Regional Job Order Contract (JOC) for General Construction
Solicitation number
N44255-18-R-5005
Issued by

About this file

This document provides details for a regional job order contract solicitation to provide general construction services. The solicitation seeks to award an indefinite delivery indefinite quantity contract for construction, alteration, and repair projects ranging from $2,000 to $1,500,000 at Naval installations in the Puget Sound region. The contract has a base period of 12 months with four 12-month options and a maximum value of $99 million. Evaluation will be based on technical approach, experience, past performance, and safety, with award to the lowest priced technically acceptable offer. The solicitation is designated as a 100% small business set-aside for 8(a) firms in SBA Region X and other qualified 8(a) businesses. Proposals are due November 20, 2018 and award is expected on April 19, 2019.

Attachment_B_REV02.xlsx

View the file

Other files

File Type Posted
Amendment_0008.pdf PDF
N4425518R5005_JOC_AMENDMENT_0007.pdf PDF
N4425518R5005_JOC_Amend06.pdf PDF
Attachment_PSNS_Contractor_Request_Blank.pdf PDF
Attachment_DBIDS_Badge_Request_Instructions.pdf PDF
Attachment_F_BDTXHT_SOW_REV02_05022019.pdf PDF
N4425518R5005_JOC_Amendment_05.pdf PDF
JOC_SEED_PROJECT_Attachments_J_F_F3.pdf PDF
Attachment_E_REV.02.pdf PDF
N4425518R5005_JOC_Amend04.pdf PDF
N4425518R5005_Amendment_01.pdf PDF
Attachment_F.pdf PDF
Attachment_J.pdf PDF
Attachment_I.pdf PDF
Attachment_J.pdf PDF
N4425518R5005_Amendment_01.pdf PDF
Attachment_F.pdf PDF
Attachment_I.pdf PDF
N44255-18-R-5005_JOC_Solicitation.pdf PDF
Attachments_A,C,D,G,H.docx DOCX document
Attachment_B.xlsx XLSX spreadsheet
Attachment_E.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Coefficients and Multipliers

Meland, Shannon N CIV NAVFAC NW, OP3A2: Meland, Shannon N CIV NAVFAC NW, OP3A2:

Identify what percentage of work we anticipate not having joint scope development? I would imagine at least 80% of the task orders would not use joint scope development so I input that number but correct as necessary.Attachment B REV02
ELINPROPOSED COEFFICIENT
#000101
Pre-Priced Work
#000102
Non-Pre-Priced Work
#000103
Pre-Priced Work for Outlying Areas
#000104
Non-Pre-Priced Work for Outlying Areas
MULTIPLIERSPROPOSED MULTIPLIERS
#01
Work in the Controlled Industrial Area (CIA) at Naval Base Kitsap at Bremerton, WA
#02
Work in the Main Limited Area (MLA), Waterfront Restricted Area (WRA) and Strategic Weapons Facility Pacific (SWFPAC) at Naval Base Kitsap at Bangor, WA
#03
Work at Naval Air Station (NAS) Whidbey Island in Oak Harbor, WA and Naval Station (NAVSTA) Everett in Everett, WA

Seed Project

Proposal of Costs for Seed Project
PRE‐PRICED ITEM DESCRIPTIONMEANS ITEM #QTY #QTY UNITMATERIAL (MATL) UNIT COSTMATL TOTAL COSTLABOR UNIT COSTLABOR TOTAL COSTEQUIPMENT (EQUIP) UNIT COSTEQUIP TOTAL COSTOTHER COSTOTHER TOTAL COST
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
TOTALS$ - 0$ - 0$ - 0$ - 0
NON-PRE‐PRICED ITEM DESCRIPTIONQTY #QTY UNITMATERIAL (MATL) UNIT COSTMATL TOTAL COSTLABOR UNIT COSTLABOR TOTAL COSTEQUIPMENT (EQUIP) UNIT COSTEQUIP TOTAL COSTOTHER COSTOTHER TOTAL COST
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
TOTALS$ - 0$ - 0$ - 0$ - 0
Pre-Priced Total (RS Means Material Total Cost + Labor Total Cost + Equip Total Cost + Other Total Cost)$ - 0
Cannot be less than 80% of the task order value
City Cost Index (CITY TBD, weighted average)
Line 30 x Line 32$ - 0
CIA, MLA/WRA/SWFPAC, Whidbey/Everett Multiplier (if applicable)<- Shall be the same number as what was proposed for either multiplier 01, 02, or 03 on the "Coefficients and Multipliers" tab. Only input if one of the three multipliers applies to the project.
Line 33 x Line 34$ - 0
Sales Tax on Materials & Equipment
(Line 36 x Line G20) + (Line 36 x Line K20)$ - 0
Subtotal (Line 33 + Line 35 +Line 37)$ - 0
Pre-Priced Coefficient (Non-Outlying or Outlying)<- Shall be the same number as what was proposed for ELIN 000101 or ELIN 000103 on the "Coefficients and Multipliers " tab.
Line 38 x Line 39$ - 0
Total (Line 38 + Line 40)$ - 0
Non-Pre-Priced Total (Material Total Cost + Labor Total Cost + Equip Total Cost + Other Total Cost)$ - 0
Cannot exceed 20% of task order value
Sales Tax on Materials & Equipment
(Line 44 x Line G29) + (Line 44 x Line K29)$ - 0
Subtotal (Line 42 + Line 45)$ - 0
Non-Pre-Priced Coefficient (Non-Outlying or Outlying)<- Shall be the same number as what was proposed for ELIN 000102 or ELIN 000104 on the "Coefficients and Multipliers " tab.
Line 46 x Line 47$ - 0
Total (Line 46 + Line 48)$ - 0
Total Evaluated Price (Line 41 + Line 49)$ - 0