Amend 0002.pdf

PDF 19 MB Posted

Attached to
Repair BEQ G702/G703
Solicitation number
N4008526R9050
Issued by

About this file

This document is Amendment No. 0002 to a federal solicitation for repair work on Building G702/G703 at MCB Camp Lejeune, North Carolina. The amendment, effective July 15, 2026, answers a Request for Information, updates G702 documents, and includes a site visit sign-in requirement. The proposal deadline remains August 5, 2026, at 2:00 PM EST, and offerors must acknowledge receipt of this amendment to avoid rejection.

The amendment adds Specification Section 23 11 20 – Facility Gas Piping to the project requirements. This section establishes standards for natural gas piping installation within the building, including both above-ground steel piping and corrugated stainless steel tubing (CSST). Key requirements include compliance with NFPA 54 and AGA standards for materials, equipment, and installation procedures. Contractors must provide shop drawings, product data, test reports, and operation/maintenance documentation. The gas piping system must include proper joints, fittings, valves, regulators, hangers, supports, and seismic provisions. Installation requirements address protection and cleaning of materials, workmanship standards, underground and above-ground piping installation, insulating joints, pipe sleeves, fire seals, electrical bonding and grounding, shutoff valves, testing procedures (pressure tests and gas tests), and purging protocols. All work must conform to referenced standards including ASME, ASTM, ANSI, API, and CSA specifications, with materials meeting NSF and UL listings where applicable.

View the file

Other files

File Type Posted
Amend 0013.pdf PDF
Amend 0012.pdf PDF
Amend 0011.pdf PDF
Amend 0010.pdf PDF
Amend 0009.pdf PDF
Amend 0008.pdf PDF
Amend 0007.pdf PDF
Amend 0006.pdf PDF
Amend 0005.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amend 0001.pdf PDF
RFP 250010.pdf PDF
25-0051 SID.pdf PDF
25-0051 BOD.pdf PDF
25-0010 BOD.pdf PDF
25-0010 APPD.pdf PDF
N4008525B0051 DWG_Signed.pdf PDF
N4008525B0051 Specs.pdf PDF
N4008525B0010 Specs.pdf PDF
25-0010 GEO.pdf PDF
25-0051 Asbestos and Lead Report.pdf PDF
25-0051 APPD.pdf PDF
N4008525B0010 DWG_Signed.pdf PDF
25-0010 Lead and Asbestos Report.pdf PDF
25-0051 DM.pdf PDF
25-0010 SID.pdf PDF
25-0051 GEO.pdf PDF
25-0010 DM for Repair BEQ 702.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1

1. CONTRACT ID CODE

I

PAG

OF PAGES

I 100

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REO. NO.

5. PROJECT NO. (If applicble)

AMENDMENT NO. 0002 07/15/26 25-0010

6. ISSUED BY CODE N40085 7. ADMINISTERED BY (If other than Item 6) CODE I

NAVFAC Mid-Atlantic See Item 6 Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICIATION NO.

,c N40085-26-R-9050

9B. DA TED (SEE ITEM 11)

07/06/26

10A. MODIFICATION OF CONTRACT/ORDER NO.

1 OB. DA TED (SEE ITEM 11)

CODE I FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[RI The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers D is extended, [RI is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 1 OA.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43. 103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor D is not, D is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

25-0010, Repair BEQ G702/G703 Amendment 0002, Answer Request for Information, Update G702 Documents, Site Visit Sign-in

The time and date for receipt of proposals remains 5 August 2026 at 2PM EST.

This amendment should be acknowledged when your proposal is submitted.

the amendment may constitute grounds for rejection of a proposal.

Failure to acknowledge

See Continuation Page(s)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 1 OA, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

1 5B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

NSN 7540-01-152-8070

Previous edition unusable

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

N40085-26-R-9050 Amendment 000 Page 2 of

CONTINUATION SHEET

1. QUESTION: Can this RFP be sent via email like all the other bids on this MACC.

RFP states electronic copy, hard copy and CD copy.

ANSWER: Proposals may be submitt via email.

E-Mail Address for Proposals: jessica.r.huebner.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil.

Replace the G702 project specification PROJECT TABLE OF CONTENTS with the revised table of contents including specification section 23 11 20 Facility Gas Piping (see pages 3-6).

Replace the G702 PROJECT SUBMITTAL REGISTER with revised project submittal register including specification section 23 11 20 (see pages 7-8 ).

Add G702 Specification Section 23 11 20 Facility Gas Piping footnoted to the project specifications. Specification added to clarify facility gas piping requirements (see pages 8 -9 ).

All other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .