240016 Revised Submittal Register.pdf
PDF 778 KB Posted
- Attached to
- Repair BEQ BB250
- Solicitation number
- N408525R9008
About this file
The document is a Submittal Register for the "Repair BEQ BB250" project, which is a Department of the Navy Naval Facilities Engineering Command contract (Solicitation Number N408525R9008). The 78-page comprehensive register details the extensive documentation and submittals required from the contractor throughout the project lifecycle, covering multiple construction and engineering disciplines including architectural, mechanical, electrical, telecommunications, and environmental systems.
The submittal register meticulously outlines specific preconstruction, product data, shop drawings, test reports, certificates, and closeout submittals across 33 specification divisions. Key submittal categories include project management documents, quality control plans, safety documentation, material specifications, equipment certifications, construction waste management, training documentation, as-built drawings, warranty information, and various technical system documentation. Each entry specifies the required submittal type, relevant specification section, paragraph number, classification, approval process, and scheduled dates for submission and review, providing a comprehensive tracking mechanism for the project's documentation requirements.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 78 PAGES
Repair BEQ BB250
01 14 00 SD-01 Preconstruction Submittals
1.3.1.1List of Contact Personnel
01 20 00 SD-01 Preconstruction Submittals
1.3Schedule of Prices
01 30 00 SD-01 Preconstruction Submittals
1.3View Location Map
1.4Progress and Completion
Pictures
01 31 23.13 20 SD-01 Preconstruction Submittals
1.4.2List of Contractor's Personnel
01 31 50 SD-11 Closeout Submittals
1.2Interim DD-1354, Transfer &
Acceptance of Military Real
Property
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2 GBaseline Construction Schedule
SD-07 Certificates
1.4Monthly Updates
01 33 00 SD-11 Closeout Submittals
1.4.1Submittal register
1.6.1Complete Submittal Package
01 33 29 SD-01 Preconstruction Submittals
1.4.1 GSustainability Action Plan
1.5.2.2 GPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 78 PAGES
01 33 29 1.5.2.2 GFinal Sustainability eNotebook
1.5.2.2 GAmended Final Sustainability
eNotebook
01 35 26 SD-01 Preconstruction Submittals
1.8.1 GAPP - Construction
1.17 GDive Operations Plan
1.8 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.13Notifications and Reports
1.13.2 GAccident Reports
1.13.3LHE Inspection Reports
SD-07 Certificates
1.5Contractor Safety Self-Evaluation
Checklist
1.7.1.5Crane Operators/Riggers
1.8.3.2 GStandard Lift Plan
1.8.3.3 GCritical Lift Plan
1.8.3.4 GNaval Architecture Analysis
1.9Activity Hazard Analysis (AHA)
1.10.1Confined Space Entry Permit
1.10.1Hot Work Permit
1.13.4Certificate of Compliance
1.13.5Third Party Certification of
Floating Cranes and
Barge-Mounted Mobile Cranes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 78 PAGES
01 35 26 1.15License Certificates
1.15.1 GRadiography Operation Planning
Work Sheet
1.15.1 GPortable Gauge Operations
Planning Worksheet
01 45 00 SD-01 Preconstruction Submittals
1.5.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
1.12.3Verification Statement
01 50 00 SD-01 Preconstruction Submittals
3.4.1Traffic Control Plan
SD-03 Product Data
1.3Backflow Preventers
SD-06 Test Reports
3.5Backflow Preventer Tests
SD-07 Certificates
1.3.1Backflow Tester
1.3Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.6.1Environmental Protection Plan
SD-06 Test Reports
3.7.1Abrasive blasting
SD-11 Closeout Submittals
1.4.1Solid waste disposal permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 78 PAGES
01 57 19 1.4.2Disposal permit for hazardous waste
1.2Environmental training documentation
1.4.3Permit to transport hazardous waste
1.4.4Hazardous waste certification
1.6.3Environmental Plan Review
2.1Annual Report of Products
Containing Recovered Materials
01 74 19 SD-01 Preconstruction Submittals
1.7 GConstruction Waste Management
Plan
SD-11 Closeout Submittals
1.9 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.6.1Warranty Management Plan
1.6.4Warranty Tags
3.4Final Cleaning
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.6.1Instructions
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 78 PAGES
01 78 00 3.3 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.2 GRecord Drawings
1.6.1As-Built Record of Equipment and Materials
3.6Final Approved Shop Drawings
2.1 GCertification of EPA Designated
Items
2.2 GCertification Of USDA Designated
Items
3.5 GInterim DD FORM 1354
3.5 GChecklist for DD FORM 1354
3.5 GHigh Performance and
Sustainable Building (HPSB)
Checklist
01 78 23 SD-10 Operation and Maintenance
Data
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 78 24.00 20 SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 78 PAGES
01 78 24.00 20 1.4.1 GeOMSI, Progress Submittal
1.4.2 GeOMSI, Prefinal Submittal
1.4.3 GeOMSI, Final Submittal
01 78 30.00 22 SD-11 Closeout Submittals
1.3.9 GGIS Data Deliverables
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals
3.3.3Receipts
02 41 01 SD-01 Preconstruction Submittals
1.2.2 GDeconstruction Plan
1.8Existing Conditions
SD-07 Certificates
1.6 GNotification
02 82 00 SD-03 Product Data
1.2.2 SAmended Water
1.3.9 GSafety Data Sheets (SDS) for All
Materials
2.1 SEncapsulants
3.1.2.1 SRespirators
3.1.7 SLocal Exhaust Equipment
3.1.7 SPressure Differential Automatic
Recording Instrument
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 78 PAGES
02 82 00 3.1.8 SVacuums
3.1.10 SGlovebags
SD-06 Test Reports
1.5.5 GAir Sampling Results
1.5.6 GPressure Differential Recordings
for Local Exhaust System
3.2.12.2 GEncapsulation Test Patches
3.2.14.5 GClearance Sampling
3.3.3.2 GAsbestos Disposal Quantity
Report
SD-07 Certificates
1.3.4 GEmployee Training
1.3.5 GNotifications
1.3.7 GRespiratory Protection Program
1.3.10 GAsbestos Hazard Abatement Plan
1.3.11 GTesting Laboratory
1.3.12 GLandfill Approval
1.3.12 GDelivery Tickets
1.3.12 GWaste Shipment Records
1.3.13 GTransporter Certification
1.3.14 GMedical Certification
1.5.1 GPrivate Qualified Person
Documentation
1.5.2 GDesignated Competent Person
1.5.3 GWorker's License
1.5.4 GContractor's License
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 78 PAGES
02 82 00 1.5.9 GFederal, State or Local Citations on Previous Projects
2.1 GEncapsulants
3.1Equipment Used to Contain
Airborne Asbestos Fibers
3.1.3.3 SWater Filtration Equipment
3.1.8 SVacuums
3.1.8 SVentilation Systems
SD-11 Closeout Submittals
1.3.5 GPermits and Licenses
1.3.5 GNotifications
1.3.7.1 GRespirator Program Records
1.7.1Rental Equipment
02 83 00 SD-01 Preconstruction Submittals
1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.4 GMedical Examinations
1.5.2.8 GLead Waste Management Plan
1.5.4 GLicenses, Permits and
Notifications
1.5.5 GOccupant Protection Plan
1.5.2.2 GLead Compliance Plan
3.1.1.6 GLead Compliance Plan
3.4.1.1 GInitial Sample Results
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 78 PAGES
02 83 00 3.5.2.1 GWritten Evidence of TSD
Approval
SD-03 Product Data
1.6.1 GRespirators
1.6.4 GVacuum Filters
1.6.7 GNegative Air Pressure System
2.1 GMaterials and Equipment
2.1.1 GExpendable Supplies
3.1.1.5 GLocal Exhaust Equipment
3.1.1.5 GPressure Differential Automatic
Recording Instrument
3.1.1.6 GPressure Differential Log
SD-06 Test Reports
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.3 GSampling Results
1.5.3 GPressure Differential Recordings
For Local Exhaust System
SD-07 Certificates
1.5.1.3 GTesting Laboratory
1.5.1.4 GThird Party Consultant
Qualifications
3.1.1.1 GOccupant Notification
3.1.1.1 GNotification of the
Commencement of LCP Hazard
Abatement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 78 PAGES
02 83 00 3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 GHazardous Waste Manifest
03 30 00 SD-01 Preconstruction Submittals
1.6.5 GQuality Control Plan
1.6.6 GQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
3.3.10Maturity Method Data
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.4.5Joint Sealants
2.4.4Joint Filler
2.1Formwork Materials
2.3.3.2Recycled Aggregate Materials
2.3.1Cementitious Materials
2.4.6Vapor Retarder
2.4.1Concrete Curing Materials
2.6Reinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 78 PAGES
03 30 00 2.6.2Mechanical Reinforcing Bar
Connectors
2.2.2Waterstops
2.2.3Biodegradable Form Release
Agent
2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.3.1Fly Ash
1.6.3.1Pozzolan
1.6.3.2Slag Cement
1.6.3.3Aggregates
3.10.2.1Tolerance Report
3.14.3.3 GCompressive Strength Tests
3.14.3.5Unit Weight of Structural
Concrete
3.14.3.4Air Content
3.14.3.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.8Welder Qualifications
1.6.6.2Field Testing Technician and
Testing Agency
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 78 PAGES
03 30 00 SD-08 Manufacturer’s Instructions
2.4.5Joint Sealants
2.4.1Curing Compound
03 30 53 SD-03 Product Data
2.2.3.1Air-Entraining Admixture
2.2.3.2Water-Reducing or Retarding
Admixture
2.2.10Curing Materials
2.2.6Expansion Joint Filler Strips, Premolded
3.2Conveying and Placing Concrete
2.2.7Formwork
2.3 GMix Design Data
2.3Ready-Mix Concrete
2.2.5Mechanical Reinforcing Bar
Connectors
SD-06 Test Reports
2.2.2Aggregates
2.1.3 GConcrete Mixture Proportions
3.8.3 GCompressive Strength Testing
3.8.3 GSlump
3.8.3Air Content
2.2.4Water
SD-07 Certificates
2.2.1Cementitious Materials
2.2.1.2Pozzolan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 78 PAGES
03 30 53 2.2.2Aggregates
2.3Delivery Tickets
03 45 00 SD-01 Preconstruction Submittals
1.12.5Pre-Installation Meeting
SD-02 Shop Drawings
1.12.1 GPrecast Drawings
SD-03 Product Data
2.3 GCast-In Embedded Items And
Connectors
2.3.2 GConnection Devices
2.2.5Admixtures
2.5Gasket
2.6Bearing Pads
SD-04 Samples
1.12.2 GConcrete Surface Finish
1.12.4Mock-up
SD-05 Design Data
1.5.4 GDesign Calculations
2.1.1 GContractor-Furnished Mix Design
2.4.9 GRepair of Surface Defects
1.5.5 GThermal Calculations
SD-06 Test Reports
1.11.2 GStrength Tests
1.11.2Slump
1.11.2Air Content
1.11.1Test for Concrete Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 78 PAGES
03 45 00 2.2.6Water
3.6.4Testing Precast Units for Strength
SD-07 Certificates
1.4 GManufacturer's Qualifications
1.8.1Fabricator Quality Certifications
1.9Erector Certification
1.10Erector's Post Audit Declaration
SD-08 Manufacturer’s Instructions
3.3 GInstallation
3.8 GCleaning
SD-11 Closeout Submittals
1.12.3 GBatch Ticket Information
2.2.1 SRecycled Content for Fly Ash and
Pozzolan
2.2.1 SRecycled Content for Ground Iron
Blast-Furnace Slag
2.2.1 SRecycled Content for Silica Fume
03 45 33 SD-02 Shop Drawings
2.1.1.2 GDrawings of Precast Members
SD-03 Product Data
2.2.8.1Inserts
2.2.9Bearing Pads
SD-04 Samples
2.3.9Surface Finish
SD-05 Design Data
2.1.1.2 GDesign Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 78 PAGES
03 45 33 1.4.3 GConcrete Mix Design
SD-06 Test Reports
1.4.3 GConcrete Mix Design
2.2.2.1Fly Ash
2.2.2.2Pozzolan
2.2.2.4Ground Granulated Blast-Furnace
Slag
2.2.4Aggregates
2.2.3Water
SD-07 Certificates
2.3Quality Control Procedures
1.4.1.3Erector's Post Audit Declaration
SD-11 Closeout Submittals
1.4.4Batch Ticket
2.2.1 SRecycled Content for Fly Ash and
Pozzolan
2.2.1 SRecycled Content for Ground Iron
Blast-Furnace Slag
2.2.1Recycled Content for Silica Fume
04 20 00 SD-02 Shop Drawings
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2 GClay or Shale Brick
2.6.7 GInsulation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 78 PAGES
04 20 00 SD-04 Samples
1.3.1.1 GMock-Up Panel
2.2.2 GClay or Shale Brick
2.6.5 GClay Masonry Expansion-Joint
Materials
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
3.2.4 GBracing Calculations
SD-06 Test Reports
2.2.2.1.4Efflorescence Test
2.2.3.4Fire-Rated Concrete Masonry
Units
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
3.6.1.4Prism Tests
SD-07 Certificates
2.2.2Clay or Shale Brick
2.2.3.2Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
2.6.7Insulation
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 78 PAGES
04 20 00 2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
2.2.2.1.3 SClay Units
2.2.3.2.1 SRecycled Content
05 30 00 SD-02 Shop Drawings
1.3.5 GFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.2.15Mechanical Fasteners
2.1.3Touch-Up Paint
1.3.3Welding Equipment
1.3.3Welding Rods and Accessories
2.1 SRecycled Content of Steel
Products
SD-04 Samples
2.2.4Flexible Closure Strips
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
1.3.3Welder Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 78 PAGES
05 30 00 1.3.3Welding Procedures
1.3.4.1Fire Safety
1.3.4.2Wind Storm Resistance
1.3.1Manufacturer's Certificate
2.2.10Stud Manufacture's Certification
2.2.10Stud Manufacture's Test Reports
05 40 00 SD-02 Shop Drawings
1.5.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
2.1 SRecycled Content of Steel
Products
SD-05 Design Data
1.5.2 GMetal Framing Calculations
SD-07 Certificates
3.2.1Welds
05 50 13 SD-02 Shop Drawings
2.4 GExpansion Joint Covers
2.8 GRoof Hatches
2.7 GRetrofit Treads
SD-03 Product Data
2.4 GExpansion Joint Covers
2.7 GRetrofit Treads
2.8 GRoof Hatches
2.5 GDownspouts
2.1 SRecycled Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 78 PAGES
05 50 13 SD-04 Samples
2.4Expansion Joint Covers
05 51 33 SD-02 Shop Drawings
2.3Ladders
SD-03 Product Data
2.3Ladders
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
1.3Fabricator Certification for Ships
Ladder Assembly
05 52 00 SD-02 Shop Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.2.1 GStructural-Steel Plates, Shapes, and Bars
2.2.2 GStructural-Steel Tubing
2.2.4 GCold-Finished Steel Bars
2.2.3 GHot-Rolled Carbon Steel Bars
2.2.5 GCold-Drawn Steel Tubing
2.2.7 GConcrete Inserts
2.2.8 GMasonry Anchorage Devices
2.1.2 GProtective Coating
2.2.10 GSteel Railings and Handrails
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 78 PAGES
05 52 00 SD-07 Certificates
1.3.1 GWelding Procedures
1.3.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 10 00 SD-06 Test Reports
1.4.2Preservative-treated
SD-07 Certificates
1.9.1Certificates of Grade
06 41 16.00 10 SD-02 Shop Drawings
2.7Shop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
2.7.7.3Finish Schedule
SD-04 Samples
2.2Plastic Laminates
2.4Cabinet Hardware
SD-07 Certificates
1.5Quality Assurance
3.1Laminate Clad Casework
1.5.2Certification
06 61 16 SD-02 Shop Drawings
1.4.2 GDetail Drawings
3.1 GInstallation
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 78 PAGES
06 61 16 2.1Solid Polymer Material
1.4.1Qualifications
2.3Fabrications
2.2.4Indoor air quality for solid surface seam and sealant products
SD-04 Samples
2.1 GMaterial
2.3.5 GCounter and Vanity Tops
SD-06 Test Reports
2.1Solid Polymer Material
SD-07 Certificates
2.3Fabrications
1.4.1Qualifications
2.1Indoor Air Quality for solid surface fabrication products
SD-10 Operation and Maintenance
Data
3.2Clean-up
07 19 00 SD-03 Product Data
2.2Water Repellents
SD-06 Test Reports
1.3.2Water Absorption
2.3.1Accelerated Weathering
2.3.1Resistance to Chloride Ion
Penetration
1.3.2Moisture Vapor Transmission
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 78 PAGES
07 19 00 2.3.1Moisture Vapor Transmission
2.3.1Scaling Resistance
1.3.2Water Penetration and Leakage
SD-07 Certificates
1.3.1Manufacturer's Qualifications
1.3.1Applicator's Qualifications
1.3.3Evidence of Acceptable Variation
1.12Warranty
SD-08 Manufacturer’s Instructions
3.4Application
1.7.1Safety Data Sheets
07 21 16 SD-03 Product Data
2.1Blanket Insulation
2.1.2 SRecycled Content for Insulation
Materials
2.2Accessories
SD-07 Certificates
2.1.5 SIndoor Air Quality for Insulation
Materials
SD-08 Manufacturer’s Instructions
3.1.1Insulation
07 27 19.01 SD-01 Preconstruction Submittals
1.7.1 GQualifications of Manufacturer
1.7.2 GQualifications of Installer
SD-02 Shop Drawings
1.4 GSelf-adhering Air Barrier
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 78 PAGES
07 27 19.01 SD-03 Product Data
1.4 GSelf-adhering Air Barrier
2.2 GPrimers, Adhesives, and Mastics
1.4.2 GSafety Data Sheets
SD-06 Test Reports
1.6 GField Peel Adhesion Test
1.4.3 GFlame Propagation of Wall
Assemblies
1.4.3 GFlame Spread and Smoke
Developed Index Ratings
3.4.1 GSite Inspections and Testing
SD-07 Certificates
1.4 GSelf-adhering Air Barrier
SD-08 Manufacturer’s Instructions
1.4 GSelf-adhering Air Barrier
2.2 GPrimers, Adhesives, and Mastics
07 27 26 SD-01 Preconstruction Submittals
1.8.1 GQualifications of Manufacturer
SD-02 Shop Drawings
1.4 GFluid-Applied Membrane Air
Barrier
SD-03 Product Data
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
2.2 GPrimers, Adhesives, and Mastics
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 78 PAGES
07 27 26 2.6 GReinforcement
1.4.2 GSafety Data Sheets
SD-06 Test Reports
1.6 GCapillary Moisture Test
1.4.3 GField Peel Adhesion Test
1.4.3 GFlame Propagation of Wall
Assemblies
1.4.3 GFlame Spread and Smoke
Developed Index Ratings
3.4.1 GSite Inspections
SD-07 Certificates
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
SD-08 Manufacturer’s Instructions
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
2.2 GPrimers, Adhesives, and Mastics
07 27 36 SD-01 Preconstruction Submittals
1.10 GQuality Control Plan
1.10 GSafety Plan
1.8.1 GFire Prevention Plan
1.8.2 GRespirator Plan
SD-02 Shop Drawings
1.5Spray Foam Air Barrier
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 78 PAGES
07 27 36 1.10 GFoam Air Barrier System
1.5.1 GFire-Rated Assemblies
SD-03 Product Data
2.1.2 GClosed Cell
2.2 GTransition Membrane
2.3 GPrimers, Adhesives, and Mastics
2.5 GSealants
1.5.2 GSafety Data Sheets
2.1.1 GIgnition Barrier Coatings
2.1.1 GAccessories
2.1.2 SRecycled Content for Closed Cell
Spray Foam Air Barrier
2.1.5Blowing Agent
SD-06 Test Reports
1.5.3 GField Peel Adhesion Test
3.4.5.1 GThermographic Test
1.5.3 GFire-Ratings Of Ignition Barrier
Materials
1.5.3 GFlame Spread And Smoke
Developed Index Ratings Of SPF
Products
1.5.3 GFlame Propagation Of Wall
Assemblies
3.4.1 GSite Inspections
SD-07 Certificates
2.1.2 GClosed cell
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 78 PAGES
07 27 36 2.2 GTransition Membrane
2.1.5 SIndoor Air Quality for Spray Foam
Air Barrier
SD-08 Manufacturer’s Instructions
1.6.1 GSPF Handling, Storage, and
Spray Procedures
3.2.1 GSubstrate Preparation
1.5.1 GIgnition Barrier
2.2 GTransition Membrane
2.3 GPrimers, Adhesives, and Mastics
SD-09 Manufacturer’s Field
Reports
1.10Core Samples
3.3.4Daily Work Record
3.4.5Visual Inspection and Thermal
Scanning
07 60 00 SD-02 Shop Drawings
2.2.1 GExposed Sheet Metal
3.1.13 GGutters
3.1.14 GDownspouts
3.1.12 GDrip Edges
2.1 SRecycled Content
SD-04 Samples
1.4.2 GFinish Samples
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 78 PAGES
07 60 00 3.5 GQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 GCleaning and Maintenance
07 61 15.00 20 SD-02 Shop Drawings
2.1 GRoofing panels
2.3 GGutters
2.3 GDownspouts
SD-03 Product Data
2.1 GRoofing panels
2.2 GAttachment clips
2.3.1Closures
2.3Accessories
2.3.2Fasteners
1.8 Gwarranty
SD-04 Samples
2.1Roofing panels
2.3Accessories
SD-05 Design Data
1.5 GLoad calculations
SD-06 Test Reports
2.4 GPanel Finish
1.3.2.8Leakage Test Report
1.3.2.9Wind Uplift Test Report
2.1.1.2Finish
3.5 GManufacturer's field inspection
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 78 PAGES
07 61 15.00 20 SD-07 Certificates
1.6.2Technical representative
1.6.3Qualification of Installer
2.1.1.5Coil stock
1.6.5Qualification of Manufacturer
SD-08 Manufacturer’s Instructions
2.3.3Sealant
3.3Installation
SD-11 Closeout Submittals
3.7Information card
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
3.1 GField Adhesion
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 78 PAGES
07 92 00 SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
2.1.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.1.4 SIndoor Air Quality For Interior
Acoustical Sealants
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.4 GFrames
2.4 GFrames
2.2Accessories
SD-03 Product Data
2.1 GDoors
2.1 SRecycled Content for Steel Door
Product
2.4 GFrames
2.4 SRecycled Content for Steel Frame
Product
2.2Accessories
08 31 00 SD-02 Shop Drawings
1.3 GAccess Doors And Panels
SD-03 Product Data
1.3 GAccess Doors And Panels
1.3.2 GHardware
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 78 PAGES
08 31 00 2.2.8 GAccessories
2.1 SRecycled Content
SD-04 Samples
2.5 GFinishes
SD-06 Test Reports
1.3.1 GFire-rating(s) of Assemblies
08 51 13 SD-02 Shop Drawings
2.1 GWindows
1.6Fabrication Drawings
SD-03 Product Data
2.1 GWindows
2.1 SRecycled Content of Aluminum
Windows
2.2.8.1 GHardware
2.2.3 GFasteners
1.7 GWindow Performance
2.3 GThermal-Barrier Windows
2.4 GMullions
2.2.10 GScreens
2.1.5 GWeatherstripping
2.2.8 GAccessories
2.2.4Adhesives
1.7.4 GThermal Performance
SD-04 Samples
1.3.3.1Finish Sample
1.3.3.2Window Sample
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 78 PAGES
08 51 13 SD-05 Design Data
2.1 GStructural Calculations for
Deflection
1.3.4 GDesign Analysis
SD-06 Test Reports
1.3.5Minimum Condensation
Resistance Factor
1.7.6Windborne-Debris-Impact
Performance
SD-07 Certificates
1.3.4Engineer's Qualifications
SD-10 Operation and Maintenance
Data
2.1 GWindows
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.6 GKeying System
SD-03 Product Data
2.3 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 78 PAGES
08 71 00 SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
2.3Insulating Glass
1.3Glazing Accessories
2.4.1.1Sealants
2.4.2Joint Backer
2.2.3Rated Glazing
SD-04 Samples
2.3Insulating Glass
2.4.4Tape
2.4.4Sealing Tapes
SD-08 Manufacturer’s Instructions
2.4Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.7.1Insulated Glass Units
08 91 00 SD-02 Shop Drawings
1.4 GWall Louvers
SD-03 Product Data
2.2 GMetal Wall Louvers
SD-04 Samples
1.5 GWall Louver Samples
09 03 00 SD-02 Shop Drawings
1.3Work Plan
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 78 PAGES
09 03 00 2.1Cleaning Solution
09 22 00 SD-03 Product Data
2.1Metal Support Systems
2.1 SRecycled Content for Metal
Support Systems
09 29 00 SD-03 Product Data
2.1.3Cementitious Backer Units
2.1.2Abuse Resistant Gypsum Board
2.1.6Accessories
2.1.1Gypsum Board
2.1.1 SRecycled Content for Gypsum
Board
2.1.1 SRecycled Content for Paper
Facing and Gypsum Cores
2.1.4 SVOC Content of Joint Compound
SD-07 Certificates
2.1 GAsbestos Free Materials
2.1.1 SIndoor Air Quality for Gypsum
Board
SD-08 Manufacturer’s Instructions
2.1Safety Data Sheets
SD-10 Operation and Maintenance
Data
2.1Manufacturer Maintenance
Instructions
09 30 10 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 78 PAGES
09 30 10 3.2 GDetail Drawings
SD-03 Product Data
2.1.1 GPorcelain Tile
2.2 GSetting-Bed
2.4 GMortar, Grout, and Adhesive
SD-04 Samples
2.1 GTile
2.1 GAccessories
2.1 GTransition Strips
2.5 GTransition Strips
2.4 GGrout
SD-07 Certificates
2.4Indoor Air Quality for Adhesives
2.4.4Indoor Air Quality for Sealants
SD-08 Manufacturer’s Instructions
3.7Maintenance Instructions
SD-10 Operation and Maintenance
Data
3.2 GInstallation
09 51 00 SD-02 Shop Drawings
2.1Drawings
SD-03 Product Data
2.2.1.1 SRecycled Content for Type IX
Ceiling Tiles
2.3 SRecycled Content for Suspension
Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 78 PAGES
09 51 00 2.1.1Acoustical Performance
SD-04 Samples
2.2Acoustical Units
SD-07 Certificates
2.2.1.1 SIndoor Air Quality for Type IX
Ceiling Tiles
2.2.2.1 SIndoor Air Quality for Humidity
Resistant Ceiling Tiles
2.5 SIndoor Air Quality for Adhesives
2.8 SIndoor Air Quality for Sealants
09 65 00 SD-02 Shop Drawings
2.7 GResilient Flooring and
Accessories
SD-03 Product Data
2.7 GResilient Flooring and
Accessories
2.3Adhesives
2.1Luxury Vinyl Tile
2.1.1Wall Base
SD-04 Samples
2.7 GResilient Flooring and
Accessories
SD-06 Test Reports
3.3 GMoisture, Alkalinity and Bond
Tests
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 78 PAGES
09 65 00 2.1.1Indoor Air Quality for Wall Base
2.3Indoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
SD-10 Operation and Maintenance
Data
2.7 GResilient Flooring and
Accessories
09 67 23.13 SD-03 Product Data
1.2.1 GManufacturer's Catalog Data
SD-04 Samples
1.5.2 GHardboard Mounted Epoxy
Flooring
SD-05 Design Data
1.2.2 GDesign Mix Data
SD-07 Certificates
1.5.1 GListing of Product Installations
1.5 GReferenced Standards
Certificates
SD-11 Closeout Submittals
1.6 GWarranty
09 72 00 SD-03 Product Data
2.1 GWallcoverings and Accessories
2.3Primer and Adhesive
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 78 PAGES
09 72 00 2.2Recycled Content for vinyl wallcovering
SD-04 Samples
2.1 GWallcoverings and Accessories
SD-07 Certificates
1.3.1Indoor Air Quality
SD-08 Manufacturer’s Instructions
2.1Wallcoverings and Accessories
SD-10 Operation and Maintenance
Data
2.1 GWallcoverings and Accessories
09 90 00 SD-02 Shop Drawings
3.8Piping Identification
SD-03 Product Data
2.1 GCoating
2.1Product Data Sheets
SD-04 Samples
2.2 GColor
SD-07 Certificates
1.6.4Indoor Air Quality for Paints and
Primers
SD-08 Manufacturer’s Instructions
3.2.1Application Instructions
2.1Mixing
1.8.1Manufacturer's Safety Data
Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 78 PAGES
09 90 00 SD-10 Operation and Maintenance
Data
2.1 GCoatings
09 97 11 SD-03 Product Data
2.1 GCOATINGS
SD-04 Samples
2.1 GCOATINGS
SD-10 Operation and Maintenance
Data
3.2 GMaintenance
10 14 00.20 SD-02 Shop Drawings
1.4.2 GDetail Drawings
SD-03 Product Data
3.1 GInstallation
1.6 GWarranty
SD-04 Samples
1.4.1 GInterior Signage
1.3 GSoftware
SD-10 Operation and Maintenance
Data
3.1 GApproved Manufacturer's
Instructions
3.1.2 GProtection and Cleaning
10 26 00 SD-02 Shop Drawings
2.2 GCorner Guards
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 78 PAGES
10 26 00 2.2 GCorner Guards
SD-04 Samples
2.4 GFinish
SD-06 Test Reports
2.2Corner Guards
SD-07 Certificates
2.2Corner Guards
2.5Indoor air quality for adhesives
10 28 13 SD-02 Shop Drawings
2.1 GProduct Schedule
SD-03 Product Data
2.1 GRecycled content for stainless
steel toilet accessories
2.1.3 GSanitary Napkin Disposal (SND)
2.1.4 GHook, Garment, Security
2.1.5 GShower Curtain Rod (SCR)
2.1.6 GToilet Tissue Dispenser (TTD)
2.1.7 GMirror (WM1 and WM2)
2.1.8 GFoam Soap Dispenser (SD)
2.1.9 GTowel Bar (TB)
2.1.10 GSemi Recessed Waste
Receptacle and Paper Towel
Dispenser (ITDW)
SD-10 Operation and Maintenance
Data
2.1.3 GSanitary Napkin Disposal (SND)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 78 PAGES
10 28 13 2.1.4 GHook, Garment, Security
2.1.5 GShower Curtain Rod (SCR)
2.1.6 GToilet Tissue Dispenser (TTD)
2.1.7 GMirror (WM1 and WM2)
2.1.8 GFoam Soap Dispenser (SD)
2.1.9 GTowel Bar (TB)
2.1.10 GSemi Recessed Waste
Receptacle and Paper Towel
Dispenser (ITDW)
10 44 16 SD-02 Shop Drawings
2.1.1 GCabinets
2.1.2 GWall Brackets
1.3 GSchedule
SD-03 Product Data
2.1.1 GCabinets
2.1.2 GWall Brackets
3.2.1 GReplacement Parts List
SD-04 Samples
1.2.1 GEquipment Samples
12 24 13 SD-02 Shop Drawings
3.2 GInstallation
SD-03 Product Data
2.1 GWindow Shades
2.1Recycled Content for various fiber components
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 78 PAGES
12 24 13 2.1 GWindow Shades
SD-06 Test Reports
2.1Window Shades
SD-07 Certificates
2.1Indoor Air Quality for roller window shades
SD-08 Manufacturer’s Instructions
2.1Window Shades
SD-10 Operation and Maintenance
Data
2.1Window Shades
SD-11 Closeout Submittals
1.7 GWarranty
21 13 13 SD-01 Preconstruction Submittals
1.2.3 GQualified Fire Protection Engineer
(QFPE)
1.4.2.1 GSprinkler System Designer
1.4.2.2 GSprinkler System Installer
SD-02 Shop Drawings
1.2.1.1 GShop Drawing
SD-03 Product Data
2.2.1 GPipe
2.3.1.2 GFittings
2.3.4 GValves
2.8.5 GRelief Valves
2.7 GSprinklers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 78 PAGES
21 13 13 2.3.3 GPipe Hangers and Supports
2.4.1 GSprinkler Alarm Switch
2.4.2 GValve Supervisory (Tamper)
Switch
2.6 GFire Department Connection
2.5 GBackflow Prevention Assembly
2.8.6 GAir Vent
2.5.1 GHose Valve
2.1.2 GNameplates
SD-05 Design Data
1.2.1.2 GHydraulic Calculations
SD-06 Test Reports
3.7.1 GTest Procedures
SD-07 Certificates
3.7.2.1 GVerification of Compliant
Installation
3.7.2.2 GRequest for Government Final
Test
SD-10 Operation and Maintenance
Data
3.9 GOperating and Maintenance
(O&M) Instructions
1.6 GSpare Parts
SD-11 Closeout Submittals
3.9As-built drawings
22 00 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 78 PAGES
22 00 00 3.8.1.1Backflow Prevention Assemblies
2.6.2Shower Faucets
2.4Fixtures
2.4.2Flush Valve Water Closets
2.4.3Wall Hung Lavatories
2.4.4Countertop Lavatories
2.4.5Service Sinks
2.4.6Drinking-Water Coolers
2.9Pumps
SD-06 Test Reports
3.8Tests, Flushing and Disinfection
3.8.1.1Test of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
SD-10 Operation and Maintenance
Data
3.8.1Plumbing System
23 05 15 SD-01 Preconstruction Submittals
1.2 GMaterial, Equipment, and Fixture
Lists
SD-02 Shop Drawings
1.2 GRecord Drawings
1.2 GConnection Diagrams
1.2 GCoordination Drawings
1.2 GFabrication Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 78 PAGES
23 05 15 3.1 GInstallation Drawings
SD-03 Product Data
2.2 GPipe and Fittings
2.3 GPiping Specialties
2.4 GValves
2.5 GMiscellaneous Materials
2.6 GSupporting Elements
1.2 GEquipment Foundation Data
SD-04 Samples
1.2 GManufacturer's Standard Color
Charts
SD-05 Design Data
2.2 GPipe and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .