Att_04_PBW 15SEP21 FINAL.xlsx
XLSX spreadsheet 212 KB Posted
- Attached to
- Engineering Contractor Instructor Services (ECIS) Federal contract opportunity
- Solicitation number
- N6134021R0048
About this file
This document contains a price breakdown worksheet (PBW) for a federal contract solicitation. The PBW provides pricing details at the task level for contractor instructional services (CIS) to be provided at seven Navy training sites. Services include firefighting, damage control, and engineering courses. The five-year contract will be awarded through a 100% set-aside for service-disabled veteran-owned small businesses. Pricing is on a firm-fixed-price basis for CIS tasks covering specialties such as firefighting, engineering, hull maintenance, and electronics. Training will take place in locations including San Diego, Norfolk, Great Lakes, Pearl Harbor, Newport, and New London.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mobilization + Base Period
| ATTACHMENT (4) MOBILIZATION + BASE PERIOD | |
| POP: | 18 JAN 2022 - 17 FEB 2023 |
| Price Breakout Worksheet (PBW): |
| CLIN | Task | Description | (QTY)Training Hours Per Year | Unit | UNIT PRICE | TOTAL PRICE | Funding Sponsor | Hours Funded | Hours Required | Funded Amount | Funding Required | Mod # | SLIN |
| 0001 | Mobilization - San Diego SWSC |
1A Attachment 1 PWS 1 LOT $0.00 SWSC 1 LOT $0.00 $0.00
0002 Mobilization Norfolk SWSC
1A Attachment 1 PWS 1 LOT $0.00 SWSC 1 LOT $0.00 $0.00
0003 Mobilization Great Lakes SWSC
1A Attachment 1 PWS 1 LOT $0.00 SWSC 1 LOT $0.00 $0.00
0004 Mobilization Pearl Harbor SWSC
| SWSC | |||||||||
| 1A | Attachment 1 PWS | 1 | LOT | $0.00 | 1 | LOT | $0.00 | $0.00 |
0005 Mobilization Newport SWSC
| SWSC | |||||||||
| 1A | Attachment 1 PWS | 1 | LOT | $0.00 | 1 | LOT | $0.00 | $0.00 |
0006 Mobilization ZTF San Diego PMS 339
| 339 | |||||||||
| 1A | Attachment 1 PWS | 1 | LOT | $0.00 | 1 | LOT | $0.00 | $0.00 |
0007 Mobilization New London SLC
| SWSC | |||||||||
| 1A | Attachment 1 PWS | 1 | LOT | $0.00 | 1 | LOT | $0.00 | $0.00 |
0008 Mobilization Travel
1A Attachment 1 PWS 1 LOT $0.00 SWSC 1 LOT $0.00 $0.00
| 0100 | San Diego Damage Control Fire Fighter High Risk CI | |||||
| 1A | Appendix 1 to Attachment 1 PWS | 28,099 | Hour | |||
| 1B | Appendix 1 to Attachment 1 PWS | 25,758 | Hour | |||
| 1C | Appendix 1 to Attachment 1 PWS | 23,416 | Hour | $0.00 | SWSC | |
| 1D | Appendix 1 to Attachment 1 PWS | 21,074 | Hour | |||
| 1E | Appendix 1 to Attachment 1 PWS | 18,733 | Hour |
| 0105 | San Diego DEI CI | |||||
| 1A | Appendix 1 to Attachment 1 PWS | 2,256 | Hour | |||
| 1B | Appendix 1 to Attachment 1 PWS | 2,068 | Hour | |||
| 1C | Appendix 1 to Attachment 1 PWS | 1,880 | Hour | $0.00 | SWSC | |
| 1D | Appendix 1 to Attachment 1 PWS | 1,692 | Hour | |||
| 1E | Appendix 1 to Attachment 1 PWS | 1,504 | Hour |
0110 San Diego Additional Instruction
1A Attachment 1 PWS 3794 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 0200 | Norfolk DEI CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 2,256 | Hour | |||
| 1B | Appendix 2 to Attachment 1 PWS | 2,068 | Hour | |||
| 1C | Appendix 2 to Attachment 1 PWS | 1,880 | Hour | $0.00 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 1,692 | Hour | |||
| 1E | Appendix 2 to Attachment 1 PWS | 1,504 | Hour |
| 0205 | Norfolk Hull Technician CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 2,624 | Hour | |||
| 1B | Appendix 2 to Attachment 1 PWS | 2,406 | Hour | |||
| 1C | Appendix 2 to Attachment 1 PWS | 2,187 | Hour | $0.00 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 1,968 | Hour | |||
| 1E | Appendix 2 to Attachment 1 PWS | 1,750 | Hour |
| 0210 | Norfolk Machinery Repairman CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 2,290 | Hour | |||
| 1B | Appendix 2 to Attachment 1 PWS | 2,099 | Hour | |||
| 1C | Appendix 2 to Attachment 1 PWS | 1,908 | Hour | $0.00 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 1,717 | Hour | |||
| 1E | Appendix 2 to Attachment 1 PWS | 1,526 | Hour |
| 0215 | Norfolk Damage Control Firefighter High Risk CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 5,273 | Hour | |||
| 1B | Appendix 2 to Attachment 1 PWS | 4,833 | Hour | |||
| 1C | Appendix 2 to Attachment 1 PWS | 4,394 | Hour | $0.00 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 3,955 | Hour | |||
| 1E | Appendix 2 to Attachment 1 PWS | 3,515 | Hour |
0220 Norfolk Additional Instruction
1A Attachment 1 PWS 896 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 0300 | Great Lakes Diesel Engine CI | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 4,512 | Hour | |||
| 1B | Appendix 3 to Attachment 1 PWS | 4,136 | Hour | |||
| 1C | Appendix 3 to Attachment 1 PWS | 3,760 | Hour | $0.00 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 3,384 | Hour | |||
| 1E | Appendix 3 to Attachment 1 PWS | 3,008 | Hour |
| 0305 | Great Lakes Electrician Mate CI | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 9,024 | Hour | |||
| 1B | Appendix 3 to Attachment 1 PWS | 8,272 | Hour | |||
| 1C | Appendix 3 to Attachment 1 PWS | 7,520 | Hour | $0.00 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 6,768 | Hour | |||
| 1E | Appendix 3 to Attachment 1 PWS | 6,016 | Hour |
| 0310 | Great Lakes Non-Destructive Testing Instructor CI | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 1,872 | Hour | |||
| 1B | Appendix 3 to Attachment 1 PWS | 1,716 | Hour | |||
| 1C | Appendix 3 to Attachment 1 PWS | 1,560 | Hour | $0.00 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,404 | Hour | |||
| 1E | Appendix 3 to Attachment 1 PWS | 1,248 | Hour |
| 0315 | Great Lakes Testing Officer | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 2,256 | Hour | |||
| 1B | Appendix 3 to Attachment 1 PWS | 2,068 | Hour | |||
| 1C | Appendix 3 to Attachment 1 PWS | 1,880 | Hour | $0.00 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,692 | Hour | |||
| 1E | Appendix 3 to Attachment 1 PWS | 1,504 | Hour |
| 0320 | Great Lakes Testing Officer Assitant | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 13,536 | Hour | |||
| 1B | Appendix 3 to Attachment 1 PWS | 12,408 | Hour | |||
| 1C | Appendix 3 to Attachment 1 PWS | 11,280 | Hour | $0.00 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 10,152 | Hour | |||
| 1E | Appendix 3 to Attachment 1 PWS | 9,024 | Hour |
| 0325 | Great Lakes Testing Proctor | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 6,768 | Hour | |||
| 1B | Appendix 3 to Attachment 1 PWS | 6,204 | Hour | |||
| 1C | Appendix 3 to Attachment 1 PWS | 5,640 | Hour | $0.00 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 5,076 | Hour | |||
| 1E | Appendix 3 to Attachment 1 PWS | 4,512 | Hour |
| 0330 | Great Lakes Computer Programmer | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 2,256 | Hour | |||
| 1B | Appendix 3 to Attachment 1 PWS | 2,068 | Hour | |||
| 1C | Appendix 3 to Attachment 1 PWS | 1,880 | Hour | $0.00 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,692 | Hour | |||
| 1E | Appendix 3 to Attachment 1 PWS | 1,504 | Hour |
| 0335 | Great Lakes Database Manager | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 2,256 | Hour | |||
| 1B | Appendix 3 to Attachment 1 PWS | 2,068 | Hour | |||
| 1C | Appendix 3 to Attachment 1 PWS | 1,880 | Hour | $0.00 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,692 | Hour | |||
| 1E | Appendix 3 to Attachment 1 PWS | 1,504 | Hour |
0340 Great Lakes Additional Instruction
1A Attachment 1 PWS 5310 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 0400 | Pearl Harbor Damage Control Fire Fighter High Risk CI | |||||
| 1A | Appendix 4 to Attachment 1 PWS | 8,748 | Hour | |||
| 1B | Appendix 4 to Attachment 1 PWS | 8,019 | Hour | |||
| 1C | Appendix 4 to Attachment 1 PWS | 7,290 | Hour | $0.00 | SWSC | |
| 1D | Appendix 4 to Attachment 1 PWS | 6,561 | Hour | |||
| 1E | Appendix 4 to Attachment 1 PWS | 5,832 | Hour |
| 0405 | Pearl Harbor EMT | |||||
| 1A | Appendix 4 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 4 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 4 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 4 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 4 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
0410 Pearl Harbor Additional Instruction
1A Attachment 1 PWS 1375 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 0500 | Newport Prospective Engineering Officer CI | |||||
| 1A | Appendix 5 to Attachment 1 PWS | 2,368 | Hour | $ - 0 | ||
| 1B | Appendix 5 to Attachment 1 PWS | 2,170 | Hour | $ - 0 | ||
| 1C | Appendix 5 to Attachment 1 PWS | 1,973 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 5 to Attachment 1 PWS | 1,776 | Hour | $ - 0 | ||
| 1E | Appendix 5 to Attachment 1 PWS | 1,578 | Hour | $ - 0 |
0505 Newport Additional Instruction
1A Attachment 1 PWS 295 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 0600 | ZTF San Diego Gas Turbine CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,275 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 2,086 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,896 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,706 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,517 | Hour | $ - 0 |
| 0605 | ZTF San Diego Damage Control CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,258 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 2,070 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,882 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,694 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,506 | Hour | $ - 0 |
| 0610 | ZTF San Diego Electrical CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,275 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 2,086 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,896 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,706 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,517 | Hour | $ - 0 |
| 0615 | ZTF San Diego Top Snipe CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,287 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 2,097 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,906 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,715 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,525 | Hour | $ - 0 |
0620 ZTF San Diego Additional Instruction
1A Attachment 1 PWS 1137 Hour $0.00 339 1 LOT $0.00 $0.00
| 0700 | New London Sonar Technician Submarines (STS) CI | |||||
| 1A | Appendix 7 to Attachment 1 PWS | 7,200 | Hour | $ - 0 | ||
| 1B | Appendix 7 to Attachment 1 PWS | 4,800 | Hour | $ - 0 | ||
| 1C | Appendix 7 to Attachment 1 PWS | 3,760 | Hour | $ - 0 | SLC | |
| 1D | Appendix 7 to Attachment 1 PWS | 2,800 | Hour | $ - 0 | ||
| 1E | Appendix 7 to Attachment 1 PWS | 1,880 | Hour | $ - 0 |
| 0705 | New London Fire Control Technician (FCT) CI | |||||
| 1A | Appendix 7 to Attachment 1 PWS | 7,200 | Hour | $ - 0 | ||
| 1B | Appendix 7 to Attachment 1 PWS | 4,800 | Hour | $ - 0 | ||
| 1C | Appendix 7 to Attachment 1 PWS | 3,760 | Hour | $ - 0 | SLC | |
| 1D | Appendix 7 to Attachment 1 PWS | 2,800 | Hour | $ - 0 | ||
| 1E | Appendix 7 to Attachment 1 PWS | 1,880 | Hour | $ - 0 |
| 0710 | New London Electronics Technician CI | |||||
| 1A | Appendix 7 to Attachment 1 PWS | 5,640 | Hour | $ - 0 | ||
| 1B | Appendix 7 to Attachment 1 PWS | 4,800 | Hour | $ - 0 | ||
| 1C | Appendix 7 to Attachment 1 PWS | 3,760 | Hour | $ - 0 | SLC | |
| 1D | Appendix 7 to Attachment 1 PWS | 2,800 | Hour | $ - 0 | ||
| 1E | Appendix 7 to Attachment 1 PWS | 1,880 | Hour | $ - 0 |
0715 New London Additional Instruction
1A Attachment 1 PWS 1692 Hour $0.00 SLC 1 LOT $0.00 $0.00
0800 Technical Data 1 Lot NSP
0850 Travel 1 Lot COST $0.00
| MOB+Base Total Evaluated Price: | $0.00 |
| Total Funded Amount | $0.00 |
| Amount Remaining to Be Funded | $0.00 |
&G 22 June 2020
Use or disclosure of data contained on this page is subject to the restriction on the cover sheet of the proposal
SOURCE SELECTION SENSITIVE – SEE FAR 3.104
Vol 2-&P
Acronyms CI = Contractor Instructor CIS = Contractor Instructor Services CLIN = Contract Line Item NSP = Not Separately Priced QTY = Quantity TBN = To Be Negotiated
For administrative purposes, the PBW data provides a distribution of the Section B Contract Line Item Number (CLIN) pricing to the task level. The task level pricing will be used in contractor performance deduction calculations. However, only the "roll-up" pricing at the CLIN level shall be reflected on the contractor invoices unless Section B states otherwise. Unit prices are Firm-Fixed-Price (FFP).
Option Period 1
| ATTACHMENT (4) OPTION PERIOD 1 | |
| POP: | 18 FEB 2023 - 17 FEB 2024 |
| Price Breakout Worksheet (PBW): |
| CLIN | Task | Description | (QTY)Training Hours Per Year | Unit | UNIT PRICE | TOTAL PRICE | Funding Sponsor | Hours Funded | Hours Required | Funded Amount | Funding Required | Mod # | SLIN |
| 1100 | San Diego Damage Control Fire Fighter High Risk CI | ||||||||||||
| 1A | Appendix 1 to Attachment 1 PWS | 28,099 | Hour | $ - 0 | |||||||||
| 1B | Appendix 1 to Attachment 1 PWS | 25,758 | Hour | $ - 0 | |||||||||
| 1C | Appendix 1 to Attachment 1 PWS | 23,416 | Hour | $ - 0 | SWSC | ||||||||
| 1D | Appendix 1 to Attachment 1 PWS | 21,074 | Hour | $ - 0 | |||||||||
| 1E | Appendix 1 to Attachment 1 PWS | 18,733 | Hour | $ - 0 |
| 1105 | San Diego DEI CI | |||||
| 1A | Appendix 1 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 1 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 1 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 1 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 1 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
1110 San Diego Additional Instruction
1A Attachment 1 PWS 3794 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 1200 | Norfolk DEI CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 2 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 2 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 2 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
| 1205 | Norfolk Hull Technician CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 2,624 | Hour | $ - 0 | ||
| 1B | Appendix 2 to Attachment 1 PWS | 2,406 | Hour | $ - 0 | ||
| 1C | Appendix 2 to Attachment 1 PWS | 2,187 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 1,968 | Hour | $ - 0 | ||
| 1E | Appendix 2 to Attachment 1 PWS | 1,750 | Hour | $ - 0 |
| 1210 | Norfolk Machinery Repairman CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 2,290 | Hour | $ - 0 | ||
| 1B | Appendix 2 to Attachment 1 PWS | 2,099 | Hour | $ - 0 | ||
| 1C | Appendix 2 to Attachment 1 PWS | 1,908 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 1,717 | Hour | $ - 0 | ||
| 1E | Appendix 2 to Attachment 1 PWS | 1,526 | Hour | $ - 0 |
| 1215 | Norfolk Damage Control Firefighter High Risk CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 5,273 | Hour | $ - 0 | ||
| 1B | Appendix 2 to Attachment 1 PWS | 4,833 | Hour | $ - 0 | ||
| 1C | Appendix 2 to Attachment 1 PWS | 4,394 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 3,955 | Hour | $ - 0 | ||
| 1E | Appendix 2 to Attachment 1 PWS | 3,515 | Hour | $ - 0 |
1220 Norfolk Additional Instruction
1A Attachment 1 PWS 896 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 1300 | Great Lakes Diesel Engine CI | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 4,512 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 4,136 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 3,760 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 3,384 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 3,008 | Hour | $ - 0 |
| 1305 | Great Lakes Electrician Mate CI | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 9,024 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 8,272 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 7,520 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 6,768 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 6,016 | Hour | $ - 0 |
| 1310 | Great Lakes Non-Destructive Testing Instructor CI | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 1,872 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 1,716 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 1,560 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,404 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 1,248 | Hour | $ - 0 |
| 1315 | Great Lakes Testing Officer | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
| 1320 | Great Lakes Testing Officer Assitant | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 13,536 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 12,408 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 11,280 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 10,152 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 9,024 | Hour | $ - 0 |
| 1325 | Great Lakes Testing Proctor | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 6,768 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 6,204 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 5,640 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 5,076 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 4,512 | Hour | $ - 0 |
| 1330 | Great Lakes Computer Programmer | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
| 1335 | Great Lakes Database Manager | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
1340 Great Lakes Additional Instruction
1A Attachment 1 PWS 5310 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 1400 | Pearl Harbor Damage Control Fire Fighter High Risk CI | |||||
| 1A | Appendix 4 to Attachment 1 PWS | 8,748 | Hour | $ - 0 | ||
| 1B | Appendix 4 to Attachment 1 PWS | 8,019 | Hour | $ - 0 | ||
| 1C | Appendix 4 to Attachment 1 PWS | 7,290 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 4 to Attachment 1 PWS | 6,561 | Hour | $ - 0 | ||
| 1E | Appendix 4 to Attachment 1 PWS | 5,832 | Hour | $ - 0 |
| 1405 | Pearl Harbor EMT | |||||
| 1A | Appendix 4 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 4 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 4 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 4 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 4 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
1410 Pearl Harbor Additional Instruction
1A Attachment 1 PWS 1375 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 1500 | Newport Prospective Engineering Officer CI | |||||
| 1A | Appendix 5 to Attachment 1 PWS | 2,368 | Hour | $ - 0 | ||
| 1B | Appendix 5 to Attachment 1 PWS | 2,170 | Hour | $ - 0 | ||
| 1C | Appendix 5 to Attachment 1 PWS | 1,973 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 5 to Attachment 1 PWS | 1,776 | Hour | $ - 0 | ||
| 1E | Appendix 5 to Attachment 1 PWS | 1,578 | Hour | $ - 0 |
1505 Newport Additional Instruction
1A Attachment 1 PWS 295 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 1600 | ZTF San Diego Gas Turbine CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,275 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 2,086 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,896 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,706 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,517 | Hour | $ - 0 |
| 1605 | ZTF San Diego Damage Control CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,258 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 2,070 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,882 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,694 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,506 | Hour | $ - 0 |
| 1610 | ZTF San Diego Electrical CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,275 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 2,086 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,896 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,706 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,517 | Hour | $ - 0 |
| 1615 | ZTF San Diego Top Snipe CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,287 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 2,097 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,906 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,715 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,525 | Hour | $ - 0 |
1620 ZTF San Diego Additional Instruction
1A Attachment 1 PWS 1137 Hour $0.00 339 1 LOT $0.00 $0.00
| 1700 | New London Sonar Technician Submarines (STS) CI | |||||
| 1A | Appendix 7 to Attachment 1 PWS | 7,200 | Hour | $ - 0 | ||
| 1B | Appendix 7 to Attachment 1 PWS | 4,800 | Hour | $ - 0 | ||
| 1C | Appendix 7 to Attachment 1 PWS | 3,760 | Hour | $ - 0 | SLC | |
| 1D | Appendix 7 to Attachment 1 PWS | 2,800 | Hour | $ - 0 | ||
| 1E | Appendix 7 to Attachment 1 PWS | 1,880 | Hour | $ - 0 |
| 1705 | New London Fire Control Technician (FT) CI | |||||
| 1A | Appendix 7 to Attachment 1 PWS | 7,200 | Hour | $ - 0 | ||
| 1B | Appendix 7 to Attachment 1 PWS | 4,800 | Hour | $ - 0 | ||
| 1C | Appendix 7 to Attachment 1 PWS | 3,760 | Hour | $ - 0 | SLC | |
| 1D | Appendix 7 to Attachment 1 PWS | 2,800 | Hour | $ - 0 | ||
| 1E | Appendix 7 to Attachment 1 PWS | 1,880 | Hour | $ - 0 |
| 1710 | New London Electronics Technician CI | |||||
| 1A | Appendix 7 to Attachment 1 PWS | 7,200 | Hour | $ - 0 | ||
| 1B | Appendix 7 to Attachment 1 PWS | 4,800 | Hour | $ - 0 | ||
| 1C | Appendix 7 to Attachment 1 PWS | 3,760 | Hour | $ - 0 | SLC | |
| 1D | Appendix 7 to Attachment 1 PWS | 2,800 | Hour | $ - 0 | ||
| 1E | Appendix 7 to Attachment 1 PWS | 1,880 | Hour | $ - 0 |
1715 New London Additional Instruction
1A Attachment 1 PWS 1692 Hour $0.00 SLC 1 LOT $0.00 $0.00
1800 Technical Data 1 Lot NSP
1850 Travel 1 Lot COST $0.00
| OY1 Total Evaluated Price: | $0.00 |
| Total Funded Amount | $0.00 |
| Amount Remaining to Be Funded | $0.00 |
&G 22 June 2020
Use or disclosure of data contained on this page is subject to the restriction on the cover sheet of the proposal
ATG = Afloat Training Group CIS = Contractor Instructor Services CLIN = Contract Line Item HPQ = Hours Per Quarter NSP = Not Separately Priced OAWR = Over and Above Work Request QTY = Quantity TBN = To Be Negotiated MM-L1 = Master Mariner Level 1 MM-L2 = Master Mariner Level 2 ML-M = Mid-level Mariner
For administrative purposes, the PBW data provides a distribution of the Section B Contract Line Item Number (CLIN) pricing to the task level. The task level pricing will be used in contractor performance deduction calculations. However, only the "roll-up" pricing at the CLIN level shall be reflected on the contractor invoices unless Section B states otherwise. Unit prices are Firm-Fixed-Price (FFP).
ATG = Afloat Training Group CIS = Contractor Instructor Services CLIN = Contract Line Item HPQ = Hours Per Quarter NSP = Not Separately Priced OAWR = Over and Above Work Request QTY = Quantity TBN = To Be Negotiated MM-L1 = Master Mariner Level 1
For administrative purposes, the PBW data provides a distribution of the Section B Contract Line Item Number (CLIN) pricing to the task level. The task level pricing will be used in contractor performance deduction calculations. However, only the "roll-up" pricing at the CLIN level shall be reflected on the contractor invoices unless Section B states otherwise. Unit prices are Firm-Fixed-Price (FFP).
CI = Contractor Instructor CIS = Contractor Instructor Services CLIN = Contract Line Item NSP = Not Separately Priced
For administrative purposes, the PBW data provides a distribution of the Section B Contract Line Item Number (CLIN) pricing to the task level. The task level pricing will be used in contractor performance deduction calculations. However, only the "roll-up" pricing at the CLIN level shall be reflected on the contractor invoices unless Section B states otherwise. Unit prices are Firm-Fixed-Price (FFP).
Option Period 2
| ATTACHMENT (4) OPTION PERIOD 2 | |
| POP: | 18 FEB 2024 - 17 FEB 2025 |
| Price Breakout Worksheet (PBW): |
| CLIN | Task | Description | (QTY)Training Hours Per Year | Unit | UNIT PRICE | TOTAL PRICE | Funding Sponsor | Hours Funded | Hours Required | Funded Amount | Funding Required | Mod # | SLIN |
| 2100 | San Diego Damage Control Fire Fighter High Risk CI | ||||||||||||
| 1A | Appendix 1 to Attachment 1 PWS | 28,099 | Hour | $ - 0 | |||||||||
| 1B | Appendix 1 to Attachment 1 PWS | 25,758 | Hour | $ - 0 | |||||||||
| 1C | Appendix 1 to Attachment 1 PWS | 23,416 | Hour | $ - 0 | SWSC | ||||||||
| 1D | Appendix 1 to Attachment 1 PWS | 21,074 | Hour | $ - 0 | |||||||||
| 1E | Appendix 1 to Attachment 1 PWS | 18,733 | Hour | $ - 0 |
| 2105 | San Diego DEI CI | |||||
| 1A | Appendix 1 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 1 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 1 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 1 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 1 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
2110 San Diego Additional Instruction
1A Attachment 1 PWS 3794 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 2200 | Norfolk DEI CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 2 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 2 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 2 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
| 2205 | Norfolk Hull Technician CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 2,624 | Hour | $ - 0 | ||
| 1B | Appendix 2 to Attachment 1 PWS | 2,406 | Hour | $ - 0 | ||
| 1C | Appendix 2 to Attachment 1 PWS | 2,187 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 1,968 | Hour | $ - 0 | ||
| 1E | Appendix 2 to Attachment 1 PWS | 1,750 | Hour | $ - 0 |
| 2210 | Norfolk Machinery Repairman CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 2,290 | Hour | $ - 0 | ||
| 1B | Appendix 2 to Attachment 1 PWS | 2,099 | Hour | $ - 0 | ||
| 1C | Appendix 2 to Attachment 1 PWS | 1,908 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 1,717 | Hour | $ - 0 | ||
| 1E | Appendix 2 to Attachment 1 PWS | 1,526 | Hour | $ - 0 |
| 2215 | Norfolk Damage Control Firefighter High Risk CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 5,273 | Hour | $ - 0 | ||
| 1B | Appendix 2 to Attachment 1 PWS | 4,833 | Hour | $ - 0 | ||
| 1C | Appendix 2 to Attachment 1 PWS | 4,394 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 3,955 | Hour | $ - 0 | ||
| 1E | Appendix 2 to Attachment 1 PWS | 3,515 | Hour | $ - 0 |
2220 Norfolk Additional Instruction
1A Attachment 1 PWS 896 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 2300 | Great Lakes Diesel Engine CI | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 4,512 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 4,136 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 3,760 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 3,384 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 3,008 | Hour | $ - 0 |
| 2305 | Great Lakes Electrician Mate CI | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 9,024 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 8,272 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 7,520 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 6,768 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 6,016 | Hour | $ - 0 |
| 2310 | Great Lakes Non-Destructive Testing Instructor CI | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 1,872 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 1,716 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 1,560 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,404 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 1,248 | Hour | $ - 0 |
| 2315 | Great Lakes Testing Officer | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
| 2320 | Great Lakes Testing Officer Assitant | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 13,536 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 12,408 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 11,280 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 10,152 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 9,024 | Hour | $ - 0 |
| 2325 | Great Lakes Testing Proctor | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 6,768 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 6,204 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 5,640 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 5,076 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 4,512 | Hour | $ - 0 |
| 2330 | Great Lakes Computer Programmer | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
| 2335 | Great Lakes Database Manager | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
2340 Great Lakes Additional Instruction
1A Attachment 1 PWS 5310 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 2400 | Pearl Harbor Damage Control Fire Fighter High Risk CI | |||||
| 1A | Appendix 4 to Attachment 1 PWS | 8,748 | Hour | $ - 0 | ||
| 1B | Appendix 4 to Attachment 1 PWS | 8,019 | Hour | $ - 0 | ||
| 1C | Appendix 4 to Attachment 1 PWS | 7,290 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 4 to Attachment 1 PWS | 6,561 | Hour | $ - 0 | ||
| 1E | Appendix 4 to Attachment 1 PWS | 5,832 | Hour | $ - 0 |
| 2405 | Pearl Harbor EMT | |||||
| 1A | Appendix 4 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 4 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 4 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 4 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 4 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
2410 Pearl Harbor Additional Instruction
1A Attachment 1 PWS 1375 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 2500 | Newport Prospective Engineering Officer CI | |||||
| 1A | Appendix 5 to Attachment 1 PWS | 2,368 | Hour | $ - 0 | ||
| 1B | Appendix 5 to Attachment 1 PWS | 2,170 | Hour | $ - 0 | ||
| 1C | Appendix 5 to Attachment 1 PWS | 1,973 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 5 to Attachment 1 PWS | 1,776 | Hour | $ - 0 | ||
| 1E | Appendix 5 to Attachment 1 PWS | 1,578 | Hour | $ - 0 |
2505 Newport Additional Instruction
1A Attachment 1 PWS 295 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 2600 | ZTF San Diego Gas Turbine CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,275 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 2,086 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,896 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,706 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,517 | Hour | $ - 0 |
| 2605 | ZTF San Diego Damage Control CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,258 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 2,070 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,882 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,694 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,506 | Hour | $ - 0 |
| 2610 | ZTF San Diego Electrical CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,275 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 2,086 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,896 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,706 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,517 | Hour | $ - 0 |
| 2615 | ZTF San Diego Top Snipe CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,287 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 2,097 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,906 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,715 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,525 | Hour | $ - 0 |
2620 ZTF San Diego Additional Instruction
1A Attachment 1 PWS 1137 Hour $0.00 339 1 LOT $0.00 $0.00
| 2700 | New London Sonar Technician Submarines (STS) CI | |||||
| 1A | Appendix 7 to Attachment 1 PWS | 7,200 | Hour | $ - 0 | ||
| 1B | Appendix 7 to Attachment 1 PWS | 4,800 | Hour | $ - 0 | ||
| 1C | Appendix 7 to Attachment 1 PWS | 3,760 | Hour | $ - 0 | SLC | |
| 1D | Appendix 7 to Attachment 1 PWS | 2,800 | Hour | $ - 0 | ||
| 1E | Appendix 7 to Attachment 1 PWS | 1,880 | Hour | $ - 0 |
| 2705 | New London Fire Control Technician (FT) CI | |||||
| 1A | Appendix 7 to Attachment 1 PWS | 7,200 | Hour | $ - 0 | ||
| 1B | Appendix 7 to Attachment 1 PWS | 4,800 | Hour | $ - 0 | ||
| 1C | Appendix 7 to Attachment 1 PWS | 3,760 | Hour | $ - 0 | SLC | |
| 1D | Appendix 7 to Attachment 1 PWS | 2,800 | Hour | $ - 0 | ||
| 1E | Appendix 7 to Attachment 1 PWS | 1,880 | Hour | $ - 0 |
| 2710 | New London Electronics Technician CI | |||||
| 1A | Appendix 7 to Attachment 1 PWS | 7,200 | Hour | $ - 0 | ||
| 1B | Appendix 7 to Attachment 1 PWS | 4,800 | Hour | $ - 0 | ||
| 1C | Appendix 7 to Attachment 1 PWS | 3,760 | Hour | $ - 0 | SLC | |
| 1D | Appendix 7 to Attachment 1 PWS | 2,800 | Hour | $ - 0 | ||
| 1E | Appendix 7 to Attachment 1 PWS | 1,880 | Hour | $ - 0 |
2715 New London Additional Instruction
1A Attachment 1 PWS 1692 Hour $0.00 SLC 1 LOT $0.00 $0.00
2800 Technical Data 1 Lot NSP
2850 Travel 1 Lot COST $0.00
| OY2 Total Evaluated Price: | $0.00 |
| Total Funded Amount | $0.00 |
| Amount Remaining to Be Funded | $0.00 |
&G 22 June 2020
Use or disclosure of data contained on this page is subject to the restriction on the cover sheet of the proposal
CIS = Contractor Instructor Services CLIN = Contract Line Item HPQ = Hours Per Quarter NSP = Not Separately Priced OAWR = Over and Above Work Request QTY = Quantity TBN = To Be Negotiated MM-L1 = Master Mariner Level 1
For administrative purposes, the PBW data provides a distribution of the Section B Contract Line Item Number (CLIN) pricing to the task level. The task level pricing will be used in contractor performance deduction calculations. However, only the "roll-up" pricing at the CLIN level shall be reflected on the contractor invoices unless Section B states otherwise. Unit prices are Firm-Fixed-Price (FFP).
ATG = Afloat Training Group CIS = Contractor Instructor Services CLIN = Contract Line Item HPQ = Hours Per Quarter NSP = Not Separately Priced OAWR = Over and Above Work Request QTY = Quantity TBN = To Be Negotiated MM-L1 = Master Mariner Level 1
For administrative purposes, the PBW data provides a distribution of the Section B Contract Line Item Number (CLIN) pricing to the task level. The task level pricing will be used in contractor performance deduction calculations. However, only the "roll-up" pricing at the CLIN level shall be reflected on the contractor invoices unless Section B states otherwise. Unit prices are Firm-Fixed-Price (FFP).
CI = Contractor Instructor CIS = Contractor Instructor Services CLIN = Contract Line Item NSP = Not Separately Priced
For administrative purposes, the PBW data provides a distribution of the Section B Contract Line Item Number (CLIN) pricing to the task level. The task level pricing will be used in contractor performance deduction calculations. However, only the "roll-up" pricing at the CLIN level shall be reflected on the contractor invoices unless Section B states otherwise. Unit prices are Firm-Fixed-Price (FFP).
Option Period 3
| ATTACHMENT (4) OPTION PERIOD 3 | |
| POP: | 18 FEB 2025 - 17 FEB 2026 |
| Price Breakout Worksheet (PBW): |
| CLIN | Task | Description | (QTY)Training Hours Per Year | Unit | UNIT PRICE | TOTAL PRICE | Funding Sponsor | Hours Funded | Hours Required | Funded Amount | Funding Required | Mod # | SLIN |
| 3100 | San Diego Damage Control Fire Fighter High Risk CI | ||||||||||||
| 1A | Appendix 1 to Attachment 1 PWS | 28,099 | Hour | $ - 0 | |||||||||
| 1B | Appendix 1 to Attachment 1 PWS | 25,758 | Hour | $ - 0 | |||||||||
| 1C | Appendix 1 to Attachment 1 PWS | 23,416 | Hour | $ - 0 | SWSC | ||||||||
| 1D | Appendix 1 to Attachment 1 PWS | 21,074 | Hour | $ - 0 | |||||||||
| 1E | Appendix 1 to Attachment 1 PWS | 18,733 | Hour | $ - 0 |
| 3105 | San Diego DEI CI | |||||
| 1A | Appendix 1 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 1 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 1 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 1 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 1 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
3110 San Diego Additional Instruction
1A Attachment 1 PWS 3794 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 3200 | Norfolk DEI CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 2 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 2 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 2 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
| 3205 | Norfolk Hull Technician CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 2,624 | Hour | $ - 0 | ||
| 1B | Appendix 2 to Attachment 1 PWS | 2,406 | Hour | $ - 0 | ||
| 1C | Appendix 2 to Attachment 1 PWS | 2,187 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 1,968 | Hour | $ - 0 | ||
| 1E | Appendix 2 to Attachment 1 PWS | 1,750 | Hour | $ - 0 |
| 3210 | Norfolk Machinery Repairman CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 2,290 | Hour | $ - 0 | ||
| 1B | Appendix 2 to Attachment 1 PWS | 2,099 | Hour | $ - 0 | ||
| 1C | Appendix 2 to Attachment 1 PWS | 1,908 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 1,717 | Hour | $ - 0 | ||
| 1E | Appendix 2 to Attachment 1 PWS | 1,526 | Hour | $ - 0 |
| 3215 | Norfolk Damage Control Firefighter High Risk CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 5,273 | Hour | $ - 0 | ||
| 1B | Appendix 2 to Attachment 1 PWS | 4,833 | Hour | $ - 0 | ||
| 1C | Appendix 2 to Attachment 1 PWS | 4,394 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 3,955 | Hour | $ - 0 | ||
| 1E | Appendix 2 to Attachment 1 PWS | 3,515 | Hour | $ - 0 |
3220 Norfolk Additional Instruction
1A Attachment 1 PWS 896 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 3300 | Great Lakes Diesel Engine CI | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 4,512 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 4,136 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 3,760 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 3,384 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 3,008 | Hour | $ - 0 |
| 3305 | Great Lakes Electrician Mate CI | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 9,024 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 8,272 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 7,520 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 6,768 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 6,016 | Hour | $ - 0 |
| 3310 | Great Lakes Non-Destructive Testing Instructor CI | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 1,872 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 1,716 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 1,560 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,404 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 1,248 | Hour | $ - 0 |
| 3315 | Great Lakes Testing Officer | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
| 3320 | Great Lakes Testing Officer Assitant | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 13,536 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 12,408 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 11,280 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 10,152 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 9,024 | Hour | $ - 0 |
| 3325 | Great Lakes Testing Proctor | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 6,768 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 6,204 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 5,640 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 5,076 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 4,512 | Hour | $ - 0 |
| 3330 | Great Lakes Computer Programmer | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
| 3335 | Great Lakes Database Manager | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
3340 Great Lakes Additional Instruction
1A Attachment 1 PWS 5310 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 3400 | Pearl Harbor Damage Control Fire Fighter High Risk CI | |||||
| 1A | Appendix 4 to Attachment 1 PWS | 8,748 | Hour | $ - 0 | ||
| 1B | Appendix 4 to Attachment 1 PWS | 8,019 | Hour | $ - 0 | ||
| 1C | Appendix 4 to Attachment 1 PWS | 7,290 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 4 to Attachment 1 PWS | 6,561 | Hour | $ - 0 | ||
| 1E | Appendix 4 to Attachment 1 PWS | 5,832 | Hour | $ - 0 |
| 3405 | Pearl Harbor EMT | |||||
| 1A | Appendix 4 to Attachment 1 PWS | 2,256 | Hour | $ - 0 | ||
| 1B | Appendix 4 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1C | Appendix 4 to Attachment 1 PWS | 1,880 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 4 to Attachment 1 PWS | 1,692 | Hour | $ - 0 | ||
| 1E | Appendix 4 to Attachment 1 PWS | 1,504 | Hour | $ - 0 |
3410 Pearl Harbor Additional Instruction
1A Attachment 1 PWS 1375 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 3500 | Newport Prospective Engineering Officer CI | |||||
| 1A | Appendix 5 to Attachment 1 PWS | 2,368 | Hour | $ - 0 | ||
| 1B | Appendix 5 to Attachment 1 PWS | 2,170 | Hour | $ - 0 | ||
| 1C | Appendix 5 to Attachment 1 PWS | 1,973 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 5 to Attachment 1 PWS | 1,776 | Hour | $ - 0 | ||
| 1E | Appendix 5 to Attachment 1 PWS | 1,578 | Hour | $ - 0 |
3505 Newport Additional Instruction
1A Attachment 1 PWS 295 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 3600 | ZTF San Diego Gas Turbine CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,275 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 2,086 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,896 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,706 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,517 | Hour | $ - 0 |
| 3605 | ZTF San Diego Damage Control CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,258 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 2,070 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,882 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,694 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,506 | Hour | $ - 0 |
| 3610 | ZTF San Diego Electrical CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,275 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 2,086 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,896 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,706 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,517 | Hour | $ - 0 |
| 3615 | ZTF San Diego Top Snipe CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,287 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 2,097 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,906 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,715 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,525 | Hour | $ - 0 |
3620 ZTF San Diego Additional Instruction
1A Attachment 1 PWS 1137 Hour $0.00 339 1 LOT $0.00 $0.00
| 3700 | New London Sonar Technician Submarines (STS) CI | |||||
| 1A | Appendix 7 to Attachment 1 PWS | 7,200 | Hour | $ - 0 | ||
| 1B | Appendix 7 to Attachment 1 PWS | 4,800 | Hour | $ - 0 | ||
| 1C | Appendix 7 to Attachment 1 PWS | 3,760 | Hour | $ - 0 | SLC | |
| 1D | Appendix 7 to Attachment 1 PWS | 2,800 | Hour | $ - 0 | ||
| 1E | Appendix 7 to Attachment 1 PWS | 1,880 | Hour | $ - 0 |
| 3705 | New London Fire Control Technician (FT) CI | |||||
| 1A | Appendix 7 to Attachment 1 PWS | 7,200 | Hour | $ - 0 | ||
| 1B | Appendix 7 to Attachment 1 PWS | 4,800 | Hour | $ - 0 | ||
| 1C | Appendix 7 to Attachment 1 PWS | 3,760 | Hour | $ - 0 | SLC | |
| 1D | Appendix 7 to Attachment 1 PWS | 2,800 | Hour | $ - 0 | ||
| 1E | Appendix 7 to Attachment 1 PWS | 1,880 | Hour | $ - 0 |
| 3710 | New London Electronics Technician CI | |||||
| 1A | Appendix 7 to Attachment 1 PWS | 7,200 | Hour | $ - 0 | ||
| 1B | Appendix 7 to Attachment 1 PWS | 4,800 | Hour | $ - 0 | ||
| 1C | Appendix 7 to Attachment 1 PWS | 3,760 | Hour | $ - 0 | SLC | |
| 1D | Appendix 7 to Attachment 1 PWS | 2,800 | Hour | $ - 0 | ||
| 1E | Appendix 7 to Attachment 1 PWS | 1,880 | Hour | $ - 0 |
3715 New London Additional Instruction
1A Attachment 1 PWS 1692 Hour $0.00 SLC 1 LOT $0.00 $0.00
3800 Technical Data 1 Lot NSP
3850 Travel 1 Lot COST $0.00
| OY3 Total Evaluated Price: | $0.00 |
| Total Funded Amount | $0.00 |
| Amount Remaining to Be Funded | $0.00 |
&G 22 June 2020
Use or disclosure of data contained on this page is subject to the restriction on the cover sheet of the proposal
CIS = Contractor Instructor Services CLIN = Contract Line Item HPQ = Hours Per Quarter NSP = Not Separately Priced OAWR = Over and Above Work Request QTY = Quantity TBN = To Be Negotiated MM-L1 = Master Mariner Level 1
For administrative purposes, the PBW data provides a distribution of the Section B Contract Line Item Number (CLIN) pricing to the task level. The task level pricing will be used in contractor performance deduction calculations. However, only the "roll-up" pricing at the CLIN level shall be reflected on the contractor invoices unless Section B states otherwise. Unit prices are Firm-Fixed-Price (FFP).
ATG = Afloat Training Group CIS = Contractor Instructor Services CLIN = Contract Line Item HPQ = Hours Per Quarter NSP = Not Separately Priced OAWR = Over and Above Work Request QTY = Quantity TBN = To Be Negotiated MM-L1 = Master Mariner Level 1
For administrative purposes, the PBW data provides a distribution of the Section B Contract Line Item Number (CLIN) pricing to the task level. The task level pricing will be used in contractor performance deduction calculations. However, only the "roll-up" pricing at the CLIN level shall be reflected on the contractor invoices unless Section B states otherwise. Unit prices are Firm-Fixed-Price (FFP).
CI = Contractor Instructor CIS = Contractor Instructor Services CLIN = Contract Line Item NSP = Not Separately Priced
For administrative purposes, the PBW data provides a distribution of the Section B Contract Line Item Number (CLIN) pricing to the task level. The task level pricing will be used in contractor performance deduction calculations. However, only the "roll-up" pricing at the CLIN level shall be reflected on the contractor invoices unless Section B states otherwise. Unit prices are Firm-Fixed-Price (FFP).
Option Period 4
| ATTACHMENT (4) OPTION PERIOD 4 | |
| POP: | 18 FEB 2026 - 17 JAN 2027 |
| Price Breakout Worksheet (PBW): |
| CLIN | Task | Description | (QTY)Training Hours Per Year | Unit | UNIT PRICE | TOTAL PRICE | Funding Sponsor | Hours Funded | Hours Required | Funded Amount | Funding Required | Mod # | SLIN |
| 4100 | San Diego Damage Control Fire Fighter High Risk CI | ||||||||||||
| 1A | Appendix 1 to Attachment 1 PWS | 25,757 | Hour | $ - 0 | |||||||||
| 1B | Appendix 1 to Attachment 1 PWS | 23,612 | Hour | $ - 0 | |||||||||
| 1C | Appendix 1 to Attachment 1 PWS | 21,465 | Hour | $ - 0 | SWSC | ||||||||
| 1D | Appendix 1 to Attachment 1 PWS | 19,318 | Hour | $ - 0 | |||||||||
| 1E | Appendix 1 to Attachment 1 PWS | 17,172 | Hour | $ - 0 |
| 4105 | San Diego DEI CI | |||||
| 1A | Appendix 1 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1B | Appendix 1 to Attachment 1 PWS | 1,896 | Hour | $ - 0 | ||
| 1C | Appendix 1 to Attachment 1 PWS | 1,723 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 1 to Attachment 1 PWS | 1,551 | Hour | $ - 0 | ||
| 1E | Appendix 1 to Attachment 1 PWS | 1,379 | Hour | $ - 0 |
4110 San Diego Additional Instruction
1A Attachment 1 PWS 3477.8333333333 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 4200 | Norfolk DEI CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1B | Appendix 2 to Attachment 1 PWS | 1,896 | Hour | $ - 0 | ||
| 1C | Appendix 2 to Attachment 1 PWS | 1,723 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 1,551 | Hour | $ - 0 | ||
| 1E | Appendix 2 to Attachment 1 PWS | 1,379 | Hour | $ - 0 |
| 4205 | Norfolk Hull Technician CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 2,405 | Hour | $ - 0 | ||
| 1B | Appendix 2 to Attachment 1 PWS | 2,206 | Hour | $ - 0 | ||
| 1C | Appendix 2 to Attachment 1 PWS | 2,005 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 1,804 | Hour | $ - 0 | ||
| 1E | Appendix 2 to Attachment 1 PWS | 1,604 | Hour | $ - 0 |
| 4210 | Norfolk Machinery Repairman CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 2,099 | Hour | $ - 0 | ||
| 1B | Appendix 2 to Attachment 1 PWS | 1,924 | Hour | $ - 0 | ||
| 1C | Appendix 2 to Attachment 1 PWS | 1,749 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 1,574 | Hour | $ - 0 | ||
| 1E | Appendix 2 to Attachment 1 PWS | 1,399 | Hour | $ - 0 |
| 4215 | Norfolk Damage Control Firefighter High Risk CI | |||||
| 1A | Appendix 2 to Attachment 1 PWS | 4,834 | Hour | $ - 0 | ||
| 1B | Appendix 2 to Attachment 1 PWS | 4,430 | Hour | $ - 0 | ||
| 1C | Appendix 2 to Attachment 1 PWS | 4,028 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 2 to Attachment 1 PWS | 3,625 | Hour | $ - 0 | ||
| 1E | Appendix 2 to Attachment 1 PWS | 3,222 | Hour | $ - 0 |
4220 Norfolk Additional Instruction
1A Attachment 1 PWS 821 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 4300 | Great Lakes Diesel Engine CI | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 4,136 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 3,791 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 3,447 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 3,102 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 2,757 | Hour | $ - 0 |
| 4305 | Great Lakes Electrician Mate CI | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 8,272 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 7,583 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 6,893 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 6,204 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 5,515 | Hour | $ - 0 |
| 4310 | Great Lakes Non-Destructive Testing Instructor CI | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 1,716 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 1,573 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 1,430 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,287 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 1,144 | Hour | $ - 0 |
| 4315 | Great Lakes Testing Officer | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 1,896 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 1,723 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,551 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 1,379 | Hour | $ - 0 |
| 4320 | Great Lakes Testing Officer Assitant | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 12,408 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 11,374 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 10,340 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 9,306 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 8,272 | Hour | $ - 0 |
| 4325 | Great Lakes Testing Proctor | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 6,204 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 5,687 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 5,170 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 4,653 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 4,136 | Hour | $ - 0 |
| 4330 | Great Lakes Computer Programmer | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 1,896 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 1,723 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,551 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 1,379 | Hour | $ - 0 |
| 4335 | Great Lakes Database Manager | |||||
| 1A | Appendix 3 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1B | Appendix 3 to Attachment 1 PWS | 1,896 | Hour | $ - 0 | ||
| 1C | Appendix 3 to Attachment 1 PWS | 1,723 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 3 to Attachment 1 PWS | 1,551 | Hour | $ - 0 | ||
| 1E | Appendix 3 to Attachment 1 PWS | 1,379 | Hour | $ - 0 |
4340 Great Lakes Additional Instruction
1A Attachment 1 PWS 4868 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 4400 | Pearl Harbor Damage Control Fire Fighter High Risk CI | |||||
| 1A | Appendix 4 to Attachment 1 PWS | 8,019 | Hour | $ - 0 | ||
| 1B | Appendix 4 to Attachment 1 PWS | 7,351 | Hour | $ - 0 | ||
| 1C | Appendix 4 to Attachment 1 PWS | 6,683 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 4 to Attachment 1 PWS | 6,014 | Hour | $ - 0 | ||
| 1E | Appendix 4 to Attachment 1 PWS | 5,346 | Hour | $ - 0 |
| 4405 | Pearl Harbor EMT | |||||
| 1A | Appendix 4 to Attachment 1 PWS | 2,068 | Hour | $ - 0 | ||
| 1B | Appendix 4 to Attachment 1 PWS | 1,896 | Hour | $ - 0 | ||
| 1C | Appendix 4 to Attachment 1 PWS | 1,723 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 4 to Attachment 1 PWS | 1,551 | Hour | $ - 0 | ||
| 1E | Appendix 4 to Attachment 1 PWS | 1,379 | Hour | $ - 0 |
4510 Pearl Harbor Additional Instruction
1A Attachment 1 PWS 1260 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 4500 | Newport Prospective Engineering Officer CI | |||||
| 1A | Appendix 5 to Attachment 1 PWS | 2,171 | Hour | $ - 0 | ||
| 1B | Appendix 5 to Attachment 1 PWS | 1,989 | Hour | $ - 0 | ||
| 1C | Appendix 5 to Attachment 1 PWS | 1,809 | Hour | $ - 0 | SWSC | |
| 1D | Appendix 5 to Attachment 1 PWS | 1,628 | Hour | $ - 0 | ||
| 1E | Appendix 5 to Attachment 1 PWS | 1,447 | Hour | $ - 0 |
4505 Newport Additional Instruction
1A Attachment 1 PWS 270.4166666667 Hour $0.00 SWSC 1 LOT $0.00 $0.00
| 4600 | ZTF San Diego Gas Turbine CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,085 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 1,912 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,738 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,564 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,391 | Hour | $ - 0 |
| 4605 | ZTF San Diego Damage Control CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,070 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 1,898 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,725 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,553 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,381 | Hour | $ - 0 |
| 4610 | ZTF San Diego Electrical CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,085 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 1,912 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,738 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,564 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,391 | Hour | $ - 0 |
| 4615 | ZTF San Diego Top Snipe CI | |||||
| 1A | Appendix 6 to Attachment 1 PWS | 2,096 | Hour | $ - 0 | ||
| 1B | Appendix 6 to Attachment 1 PWS | 1,922 | Hour | $ - 0 | ||
| 1C | Appendix 6 to Attachment 1 PWS | 1,747 | Hour | $ - 0 | 339 | |
| 1D | Appendix 6 to Attachment 1 PWS | 1,572 | Hour | $ - 0 | ||
| 1E | Appendix 6 to Attachment 1 PWS | 1,398 | Hour | $ - 0 |
4620 ZTF San Diego Additional Instruction
1A Attachment 1 PWS 1042 Hour $0.00 SLC 1 LOT $0.00 $0.00
| 4700 | New London Sonar Technician Submarines (STS) CI | |||||
| 1A | Appendix 7 to Attachment 1 PWS | 6,600 | Hour | $ - 0 | ||
| 1B | Appendix 7 to Attachment 1 PWS | 4,400 | Hour | $ - 0 | ||
| 1C | Appendix 7 to Attachment 1 PWS | 3,447 | Hour | $ - 0 | SLC | |
| 1D | Appendix 7 to Attachment 1 PWS | 2,567 | Hour | $ - 0 | ||
| 1E | Appendix 7 to Attachment 1 PWS | 1,723 | Hour | $ - 0 |
| 4705 | New London Fire Control Technician (FT) CI | |||||
| 1A | Appendix 7 to Attachment 1 PWS | 6,600 | Hour | $ - 0 | ||
| 1B | Appendix 7 to Attachment 1 PWS | 4,400 | Hour | $ - 0 | ||
| 1C | Appendix 7 to Attachment 1 PWS | 3,447 | Hour | $ - 0 | SLC | |
| 1D | Appendix 7 to Attachment 1 PWS | 2,567 | Hour | $ - 0 | ||
| 1E | Appendix 7 to Attachment 1 PWS | 1,723 | Hour | $ - 0 |
| 4710 | New London Electronics Technician CI | |||||
| 1A | Appendix 7 to Attachment 1 PWS | 6,600 | Hour | $ - 0 | ||
| 1B | Appendix 7 to Attachment 1 PWS | 4,400 | Hour | $ - 0 | ||
| 1C | Appendix 7 to Attachment 1 PWS | 3,447 | Hour | $ - 0 | SLC | |
| 1D | Appendix 7 to Attachment 1 PWS | 2,567 | Hour | $ - 0 | ||
| 1E | Appendix 7 to Attachment 1 PWS | 1,723 | Hour | $ - 0 |
4715 New London Additional Instruction
1A Attachment 1 PWS 1551 Hour $0.00 SLC 1 LOT $0.00 $0.00
4800 Technical Data 1 Lot NSP
4850 Travel 1 Lot COST $0.00
| OY4 Total Evaluated Price: | $0.00 |
| Total Funded Amount | $0.00 |
| Amount Remaining to Be Funded | $0.00 |
&G 22 June 2020
Use or disclosure of data contained on this page is subject to the restriction on the cover sheet of the proposal
CIS = Contractor Instructor Services CLIN = Contract Line Item HPQ = Hours Per Quarter NSP = Not Separately Priced OAWR = Over and Above Work Request QTY = Quantity TBN = To Be Negotiated MM-L1 = Master Mariner Level 1
For administrative purposes, the PBW data provides a distribution of the Section B Contract Line Item Number (CLIN) pricing to the task level.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .