This is an Amendment to a federal solicitation (Amendment 0013) for contract N40085-26-R-9050, issued by NAVPAC Mid-Atlantic with an effective date of 08/19/26. The amendment contains answers to contractor inquiries regarding construction work related to two engineering line items (ELINs): G702 and G703, which involve milling, overlaying, and striping of a parking lot at a NAVFAC facility located at 1107A Birch Street, Camp Lejeune, NC.
The amendment addresses three key questions and answers. First, regarding early procurement and on-site storage for G703 work, only specialized items such as mechanical/electrical equipment and long-lead materials may be approved for on-site storage and advance payment prior to construction, subject to Construction Manager approval; standard off-the-shelf construction materials are not eligible for early delivery or payment. Second, the amendment confirms that milling, overlaying, and striping work is associated with ELIN 0003 for G702 and ELIN 0014 for G703, with existing ABC stone base material to remain in place and be graded per Detail D on sheet CS501. The proposal receipt deadline is 24 August 2026 at 2:00 PM EST, and contractors must acknowledge receipt of this amendment when submitting proposals. All other terms and conditions of the solicitation remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0011.pdf | ||
| Amend 0012.pdf | ||
| Amend 0010.pdf | ||
| Amend 0009.pdf | ||
| Amend 0008.pdf | ||
| Amend 0007.pdf | ||
| Amend 0006.pdf | ||
| Amend 0005.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| 25-0010 Lead and Asbestos Report.pdf | ||
| 25-0051 DM.pdf | ||
| RFP 250010.pdf | ||
| 25-0051 SID.pdf | ||
| 25-0051 BOD.pdf | ||
| 25-0010 BOD.pdf | ||
| 25-0010 APPD.pdf | ||
| N4008525B0051 DWG_Signed.pdf | ||
| N4008525B0051 Specs.pdf | ||
| N4008525B0010 Specs.pdf | ||
| 25-0010 GEO.pdf | ||
| 25-0051 Asbestos and Lead Report.pdf | ||
| 25-0051 APPD.pdf | ||
| N4008525B0010 DWG_Signed.pdf | ||
| 25-0010 SID.pdf | ||
| 25-0051 GEO.pdf | ||
| 25-0010 DM for Repair BEQ 702.pdf |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N40085-26-R-9050 Amendment 0013
CONTINUATION SHEET
1. QUESTION: G703 cannot be started until G702 is completed. If G703 is awarded, will the contractor be allowed to release and procure approved equipment, and materials prior to the start of construction and store on site to mitigate cost increases?
ANSWER: Only specialized items, such as mechanical/electrical equipment and long-lead materials, may be approved for on-site storage and payment prior to construction of G703, subject to prior CM approval. Standard, off-the-shelf construction materials are not eligible for early delivery, storage, or payment.
2 QUESTION:
ELIN 0003 G702 & ELIN 0014 G703 for Milling, Overlaying, & Striping of the parking lot.
ANSWER: Yes, this work is associated with the ELIN 0003 for G702 and ELIN 0014 for G703;
refer to Detail D on sheet CS501 for details. Existing ABC stone beneath the asphalt is to remain in place and be graded according to the notes found in Detail D on sheet CS501.
3. All other terms and conditions remain unchanged.