N6134021R0048 - Final RFP.docx
DOCX document 231 KB Posted
- Attached to
- Engineering Contractor Instructor Services (ECIS) Federal contract opportunity
- Solicitation number
- N6134021R0048
About this file
This document provides the requirements for a federal solicitation seeking Contractor Instructional Services. The Department of the Navy, Naval Air Warfare Center Training Systems Division is soliciting proposals to provide firefighting training, damage control training, and specialized engineering courses at seven Navy training sites for the Surface Warfare School Command, Naval Sea Systems Command Program Executive Office for Ships, and Submarine Learning Center. The procurement will be set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The solicitation seeks qualified instructors to provide approximately 150,000 hours of instruction annually at sites in San Diego, Norfolk, Great Lakes, Pearl Harbor, Newport, and New London. Proposals are due based on instructions to be amended. The period of performance is a one-year base period starting in February 2022 with four one-year option periods extending to February 2025. Pricing will be firm fixed price.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6134021R0048
Section B - Supplies or Services and Prices
ADDITIONAL SECTION B INFO
B.1 ACRONYMS
The following definitions are provided for acronyms that may be used in this solicitation:
| ACRN | Accounting Classification Reference Number |
| CBA | Collective Bargaining Agreement |
| CDRL | Contract Data Requirements List |
| CIS | Contractor Instructor Service |
| CLIN | Contract Line Item Number |
| CI | Contractor Instructor |
| CIS | Contractor Instructor Services |
| COR | Contracting Officer’s Representative |
| DOL | Department of Labor |
| EA | Each |
| FFP | Firm Fixed Price |
| GFP | Government Furnished Property |
| IAW | In accordance with |
| MO | Month |
| N/A | Not Applicable |
| NSP | Not Separately Priced |
| PCO | Procurement Contracting Officer |
| SLIN | Subcontract Line Item Number |
| SWSC | Surface Warfare Schools Command |
| PWS | Performance Work Statement |
| ZTF | Zumwalt Training Facility |
B.2 PRICE BREAKOUT
The structure and line items of Section B are based on the data from Attachment 4, Price Breakout Worksheet (PBW), in Section J. Pricing for all CLINs/Tasks will be populated in Section B of the resultant contract at the time of award.
The PBW is provided as Attachment 4 within Section J to show the Offeror’s pricing of the contract requirements at the CLIN/Task Levels. The prices placed in Section B at award will reflect the respective evaluated stepladder price of the selected CLINs/Tasks from the successful Offeror’s Price Evaluation Worksheet (PEW). The Government retains the right to exercise option periods at any stepladder level IAW the procedures listed in contract clause 52.217-9. The Government also retains the right to unilaterally move up or down the stepladder level within the specified execution period with a 30 day notice of intent given to the contractor.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Mobilization San Diego SWSC
FFP
The Contractor shall be responsible for performing all site specific mobilization tasks necessary to assume full performance responsibility at Contractor Start Date (CSD) IAW the PWS in Section J.
FOB: Destination U099
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Mobilization Norfolk SWSC
The Contractor shall be responsible for performing all site specific mobilization tasks necessary to assume full performance responsibility at CSD IAW the PWS in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Mobilization Great Lakes SWSC
The Contractor shall be responsible for performing all site specific mobilization tasks necessary to assume full performance responsibility at CSD IAW the PWS in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Mobilization Pearl Harbor SWSC
The Contractor shall be responsible for performing all site specific mobilization tasks necessary to assume full performance responsibility at CSD IAW the PWS in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Mobilization Newport SWSC
The Contractor shall be responsible for performing all site specific mobilization tasks necessary to assume full performance responsibility at CSD IAW the PWS in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Mobilization ZTF San Diego PMS 339
The Contractor shall be responsible for performing all site specific mobilization tasks necessary to assume full performance responsibility at CSD IAW the PWS in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Mobilization New London SLC
The Contractor shall be responsible for performing all site specific mobilization tasks necessary to assume full performance responsibility at CSD IAW the PWS in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 23,416 |
| Hours |
San Diego DC Firefighter High Risk CI
The Contractor shall furnish Damage Control (DC) CIs at the Surface Warfare Schools Command (SWSC) San Diego training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
San Diego DEI CI
The Contractor shall furnish Diesel Engine Inspector (DEI) CIs at the SWSC San Diego training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
San Diego Additional Instruction
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
Norfolk Diesel Engine CI
The Contractor shall furnish Diesel Engine CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2,187 |
| Hours |
Norfolk Hull Technician CI
The Contractor shall furnish Hull Technician CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,908 |
| Hours |
Norfolk Machinery Repairman CI
The Contractor shall furnish Machinery Repairman CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 4,394 |
| Hours |
Norfolk DC Firefighter High Risk CI
The Contractor shall furnish DC Firefighter CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
Norfolk Additional Instruction
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,760 |
| Hours |
Great Lakes Diesel Engine CI
The Contractor shall furnish Diesel Engine CIs at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 7,520 |
| Hours |
Great Lakes Electrician Mate CI
The Contractor shall furnish Electrician Mate CIs at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,560 |
| Hours |
Great Lakes Testing Instructor
The Contractor shall furnish Testing Instructors at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
Great Lakes Testing Officer
The Contractor shall furnish Testing Officers at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 11,280 |
| Hours |
Great Lakes Testing Officer Assistant
The Contractor shall furnish Testing Officer Assistant's at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5,640 |
| Hours |
Great Lakes Testing Proctor
The Contractor shall furnish Testing Proctor at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
Great Lakes Computer Programmer
The Contractor shall furnish Computer Programmers at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
Great Lakes Database Manager
The Contractor shall furnish Database Managers at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
Great Lakes Additional Instruction
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 7,290 |
| Hours |
Pearl Harbor DC Firefighter High Risk CI
The Contractor shall furnish DC Firefighter CIs at the SWSC Pearl Harbor training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
Pearl Harbor EMT
The Contractor shall furnish Emergency Medical Technicians (EMT) at the SWSC Pearl Harbor training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
Pearl Harbor Additional Instruction
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,973 |
| Hours |
Newport Prospective ENG Officer CI
The Contractor shall furnish Prospective Engineering (ENG) Officer CIs at the SWSC Newport training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
Newport Additional Instruction
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,896 |
| Hours |
ZTF San Diego Gas Turbine CI
The Contractor shall furnish Gas Turbine CIs at the Zumwalt Training Facility (ZTF) training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,882 |
| Hours |
ZTF San Diego DC CI
The Contractor shall furnish DC CIs at the ZTF training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,896 |
| Hours |
ZTF San Diego Electrical CI
The Contractor shall furnish Electrical CIs at the ZTF training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,906 |
| Hours |
ZTF San Diego Top Snipe CI
The Contractor shall furnish Top Snipe CIs at the ZTF training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
ZTF San Diego Additional Instruction
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,760 |
| Hours |
New London STS CI
The Contractor shall furnish Sonar Technician Submarines (STS) CIs at the Submarine Learning Center (SLC) training site in New London and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,760 |
| Hours |
New London Fire Control Technician CI
The Contractor shall furnish Fire Control Technician CIs at the SLC training site in New London and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,760 |
| Hours |
New London Electronics Technician CI
The Contractor shall furnish Electronic Technician CIs at the SLC training site in New London and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
New London Additional Instruction
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Technical Data
Technical Data, when applicable, IAW Exhibit A in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Travel
COST
Contractor travel shall be conducted as required IAW the PWS.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 23,416 |
| Hours |
| OPTION |
| San Diego DC Firefighter High Risk CI |
FFP
The Contractor shall furnish Damage Control (DC) CIs at the Surface Warfare Schools Command (SWSC) San Diego training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| San Diego DEI CI |
FFP
The Contractor shall furnish Diesel Engine Inspector (DEI) CIs at the SWSC San Diego training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| San Diego Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| Norfolk Diesel Engine CI |
FFP
The Contractor shall furnish Diesel Engine CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2,187 |
| Hours |
| OPTION |
| Norfolk Hull Technician CI |
FFP
The Contractor shall furnish Hull Technician CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,908 |
| Hours |
| OPTION |
| Norfolk Machinery Repairman CI |
FFP
The Contractor shall furnish Machinery Repairman CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 4,394 |
| Hours |
| OPTION |
| Norfolk DC Firefighter High Risk CI |
FFP
The Contractor shall furnish DC Firefighter CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Norfolk Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,760 |
| Hours |
| OPTION |
| Great Lakes Diesel Engine CI |
FFP
The Contractor shall furnish Diesel Engine CIs at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 7,520 |
| Hours |
| OPTION |
| Great Lakes Electrician Mate CI |
FFP
The Contractor shall furnish Electrician Mate CIs at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,560 |
| Hours |
| OPTION |
| Great Lakes Testing Instructor |
FFP
The Contractor shall furnish Testing Instructors at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| Great Lakes Testing Officer |
FFP
The Contractor shall furnish Testing Officers at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 11,280 |
| Hours |
| OPTION |
| Great Lakes Testing Officer Assistant |
FFP
The Contractor shall furnish Testing Officer Assistant's at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5,640 |
| Hours |
| OPTION |
| Great Lakes Testing Proctor |
FFP
The Contractor shall furnish Testing Proctor at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| Great Lakes Computer Programmer |
FFP
The Contractor shall furnish Computer Programmers at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| Great Lakes Database Manager |
FFP
The Contractor shall furnish Database Managers at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Great Lakes Addtional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 7,290 |
| Hours |
| OPTION |
| Pearl Harbor DC Firefighter High Risk CI |
FFP
The Contractor shall furnish DC Firefighter CIs at the SWSC Pearl Harbor training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| Pearl Harbor EMT |
FFP
The Contractor shall furnish Emergency Medical Technicians (EMT) at the SWSC Pearl Harbor training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Pearl Harbor Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,973 |
| Hours |
| OPTION |
| Newport Prospective ENG Officer CI |
FFP
The Contractor shall furnish Prospective Engineering (ENG) Officer CIs at the SWSC Newport training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Newport Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,896 |
| Hours |
| OPTION |
| ZTF San Diego Gas Turbine CI |
FFP
The Contractor shall furnish Gas Turbine CIs at the Zumwalt Training Facility (ZTF) training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,882 |
| Hours |
| OPTION |
| ZTF San Diego DC CI |
FFP
The Contractor shall furnish DC CIs at the ZTF training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,896 |
| Hours |
| OPTION |
| ZTF San Diego Electrical CI |
FFP
The Contractor shall furnish Electrical CIs at the ZTF training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,906 |
| Hours |
| OPTION |
| ZTF San Diego Top Snipe CI |
FFP
The Contractor shall furnish Top Snipe CIs at the ZTF training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| ZTF San Diego Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,760 |
| Hours |
| OPTION |
| New London STS CI |
FFP
The Contractor shall furnish Sonar Technician Submarines (STS) CIs at the Submarine Learning Center (SLC) training site in New London and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,760 |
| Hours |
| OPTION |
| New London Fire Control Technician CI |
FFP
The Contractor shall furnish Fire Control Technician CIs at the SLC training site in New London and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,760 |
| Hours |
| OPTION |
| New London Electronics Technician CI |
FFP
The Contractor shall furnish Electronic Technician CIs at the SLC training site in New London and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| New London Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Technical Data |
FFP
Technical Data, when applicable, IAW Exhibit A in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Travel |
COST
Contractor travel shall be conducted as required IAW the PWS.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 23,416 |
| Hours |
| OPTION |
| San Diego DC Firefighter High Risk CI |
FFP
The Contractor shall furnish Damage Control (DC) CIs at the Surface Warfare Schools Command (SWSC) San Diego training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| San Diego DEI CI |
FFP
The Contractor shall furnish Diesel Engine Inspector (DEI) CIs at the SWSC San Diego training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| San Diego Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| Norfolk Diesel Engine CI |
FFP
The Contractor shall furnish Diesel Engine CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2,187 |
| Hours |
| OPTION |
| Norfolk Hull Technician CI |
FFP
The Contractor shall furnish Hull Technician CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,908 |
| Hours |
| OPTION |
| Norfolk Machinery Repairman CI |
FFP
The Contractor shall furnish Machinery Repairman CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 4,394 |
| Hours |
| OPTION |
| Norfolk DC Firefighter High Risk CI |
FFP
The Contractor shall furnish DC Firefighter CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Norfolk Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,760 |
| Hours |
| OPTION |
| Great Lakes Diesel Engine CI |
FFP
The Contractor shall furnish Diesel Engine CIs at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 7,520 |
| Hours |
| OPTION |
| Great Lakes Electrician Mate CI |
FFP
The Contractor shall furnish Electrician Mate CIs at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,560 |
| Hours |
| OPTION |
| Great Lakes Testing Instructor |
FFP
The Contractor shall furnish Testing Instructors at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| Great Lakes Testing Officer |
FFP
The Contractor shall furnish Testing Officers at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 11,280 |
| Hours |
| OPTION |
| Great Lakes Testing Officer Assistant |
FFP
The Contractor shall furnish Testing Officer Assistant's at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5,640 |
| Hours |
| OPTION |
| Great Lakes Testing Proctor |
FFP
The Contractor shall furnish Testing Proctor at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| Great Lakes Computer Programmer |
FFP
The Contractor shall furnish Computer Programmers at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| Great Lakes Database Manager |
FFP
The Contractor shall furnish Database Managers at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Great Lakes Addtional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 7,290 |
| Hours |
| OPTION |
| Pearl Harbor DC Firefighter High Risk CI |
FFP
The Contractor shall furnish DC Firefighter CIs at the SWSC Pearl Harbor training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| Pearl Harbor EMT |
FFP
The Contractor shall furnish Emergency Medical Technicians (EMT) at the SWSC Pearl Harbor training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Pearl Harbor Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,973 |
| Hours |
| OPTION |
| Newport Prospective ENG Officer CI |
FFP
The Contractor shall furnish Prospective Engineering (ENG) Officer CIs at the SWSC Newport training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Newport Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,896 |
| Hours |
| OPTION |
| ZTF San Diego Gas Turbine CI |
FFP
The Contractor shall furnish Gas Turbine CIs at the Zumwalt Training Facility (ZTF) training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,882 |
| Hours |
| OPTION |
| ZTF San Diego DC CI |
FFP
The Contractor shall furnish DC CIs at the ZTF training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,896 |
| Hours |
| OPTION |
| ZTF San Diego Electrical CI |
FFP
The Contractor shall furnish Electrical CIs at the ZTF training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,906 |
| Hours |
| OPTION |
| ZTF San Diego Top Snipe CI |
FFP
The Contractor shall furnish Top Snipe CIs at the ZTF training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| ZTF San Diego Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,760 |
| Hours |
| OPTION |
| New London STS CI |
FFP
The Contractor shall furnish Sonar Technician Submarines (STS) CIs at the Submarine Learning Center (SLC) training site in New London and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,760 |
| Hours |
| OPTION |
| New London Fire Control Technician CI |
FFP
The Contractor shall furnish Fire Control Technician CIs at the SLC training site in New London and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,760 |
| Hours |
| OPTION |
| New London Electronics Technician CI |
FFP
The Contractor shall furnish Electronic Technician CIs at the SLC training site in New London and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| New London Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Technical Data |
FFP
Technical Data, when applicable, IAW Exhibit A in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Travel |
COST
Contractor travel shall be conducted as required IAW the PWS.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 23,416 |
| Hours |
| OPTION |
| San Diego DC Firefighter High Risk CI |
FFP
The Contractor shall furnish Damage Control (DC) CIs at the Surface Warfare Schools Command (SWSC) San Diego training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| San Diego DEI CI |
FFP
The Contractor shall furnish Diesel Engine Inspector (DEI) CIs at the SWSC San Diego training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| San Diego Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| Norfolk Diesel Engine CI |
FFP
The Contractor shall furnish Diesel Engine CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2,187 |
| Hours |
| OPTION |
| Norfolk Hull Technician CI |
FFP
The Contractor shall furnish Hull Technician CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,908 |
| Hours |
| OPTION |
| Norfolk Machinery Repairman CI |
FFP
The Contractor shall furnish Machinery Repairman CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 4,394 |
| Hours |
| OPTION |
| Norfolk DC Firefighter High Risk CI |
FFP
The Contractor shall furnish DC Firefighter CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Norfolk Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,760 |
| Hours |
| OPTION |
| Great Lakes Diesel Engine CI |
FFP
The Contractor shall furnish Diesel Engine CIs at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 7,520 |
| Hours |
| OPTION |
| Great Lakes Electrician Mate CI |
FFP
The Contractor shall furnish Electrician Mate CIs at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,560 |
| Hours |
| OPTION |
| Great Lakes Testing Instructor |
FFP
The Contractor shall furnish Testing Instructors at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| Great Lakes Testing Officer |
FFP
The Contractor shall furnish Testing Officers at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 11,280 |
| Hours |
| OPTION |
| Great Lakes Testing Officer Assistant |
FFP
The Contractor shall furnish Testing Officer Assistant's at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5,640 |
| Hours |
| OPTION |
| Great Lakes Testing Proctor |
FFP
The Contractor shall furnish Testing Proctor at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| Great Lakes Computer Programmer |
FFP
The Contractor shall furnish Computer Programmers at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| Great Lakes Database Manager |
FFP
The Contractor shall furnish Database Managers at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Great Lakes Addtional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 7,290 |
| Hours |
| OPTION |
| Pearl Harbor DC Firefighter High Risk CI |
FFP
The Contractor shall furnish DC Firefighter CIs at the SWSC Pearl Harbor training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,880 |
| Hours |
| OPTION |
| Pearl Harbor EMT |
FFP
The Contractor shall furnish Emergency Medical Technicians (EMT) at the SWSC Pearl Harbor training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Pearl Harbor Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,973 |
| Hours |
| OPTION |
| Newport Prospective ENG Officer CI |
FFP
The Contractor shall furnish Prospective Engineering (ENG) Officer CIs at the SWSC Newport training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Newport Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,896 |
| Hours |
| OPTION |
| ZTF San Diego Gas Turbine CI |
FFP
The Contractor shall furnish Gas Turbine CIs at the Zumwalt Training Facility (ZTF) training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,882 |
| Hours |
| OPTION |
| ZTF San Diego DC CI |
FFP
The Contractor shall furnish DC CIs at the ZTF training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,896 |
| Hours |
| OPTION |
| ZTF San Diego Electrical CI |
FFP
The Contractor shall furnish Electrical CIs at the ZTF training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,906 |
| Hours |
| OPTION |
| ZTF San Diego Top Snipe CI |
FFP
The Contractor shall furnish Top Snipe CIs at the ZTF training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| ZTF San Diego Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,760 |
| Hours |
| OPTION |
| New London STS CI |
FFP
The Contractor shall furnish Sonar Technician Submarines (STS) CIs at the Submarine Learning Center (SLC) training site in New London and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,760 |
| Hours |
| OPTION |
| New London Fire Control Technician CI |
FFP
The Contractor shall furnish Fire Control Technician CIs at the SLC training site in New London and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,760 |
| Hours |
| OPTION |
| New London Electronics Technician CI |
FFP
The Contractor shall furnish Electronic Technician CIs at the SLC training site in New London and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| New London Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Technical Data |
FFP
Technical Data, when applicable, IAW Exhibit A in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Travel |
COST
Contractor travel shall be conducted as required IAW the PWS.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 21,465 |
| Hours |
| OPTION |
| San Diego DC Firefighter High Risk CI |
FFP
The Contractor shall furnish Damage Control (DC) CIs at the Surface Warfare Schools Command (SWSC) San Diego training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,723 |
| Hours |
| OPTION |
| San Diego DEI CI |
FFP
The Contractor shall furnish Diesel Engine Inspector (DEI) CIs at the SWSC San Diego training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| San Diego Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,723 |
| Hours |
| OPTION |
| Norfolk Diesel Engine CI |
FFP
The Contractor shall furnish Diesel Engine CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2,005 |
| Hours |
| OPTION |
| Norfolk Hull Technician CI |
FFP
The Contractor shall furnish Hull Technician CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,749 |
| Hours |
| OPTION |
| Norfolk Machinery Repairman CI |
FFP
The Contractor shall furnish Machinery Repairman CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 4,028 |
| Hours |
| OPTION |
| Norfolk DC Firefighter High Risk CI |
FFP
The Contractor shall furnish DC Firefighter CIs at the SWSC Norfolk training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Norfolk Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,447 |
| Hours |
| OPTION |
| Great Lakes Diesel Engine CI |
FFP
The Contractor shall furnish Diesel Engine CIs at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6,893 |
| Hours |
| OPTION |
| Great Lakes Electrician Mate CI |
FFP
The Contractor shall furnish Electrician Mate CIs at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,430 |
| Hours |
| OPTION |
| Great Lakes Testing Instructor |
FFP
The Contractor shall furnish Testing Instructors at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,723 |
| Hours |
| OPTION |
| Great Lakes Testing Officer |
FFP
The Contractor shall furnish Testing Officers at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 10,340 |
| Hours |
| OPTION |
| Great Lakes Testing Officer Assistant |
FFP
The Contractor shall furnish Testing Officer Assistant's at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5,170 |
| Hours |
| OPTION |
| Great Lakes Testing Proctor |
FFP
The Contractor shall furnish Testing Proctor at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,723 |
| Hours |
| OPTION |
| Great Lakes Computer Programmer |
FFP
The Contractor shall furnish Computer Programmers at the SWSC Great Lakes training site in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,723 |
| Hours |
| OPTION |
| Great Lakes Database Manager |
FFP
The Contractor shall furnish Database Managers at the SWSC Great Lakes training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Great Lakes Addtional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6,683 |
| Hours |
| OPTION |
| Pearl Harbor DC Firefighter High Risk CI |
FFP
The Contractor shall furnish DC Firefighter CIs at the SWSC Pearl Harbor training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,723 |
| Hours |
| OPTION |
| Pearl Harbor EMT |
FFP
The Contractor shall furnish Emergency Medical Technicians (EMT) at the SWSC Pearl Harbor training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Pearl Harbor Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,809 |
| Hours |
| OPTION |
| Newport Prospective ENG Officer CI |
FFP
The Contractor shall furnish Prospective Engineering (ENG) Officer CIs at the SWSC Newport training site and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Newport Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,738 |
| Hours |
| OPTION |
| ZTF San Diego Gas Turbine CI |
FFP
The Contractor shall furnish Gas Turbine CIs at the Zumwalt Training Facility (ZTF) training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,725 |
| Hours |
| OPTION |
| ZTF San Diego DC CI |
FFP
The Contractor shall furnish DC CIs at the ZTF training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,738 |
| Hours |
| OPTION |
| ZTF San Diego Electrical CI |
FFP
The Contractor shall furnish Electrical CIs at the ZTF training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,747 |
| Hours |
| OPTION |
| ZTF San Diego Top Snipe CI |
FFP
The Contractor shall furnish Top Snipe CIs at the ZTF training site in San Diego and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| ZTF San Diego Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,447 |
| Hours |
| OPTION |
| New London STS CI |
FFP
The Contractor shall furnish Sonar Technician Submarines (STS) CIs at the Submarine Learning Center (SLC) training site in New London and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,447 |
| Hours |
| OPTION |
| New London Fire Control Technician CI |
FFP
The Contractor shall furnish Fire Control Technician CIs at the SLC training site in New London and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3,447 |
| Hours |
| OPTION |
| New London Electronics Technician CI |
FFP
The Contractor shall furnish Electronic Technician CIs at the SLC training site in New London and provide training in accordance with the PWS, the associated site Appendix, and Attachment 4 PBW in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| New London Additional Instruction |
FFP
The Contractor shall provide additional instruction hours, as needed, IAW the PWS and the associated site Appendix in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Technical Data |
FFP
Technical Data, when applicable, IAW Exhibit A in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Travel |
COST
Contractor travel shall be conducted as required IAW the PWS.
ESTIMATED COST
Section C - Descriptions and Specifications
C.1-…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .