N4425518R5005_JOC_Amend06.pdf
PDF 394 KB Posted
- Solicitation number
- N44255-18-R-5005
About this file
This document provides details on a regional job order contract solicitation for general construction services. The solicitation is being advertised as a 100% Small Business Administration 8(a) small business set-aside for firms located in Alaska, Idaho, Oregon, and Washington. The Naval Facilities Engineering Command Northwest seeks to award an indefinite delivery indefinite quantity contract for construction, repair, and alteration projects ranging from $2,000 to $1,500,000 at various installations in the Puget Sound region. The base period of performance is one year with four additional one-year options allowing for a maximum term of five years. Evaluation criteria include technical approach, experience, past performance, and safety, with the lowest priced technically acceptable proposal receiving award. The solicitation is anticipated to be released on October 19th, 2018 with proposals due November 20th, 2018 and award by April 19th, 2019.
Amendment 0006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0008.pdf | ||
| N4425518R5005_JOC_AMENDMENT_0007.pdf | ||
| Attachment_PSNS_Contractor_Request_Blank.pdf | ||
| Attachment_DBIDS_Badge_Request_Instructions.pdf | ||
| Attachment_F_BDTXHT_SOW_REV02_05022019.pdf | ||
| N4425518R5005_JOC_Amendment_05.pdf | ||
| JOC_SEED_PROJECT_Attachments_J_F_F3.pdf | ||
| Attachment_B_REV02.xlsx | XLSX spreadsheet | |
| Attachment_E_REV.02.pdf | ||
| N4425518R5005_JOC_Amend04.pdf | ||
| N4425518R5005_Amendment_01.pdf | ||
| Attachment_F.pdf | ||
| Attachment_J.pdf | ||
| Attachment_I.pdf | ||
| Attachment_J.pdf | ||
| N4425518R5005_Amendment_01.pdf | ||
| Attachment_F.pdf | ||
| Attachment_I.pdf | ||
| N44255-18-R-5005_JOC_Solicitation.pdf | ||
| Attachments_A,C,D,G,H.docx | DOCX document | |
| Attachment_B.xlsx | XLSX spreadsheet | |
| Attachment_E.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment provides Government response to a pre-proposal inquiry and updates required w age rates for construction Description continues on Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-May-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4425518R5005
X 9B. DATED (SEE ITEM 11)
21-Feb-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-May-2019
CODE
NAVFAC NORTHWEST
1101 TAUTOG CIRCLE
SILVERDALE WA 98315-1101
N44255 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4425518R5005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES (REV.)
The following have been added by full text:
AMENDMENT 06
1. Provide updates to the Construction Wage Rate Requirements in solicitation Section 00805.
2. This amendment does not revise the proposal due date.
3. Provide Government response to the following pre-proposal inquiry (PPI):
PPI 051: During the site visit the existing chain link fence on Pier 7 was measured at 10’ tall. Will the Government confirm that the new chain link fence?
GOVT RESPONSE: The existing fence is approximately 12 feet in height.
4. All other terms and conditions remain unchanged. Offerors are reminded to acknowledge receipt of this amendment when submitting proposals in accordance with the RFP instructions.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
SPECIAL CONTRACT REQUIREMENTS
SECTION 00805
1. EPAYROLL
SPECIAL CONTRACT REQUIREMENT FOR CONTRACTOR TO SUPPLY AND USE AN
ELECTRONIC SOFTWARE FOR PROCESSING WAGE RATE REQUIREMENTS (CONSTRUCTION)
ACT CERTIFIED PAYROLLS INCOMPLIANCE WITH FAR 52.222-8, PAYROLLS AND BASIC
RECORDS AND FAR 52.222-13, COMPLIANCE WITH WAGE RATE REQUIREMENTS
(CONSTRUCTION) AND RELATED ACT REGULATIONS.
The US Department of Labor accepts the electronic submission of certified payrolls and the “electronic signature” is accepted for the purposes of “certifying the payroll”. There are several electronic systems currently commercially available to contractors for payroll processing in compliance with the Wage Rate Requirements (Construction) and Related Acts.
The contractor shall use a supplemental electronic Wage Rate Requirements (Construction) Act payroll processing system to process and submit certified payrolls electronically to the Government that are compliant with appropriate Wage Rate Requirements (Construction) Act payroll provisions in the FAR. The contractor shall be responsible for obtaining and providing all access, licenses, and other services required for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Wage Rate Requirements (Construction) and Related Act Regulations. The electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion, and providing a durable record copy of all payrolls and other documentation to the government at contract closeout. The contractor shall obtain and provide
N4425518R5005 access to the Government via the internet with login authorization, as required to comply with the Wage Rate Requirements (Construction) and Related Act Regulations over the duration of this construction contract. The access shall include electronic review access via the internet by the Government contract administrative office to the electronic payroll processing system used by the contractor.
The supplemental electronic payroll processing service shall meet the following basic functional criteria:
commercially available; compliant with appropriate Wage Rate Requirements (Construction) Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; demonstrated security of data and data entry rights; ability to produce contractor-certified electronic versions of weekly payroll data; ability to identify erroneous entries and track the data/time of all versions of the certified Wage Rate Requirements (Construction) payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Wage Rate Requirements (Construction) payroll processing system shall be provided to the Government during contract closeout.
All contractor-incurred costs related to the contractor’s provision and use of an electronic payroll processing service shall be included in the contractor’s price for the overall work under the contract. The costs for Wage Rate Requirements (Construction) Act compliance using electronic payroll processing services shall not be a separately bid or reimbursed item under this contract.
2. WAGE DETERMINATIONS
The following Department of Labor Wage Determinations are hereby incorporated and are applicable to the base year of performance. This list of wage determinations is based on the primary locations of work anticipated under this contract. Updated Wage Determinations shall be incorporated with the exercise of any option periods. The applicable wage determination shall be cited in each Task Order. If none of the listed wage determinations apply to a specific Task Order, the appropriate wage determination shall be issued with the Task Order RFP and incorporated into the Task Order.
Wage Determinations
Washington Statewide Highway WA20190001 Revision 03 05/03/2019 Washington Statewide Heavy Dredging WA20190080 Revision 00 01/04/2019 Washington Kitsap Building WA20190012 Revision 05 05/03/2019 Washington Kitsap Heavy WA20190071 Revision 01 05/03/2019 Washington Snohomish Building WA20190016 Revision 04 04/12/2019 Washington Snohomish Heavy WA20190075 Revision 02 04/12/2019 Washington Island Building WA20190028 Revision 04 04/12/2019 Washington Island Heavy WA20190047 Revision 00 01/04/2019 Washington Jefferson Building WA20190029 Revision 04 05/03/2019 Washington Jefferson Heavy WA20190048 Revision 01 05/03/2019
ADDITIONAL WAGE DETERMINATIONS MAY BE INCLUDED WITH EACH TASK ORDER BASED
ON SITE LOCATION.
*The wage determinations for option periods will be provided when the option is exercised.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .