Amend 0013.pdf

PDF 1 MB Posted

Attached to
Repair BEQ G702/G703
Solicitation number
N4008526R9050
Issued by

About this file

This is an Amendment to a federal solicitation (Amendment 0013) for contract N40085-26-R-9050, issued by NAVPAC Mid-Atlantic with an effective date of 08/19/26. The amendment contains answers to contractor inquiries regarding construction work related to two engineering line items (ELINs): G702 and G703, which involve milling, overlaying, and striping of a parking lot at a NAVFAC facility located at 1107A Birch Street, Camp Lejeune, NC.

The amendment addresses three key questions and answers. First, regarding early procurement and on-site storage for G703 work, only specialized items such as mechanical/electrical equipment and long-lead materials may be approved for on-site storage and advance payment prior to construction, subject to Construction Manager approval; standard off-the-shelf construction materials are not eligible for early delivery or payment. Second, the amendment confirms that milling, overlaying, and striping work is associated with ELIN 0003 for G702 and ELIN 0014 for G703, with existing ABC stone base material to remain in place and be graded per Detail D on sheet CS501. The proposal receipt deadline is 24 August 2026 at 2:00 PM EST, and contractors must acknowledge receipt of this amendment when submitting proposals. All other terms and conditions of the solicitation remain unchanged.

View the file

Other files

File Type Posted
Amend 0011.pdf PDF
Amend 0012.pdf PDF
Amend 0010.pdf PDF
Amend 0009.pdf PDF
Amend 0008.pdf PDF
Amend 0007.pdf PDF
Amend 0006.pdf PDF
Amend 0005.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
25-0010 Lead and Asbestos Report.pdf PDF
25-0051 DM.pdf PDF
RFP 250010.pdf PDF
25-0051 SID.pdf PDF
25-0051 BOD.pdf PDF
25-0010 BOD.pdf PDF
25-0010 APPD.pdf PDF
N4008525B0051 DWG_Signed.pdf PDF
N4008525B0051 Specs.pdf PDF
N4008525B0010 Specs.pdf PDF
25-0010 GEO.pdf PDF
25-0051 Asbestos and Lead Report.pdf PDF
25-0051 APPD.pdf PDF
N4008525B0010 DWG_Signed.pdf PDF
25-0010 SID.pdf PDF
25-0051 GEO.pdf PDF
25-0010 DM for Repair BEQ 702.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N40085-26-R-9050 Amendment 0013

CONTINUATION SHEET

1. QUESTION: G703 cannot be started until G702 is completed. If G703 is awarded, will the contractor be allowed to release and procure approved equipment, and materials prior to the start of construction and store on site to mitigate cost increases?

ANSWER: Only specialized items, such as mechanical/electrical equipment and long-lead materials, may be approved for on-site storage and payment prior to construction of G703, subject to prior CM approval. Standard, off-the-shelf construction materials are not eligible for early delivery, storage, or payment.

2 QUESTION:

ELIN 0003 G702 & ELIN 0014 G703 for Milling, Overlaying, & Striping of the parking lot.

ANSWER: Yes, this work is associated with the ELIN 0003 for G702 and ELIN 0014 for G703;

refer to Detail D on sheet CS501 for details. Existing ABC stone beneath the asphalt is to remain in place and be graded according to the notes found in Detail D on sheet CS501.

3. All other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .