipment (Bosch 6600 panel) to the base programmer. The base programmer will then reprogram the base microkey reporting software.

Provide semi-flush manual pull stations .

D4020 FIRE SUPPRESSION WATER SUPPLY AND EQUIPMENT

Base hydraulic calculations on a hydrant flow test performed by contractor’s fire protection engineer.

D4030 STANDPIPE SYSTEMS

Standpipe system is existing to remain.

D4040 SPRINKLER SYSTEMS

Modify existing wet and dry pipe automatic sprinkler protection to provide complete coverage throughout renovated spaces.

For light hazard areas the sprinkler rate of application must be 0.1 gpm/ft2, over an area of 1,500 ft2 with hose stream allowance of 250 gpm.

PART 3 - CHAPTER 6 - Page 667 06/17/2020

Provide quick-response recessed sprinklers with ordinary temperature rating in areas with finished ceilings. Provide white sprinklers escutcheon plates.

D4090 OTHER FIRE PROTECTION SYSTEMS

Provide portable fire extinguishers as required per UFC 3-600-01.

--End of Section--

PART 3 - CHAPTER 6 - Page 668 06/17/2020

D50 ELECTRICAL

SYSTEM DESCRIPTION

This project includes the demolition and construction of buildings and structures as listed below. Refer to site plans for building locations.

Demolish the existing interior electrical system consisting of Service Entrance Wiring and Equipment, Distribution and Lighting Panelboards, Conduits, Feeder and Branch Circuits, Motor Control Equipment, Lighting and Branch Wiring, Communications, Security and Alarm Systems, Emergency Generator, Emergency Lighting and Power, Grounding, and Lightning Protection, including all associated accessories and devices. This section covers demolition out to the building 5 foot (1.5 meter) line.

Provide an interior electrical system consisting of Service Entrance Wiring and Equipment, Distribution and Lighting Panelboards, Dry Type Transformers, Conduits, Feeder and Branch Circuits, Motor Control Equipment, Lighting and Branch Wiring, Communications, Security and Alarm Systems, Emergency Generator, Emergency Lighting and Power, Grounding Lightning Protection, including accessories and devices as necessary and required for a complete and usable system. This section covers installations out to the building 5 foot (1.5 meter) line.

Provide a single utility service with radial power distribution.

Select electrical characteristics of the power system to provide a safe, efficient and economical distribution of power based upon the size and types of electrical loads to be served. Use distribution and utilization voltages of the highest level that is practical for the load to be served.

Provide a minimum of 20 percent spare circuit and load capacity at all levels of the power distribution system including any stand-by power systems.

Provide an interior distribution system consisting of insulated conductors in conduit.

GENERAL SYSTEM REQUIREMENTS

Provide an Electrical System complete in place, tested and approved, as specified throughout this RFP, as needed for a complete, usable and proper installation. Install all equipment in accordance with the criteria of PTS Section D50 and the manufacturer’s recommendations. Where the word "should" is used in the manufacturer’s recommendations, substitute the word "must".

This section of the RFP includes all electrical work on or within the building out to the five (5) foot line. Electrical site work outside the five (5) foot line is covered in section G40.

SUSTAINABILITY

Provide electrical systems and components that support project sustainability and energy goals.