Attachment_B.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Regional Job Order Contract (JOC) for General Construction
Solicitation number
N44255-18-R-5005
Issued by

About this file

This solicitation notice is for an indefinite delivery indefinite quantity construction contract to be awarded as a 100% 8(a) small business set-aside by the Naval Facilities Engineering Command Northwest. Work will include general construction, repair, and alteration projects ranging from $2,000 to $1.5 million at facilities in Washington, Alaska, Idaho, Oregon, and surrounding states. The awarded 8(a) contractor will receive requirement packages and jointly develop scopes of work with government personnel. The contract period is one base year with four optional one-year extensions, for a potential total of five years. Proposals are due November 20th, 2018 and award is expected April 19th, 2019. Evaluation criteria are technical approach, experience, past performance, and safety, with award based on lowest price technically acceptable. The guaranteed minimum value is $5,000 over the five-year contract term.

Attachment B to the Solicitation

View the file

Other files

File Type Posted
Amendment_0008.pdf PDF
N4425518R5005_JOC_AMENDMENT_0007.pdf PDF
N4425518R5005_JOC_Amend06.pdf PDF
Attachment_PSNS_Contractor_Request_Blank.pdf PDF
Attachment_DBIDS_Badge_Request_Instructions.pdf PDF
Attachment_F_BDTXHT_SOW_REV02_05022019.pdf PDF
N4425518R5005_JOC_Amendment_05.pdf PDF
JOC_SEED_PROJECT_Attachments_J_F_F3.pdf PDF
Attachment_B_REV02.xlsx XLSX spreadsheet
Attachment_E_REV.02.pdf PDF
N4425518R5005_JOC_Amend04.pdf PDF
N4425518R5005_Amendment_01.pdf PDF
Attachment_F.pdf PDF
Attachment_J.pdf PDF
Attachment_I.pdf PDF
Attachment_J.pdf PDF
N4425518R5005_Amendment_01.pdf PDF
Attachment_F.pdf PDF
Attachment_I.pdf PDF
N44255-18-R-5005_JOC_Solicitation.pdf PDF
Attachments_A,C,D,G,H.docx DOCX document
Attachment_E.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Coefficients and Multipliers

Meland, Shannon N CIV NAVFAC NW, OP3A2: Meland, Shannon N CIV NAVFAC NW, OP3A2:

Identify what percentage of work we anticipate not having joint scope development? I would imagine at least 80% of the task orders would not use joint scope development so I input that number but correct as necessary.ELINPROPOSED COEFFICIENTS
#000101
Pre-Priced Work
#000102
Non-Pre-Priced Work
MULTIPLIERSPROPOSED MULTIPLIERS
#01
Work in the Controlled Industrial Area (CIA) at Naval Base Kitsap at Bremerton, WA
#02
Work in the Main Limited Area (MLA), Waterfront Restricted Area (WRA) and Strategic Weapons Facility Pacific (SWFPAC) at Naval Base Kitsap at Bangor, WA
#03
Work at Naval Hospital Bremerton in Bremerton, WA
#04
Work at Naval Air Station (NAS) Whidbey Island in Oak Harbor, WA and Naval Station (NAVSTA) Everett in Everett, WA

Seed Project

Proposal of Costs for Seed Project
PRE‐PRICED ITEM DESCRIPTIONMEANS ITEM #QTY #QTY UNITMATERIAL (MATL) UNIT COSTMATL TOTAL COSTLABOR UNIT COSTLABOR TOTAL COSTEQUIPMENT (EQUIP) UNIT COSTEQUIP TOTAL COSTOTHER COSTOTHER TOTAL COST
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
TOTALS0000
NON-PRE‐PRICED ITEM DESCRIPTIONQTY #QTY UNITMATERIAL (MATL) UNIT COSTMATL TOTAL COSTLABOR UNIT COSTLABOR TOTAL COSTEQUIPMENT (EQUIP) UNIT COSTEQUIP TOTAL COSTOTHER COSTOTHER TOTAL COST
0000
0000
0000
0000
0000
0000
0000
TOTALS0000
Pre-Priced Total (RS Means Material Total Cost + Labor Total Cost + Equip Total Cost + Other Total Cost)0
Cannot be less than 80% of the task order value
City Cost Index (CITY TBD, weighted average)
Line 30 x Line 320
CIA, MLA/WRA/SWFPAC, Hospital, Whidbey/Everett Multiplier (if applicable)<- Shall be the same number as what was proposed for either multiplier 01, 02, 03, or 04 on the "Coefficients and Multipliers" tab. Only input if one of the four multipliers applies to the project.
Line 30 x Line 340
Sales Tax on Materials & Equipment
Line 30 x Line 360
Subtotal (Line 30 + Line 33 + Line 35 +Line 37)0
Pre-Priced Coefficient<- Shall be the same number as what was proposed for ELIN 000101 on the "Coefficients and Multipliers " tab.
Line 38 x Line 390
Total (Line 38 + Line 40)0
Non-Pre-Priced Total (Material Total Cost + Labor Total Cost + Equip Total Cost + Other Total Cost)0
Cannot exceed 20% of task order value
Sales Tax on Materials & Equipment
Line 42 x Line 440
Subtotal (Line 42 + Line 45)0
Non-Pre-Priced Coefficient<- Shall be the same number as what was proposed for ELIN 000102 on the "Coefficients and Multipliers " tab.
Line 46 x Line 470
Total (Line 46 + Line 48)0
Total Evaluated Price (Line 41 + Line 49)0

File details come from the government source that posted it. Updated .