This document is a mechanical schedules drawing (Sheet M-602) for a Marine Corps Base project involving repair of a Bachelor Enlisted Quarters (BEQ) building BB250, prepared by the Department of the Navy Naval Facilities Engineering Systems Command at Camp Lejeune, North Carolina. The detailed technical drawing includes comprehensive schedules for multiple mechanical systems, specifically covering Dedicated Outside Air Systems (DOAS), Air Handling Units (AHU), Ductless Split Systems, Packaged Terminal Heat Pumps (PTHP), Fans, Air Distribution, Louvers, and Control Valves. The drawing provides extensive technical specifications for each system, including airflow rates, electrical characteristics, cooling and heating capacities, motor specifications, and specific installation requirements such as filter types, coil protections, and mounting details. The contract number is N40085-24-B-0016, and the drawing is part of a larger set of construction documents for mechanical system renovations.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYM. DESCRIPTION DATE APP.
REVISIONS
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
CAMP LEJEUNE, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091
CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M B
F A
N O
SPEC.
M-602
PJR
MAS
KELLY ROOT
LWM
REPAIR BEQ BB250
MECHANICAL SCHEDULES
60041637 N40085-24-B-0016
05-24-0016 133 OF 174
9. PROVIDE DUCT MOUNTED SMOKE DETECTOR IN SUPPLY DUCTWORK.
8. PROVIDE UNIT WITH 3-POINT POWER CONNECTION. A SINGLE CONNECTION FOR THE SUPPLY FAN, A SINGLE CONNECTION FOR THE EXHAUST FAN AND A SINGLE CONNECTION FOR THE MARINE LIGHTS.
7. UNIT MUST HAVE CROSSFLOW FIXED PLATE TOTAL ENERGY HEAT EXCHANGER, PLENUM SUPPLY/EXHAUST FANS, PREHEAT COIL, COOLING COIL, REHEAT COIL AND MARINE LIGHTS IN EACH FAN SECTIONS.
6. PROVIDE 6000 HR SALT SPRAY PROTECTIVE COATING ON THE PREHEAT, COOLING AND REHEAT COILS.
5. CONTRACTOR MUST VERIFY THAT UNIT CAN BE INSTALLED IN LOCATION SHOWN ON DRAWINGS PRIOR TO SUBMITTING FOR APPROVAL.
4. PROVIDE UNIT WITH VERTICAL SUPPLY DISCHARGE DUCT CONNECTION AND HORIZONTAL EXHAUST & OUTSIDE AIR DUCT CONNECTIONS. UNIT MUST HAVE 2" DOUBLE WALL CONSTRUCTION.
3. PROVIDE WITH CLASS 1A LOW LEAKAGE DAMPERS ON THE EXHAUST AND OUTSIDE AIR INTAKE UNIT CONNECTIONS.
2. PROVIDE PREMIUM EFFICIENCY MOTORS FOR SUPPLY AND EXHAUST FANS, COMPATIBLE WITH VARIABLE FREQUENCY DRIVES.
1. PROVIDE WITH 2" MERV 8 FILTERS ON THE EXHAUST AND 2" MERV 8 PREFILTERS & 2" MERV 13 FINAL FILTERS ON THE OUTSIDE AIR INTAKE.
REMARKS
DOAS-6 2155 1.50 4.99 1,800 1.50 3.74 65.9 26.8 55.0 200 0.25 140.0 110.0 5.0 4.4 194.2 70.8 0.4 83.3 78.5 53.0 53.0 200 0.25 44.0 54.0 5.0 4 38.8 46.8 53.0 73.0 200 0.25 140.0 110.0 5.0 3.1 208/3 1.0 2.9 4.0 9.3 11.6 20.0 1.0 1.8 4.0 9.3 11.6 20.0 1.7 15.0 1847 1-8
DOAS-5 2300 1.50 5.28 1,900 1.50 3.82 70.4 26.8 55.0 200 0.25 140.0 110.0 5.0 4.7 207.2 75.6 0.4 83.3 78.5 53.0 53.0 200 0.25 44.0 54.0 5.0 4 41.4 49.9 53.0 73.0 200 0.25 140.0 110.0 5.0 3.3 208/3 1.0 3.26 4.0 9.3 11.6 20.0 1.0 1.96 4.0 9.3 11.6 20.0 1.7 15.0 1849 1-8
DOAS-4 2105 1.50 4.87 1,800 1.50 3.72 64.4 26.8 55.0 200 0.25 140.0 110.0 5.0 4.3 189.7 69.2 0.4 83.3 78.5 53.0 53.0 200 0.25 44.0 54.0 5.0 4 37.9 45.7 53.0 73.0 200 0.25 140.0 110.0 5.0 3.0 208/3 1.0 2.75 4.0 9.3 11.6 20.0 1.0 1.80 4.0 9.3 11.6 20.0 1.7 15.0 1846 1-8
DOAS-3 2300 1.50 5.28 1,900 1.50 3.82 70.4 26.8 55.0 200 0.25 140.0 110.0 5.0 4.7 207.2 75.6 0.4 83.3 78.5 53.0 53.0 200 0.25 44.0 54.0 5.0 4 41.4 49.9 53.0 73.0 200 0.25 140.0 110.0 5.0 3.3 208/3 1.0 3.26 4.0 9.3 11.6 20.0 1.0 1.96 4.0 9.3 11.6 20.0 1.7 15.0 1849 1-8
DOAS-2 2155 1.50 4.99 1,800 1.50 3.74 65.9 26.8 55.0 200 0.25 140.0 110.0 5.0 4.4 194.2 70.8 0.4 83.3 78.5 53.0 53.0 200 0.25 44.0 54.0 5.0 4 38.8 46.8 53.0 73.0 200 0.25 140.0 110.0 5.0 3.1 208/3 1.0 2.9 4.0 9.3 11.6 20.0 1.0 1.8 4.0 9.3 11.6 20.0 1.7 15.0 1847 1-8
DOAS-1 2125 1.50 4.91 1,700 1.50 3.82 65.0 26.8 55.0 200 0.25 140.0 110.0 5.0 4.3 191.5 69.9 0.4 83.3 78.5 53.0 53.0 200 0.25 44.0 54.0 5.0 4 38.3 69.2 53.0 73.0 200 0.25 140.0 110.0 5.0 4.6 208/3 1.0 2.8 4.0 9.3 11.6 20.0 1.0 1.8 4.0 9.3 11.6 20.0 1.7 15.0 1846 1-8
(IN.WG) (IN. WG) (IN. WG) (IN. WG) (MBH) ( ºF) ( ºF) (FPM) (FT. WG) ( ºF) ( ºF) (FT. WG) (MBH) (MBH) ( ºF) ( ºF) ( ºF) ( ºF) (FPM) (FT. WG) ( ºF) ( ºF) (FT. WG) (MBH) ( ºF) ( ºF) (FPM) (FT. WG) ( ºF) ( ºF) (FT. WG) QTY BHP HP FLA MCA MOP QTY BHP HP FLA MCA MOP MCA MOP (LBS)
CFM CFM VEL. MAX MAX DB WB DB WB VEL. MAX MAX VEL. MAX MAX
SA
ESP TSP
EA
ESP TSP
TOTAL
CAP.
EAT LAT
FACE AIR PD
EWT LWT
WATER PD
GPM
TOTAL
CAP.
SENS.
CAP.
SHR
EAT EAT LAT LAT FACE AIR PD
EWT LWT
WATER PD
MIN. NUM.
OF ROWS
GPM
TOTAL
CAP.
EAT LAT
FACE AIR PD
EWT LWT
WATER PD
GPM V/PH
SUPPLY FAN (CKT #1) EXHAUST FAN (CKT #2)
MARINE LIGHTS
(CKT #3)MARK
SUPPLY FAN EXHAUST FAN PREHEAT HEATING CAPACITY (HOT WATER) COOLING CAPACITY (CHILLED WATER) REHEAT HEATING CAPACITY (HOT WATER) ELECTRICAL
UNIT
WEIGHT
REMARKS
DEDICATED OUTSIDE AIR SYSTEM (DOAS) SCHEDULE
6. PROVIDE UNIT WITH SINGLE POINT POWER CONNECTION.
5. PROVIDE 6000 HR SALT SPRAY PROTECTIVE COATING ON THE REHEAT AND COOLING COILS.
4. CONTRACTOR MUST VERIFY THAT UNIT CAN BE INSTALLED IN LOCATION SHOWN ON DRAWINGS PRIOR TO SUBMITTING FOR APPROVAL.
3. PROVIDE UNIT WITH VERTICAL SUPPLY DISCHARGE AND HORIZONTAL RETURN INLET DUCT CONNECTIONS. UNIT MUST HAVE 2" DOUBLE WALL CONSTRUCTION.
2. PROVIDE PREMIUM EFFICIENCY MOTORS FOR SUPPLY FAN, COMPATIBLE WITH VARIABLE FREQUENCY DRIVES.
1. PROVIDE WITH 2" MERV 8 FILTERS ON THE EXHAUST AND 2" MERV 8 PREFILTERS & 2" MERV 13 FINAL FILTERS ON THE RETURN AND OUTSIDE AIR INTAKE.
REMARKS:
AHU-3 400 0.50 2.00 14.6 9.84 78.4 / 67.3 55.8 / 55.8 44 / 54 5.0 3 4 2.9 13.0 55.0 / 80.0 140 / 110 5.0 4 2.6 208/3 0.5 3.0 / 15.0 135 1,2,3,4,5,6
AHU-2 400 0.50 2.00 15.8 10.3 79.5 / 68.2 56.1 / 56.1 44 / 54 5.0 3 4 3.2 13.0 55.0 / 80.0 140 / 110 5.0 4 2.6 208/3 0.5 3.0 / 15.0 135 1,2,3,4,5,6
AHU-1 600 0.50 1.20 24.4 16.1 80.5 / 68.5 55.9 / 55.9 44 / 54 5.0 3 4 4.9 19.5 55.0 / 85.0 140 / 110 5.0 4 3.9 208/3 0.5 3.0 / 15.0 135 1,2,3,4,5,6
EWT/LWT
CFM
E.S.P.
"WC
T.S.P.
"WC
TOTAL MBH SENSIBLE MBH
EAT (DB/WB)
ºF
LAT
(DB/WB) ºF
WATER TEMP.
(ºF) WATER PD
FT. MAX.
VELOCITY
FPM, MAX
MIN. NUM. OF
ROWS
GPM
TOTAL
MBH
EAT/LAT ºF EWT/LWT ºF
WATER PD
FT. MAX
VELOCITY
FPM, MAX
GPM V/PH
SUPPLY
HP
MCA/MOP
MARK
SUPPLY FAN COOLING CAPACITY (CHILLED WATER) REHEAT HEATING CAPACITY (HOT WATER) ELECTRICAL
UNIT
WEIGHT
(LBS)
REMARKS
AIR HANDLING UNIT SCHEDULE
5. PROVIDE CONDENSATE PUMP FOR USE WITH UNIT. PUMP MUST BE 120V/1 AND MUST PROVIDE MIN. 10 GPH AT 20' HEAD.
4. DUCTLESS SPLIT SYSTEM MUST BE CAPABLE OF HANDLING 100 FEET OF REFRIGERANT LINE BETWEEN AC AND CU.
3. AHU IS POWERED FROM CONDENSING UNIT.
2. PROVIDE UNIT WITH WALL MOUNTED CONDENSATE PUMP, WIRED TO MOTOR RATED SWITCH.
1. PROVIDE UNIT WITH WIRED WALL MOUNTED THERMOSTAT, AND CLEANABLE FILTERS.
REMARKS:
DAC-1 2ND FLR COMM HEAT PUMP 754 1.0 R-32 30.5 1,2,3,4,5
MARK SERVES FUNCTION CFM MCA REFRIGERANT WEIGHT (LBS) REMARKS
DUCTLESS SPLIT SYSTEM AIR HANDLING UNIT SCHEDULE
2. DUCTLESS SPLIT SYSTEM MUST BE CAPABLE OF HANDLING 95 FEET OF REFRIGERANT LINE BETWEEN AC AND CU.
QUANTITIES.
SALT-HOUR SEACOAST CONSTRUCTION. COATINGS MUST NOT REDUCE UNIT PERFORMANCE BELOW SCHEDULED
1. PROVIDE ACCESSORIES REQUIRED FOR LOW AMBIENT OPERATION TO 0ºF. PROVIDE COIL GUARDS AND 3,000
REMARKS:
DHP-1 2ND FLR COMM 1 1/2 HEAT PUMP 21 208/1 16.34 20 101 1,2
MARK SERVES
NOMINAL
TONS
FUNCTION SEER VOLT/PH MCA MOCP
WEIGHT
(LBS)
REMARKS
DUCTLESS SPLIT SYSTEM CONDENSING UNIT SCHEDULE
4. INCLUDE WALL MOUNTED PROGRAMMABLE THERMOSTAT INTERFACED WITH THE BACNET MS/TP DDC CONTROL SYSTEM.
3. PROVIDE UNIT WITH WALL SLEEVE, POLYCARBONATE OR STAINLESS STEEL DRAIN PAN, CENTER HOLE CONDENSATE DRAIN KIT AND OUTDOOR GRILLE.
2. MAKE PTHP CORROSION RESISTANT AND FITTED WITH A METAL LIGATURE PROOF SECURITY COVER.
1. PROVIDE PACKAGED TERMINAL HEAT PUMP WITH AUXILIARY ELECTRIC HEAT AND POWER CORD.
REMARKS:
PTHP SLEEPING ROOMS & OFFICES HEAT PUMP 12.0 320 9.9 350 3.0 KW 3.1 11.8 208/1 100 1,2,3,4
TOTAL MBH CFM TOTAL MBH CFM ELEC HEAT AMPS V/PH
MARK AREA SERVED FUNCTION
COOLING HEATING DEHUMIDIFICATION
(PINTS/HR)
ELECTRICAL OPER.WEIGHT
(LBS)
REMARKS
PTHP SCHEDULE
4. PROVIDE FAN WITH TEFC MOTOR AND HANGING VIBRATION ISOLATION KIT.
3. FAN MUST OPERATE CONTINUOUSLY.
2. FAN MUST BE TIED TO THERMOSTAT.
1. PROVIDE WITH WALL SLEEVE, MOTOR GUARD, BACKDRAFT DAMPER, BIRDSCREEN AND TEFC MOTOR.
REMARKS:
EF-5 CORE JANITORS CLOSETS INLINE 225 0.75 DIRECT 1350 5 113 W 120/1 25 3,4
EF-2,3,4 LAUNDRY ROOMS WALL PROP 200 0.125 DIRECT 1350 3 1/50 120/1 15 1,2
EF-1 MECHANICAL BLDG ROOF MTD 4,200 0.5 DIRECT 1160 4 3/4 277/1 165 1,2
HP V/PH
MARK AREA SERVED ORIENTATION CFM
ESP
(IN H2O)
DRIVE RPM MAX. SONES
ELECTRICAL OPER.WEIGHT
(LBS)
REMARKS
FAN SCHEDULE
83.3 78.5 76.0 50.0 79.7 71.6 26.8 22.5 70.0 35.0 52.7 43.5 50% / 60%
83.3 78.5 76.0 50.0 79.7 71.6 26.8 22.5 70.0 35.0 52.7 43.5 50% / 60%
83.3 78.5 76.0 50.0 79.7 71.6 26.8 22.5 70.0 35.0 52.7 43.5 50% / 60%
83.3 78.5 76.0 50.0 79.7 71.6 26.8 22.5 70.0 35.0 52.7 43.5 50% / 60%
83.3 78.5 76.0 50.0 79.7 71.6 26.8 22.5 70.0 35.0 52.7 43.5 50% / 60%
83.3 78.5 76.0 50.0 79.7 71.6 26.8 22.5 70.0 35.0 52.7 43.5 50% / 60%
DB WB DB %RH DB WB DB WB DB %RH DB WB
OA EA SA OA EA SA
SUMMER WINTER HX EFF.
SUMMER/
WINTER %
TOTAL ENERGY HEAT EXCHANGER
5. PROVIDE GRILLE WITH OBD.
4. PROVIDE BLANKET INSULATION ON THE BACK OF DIFFUSERS.
3. AIR DISTRIBUTION MUST BE 100% ALUMINUM CONSTRUCTION.
2. PROVIDE WITH SQUARE TO ROUND TRANSITION IF REQUIRED.
1. VERIFY CEILING TYPES WITH ARCHITECTURAL PLANS TO DETERMINE MOUNTING DETAILS AND ACCESSORIES REQUIRED. COORDINATE COLOR WITH ARCHITECT.
REMARKS
R1 ALUMINUM FIXED VANE NA 10x20 10x20 600 CFM 800 CFM 30 3
E2 ALUMINUM FIXED VANE NA 8X8 6X6 50 CFM 75 CFM 30 1,2,3,4,5
E1 ALUMINUM FIXED VANE NA 6X6 4" 25 CFM 50 CFM 30 1,2,3,4,5
S4 SQUARE PLAQUE DIFFUSER 4 WAY 24X24 12X12 100 CFM 200 CFM 30 1,2,3,4
S2 (NOT USED) - - - - - - -
S2 (NOT USED) - - - - - - -
S1 ALUMINUM DOUBLE DEFLECTION 4 WAY 8X6 8" 25 CFM 140 CFM 30 1,2,3,4,5
MARK DESCRIPTION THROW FACE SIZE NECK SIZE MINIMUM CFM MAXIMUM CFM MAX. NC REMARKS
AIR DISTRIBUTION SCHEDULE
6. LOUVER IS TRIANGULAR SHAPE TO FIT IN EXISTING GABLE ABOVE ROOF. CONTRACTOR TO FIELD VERIFY MEASUREMENTS.
5. PROVIDE WITH WIND DRIVEN RAIN RESISTANT CONSTRUCTION WITH MIAMI DADE APPROVAL.
4. PROVIDE WITH CLASS 1A LOW LEAKAGE DAMPER BEHIND LOUVER.
3. PROVIDE WITH ALUMINUM BIRDSCREEN.
2. PROVIDE ALUMINUM LOUVER WITH BAKED ENAMEL FINISH TO MATCH BUILDING EXTERIOR.
1. PROVIDE FULL SIZE PLENUM BEHIND LOUVER AND PAINT INSIDE OF PLENUM FLAT BLACK.
REMARKS :
L-8,9,10,11 RUSKIN ELF6375DX DOAS EXH EXHAUST SEE PLANS 4.125 800 3300 1,2,3,4,5,6
L-4,5,6,7 RUSKIN ELF6375DX DOAS OA INTAKE SEE PLANS 4.69 800 3750 1,2,3,4,5,6
L-1,2,3 RUSKIN ELF375DX LAUNDRY EXHAUST 8X24 0.70 900 600 1,2,3,4,5
MARK MANUFACTURER MODEL SERVES FLOW SIZE WxH (in.)
FREE AREA
REQUIRED (s.f.)
MAX AIR VELOCITY
(fpm)
CFM REMARKS
LOUVER SCHEDULE
UH-4 1.3 1/2 2.0 3.0 HW 2-WAY MOD
UH-3 1.3 1/2 2.0 3.0 HW 2-WAY MOD
UH-2 1.3 1/2 2.0 3.0 HW 2-WAY MOD
(EX) UH-1 3.5 3/4 2.0 3.0 HW 2-WAY MOD
AHU-3 2.6 3/4 2.0 3.0 HW 2-WAY MOD
AHU-2 2.6 3/4 2.0 3.0 HW 2-WAY MOD
AHU-1 3.9 3/4 2.0 3.0 HW 3-WAY MOD
DOAS-6 REHEAT 3.1 3/4 2.0 3.0 HW 3-WAY MOD
DOAS-5 REHEAT 3.3 3/4 2.0 3.0 HW 3-WAY MOD
DOAS-4 REHEAT 3.0 3/4 2.0 3.0 HW 2-WAY MOD
DOAS-3 REHEAT 3.3 3/4 2.0 3.0 HW 2-WAY MOD
DOAS-2 REHEAT 3.1 3/4 2.0 3.0 HW 2-WAY MOD
DOAS-1 REHEAT 4.6 3/4 2.0 3.0 HW 2-WAY MOD
DOAS-6 PREHEAT 4.4 3/4 2.0 3.0 HW 3-WAY MOD
DOAS-5 PREHEAT 4.7 3/4 2.0 3.0 HW 3-WAY MOD
DOAS-4 PREHEAT 4.3 3/4 2.0 3.0 HW 2-WAY MOD
DOAS-3 PREHEAT 4.7 3/4 2.0 3.0 HW 2-WAY MOD
DOAS-2 PREHEAT 4.4 3/4 2.0 3.0 HW 2-WAY MOD
DOAS-1 PREHEAT 4.3 3/4 2.0 3.0 HW 2-WAY MOD
AHU-3 2.9 3/4 2.0 3.0 CHW 3-WAY MOD
AHU-2 3.2 3/4 2.0 3.0 CHW 3-WAY MOD
AHU-1 4.9 3/4 2.0 3.0 CHW 3-WAY MOD
DOAS 6 38.8 2 2.0 3.0 CHW 3-WAY MOD
DOAS 5 41.4 2 2.0 3.0 CHW 3-WAY MOD
DOAS 4 37.9 2 2.0 3.0 CHW 3-WAY MOD
DOAS 3 41.4 2 2.0 3.0 CHW 3-WAY MOD
DOAS 2 38.8 2 2.0 3.0 CHW 3-WAY MOD
DOAS 1 38.3 2 2.0 3.0 CHW 3-WAY MOD
EQUIPMENT FLOW RATE (gpm) NOMINAL SIZE (in) MIN. CV MAX. PD (psi) SERVICE CONFIGURATION ACTION
CONTROL VALVE SCHEDULE
1 PPI 04 REVISION 07.25.25
| Sheets |
| M-602 - MECHANICAL SCHEDULES |