AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 5
AMENDMENT NO. 0005 07/08/20 1634272
ROICC81
OFFICER IN CHARGE OF CONSTRUCTION FLORENCE
NAVAL FACILITIES ENGINEERING COMMAND ATLANTIC
1121 HAMMOND ROAD
CAMP LEJEUNE, NC 28547-2521
See Item 6
✘ N6247020R6003
05/08/20
N6247020R6003 Repair Building Envelope and Interior Finishes, Building 298, Marine Corps Air Station Cherry Point, NC
The date and the hour for the receipt of proposals remains 10 July 2020 no later than 2:00 pm
(EDT).
See continuation page(s).
Repair Building Envelope and Interior Finishes, Building 298 Solicitation N6247020R6003 Marine Corps Air Station Cherry Point, North Carolina Amendment 0005
Block 14. DESCRIPTION OF AMENDMENT (cont.)
CONTINUATION SHEET
NAVFAC Drawing 4100795 is added to PART 6 Chapter 3 and made part of this Amendment.
NAVFAC Drawing 4100802-4100805 is added to PART 6 Chapter 3 and made part of this Amendment.
NAVFAC Drawing 4100806 is added to PART 6 Chapter 3 and made part of this Amendment.
NAVFAC Drawing 4483054 is added to PART 6 Chapter 3 and made part of this Amendment.
A. The following provides the Government’s responses to preaward inquiries submitted after the cutoff date listed in the RFP. As a result, the Government is unable to extend the date for receipt of proposals.
REFERENCE
Page Section Para.
QUESTION GOVERNMENT RESPONSE
709 G40 G403004 Section G403004 states to provide a system of ductbanks, manholes and handholes for site Telecom and security. Please confirm that Building 298 OSP/ CATV connections are to remain to include site raceway system and no additional work on the site will be required.
Refer to section G403001 and G403002.
709 -
G40 01 50 00.05 20
What are the OSP requirements for the Temporary Trailers? What are the CATV and Fiber Optic/ Copper OSP cabling requirements? Where is the connection point?
Refer to Part 6 of the RFP, drawing C-201 and Part 2 paragraph 2.3.1 subparagraphs S and T.
1014 A-101 Telecom room C-141 is centrally located at the south end of the building. Is this the existing MDF?
Will the MDF equipment remain or will all new equipment to include patch panels be required? This room is narrow and may not allow for the racks to be located in the center with required clearances on both sides.
C-141 is the existing MDF.
Existing equipment to remain.
Submit in accordance with the
RFP.
1014 A-101 Will additional IDFs be required.
No Telecom rooms other than the MDF are specifically identified on the RFP Architectural drawing and typically the area served is limited per IDF. A specific Telecom room is not identified on the second floor.
Should there be an IDF in each wing and each floor for a total of 4 plus the MDF with the exception of Wing B 2nd Floor which is identified as existing to remain to include SIPR spaces?
No new telecom or electrical work is required in these areas.
Submit in accordance with the
RFP.
670 D50 D503001 Backbone cabling is not described in the RFP. Minimum would be 50 pair copper CAT 3 and 12 strand Single Mode Fiber Optic cable.
Please confirm this is acceptable for
Refer to Part 2 paragraph 2.3.1 subparagraph T.
backbone cabling or if a different configuration is required.
The Library spaces do not list power or Telcom provisions and mentions that this part of the work will be a separate modification to the contract. Will this be a later date or should base systems be allowed for these spaces? However, there is no quantifying documents for number of work stations and A/V provisions. Please clarify what if anything should be figured for this space other than Lighting and general power outlets until the program and funding are defined.
Submit in accordance with the
RFP.
381 Room definitions for private offices list a single outlet with 2 ports at the work station. UFC 3-580-01 is also referenced which indicates to provide two outlets with two ports each on opposite sides of the room for private offices. Is the single outlet at the work station only the intention of the RFP or should two outlets be provided at each Private Office?
Refer to Part 3 Chapter 5 Room Requirements.
559 -
Open Offices A213 and A222 are undefined as to quantity of work stations and the staff is listed as To Be Determined (TBD). How many work stations should be figured for these areas and should a copier/ printer station be figured for each area?
Refer to Part 3 Chapter 5 Room A213 and A222 FF&E requirements at bottom of room description table. Refer to Part 3 Chapter 5 Room Requirements for location of copier/printer stations.
579 -
Room Definitions for Wing B (spaces B201- B231) indicate existing space to remain and does list Telecom provisions. Please verify existing Telecom back to the MDF and server equipment in place will remain in service with no other modifications.
No new telecom or electrical work is required in these areas.
Submit in accordance with the
RFP.
609 -
Room Definitions for Wing B (spaces B232-B240) indicate existing secure space to remain and does not list Telecom provisions.
Please verify existing SIPR telecom provisions are to remain to include existing SIPR Telecom Room
No new telecom or electrical work is required in these areas.
Submit in accordance with the
RFP.
equipment with no other modifications.
579 -
Room definitions did not identify any additional SIPR requirements other than the existing 2nd floor to remain. Please confirm all other areas will be NIPR provisions to include the temporary trailer telecom provisions.
Submit in accordance with the
RFP.
888 D50 The RFP under section D50 indicates to provide CATV per Room Definitions. Room Definitions did not identify CATV requirements. Will CATV drops be required at each conference room and break rooms? Any other locations?
Refer to Part 3, Chapter 5 Room Requirements.
686 E202090 Please verify synchronized clock data drops are not required at private/ command offices.
Refer to Part 3 Section E202090.
Are there any specific Telecom Base Standards for Cherry Point that needs to be addressed beyond the specifics of the RFP and UFC 3- 580-01?
Submit in accordance with the
RFP.
671 D50 D509002 The RFP requires a standby generator for FRC East areas on the Northeast wing of the second floor.
Please provide the size of the panel or panels that are rquired to be backed up by this generator so the generator can be sized.
Refer to Part 6 Chapter 1 Drawings E-103 thru E-105.
thru
E-103 E- 104 E-105
Please provide the size of the existing service transformer, the main service switchboard and the generator. Also please provide a floor plan showing where the panels on E-103 through E-105 are located, or a narrative describing which rooms/locations each panel serve.
Refer to NAVFAC Drawing 4100795 added to Part 6 Chapter 3 Record Drawings for existing service transformer. Refer to NAVFAC Drawing 4100806 added to Part 6 Chapter 3 Record Drawings for existing main service switchboard size. Refer to NAVFAC Drawing 4483054 added to Part 6 Chapter 3 Record for existing generator size. Refer to NAVFAC Drawings 4100802- 4100805 added to Part 6 Chapter 3 for panel location shown on drawings E-103 through E-105 in Part 6 Chapter 1.
B. All other contract terms and conditions remain unchanged.