240016 Spec 32 05 33_Landscape Establishment.pdf
PDF 37 KB Posted
- Attached to
- Repair BEQ BB250
- Solicitation number
- N408525R9008
About this file
This document is a Landscape Establishment specification for the Repair BEQ BB250 Project at MCB Camp Lejeune, NC, prepared by the Department of the Navy Naval Facilities Engineering Command. The specification details comprehensive landscape maintenance requirements for a 120-day establishment period, covering extensive protocols for turf, exterior plants, groundcover, and planter beds. Key maintenance activities include mowing, edging, pruning, fertilizing, watering, weed control, and plant replacement, with specific guidelines for shrub and tree maintenance, such as selectively pruning for health and safety, adjusting stakes and supports, and ensuring 95 percent ground cover.
The document mandates precise maintenance standards, including weekly inspections, careful plant care, and specific requirements for mulching, fertilization, and irrigation. Contractors must use organic fertilizers, follow water conservation regulations, and submit maintenance inspection reports quarterly. The specification emphasizes plant health, growth promotion, and replacement of dying or dead plants, with final acceptance based on satisfactory plant growth, mulching, tree supports, and completion of any remedial work directed by the Contracting Officer. Synthetic chemical fertilizers and pesticides are prohibited, and all maintenance must align with an Integrated Pest Management Plan.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair BEQ BB250 Project No. 24-0016 MCB Camp Lejeune, NC
SECTION 32 05 33
LANDSCAPE ESTABLISHMENT
08/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D5851 (1995; R 2015) Planning and Implementing a Water Monitoring Program
ASTM D6155 (2019) Nontraditional Coarse Aggregate for Bituminous Paving Mixtures
TREE CARE INDUSTRY ASSOCIATION (TCIA)
TCIA Z133 (2017) American National Standard for Arboricultural Operations - Pruning, Repairing, Maintaining, and Removing Trees, and Cutting Brush - Safety Requirements
1.2 DEFINITIONS
1.2.1 Pesticide
Any substance or mixture of substances, including biological control agents, that may prevent, destroy, repel, or mitigate pests and are specifically labeled for use by the U.S. Environmental Protection Agency (EPA). Also, any substance used as a plant regulator, defoliant, disinfectant, or biocide. Examples of pesticides include fumigants, herbicides, insecticides, fungicides, nematicides, molluscicides and rodenticides.
1.2.2 Stand of Turf
100 percent ground cover of the established species.
1.2.3 Planter Beds
A planter bed is defined as an area containing one or a combination of the following plant types: shrubs, vines, wildflowers, annuals, perennials, ground cover, and a mulch topdressing excluding turf. Trees may also be found in planter beds.
1.3 RELATED REQUIREMENTS
Section 32 92 23 SODDING applies to this section for installation of sod requirements, with additions and modifications herein.
Section 32 93 00 EXTERIOR PLANTS applies to this section for installation
SECTION 32 05 33 Page 1 of trees and shrubs, with additions and modifications herein.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Integrated Pest Management Plan ; G
SD-03 Product Data
Fertilizer ; G
Mulches Topdressing
Organic Mulch Materials
SD-07 Certificates
Maintenance Inspection Report
SD-10 Operation and Maintenance Data
Maintenance
1.5 DELIVERY, STORAGE AND HANDLING
1.5.1 Delivery
Deliver fertilizer, and gypsum to the site in original containers bearing manufacturer's chemical analysis, name, trade name, or trademark, and indication of conformance to state and federal laws. Instead of containers, fertilizer, gypsum may be furnished in bulk with a certificate indicating the above information.
1.5.2 Storage
1.5.2.1 Fertilizer, Lime, Mulch Storage
Store material in designated areas. Store lime and fertilizer in cool, dry locations away from contaminants.
1.5.2.2 Antidesiccant's Storage
Do not store with fertilizers or other landscape maintenance materials.
1.5.3 Handling
Do not drop or dump materials from vehicles.
SECTION 32 05 33 Page 2
1.6 MAINTENANCE
Submit Operation and Maintenance (O&M) Manuals for planting materials.
Include instructions indicating procedures during one typical year including variations of maintenance for climatic conditions throughout the year. Provide instructions and procedures for watering; promotion of growth, including fertilizing, pruning, and mowing; and integrated pest management. O&M Manuals must include pictures of planting materials cross referenced to botanical and common names, with a description of the normal appearance in each season.
Develop a water monitoring program for surface and ground water on the project site in accordance with ASTM D5851 and consistent with the water management program utilized during construction operations.
PART 2 PRODUCTS
2.1 POST-PLANT FERTILIZER
Fertilizer for groundcover, wildflowers, and grasses is not permitted.
Provide fertilizer for trees, plants, and shrubs as recommended by plant supplier, except synthetic chemical fertilizers are not permitted.
Fertilizers containing petrochemical additives or that have been treated with pesticides or herbicides are not permitted.
2.1.1 Granular Fertilizer
Organic, granular controlled release fertilizer containing the following minimum percentages, by weight, of plant food nutrients:
10 percent available nitrogen 10 percent available phosphorus 10 percent available potassium
2.2 WATER
Source of water must be approved by the Contracting Officer, and be of suitable quality for irrigation. Use collected storm water or graywater when available.
2.3 MULCHES TOPDRESSING
Free from noxious weeds, mold, pesticides, or other deleterious materials.
2.3.1 Inert Mulch Materials
Provide riverbank stone complying with ASTM D6155, ranging in size from 3 to 5 inches . Color shall be Bershire Blend or approved equal.
2.3.2 Organic Mulch Materials
Provide shredded hardwood mulch . Wood cellulose fiber must be processed to contain no growth or germination-inhibiting factors, dyed with non-toxic, biodegradable dye to an appropriate color to facilitate visual metering of materials application.
SECTION 32 05 33 Page 3
PART 3 EXECUTION
3.1 EXTENT OF WORK
Provide landscape construction maintenance to include irrigation equipment cleaning and adjustments, mowing, edging, aeration, fertilizing, watering, and stake and guy adjusting, for all newly installed landscape areas, unless indicated otherwise, and at all areas inside or outside the limits of the construction that are disturbed by the Contractor's operations.
3.1.1 Policing
Police all landscaped areas. Policing includes removal of leaves, branches and limbs regardless of length or diameter, dead vegetation, paper, trash, cigarette butts, garbage, rocks or other debris. Collected debris must be promptly removed and disposed of at an approved disposal site.
3.2 IRRIGATION ESTABLISHMENT PERIOD
The irrigation establishment period will commence on the date that inspection by the Contracting Officer shows that all new plantings provided under this contract have been satisfactorily installed and must continue for a period of 120 days.
3.2.1 Water Restrictions
Abide by state, local or other water conservation regulations in force during the establishment period. Automatic controller must be adjusted to comply with the water conservation regulations schedule.
3.2.2 Fire Hydrants
To use a fire hydrant for irrigation, obtain prior clearance from the Contracting Officer and provide the tools and connections approved for use on fire hydrants. If a fire hydrant is used, Provide a reduced pressure backflow preventer for each connection between hose and fire hydrant.
Backflow preventer used must be tested once per month by a certified backflow preventer tester.
3.2.3 Final Acceptance
Upon completion of the irrigation establishment period and final acceptance of groundcover and exterior plants, irrigation equipment must be removed.
3.3 GROUNDCOVER ESTABLISHMENT PERIOD
Groundcover establishment period will commence on the date that inspection by the Contracting Officer shows that the new turf furnished under this contract has been satisfactorily installed to a 100 percent stand of coverage. The establishment period must continue for a period of 120 days.
3.3.1 Frequency of Maintenance
Begin maintenance immediately after turf has been installed. Inspect areas once a week during the installation and establishment period and perform needed maintenance promptly.
SECTION 32 05 33 Page 4
3.3.2 Promotion of Growth
Maintain groundcover in a manner that promotes proper health, growth, natural color. Turf must have a neat uniform manicured appearance, free of bare areas, ruts, holes, weeds, pests, dead vegetation, debris, and unwanted vegetation that present an unsightly appearance. Mow, remove excess clippings, eradicate weeds, water, fertilize, overseed, aerate, and perform other operations necessary to promote growth, as approved by Contracting Officer and consistent with approved Integrated Pest Management Plan . Remove noxious weeds common to the area from planting areas by mechanical means.
3.3.3 Mowing
3.3.3.1 Turf
Mow turf at a uniform finished height. Mow turfed areas to a minimum average height of 3 inches when average height of grass becomes 4 inches for spring/summer maintenance and to a minimum average height of 3 inches when the average height of grass reaches 4 inches for fall maintenance.
The height of turf is measured from the soil. Perform mowing of turf in a manner that prevents scalping, rutting, bruising, uneven and rough cutting. Prior to mowing, all rubbish, debris, trash, leaves, rocks, paper, and limbs or branches on a turf area must be picked up and disposed. Adjacent paved areas must be swept/vacuumed clean.
3.3.4 Turf Edging and Trimming
Perimeter of planter bed edges, sidewalks, driveways, curbs, and other paved surfaces must be edged. Uniformly edge these areas to prevent encroachment of vegetation onto paved surfaces and to provide a clear cut division line between planter beds, turf, and ground cover. Edging is to be accomplished in a manner that prevents scalping, rutting, bruising, uneven and rough cutting. Perform edging on the same day that turf is mowed. Use of string line trimmers is permitted in "soft" areas such as an edge between turfgrass and a planter bed. Exercise care to avoid damage to any plant materials, structures, and other landscape features.
Trimming around trees, fences, poles, walls, irrigation valve boxes and other similar objects is to be accomplished to match the height and appearance of surrounding mowed turf growth. Trimming must be performed on the same day the turf's mowed. Care must be exercised to avoid "Girdling" trees located in turf areas. The use of protective tree collars on trees in turf areas may be utilized as a temporary means to avoid injury to tree trunks. At the end of the plant establishment period Contractor will be responsible for removing all protective tree collars.
3.3.5 Post-Fertilizer Application
Do not fertilize groundcover, and grasses. Apply turf fertilizer in a manner that promotes health, growth, vigor, color and appearance of cultivated turf areas. The method of application, fertilizer type and frequencies must be determined by the laboratory soil analysis results the requirements of the particular turf species.
3.3.6 Turf Watering
Perform irrigation in a manner that promotes the health, growth, color and appearance of cultivated vegetation and that complies with all Federal, SECTION 32 05 33 Page 5
State, and local water agencies and authorities directives. The Contractor must be responsible to prevent over watering, water run-off, erosion, and ponding due to excessive quantities or rate of application.
Abide by state, local or other water conservation regulations or restrictions in force during the establishment period.
3.3.7 Replanting
Replant in accordance with Section 32 92 23 SODDING and within specified planting dates areas which do not have a satisfactory stand of turf.
Replant areas which do not have a satisfactory stand of other groundcover and grasses.
3.3.8 Final Inspection and Acceptance
Final inspection will be make upon written request from the Contractor at least 10 days prior to the last day of the turf establishment period.
Final turf acceptance will be based upon a satisfactory stand of turf.
Final acceptance of grass areas will be based upon a stand of 95 percent groundcover of established species.
3.3.9 Unsatisfactory Work
When work is found to not meet design intent and specifications, maintenance period will be extended at no additional cost to the Government until work has been completed, inspected and accepted by Contracting Officer.
3.4 EXTERIOR PLANT ESTABLISHMENT PERIOD
The exterior plant establishment period will commence on the date that inspection by the Contracting Officer shows that the new plants furnished under this contract have been satisfactorily installed and must continue for a period of 120 days.
3.4.1 Frequency of Maintenance
Begin maintenance immediately after plants have been installed. Inspect exterior plants at least once a week during the installation and establishment period and perform needed maintenance promptly.
3.4.2 Promotion of Plant Growth and Vigor
Water, prune, fertilize, mulch, adjust stakes, guys and turnbuckles, eradicate weeds and perform other operations necessary to promote plant growth, and vigor.
3.4.3 Planter Bed Maintenance
Planter beds must be weeded, fertilized, irrigated, kept pest free, turf free, pruned, and mulch levels maintained. Planter beds will not be allowed to encroach into turf areas. A definite break must be maintained between turf areas and planter beds. Fertilize exterior planting materials to promote healthy plant growth without encouraging excessive top foliar growth. Remove noxious weeds common to the area from planting areas by mechanical means.
SECTION 32 05 33 Page 6
3.4.3.1 Shrub Selective Maintenance
In addition to the above requirements, shrubs must be selectively pruned, and shaped for health and safety when the following conditions exist:
Remove growth in front of windows, over entrance ways or walks, and any growth which will obstruct vision at street intersections or of security personnel; Remove dead, damaged or diseased branches or limbs; where shrub growth obstructs pedestrian walkways; where shrub growth is found growing against or over structures; where shrub growth permits concealment of unauthorized persons. Dispose of all pruning debris in a proper manner.
3.4.3.2 Tree Maintenance
Tree maintenance must include adjustment of stakes, ties, guy supports, watering, fertilizing, pest control, mulching, pruning for health and safety and fall leaf cleanup. Fertilize exterior trees to promote healthy plant growth without encouraging excessive top foliar growth. Inspect and adjust stakes, ties, guy supports to avoid girdling and promote natural development. All trees within the project boundaries, regardless of caliper, must be selectively pruned for safety and health reasons. These include but are not limited to removal of dead and broken branches and correction of structural defects. Prune trees according to their natural growth characteristics leaving trees well shaped and balanced. Pruning of all trees including palm trees must be accomplished by or in the presence of a certified member of the International Society of Arboriculture and in accordance with TCIA Z133 . All pruning debris generated must be disposed of in a proper manner.
3.4.4 Removal of Dying or Dead Plants
Remove dead and dying plants and provide new plants immediately upon commencement of the specified planting season, and replace stakes, mulch and eroded earth mound water basins. Provide an additional 90 day establishment period for replacement plants beyond the original warranty period. A tree must be considered dying or dead when the main leader has died back, or a minimum of 20 percent of the crown has died. A shrub or ground cover must be considered dying or dead when a minimum of 20 percent of the plant has died. This condition must be determined by scraping on a branch an area 1/16 inch square, maximum, to determine the cause for dying plant material and must provide recommendations for replacement. The Contractor must determine the cause for dying plant material and provide recommendations for replacement.
3.4.5 Tracking of Unhealthy Plants
Note plants not in healthy growing condition, as determined by the Contracting Officer, and as soon as seasonal conditions permit, remove and replace with plants of the same species and sizes as originally specified.
Install replacement plantings in accordance with Section 32 93 00 EXTERIOR
PLANTS.
3.4.6 Final Inspection
Final inspection will be made upon written request from the Contractor at least 10 days prior to the last day of the establishment period. Final inspection will be based upon satisfactory health and growth of plants and on the following:
SECTION 32 05 33 Page 7
3.4.6.1 Total Plants on Site
Plants have been accepted and required number of replacements have been installed.
3.4.6.2 Mulching and Weeding
Planter beds and earth mound water basins are properly mulched and free of weeds.
3.4.6.3 Tree Supports
Stakes , guys and turnbuckles are in good condition.
3.4.6.4 Remedial Work
Remedial measures directed by the Contracting Officer to ensure plant material survival and promote healthy growth have been completed.
3.4.7 Unsatisfactory Work
When work is found to not meet design intent and specifications, maintenance period will be extended at no additional cost to the Government until work has been completed, inspected and accepted by Contracting Officer.
3.5 FIELD QUALITY CONTROL
3.5.1 Maintenance Inspection Report
Provide maintenance inspection report to assure that landscape maintenance is being performed in accordance with the specifications and in the best interest of plant growth and survivability. Site observations must be documented at the start of the establishment period, then quarterly following the start, and at the end of establishment period. Submit results of site observation visits to the Contracting Officer within 7 calendar days of each site observation visit.
-- End of Section --
SECTION 32 05 33 Page 8
| 32 05 33 - LANDSCAPE ESTABLISHMENT |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 Pesticide |
| 1.2.2 Stand of Turf |
| 1.2.3 Planter Beds |
| 1.3 RELATED REQUIREMENTS |
| 1.4 SUBMITTALS |
| 1.5 DELIVERY, STORAGE AND HANDLING |
| 1.5.1 Delivery |
| 1.5.2 Storage |
| 1.5.2.1 Fertilizer, Lime, Mulch Storage |
| 1.5.2.2 Antidesiccant's Storage |
1.5.3 Handling
1.6 MAINTENANCE
| PART 2 PRODUCTS |
| 2.1 POST-PLANT FERTILIZER |
| 2.1.1 Granular Fertilizer |
| 2.2 WATER |
| 2.3 MULCHES TOPDRESSING |
| 2.3.1 Inert Mulch Materials |
| 2.3.2 Organic Mulch Materials |
| PART 3 EXECUTION |
| 3.1 EXTENT OF WORK |
| 3.1.1 Policing |
| 3.2 IRRIGATION ESTABLISHMENT PERIOD |
| 3.2.1 Water Restrictions |
| 3.2.2 Fire Hydrants |
| 3.2.3 Final Acceptance |
| 3.3 GROUNDCOVER ESTABLISHMENT PERIOD |
| 3.3.1 Frequency of Maintenance |
| 3.3.2 Promotion of Growth |
| 3.3.3 Mowing |
| 3.3.3.1 Turf |
| 3.3.4 Turf Edging and Trimming |
| 3.3.5 Post-Fertilizer Application |
| 3.3.6 Turf Watering |
| 3.3.7 Replanting |
| 3.3.8 Final Inspection and Acceptance |
| 3.3.9 Unsatisfactory Work |
| 3.4 EXTERIOR PLANT ESTABLISHMENT PERIOD |
| 3.4.1 Frequency of Maintenance |
| 3.4.2 Promotion of Plant Growth and Vigor |
| 3.4.3 Planter Bed Maintenance |
| 3.4.3.1 Shrub Selective Maintenance |
| 3.4.3.2 Tree Maintenance |
| 3.4.4 Removal of Dying or Dead Plants |
| 3.4.5 Tracking of Unhealthy Plants |
| 3.4.6 Final Inspection |
| 3.4.6.1 Total Plants on Site |
| 3.4.6.2 Mulching and Weeding |
| 3.4.6.3 Tree Supports |
| 3.4.6.4 Remedial Work |
3.4.7 Unsatisfactory Work
| 3.5 FIELD QUALITY CONTROL |
| 3.5.1 Maintenance Inspection Report |
File details come from the government source that posted it. Updated .