A008 - TESTING AND EVALUATION REPORT FINAL.pdf

PDF 160 KB Posted

Attached to
Engineering Contractor Instructor Services (ECIS) Federal contract opportunity
Solicitation number
N6134021R0048
Issued by
Department of the Navy Naval Air Systems Command

About this file

This document contains a Contract Data Requirements List (CDRL) outlining reporting requirements for a contract to provide Engineering Contractor Instructor Services. The CDRL requires monthly technical reports detailing statistical data from each testing center, including the percentage of time spent on administrative duties, test analysis, correcting and writing test items, test design execution, and miscellaneous test requirements. Reports are due by the 15th of each month and cover the prior month's statistics. The government will have 15 business days to review each submission. Distribution of the reports shall be via email to addresses provided in the contract schedule or CDRL addressee list. The CDRL also relates to Solicitation Number N6134021R0048 for Engineering Contractor Instructor Services to provide contractor instructional services for fire fighting training, damage control training, and specialized engineering courses at seven Navy training sites, issued as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses.

View the file

Other files for this federal contract opportunity

Other files attached to Engineering Contractor Instructor Services (ECIS), newest first.
File Type Posted
Amendment_4_N6134021R0048-0004.pdf PDF
Amendment_4_Attachments.zip ZIP file
Amendment_4_N6134021R0048-0004_Conformed.pdf PDF
Amendment_3_N6134021R0048-0003.pdf PDF
Amendment_3_Attachments.zip ZIP file
Amendment_3_N6134021R0048-0003_Conformed.pdf PDF
Amendment_2_N6134021R0048-0002_Conformed.pdf PDF
Amendment_2_N6134021R0048-0002.pdf PDF
Amendment_2_Attachments.zip ZIP file
Amendment_1_N6134021R0048-0001_Conformed.pdf PDF
Amendment_1_N6134021R0048-0001.pdf PDF
A007 - ECIS OPSEC FINAL.pdf PDF
Att_14_Wage_Determination_No._2015-4936.pdf PDF
Att_01_ECIS_PWS_15_Sep_21_Final.pdf PDF
Att_5_Appendix_1_San_Diego_CA_FINAL.pdf PDF
Att_7_Appendix_3_Great_Lakes_IL_FINAL.pdf PDF
Att_03_Data-Item-Transmittal-2018.pdf PDF
Att_12_Wage_Determination_No._2015-5635.pdf PDF
Att_L-4_Staffing_Chart.xlsx XLSX spreadsheet
Att_L-1_Solicitation_QA_Form.xlsx XLSX spreadsheet
Att_L-3_PPQ.docx DOCX document
A001 - ECIS CFSR FINAL.pdf PDF
Att_15_Wage_Determination_No._2015-5689.pdf PDF
Att_9_Appendix_5_Newport_RI_FINAL.pdf PDF
Att_10_Appendix_6_ZTF_San_ Diego_CA_FINAL.pdf PDF
Att_13_Wage_Determination_No._2015-4342.pdf PDF
Att_18_PACT-User-Guide.pdf PDF
Att_02_DD 254.pdf PDF
N6134021R0048 - Final RFP.docx DOCX document
A006 - ECIS QSP FINAL.pdf PDF
A005 - ECIS CPSR FINAL.pdf PDF
A004 - ECIS MOB CPSR FINAL.pdf PDF
A009 - INSTRUCTOR SCHEDULE REPORT FINAL.pdf PDF
A002 - ECIS CONFERENCE MEETING MIN FINAL.pdf PDF
Att_11_Appendix_7_New_London_CT_FINAL.pdf PDF
Att_8_Appendix_ 4_Pearl_Harbor_HI_FINAL.pdf PDF
Att_04_PBW 15SEP21 FINAL.xlsx XLSX spreadsheet
Att_16_Wage_Determination_No._2015-4089.pdf PDF
Att_L-2_PEW.xlsx XLSX spreadsheet
A003 - ECIS INVENTORY FINAL.pdf PDF
Att_6_Appendix_2_Norfolk_VA_FINAL.pdf PDF
Att_17_Wage_Determination_No._2015-4111.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP _____ TM ___ OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

ECIS N61340-21-R0048

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A008 TECHNICAL REPORT: STUDY/SERVICES

TESTING AND EVALUATION REPORT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508B SEE BLK 16 NAWCTSD

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED MONTHLY SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

B

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft Final

SEE BLK 16 Reg Repro

16. REMARKS: NAWCTSD PJM 1 1

1. REPORT SHALL INCLUDE THE FOLLOWING STATISTICAL DATA FROM EACH TESTING

CENTER AS FOLLOWS:

A. PERCENTAGE OF TIME SPENT ON ADMINISTRATIVE DUTIES (I.E., ISSUING OF

TESTS, GRADING TESTS, ARB ENTRIES AND WORKSHEETS FILING, ROUTING

CRITIQUES)

B. PERCENTAGE OF TIME PERFORMING TEST ANALYSIS BY TEST CENTER

INCLUDING BREAKOUT OF:

1) NUMBER OF FAULTY ITEMS

2) TEST NUMBERS

3) COURSE NAME/CIN

C. PERCENTAGE OF TIME CORRECTING, WRITING AND REWRITING TEST ITEMS

INCLUDING:

1) NUMBER OF ITEMS CORRECTED OR REWRITTEN BY TEST CENTER

2) NUMBER OF NEW TEST ITEMS WRITTEN BY TEST CENTER

3) NUMBER OF ITEMS INCORPORATED INTO EXISTING TESTS

4) NUMBER OF NEW TEST SERIES LAUNCHED

5) VERIFYING QUESTIONS TO CBT

D. PERCENTAGE OF TIME EXECUTING TEST DESIGN (I.E., CRITICALITY, TEST

DESIGN WORKSHEETS):

1) CIN/UNIT NUMBER TITLE/LENGTH OF UNIT/NUMBER OF CRITICAL OBJECTIVES

E. PERCENTAGE OF TIME EXECUTING MISCELLANEOUS TEST REQUIREMENTS

1) NUMBER OF TEST PLANS REVIEWED AND/OR REVISED BY CIN

2) FCR PARTICIPATION BY CIN AND NUMBER OF HOURS

2. BLK 5: SEE PWS PARAGRAPH 3.2.1

3. BLOCK 13: DUE NO LATER THAN THE 15TH OF EACH MONTH FOR THE PRIOR MONTH’S

STATISTICS.

4. THE GOVERNMENT WILL HAVE FIFTEEN (15) WORKING DAYS FROM RECEIPT OF

SUBMISSION FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION.

5. BLOCK 14: SUBMITTED REPORTS SHALL BE SENT VIA EMAIL. ALL APPLICABLE EMAIL

ADDRESSES FOR DISTRIBUTION (BLK 14) SHALL BE ON EACH SUBMISSION. EMAIL

SUBJECT LINE SHALL INCLUDE CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND

PERIOD (E.G., N61340-19-C-#### B007-1 MONTH PERIOD). ALL REPORTS SHALL BE IN

MICROSOFT OFFICE 2010 COMPATIBLE FORMAT. EMAIL ADDRESSES ARE PROVIDED

IN THE CONTRACT SCHEDULE AND/OR THE CDRL ADDRESSEE LIST OF THE

CONTRACT.

6. BLOCK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED IN THE DELIVERABLE:

DISTIBUTION B: DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT AGENCIES ONLY,

(ADMINISTRATIVE OR OPERATIONAL USE), 14 JANUARY 2020. OTHER REQUESTS FOR

THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR

WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6.6.4.10), 12211

RESEARCHPARKWAY, ORLANDO, FL 32826-3275.

NAWCTSD PCO 1

NAWCTSD Sustainment 1 1

COR Great Lakes 1

15. TOTAL ▬▬▬▬► 2 4

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

R. SMITH, NAWCTSD Sustainment 02/10/2021 C. CAUDILL NAWCTSD PJM 04/22/2021

File details come from the government source that posted it. Updated .