Attachment_B.xlsx
XLSX spreadsheet 20 KB Posted
- Solicitation number
- N44255-18-R-5005
About this file
This solicitation notice is for an indefinite delivery indefinite quantity construction contract to be awarded as a 100% 8(a) small business set-aside by the Naval Facilities Engineering Command Northwest. Work will include general construction, repair, and alteration projects ranging from $2,000 to $1.5 million at facilities in Washington, Alaska, Idaho, Oregon, and surrounding states. The awarded 8(a) contractor will receive requirement packages and jointly develop scopes of work with government personnel. The contract period is one base year with four optional one-year extensions, for a potential total of five years. Proposals are due November 20th, 2018 and award is expected April 19th, 2019. Evaluation criteria are technical approach, experience, past performance, and safety, with award based on lowest price technically acceptable. The guaranteed minimum value is $5,000 over the five-year contract term.
Attachment B to the Solicitation
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Coefficients and Multipliers
Meland, Shannon N CIV NAVFAC NW, OP3A2: Meland, Shannon N CIV NAVFAC NW, OP3A2:
| Identify what percentage of work we anticipate not having joint scope development? I would imagine at least 80% of the task orders would not use joint scope development so I input that number but correct as necessary. | ELIN | PROPOSED COEFFICIENTS | ||
| #000101 | ||||
| Pre-Priced Work | ||||
| #000102 | ||||
| Non-Pre-Priced Work | ||||
| MULTIPLIERS | PROPOSED MULTIPLIERS |
| #01 |
| Work in the Controlled Industrial Area (CIA) at Naval Base Kitsap at Bremerton, WA |
| #02 |
| Work in the Main Limited Area (MLA), Waterfront Restricted Area (WRA) and Strategic Weapons Facility Pacific (SWFPAC) at Naval Base Kitsap at Bangor, WA |
| #03 |
| Work at Naval Hospital Bremerton in Bremerton, WA |
| #04 |
| Work at Naval Air Station (NAS) Whidbey Island in Oak Harbor, WA and Naval Station (NAVSTA) Everett in Everett, WA |
Seed Project
| Proposal of Costs for Seed Project | |||||||||||
| PRE‐PRICED ITEM DESCRIPTION | MEANS ITEM # | QTY # | QTY UNIT | MATERIAL (MATL) UNIT COST | MATL TOTAL COST | LABOR UNIT COST | LABOR TOTAL COST | EQUIPMENT (EQUIP) UNIT COST | EQUIP TOTAL COST | OTHER COST | OTHER TOTAL COST |
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| TOTALS | 0 | 0 | 0 | 0 | |||||||
| NON-PRE‐PRICED ITEM DESCRIPTION | QTY # | QTY UNIT | MATERIAL (MATL) UNIT COST | MATL TOTAL COST | LABOR UNIT COST | LABOR TOTAL COST | EQUIPMENT (EQUIP) UNIT COST | EQUIP TOTAL COST | OTHER COST | OTHER TOTAL COST | |
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | ||||||||
| TOTALS | 0 | 0 | 0 | 0 | |||||||
| Pre-Priced Total (RS Means Material Total Cost + Labor Total Cost + Equip Total Cost + Other Total Cost) | 0 | ||||||||||
| Cannot be less than 80% of the task order value | |||||||||||
| City Cost Index (CITY TBD, weighted average) | |||||||||||
| Line 30 x Line 32 | 0 | ||||||||||
| CIA, MLA/WRA/SWFPAC, Hospital, Whidbey/Everett Multiplier (if applicable) | <- Shall be the same number as what was proposed for either multiplier 01, 02, 03, or 04 on the "Coefficients and Multipliers" tab. Only input if one of the four multipliers applies to the project. | ||||||||||
| Line 30 x Line 34 | 0 | ||||||||||
| Sales Tax on Materials & Equipment | |||||||||||
| Line 30 x Line 36 | 0 | ||||||||||
| Subtotal (Line 30 + Line 33 + Line 35 +Line 37) | 0 | ||||||||||
| Pre-Priced Coefficient | <- Shall be the same number as what was proposed for ELIN 000101 on the "Coefficients and Multipliers " tab. | ||||||||||
| Line 38 x Line 39 | 0 | ||||||||||
| Total (Line 38 + Line 40) | 0 | ||||||||||
| Non-Pre-Priced Total (Material Total Cost + Labor Total Cost + Equip Total Cost + Other Total Cost) | 0 | ||||||||||
| Cannot exceed 20% of task order value | |||||||||||
| Sales Tax on Materials & Equipment | |||||||||||
| Line 42 x Line 44 | 0 | ||||||||||
| Subtotal (Line 42 + Line 45) | 0 | ||||||||||
| Non-Pre-Priced Coefficient | <- Shall be the same number as what was proposed for ELIN 000102 on the "Coefficients and Multipliers " tab. | ||||||||||
| Line 46 x Line 47 | 0 | ||||||||||
| Total (Line 46 + Line 48) | 0 | ||||||||||
| Total Evaluated Price (Line 41 + Line 49) | 0 |
File details come from the government source that posted it. Updated .