N4008525B0051 Specs.pdf
PDF 16 MB Posted
- Attached to
- Repair BEQ G702/G703
- Solicitation number
- N4008526R9050
About this file
This is a comprehensive specification document for Contract N40085-25-B-0051, which covers repairs and renovation of Building G703 at Marine Corps Base Camp Lejeune, North Carolina. The project includes construction of a new mechanical equipment building adjacent to Building G703, a new trash dumpster enclosure, and demolition of Building G713. The work is located at MCB Camp Lejeune in North Carolina with a contract award date of 29 May 2026. The scope encompasses multi-phase construction with regular working hours of 0730-1600, Monday through Friday, excluding government holidays, though work outside these hours requires Contracting Officer's Representative approval with 15 calendar days' notice.
The specification details extensive administrative, technical, and operational requirements across 33 divisions of work including general requirements, demolition, concrete, masonry, metals, wood, thermal protection, openings, finishes, specialties, equipment, furnishings, fire suppression, plumbing, HVAC, electrical, telecommunications, earthwork, and utilities. Key contractual requirements include submission of a Baseline Construction Schedule within 30 calendar days of award; a Schedule of Prices with detailed cost breakdowns separated by primary and supporting facilities; monthly updates and 3-week look-ahead schedules; comprehensive quality control plans and environmental protection plans; and extensive photographic documentation with a minimum of 20 digital photographs weekly from at least ten viewpoints. The contractor must maintain full-time on-site supervision with a superintendent possessing minimum five years' experience and a valid OSHA 30-hour Construction certificate. All technical submittals must be processed through the eCMS system with appropriate CUI or unclassified markings. The contract requires coordination with BaseTel for telecommunications infrastructure during final construction phases and compliance with DBIDS registration for contractor personnel access to the installation. Progress payments may be made for major high-cost, long-lead items such as structural steel and equipment with proper surety consent and documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0013.pdf | ||
| Amend 0012.pdf | ||
| Amend 0011.pdf | ||
| Amend 0010.pdf | ||
| Amend 0009.pdf | ||
| Amend 0008.pdf | ||
| Amend 0007.pdf | ||
| Amend 0006.pdf | ||
| Amend 0005.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| RFP 250010.pdf | ||
| 25-0051 SID.pdf | ||
| 25-0051 BOD.pdf | ||
| 25-0010 BOD.pdf | ||
| 25-0010 APPD.pdf | ||
| N4008525B0051 DWG_Signed.pdf | ||
| N4008525B0010 Specs.pdf | ||
| 25-0010 GEO.pdf | ||
| 25-0051 Asbestos and Lead Report.pdf | ||
| 25-0051 APPD.pdf | ||
| N4008525B0010 DWG_Signed.pdf | ||
| 25-0010 Lead and Asbestos Report.pdf | ||
| 25-0051 DM.pdf | ||
| 25-0010 SID.pdf | ||
| 25-0051 GEO.pdf | ||
| 25-0010 DM for Repair BEQ 702.pdf |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repairs G703 Project No.: 25-0051 MCB Camp Geiger, NC 29 May 2026
CONTRACT N40085-25-B-0051
NAVFAC SPECIFICATION
NO. 05-25-0051
REPAIRS G703
AT THE
MARINE CORPS BASE, CAMP GEIGER, NORTH CAROLINA
DESIGN BY:
MBF ARCHITECTS, P.A.
317-C POLLOCK ST.
NEW BERN, NC 28560
A/E Contract: N40085-25-D-2528
SPECIFICATION PREPARED BY:
Darden J. Eure, III MBF Architects, PA
Date: 29 May 2026
SPECIFICATION APPROVED BY:
Christopher J. Maas PE, Director
Design Branch, Public Works Division
Jonathan D. McGuire, Commander, CEC, U.S. Navy for Commander, Naval Facilities Engineering Command
05250051
SECTION COVER Page 1
29 May 2026
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION COVER Page 2
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/25 SUMMARY OF WORK
01 14 00 04/22 WORK RESTRICTIONS (MCBL)
01 20 00 11/20, CHG 3: 02/23 PRICE AND PAYMENT PROCEDURES
01 30 00 08/25 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 05/17, CHG 7: 11/21 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
01 31 50 04/22 TRANSFER AND ACCEPTANCE OF MILITARY
REAL PROPERTY
01 32 16.00 20 08/18, CHG 1: 08/20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
01 33 00 04/22 SUBMITTAL PROCEDURES
01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND REPORTING
01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 08/23
SCHEDULE OF FIRE PROTECTION SYSTEM INSPECTIONS
01 50 00 12/21 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 09/25 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 04/22 CLOSEOUT SUBMITTALS
01 78 23 04/22 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 03/23 FACILITY ELECTRONIC OPERATION AND
MAINTENANCE SUPPORT INFORMATION (eOMSI)
01 78 30.00 22 5/22 GIS DATA DELIVERABLES
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
02 41 01 08/22 BUILDING DECONSTRUCTION
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 10: 08/25 CAST-IN-PLACE CONCRETE
03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE
(SIDEWALKS)
DIVISION 04 - MASONRY
04 20 01 11/15, CHG 2: 05/19 MASONRY INFILL AND PATCHING
DIVISION 05 - METALS
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 08/24, CHG 1: 08/25 MISCELLANEOUS METAL FABRICATIONS
05 51 33 02/16, CHG 2: 02/18 METAL LADDERS
05 52 01 02/18, CHG 1: 02/20 ALUMINUM RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 3: 05/25 ROUGH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
PROJECT TABLE OF CONTENTS Page 1
SUBMITTAL REGISTER
QUALITY CONTROL
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 19 00 05/11, CHG 1: 08/17 WATER REPELLENTS
07 21 13 08/23, CHG 1: 08/25 BOARD AND BLOCK INSULATION
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 22 00 08/23 ROOF AND DECK INSULATION
07 27 19.01 08/23, CHG 1: 08/24 SELF-ADHERING AIR BARRIERS
07 27 26 08/23 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 08/23 SPRAY FOAM AIR BARRIERS
07 60 00 08/23, CHG 1: 05/25 FLASHING AND SHEET METAL
07 61 15.00 20 08 March 2021 CL ALUMINUM STANDING SEAM ROOFING
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/23 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS
08 33 24 08/20, CHG 1: 02/22 ALUMINUM OVERHEAD COILING DOORS
08 33 25 08/20, CHG 1: 02/22 STAINLESS STEEL OVERHEAD COILING DOORS
08 51 13 05/19 ALUMINUM WINDOWS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 06/24 MCBCL ALUMINUM WALL LOUVERS
DIVISION 09 - FINISHES
09 03 00 03/22 LOW PRESSURE BUILDING CLEANING
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 67 23.13 11/19 STANDARD RESINOUS FLOORING
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 50 00 02/16 MISCELLANEOUS SPECIALTIES
DIVISION 11 - EQUIPMENT
11 24 24 08/20 PERMANENT HORIZONTAL FALL PROTECTION,
METAL ROOFING
DIVISION 12 - FURNISHINGS
12 24 13 08/20 ROLLER WINDOW SHADES
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROJECT TABLE OF CONTENTS Page 2
PROTECTION
DIVISION 22 - PLUMBING
22 00 00 05/24, CHG 1: 11/24 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 08/24 MCBCL BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 05/22, CHG 1: 02/24 COMMON PIPING FOR HVAC
23 05 48.19 05/18 BRACING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 08/24 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/25 MCBCL INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 02/25 MCBCL INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/25 MCBCL BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 21 13.00 20 04/06, CHG 2: 11/19 LOW TEMPERATURE WATER (LTW) HEATING
SYSTEM
23 23 00 08/21 REFRIGERANT PIPING
23 24 00 08/10 HYDRONIC PIPE CLEANING AND FLUSHING
PROCEDURES
23 25 00 05/21 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS
23 30 00 02/25 HVAC AIR DISTRIBUTION
23 52 43.00 20 05/15, CHG 2: 08/18 LOW PRESSURE WATER HEATING BOILERS
(UNDER 800,000 BTU/HR OUTPUT)
23 64 10 05/25 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09, CHG 5: 11/19 CHILLED WATER PIPING SYSTEMS
23 81 00 05/24 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.00 09/22 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - ISOLATED SYSTEMS
DIVISION 26 - ELECTRICAL
26 05 73 08/23 POWER SYSTEM STUDIES
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 12 19 05/24 PAD-MOUNTED, LIQUID-FILLED,
MEDIUM-VOLTAGE TRANSFORMERS
26 20 00 05/25, CHG 1: 08/25 INTERIOR DISTRIBUTION SYSTEM
26 24 13 08/21 SWITCHBOARDS
26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING
26 41 00 08/23 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 04/22 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM (MCBCL)
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
PROJECT TABLE OF CONTENTS Page 3
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 08/23 EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
31 31 16.13 08/22, CHG 1: 11/23 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 23 05/22 AGGREGATE BASE COURSE
32 11 26 05/20 HOT-MIX BITUMINOUS BASE COURSE FOR
ROADS AND STREETS
32 17 23.16 11/24 ROAD AND PARKING LOT PAVEMENT MARKINGS
32 31 14 11/21 HIGH-SECURITY FENCES (ORNAMENTAL) AND
GATES
32 92 23 04/06, CHG 1: 08/21 SODDING
32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 08/24 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 11/21 STORMWATER UTILITIES
33 61 14 02/10 EXTERIOR BURIED PREINSULATED WATER
PIPING
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 08/22 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
APPENDIX
HAZARDOUS MATERIALS SURVEY
LIST OF DRAWINGS
Contract drawings are as follows:
NAVFAC SHEET SHEET
NO NO TITLE
G GENERAL
60043438 G-001 TITLE SHEET AND INDEX OF DRAWINGS
GI LIFE SAFETY
60043439 GI001 LIFE SAFETY GENERAL NOTES AND LEGEND
60043440 GI002 CODE COMPLIANCE SITE PLAN
60043441 GI101 LIFE SAFETY FIRST FLOOR PLAN - CONSTRUCTION
60043442 GI102 LIFE SAFETY SECOND FLOOR PLAN - CONSTRUCTION
60043443 GI103 LIFE SAFETY THIRD FLOOR PLAN - CONSTRUCTION
C CIVIL
60043444 C-001 CIVIL NOTES, LEGEND AND ABBREVIATIONS
60043445 C-100 OVERALL SITE PLAN
60043446 CD101 SITE PLAN-EXISTING CONDITIONS AND DEMOLITION
60043447 CS101 SITE PLAN-NEW WORK
60043448 CG101 GUTTER LEADER SYSTEM
60043449 CG102 SITE GRADING PLAN
60043450 CU101 SITE UTILITY PLAN
60043451 CU102 ENLARGED SITE UTILITY PLAN
60043452 CS501 DETAILS
60043453 CS502 DETAILS
60043454 CG501 DETAILS
60043455 CG502 DETAILS
60043456 CU501 DETAILS
60043457 L-701 SITE LANDSCAPE PLAN
60043458 L-702 DETAILS
S STRUCTURAL
60043459 S-101 GENERAL NOTES
60043460 S-102 CONCRETE REPAIR PLAN
60043461 S-103 CATWALK FRAMING PLAN
60043462 S-104 MECHANICAL EQUIPMENT BUILDING - CONSTRUCTION
60043463 S-201 MECHANICAL EQUIPMENT BUILDING SECTIONS
60043464 S-501 TYPICAL CONSTRUCTION DETAILS
A ARCHITECTURAL
60043465 A-001 SYMBOL LEGEND AND ABBREVIATIONS
60043466 AD101 FIRST FLOOR PLAN - EXISTING/DEMOLITION
60043467 AD102 SECOND FLOOR PLAN - EXISTING/DEMOLITION
60043468 AD103 THIRD FLOOR PLAN - EXISTING/DEMOLITION
60043469 AD104 ATTIC PLAN - EXISTING/DEMOLITION
60043470 AD105 ROOF PLAN - EXISTING/DEMOLITION
60043471 AD106 FIRST FLOOR PLAN - SLAB DEMOLITION
60043472 AD110 FIRST FLOOR REFLECTED CEILING PLAN - EXISTING/DEMOLITION
60043473 AD111 SECOND FLOOR REFLECTED CEILING PLAN - EXISTING/DEMOLITION
60043474 AD112 THIRD FLOOR REFLECTED CEILING PLAN - EXISTING/DEMOLITION
60043475 AD120 MECHANICAL EQUIPMENT BUILDING - EXISTING/DEMOLITION
60043476 AD201 EXTERIOR ELEVATIONS - EXISTING/DEMOLITION
60043477 AD202 EXTERIOR ELEVATIONS - EXISTING/DEMOLITION
60043478 AD203 EXTERIOR ELEVATIONS - EXISTING/DEMOLITION
60043479 AD401 ENLARGED PLANS - EXISTING/DEMOLITION
SECTION DWGLIST - SI Template Page 1
NAVFAC SHEET SHEET
NO NO TITLE
60043480 A-101 FIRST FLOOR PLAN - CONSTRUCTION
60043481 A-102 SECOND FLOOR PLAN - CONSTRUCTION
60043482 A-103 THIRD FLOOR PLAN - CONSTRUCTION
60043483 A-104 ATTIC PLAN - CONSTRUCTION
60043484 A-105 ROOF PLAN - CONSTRUCTION
60043485 A-110 FIRST FLOOR REFLECTED CEILING PLAN - CONSTRUCTION
60043486 A-111 SECOND FLOOR REFLECTED CEILING PLAN - CONSTRUCTION
60043487 A-112 THIRD FLOOR REFLECTED CEILING PLAN - CONSTRUCTION
60043488 A-120 MECHANICAL EQUIPMENT BUILDING - CONSTRUCTION
60043489 A-121 MECHANICAL EQUIPMENT BUILDING - EXTERIOR
ELEVATIONS/BUILDING SECTION
60043490 A-201 EXTERIOR ELEVATIONS - CONSTRUCTION
60043491 A-202 EXTERIOR ELEVATIONS - CONSTRUCTION
60043492 A-203 EXTERIOR ELEVATIONS - CONSTRUCTION
60043493 A-301 BUILDING SECTIONS
60043494 A-310 WALL SECTIONS
60043495 A-401 ENLARGED PLANS - CONSTRUCTION
60043496 A-402 ENLARGED PLANS - CONSTRUCTION
60043497 A-403 ENLARGED PLANS - CONSTRUCTION
60043498 A-404 ENLARGED PLANS - CONSTRUCTION
60043499 A-501 ASSEMBLIES
60043500 A-502 DETAILS
60043501 A-503 DETAILS
60043502 A-504 DETAILS
60043503 A-601 DOOR AND FRAME SCHEDULE
60043504 A-602 DOOR AND FRAME DETAILS
60043505 A-603 WINDOW TYPES AND DETAILS
AI ARCHITECTURAL INTERIOR
60043506 AI101 FIRST FLOOR FINISH PLAN
60043507 AI102 SECOND FLOOR FINISH PLAN
60043508 AI103 THIRD FLOOR FINISH PLAN
I INTERIOR DESIGN
60043509 I-101 FIRST FLOOR FINISH PLAN
60043510 I-102 SECOND FLOOR FINISH PLAN
60043511 I-103 THIRD FLOOR FINISH PLAN
60043512 I-111 FIRST FLOOR SIGNAGE PLAN
60043513 I-112 SECOND FLOOR SIGNAGE PLAN
60043514 I-113 THIRD FLOOR SIGNAGE PLAN
60043515 I-201 INTERIOR ELEVATIONS
60043516 I-202 INTERIOR ELEVATIONS
60043517 I-301 CASEWORK SECTIONS
60043518 I-401 ENLARGED PLANS
60043519 I-501 SIGNAGE DETAILS
60043520 I-502 INTERIOR DETAILS
60043521 I-601 SCHEDULES & LEGENDS
60043522 I-602 SCHEDULES & LEGENDS
F FIRE PROTECTION
60043523 FD001 FIRE PROTECTION DEMOLITION GENERAL NOTES AND LEGEND
60043524 FD101 FIRE PROTECTION FIRST FLOOR PLAN - DEMOLITION
60043525 FD102 FIRE PROTECTION SECOND FLOOR PLAN - DEMOLITION
60043526 FD103 FIRE PROTECTION THIRD FLOOR PLAN - DEMOLITION
60043527 FA001 FIRE ALARM GENERAL NOTES AND LEGEND
60043528 FA101 FIRE ALARM FIRST FLOOR PLAN - CONSTRUCTION
60043529 FA102 FIRE ALARM SECOND FLOOR PLAN - CONSTRUCTION
SECTION DWGLIST - SI Template Page 2
NAVFAC SHEET SHEET
NO NO TITLE
60043530 FA103 FIRE ALARM THIRD FLOOR PLAN - CONSTRUCTION
60043531 FA501 FIRE ALARM DETAILS
60043532 FA502 FIRE ALARM DETAILS
60043533 FX001 FIRE SUPPRESSION GENERAL NOTES AND LEGEND
60043534 FX101 FIRE SUPPRESSION FIRST FLOOR PLAN - CONSTRUCTION
60043535 FX102 FIRE SUPPRESSION SECOND FLOOR PLAN - CONSTRUCTION
60043536 FX103 FIRE SUPPRESSION THIRD FLOOR PLAN - CONSTRUCTION
60043537 FX501 FIRE SUPPRESSION DETAILS
P PLUMBING
60043538 P-001 PLUMBING COVER SHEET
60043539 PD101 FIRST FLOOR PLAN- EXISTING/DEMOLITION - PLUMBING
60043540 PD102 SECOND FLOOR PLAN - EXISTING/DEMOLITION - PLUMBING
60043541 PD103 THIRD FLOOR PLAN - EXISTING/DEMOLITION - PLUMBING
60043542 P-101 FIRST FLOOR PLAN - WASTE AND VENT
60043543 P-102 SECOND FLOOR PLAN - WASTE AND VENT
60043544 P-103 THIRD FLOOR PLAN - WASTE AND VENT
60043545 P-104 FIRST FLOOR PLAN - WATER
60043546 P-105 SECOND FLOOR PLAN - WATER
60043547 P-106 THIRD FLOOR PLAN - WATER
60043548 P-401 FIRST FLOOR ENLARGED PLANS - WASTE AND VENT
60043549 P-402 SECOND AND THIRD FLOOR ENLARGED PLANS - WASTE AND VENT
60043550 P-403 FIRST FLOOR ENLARGED PLANS - WATER
60043551 P-404 SECOND AND THIRD FLOOR ENLARGED PLANS - WATER
60043552 P-501 PLUMBING DETAILS
60043553 P-601 PLUMBING SCHEDULES
60043554 P-701 RISER DIAGRAMS-WASTE AND VENT
60043555 P-702 RISER DIAGRAMS-WATER
M MECHANICAL
60043556 M-001 MECHANICAL NOTES, LEGEND & ABBREVIATIONS
60043557 MD101 OVERALL FIRST FLOOR PLAN - MECHANICAL DEMOLITION
60043558 MD102 OVERALL SECOND FLOOR PLAN - MECHANICAL DEMOLITION
60043559 MD103 OVERALL THIRD FLOOR PLAN - MECHANICAL DEMOLITION
60043560 MD104 OVERALL ATTIC FLOOR PLAN - MECHANICAL DEMOLITION
60043561 MD105 ENLARGED FIRST FLOOR PLAN - MECHANICAL ROOMS
- MECHANICAL DEMOLITION
60043562 MD106 ENLARGED FIRST FLOOR PLAN - CENTRAL CORE
- MECHANICAL DEMOLITION
60043563 MD107 ENLARGED SECOND FLOOR PLAN - MECHANICAL ROOMS
- MECHANICAL DEMOLITION
60043564 MD108 ENLARGED SECOND FLOOR PLAN - CENTRAL CORE
- MECHANICAL DEMOLITION
60043565 MD109 ENLARGED THIRD FLOOR PLAN - MECHANICAL ROOMS
- MECHANICAL DEMOLITION
60043566 MD110 ENLARGED THIRD FLOOR PLAN - CENTRAL CORE
- MECHANICAL DEMOLITION
60043567 MD111 SITE PLAN - MECHANICAL DEMOLITION
60043568 MD112 ENLARGED MECHANICAL BUILDINGS - MECHANICAL DEMOLITION
60043569 MD301 MECHANICAL SECTION VIEWS
60043570 M-101 OVERALL FIRST FLOOR PLAN - MECHANICAL
60043571 M-102 OVERALL SECOND FLOOR PLAN - MECHANICAL
60043572 M-103 OVERALL THIRD FLOOR PLAN - MECHANICAL
60043573 M-104 OVERALL ATTIC FLOOR PLAN - MECHANICAL
60043574 M-105 ENLARGED FIRST FLOOR PLAN - MECHANICAL ROOMS - MECHANICAL
60043575 M-106 ENLARGED FIRST FLOOR PLAN - CENTRAL CORE - MECHANICAL
60043576 M-107 ENLARGED SECOND FLOOR PLAN - MECHANICAL ROOMS - MECHANICAL
SECTION DWGLIST - SI Template Page 3
NAVFAC SHEET SHEET
NO NO TITLE
60043577 M-108 ENLARGED SECOND FLOOR PLAN - CENTRAL CORE - MECHANICAL
60043578 M-109 ENLARGED THIRD FLOOR PLAN - MECHANICAL ROOMS - MECHANICAL
60043579 M-110 ENLARGED THIRD FLOOR PLAN - CENTRAL CORE - MECHANICAL
60043580 M-111 SITE PLAN - MECHANICAL
60043581 M-112 ENLARGED MECHANICAL BUILDING - MECHANICAL
M MECHANICAL
60043582 M-301 MECHANICAL SECTION VIEWS
60043583 M-302 MECHANICAL SECTION VIEWS
60043584 M-501 MECHANICAL DETAILS
60043585 M-502 MECHANICAL DETAILS
60043586 M-503 MECHANICAL DETAILS
60043587 M-504 MECHANICAL DETAILS
60043588 M-505 MECHANICAL DETAILS
60043589 M-506 MECHANICAL DETAILS
60043590 M-507 MECHANICAL DETAILS
60043591 M-601 MECHANICAL SCHEDULES
60043592 M-602 MECHANICAL SCHEDULES
60043593 M-603 MECHANICAL SCHEDULES
60043594 M-701 MECHANICAL CONTROLS
60043595 M-702 MECHANICAL CONTROLS
60043596 M-703 MECHANICAL CONTROLS
60043597 M-704 MECHANICAL CONTROLS
60043598 M-705 MECHANICAL CONTROLS
60043599 M-706 MECHANICAL CONTROLS
60043600 M-707 MECHANICAL CONTROLS
60043601 M-801 EXISTING DUAL TEMPERATURE WATER SYSTEM DIAGRAM
60043602 M-802 CHILLED WATER SYSTEM DIAGRAM
60043603 M-803 HOT WATER SYSTEM DIAGRAM
60043604 M-901 3D ISOMETRIC VIEWS - MECHANICAL
E ELECTRICAL
60043605 E-001 ELECTRICAL NOTES AND LEGENDS
60043606 ES101 SITE PLAN - ELECTRICAL
60043607 ES501 SITE ELECTRICAL DETAILS
60043608 ED101 FIRST FLOOR PLAN - POWER DEMOLITION
60043609 ED102 SECOND FLOOR PLAN - POWER DEMOLITION
60043610 ED103 THIRD FLOOR PLAN - POWER DEMOLITION
60043611 ED104 FIRST FLOOR PLAN - LIGHTING DEMOLITION
60043612 ED105 SECOND FLOOR PLAN - LIGHTING DEMOLITION
60043613 ED106 THIRD FLOOR PLAN - LIGHTING DEMOLITION
60043614 E-101 FIRST FLOOR PLAN - POWER
60043615 E-102 SECOND FLOOR PLAN - POWER
60043616 E-103 THIRD FLOOR PLAN - POWER
60043617 E-104 ATTIC PLAN - ELECTRICAL
60043618 E-105 FIRST FLOOR PLAN - EQUIPMENT CONNECTIONS
60043619 E-106 SECOND FLOOR PLAN - EQUIPMENT CONNECTIONS
60043620 E-107 THIRD FLOOR PLAN - EQUIPMENT CONNECTIONS
60043621 E-108 FIRST FLOOR PLAN - LIGHTING
60043622 E-109 SECOND FLOOR PLAN - LIGHTING
60043623 E-110 THIRD FLOOR PLAN - LIGHTING
60043624 E-111 ROOF PLANS - LIGHTNING PROTECTION
60043625 E-112 MECHANICAL BUILDING PLAN - ELECTRICAL
60043626 E-501 ELECTRICAL DETAILS
60043627 E-502 ELECTRICAL DETAILS
60043628 E-503 ELECTRICAL DETAILS
60043629 E-601 ELECTRICAL SCHEDULES
SECTION DWGLIST - SI Template Page 4
NAVFAC SHEET SHEET
NO NO TITLE
60043630 E-602 ELECTRICAL SCHEDULES
60043631 E-603 ELECTRICAL SCHEDULES
60043632 E-604 ELECTRICAL SCHEDULES
60043633 E-605 ELECTRICAL SCHEDULES
60043634 E-701 ELECTRICAL RISER DIAGRAM
T TELECOMMUNICATIONS
60043635 T-001 TELECOMMUNICATIONS NOTES AND LEGEND
60043636 T-101 FIRST FLOOR PLAN - TELECOMMUNICATIONS
60043637 T-102 SECOND FLOOR PLAN - TELECOMMUNICATIONS
60043638 T-103 THIRD FLOOR PLAN - TELECOMMUNICATIONS
60043639 T-501 TELECOMMUNICATIONS DETAILS
60043640 T-502 TELECOMMUNICATIONS DETAILS
SECTION DWGLIST - SI Template Page 5
SECTION DWGLIST - SI Template Page 6
SECTION 01 11 00
SUMMARY OF WORK
08/25
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes the repair and renovation of Building G703. It also includes the construction of a new mechanical building adjacent to Building G703, construction of a new trash dumpster enclosure, and the demolition of Building G713 and incidental related work.
1.1.2 Location
The work shall be located at the Marine Corps Base Camp Lejeune, North Carolina, at the building and/or area as described in the project description above . The exact location will be indicated by the Contracting Officer.
1.2 PHASED CONSTRUCTION SCHEDULE
Within the overall project schedule, commence and complete the work in phases as described in the project description above.
1.3 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.4 LOCATION OF UNDERGROUND FACILITIES
The Contractor will be responsible for obtaining the services of a professional utility locator to scan the construction site with electromagnetic or sonic equipment, and mark the surface of the ground where existing underground utilities are discovered. If the underground utility cannot be confirmed, the contractor shall pot-hole area until piping location is verified. Dowsing or any other type of divination method is not considered an acceptable practice for locating utilities on board MCB Camp Lejeune. Verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated or specified to be removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be
SECTION 01 11 00 Page 1 installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.4.1 Notification Prior to Excavation
Notify the Contracting Officer's Representative (COR) 48 hours prior to starting excavation work.
1.5 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
Government furnished material and equipment will be indicated on drawings and in scope of work if applicable.
1.6 MARINE CORPS ENTERPRISE NETWORK (MCEN) COORDINATION REQUIREMENTS
1.6.1 BaseTel Access
Allow BaseTel access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections. Coordinate efforts with BaseTel to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer Representative has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with BaseTel into the construction schedule to demonstrate a plan for maintaining the Contract duration.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
SECTION 01 14 00
WORK RESTRICTIONS (MCBL)
04/22
PART 1 GENERAL
1.1 SUBMITTALS
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel
1.2 SPECIAL SCHEDULING REQUIREMENTS
a. The Contractor shall comply with all special scheduling requirements as described in the attached project description, and as noted on the drawings.
d. Permission to interrrupt any Station roads, railroads, and/or utility service shall be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, include delivery vehicles, are clearly identified with their company name.
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.1.2 Installation Access
Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html . No fees are associated with obtaining a DBIDS credential.
Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.
SECTION 01 14 00 Page 1
The following are specific details regarding contractor personnel requirements. For the most up-to-date information regarding Base Access please visit https://www.lejeune.marines.mil/Base-Access/.
1.3.1.2.1 Registration for DBIDS
Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html . Procedure includes:
a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.
b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html .
d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.
e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.
1.3.1.2.2 DBIDS Eligibility Requirements
Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.
The Government is the final authority.
1.3.1.2.3 DBIDS Notification Requirements
a. Immediately report instances of lost or stolen badges to the Contracting Officer.
b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
SECTION 01 14 00 Page 2
1.3.1.2.4 One-Day Passes
Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
1.3.2 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.3.3 Working Hours
Regular working hours shall be 0730-1600, Monday through Friday, excluding Government holidays .
1.3.4 Work Outside Regular Hours
Work outside regular working hours requires COR approval. Provide written request at least 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress. During periods of darkness, the different parts of the work shall be lighted in a manner approved by the COR.
1.3.5 Occupied Building and Existing Buildings
The Contractor shall be working in portions of an existing building which is occupied. The existing building and its contents shall be kept secure at all times.
1.3.6 Utility Cutovers and Interruptions
a. The Contractor shall coordinate a minimum of 14 calendar days prior to any planned utility cutover / interruption. Make utility cutovers and interruptions OUTSIDE normal working hours. Working hours are indicated on the drawings.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air shall be considered utility cutovers. This time limit includes time for deactivation and reactivation.
d. Operation of Station Utilities: The Contractor shall not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor shall notify the Contracting Officer at least 15 days prior to such operation.
SECTION 01 14 00 Page 3
1.4 SECURITY REQUIREMENTS
Contract Clause "FAR 52.204-2, Security Requirements and Alternate II," "FAC 5252.236-9301, Special Working Conditions and Entry to Work Area," apply.
1.5 EMERGENCY UNEXPLODED ORDNANCE (UXO) RESPONSE
In the event that UXO, as defined in 40 CFR 260 is encountered during the construction activities that is deemed to be a threat to human health or the environment, Camp Lejeune Military Police and EOD professionals shall be immediately contacted to conduct an emergency response. Additionally, immediately contact the Contracting Officer if UXO is encountered. An evaluation of this scenario and procedures, with contract numbers, shall be included in the Health and Safety Plan (HASP) for the fieldwork.
1.5.1 3R TRAINING
All Contractor personnel performing ground disturbing activities must complete contractor awareness training related to recognizing UXO. This training (3R TRAINING) is available online at:
http://www.lejeune.marines.mil/OfficesStaff/EnvironmentalMgmt/TrainingVideo.aspx
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 14 00 Page 4
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
11/20, CHG 3: 02/23
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP 1110-1-8 (2021) Engineering and Design -- Construction Equipment Ownership and Operating Expense Schedule
1.2 SUBMITTALS
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Schedule of Prices ; G
1.3 SCHEDULE OF PRICES
1.3.1 Data Required
Within 15 calendar days of notice of award, prepare and deliver to COR a schedule of prices (construction contract). Schedule of Prices must have cost summarized and totals provided for each construction category.
Provide a detailed breakdown of the Contract price, giving quantities for each of the various kinds of work, unit prices and extended prices.
Schedule of prices shall be separated by individual building numbers with subtotals for each building. Contractor overhead and profit including salaries for field office personnel, if applicable, must be proportionately spread over all pay items and not included as individual pay items.
1.3.2 Payment Schedule Instructions
Payments will not be made until the Schedule of Prices has been submitted to and accepted by the Contracting Officer.
Additionally, the Schedule of Prices must be separated as follows:
a. Primary Facilities Cost Breakdown:
Defined as work on the primary facilities out to the 5 foot line.
Work out to the 5 foot line includes construction encompassed within a theoretical line 5 foot from the face of exterior walls and includes attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 5 foot line.
SECTION 01 20 00 Page 1
b. Supporting Facilities Cost Breakdown:
Defined as site work, including incidental work, outside the 5 foot line.
1.4 CONTRACT MODIFICATIONS
In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, base equipment use rates upon the applicable provisions of the
EP 1110-1-8 .
1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT
1.5.1 Content of Invoice
Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27 Prompt Payment for Construction Contracts and FAR 52.232-5 Payments Under Fixed-Price Construction Contracts. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies. The requests for payment shall include the documents listed below.
a. The Contractor's invoice, on NAVFAC Form 7300/30 furnished by the Government, showing in summary form, the basis for arriving at the amount of the invoice. Form 7300/30 must include certification by Quality Control (QC) Manager as required by the Contract.
b. The Estimate for Voucher/ Contract Performance Statement on NAVFAC Form 4330/54 furnished by the Government. Use NAVFAC Form 4330, unless otherwise directed by the Contracting Officer, on NAVFAC Contracts when a Monthly Estimate for Voucher is required.
c. Contractor's Monthly Estimate for Voucher and Contractors Certification (NAVFAC Form 4330) with Subcontractor and supplier payment certification. Other documents, including but not limited to, that need to be received prior to processing payment include the following submittals as required. These items are still required monthly even when a pay voucher is not submitted.
d. Monthly Work-hour report.
e. Updated Construction Progress Schedule and tabular reports required by the contract.
f. Contractor Safety Self Evaluation Checklist.
g. Updated submittal register.
h. Solid Waste Disposal Report.
i. Certified payrolls.
j. Updated testing logs.
k. Other supporting documents as requested.
SECTION 01 20 00 Page 2
1.5.2 Submission of Invoices
If DFARS Clause 252.232-7006 Wide Area WorkFlow Payment Instructions is included in the Contract, provide the documents listed in above paragraph CONTENT OF INVOICE in their entirety as attachments in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction, provide it as instructed by the Contracting Officer.
Monthly invoices and supporting forms for work performed through the anniversary award date of the Contract must be submitted to the Contracting Officer within 5 calendar days of the date of invoice. For example, if Contract award date is the 7th of the month, the date of each monthly invoice must be the 7th and the invoice must be submitted by the 12th of the month.
1.5.3 Final Invoice
a. A final invoice must be accompanied by the certification required by DFARS 252.247.7023 Transportation of Supplies by Sea, and the Contractor's Final Release. If the Contractor is incorporated, the Final Release must contain the corporate seal. An officer of the corporation must sign and the corporate secretary must certify the Final Release.
b. For final invoices being submitted via WAWF, the original Contractor's Final Release Form and required certification of Transportation of Supplies by Sea must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final Release Form and required certification of Transportation of Supplies by Sea has been confirmed by the Contracting Officer, the Contractor must then submit final invoice and attach a copy of the Final Release Form and required certification of Transportation of Supplies by Sea in WAWF.
c. Final invoices not accompanied by the Contractor's Final Release and required certification of Transportation of Supplies by Sea will be considered incomplete and will be returned to the Contractor.
1.6 PAYMENTS TO THE CONTRACTOR
Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous payments to the Contractor.
1.6.1 Obligation of Government Payments
The obligation of the Government to make payments required under the provisions of this Contract will, at the discretion of the Contracting Officer, be subject to reductions and suspensions permitted under the FAR and agency regulations including the following in accordance with FAR
32.103 Progress Payments Under Construction Contracts:
a. Reasonable deductions due to defects in material or workmanship;
b. Claims which the Government may have against the Contractor under or in connection with this Contract;
SECTION 01 20 00 Page 3
c. Unless otherwise adjusted, repayment to the Government upon demand for overpayments made to the Contractor; and
d. Failure to maintain accurate "as-built" or record drawings in accordance with FAR 52.236.21.
1.6.2 Payment for Onsite and Offsite Materials
Progress payments may be made to the Contractor for materials delivered on the site, for materials stored off construction sites, or materials that are in transit to the construction sites under the following conditions:
a. FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts.
b. Materials delivered on the site but not installed, including completed preparatory work, and off-site materials to be considered for progress payment must be major high cost, long lead, special order, or specialty items, not susceptible to deterioration or physical damage in storage or in transit to the construction site. Examples of materials acceptable for payment consideration include, but are not limited to, structural steel, non-magnetic steel, non-magnetic aggregate, equipment, machinery, large pipe and fittings, precast/prestressed concrete products, plastic lumber (e.g., fender piles/curbs), and high-voltage electrical cable. Materials not acceptable for payment include consumable materials such as nails, fasteners, conduits, gypsum board, glass, insulation, and wall coverings.
c. Materials to be considered for progress payment prior to installation must be specifically and separately identified in the Contractor's estimates of work submitted for the Contracting Officer's approval in accordance with Schedule of Prices requirement of this Contract.
Requests for progress payment consideration for such items must be supported by documents establishing their value and that the title requirements of the clause at FAR 52.232-5 Payments Under Fixed-Price Construction Contracts have been met.
d. Materials are adequately insured and protected from theft and exposure.
e. Provide a written consent from the surety company with each payment request for offsite materials.
f. Materials to be considered for progress payments prior to installation must be stored either in Hawaii, Guam, Puerto Rico, or the Continental United States. Other locations are subject to written approval by the Contracting Officer.
g. Materials in transit to the job site or storage site are not acceptable for payment.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 20 00 Page 4
SECTION 01 20 00 Page 5
SECTION 01 20 00 Page 6
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
08/25
PART 1 GENERAL
1.1 SUBMITTALS
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
View Location Map
Progress and Completion Pictures
1.2 VIEW LOCATION MAP
Submit, prior to or with the first digital photograph submittals, a sketch or drawing indicating the required photographic locations. Update as required if the locations are moved.
1.3 PROGRESS AND COMPLETION PICTURES
Photographically document site conditions prior to start of construction operations. Provide monthly, and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color minimum resolution in JPEG file format showing the sequence and progress of work. Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten different viewpoints selected by the Contractor unless otherwise directed by the Contracting Officer. Submit with the monthly invoice one set of digital photographs in the agency construction management system of record, cumulative of all photos to date. Indicate photographs demonstrating environmental procedures. Provide photographs for each month in a separate monthly directory and name each file to indicate its location on the view location sketch. Also provide the view location sketch with the submission in the agency construction management system of record as a digital file. Include a date designator in file names. Photographs provided are for unrestricted use by the Government.
1.4 MINIMUM INSURANCE REQUIREMENTS
Provide the minimum insurance coverage required by FAR 28.307-2 Liability, during the entire period of performance under this contract. Provide other insurance coverage as required by State law.
1.5 SUPERVISION
1.5.1 Superintendent Qualifications
The Contractor shall provide a full-time, on-site Superintendent with a minimum of five (5) years of experience managing field construction operations of similar size, scope, and complexity. The Superintendent shall hold a valid OSHA 30-hour Construction certificate and demonstrate experience coordinating subcontractors, materials, equipment, and project schedules.
SECTION 01 30 00 Page 1
For projects where the superintendent is permitted to also serve as the Quality Control (QC) Manager as established in Section 01 45 00 QUALITY CONTROL,(one person, three hats) the superintendent must have qualifications in accordance with that section.
1.5.2 Minimum Communication Requirements
Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of Contract work. In addition, if a Quality Control (QC) representative is required on the Contract, then that individual must also have fluent English communication skills.
1.5.3 Duties
The project superintendent is primarily responsible for managing subcontractors and coordinating day-to-day production and schedule adherence on the project. The superintendent is required to attend Red Zone meetings, partnering meetings, and quality control meetings. The superintendent or qualified alternative must be on-site at all times during the performance of this contract until the work is completed and accepted.
1.5.4 Non-Compliance Actions
The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to ensure timely completion.
Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time or excess costs or damages by the Contractor.
1.6 PRECONSTRUCTION MEETING
Immediately after award, prior to commencing any work at the site, coordinate with the Contracting Officer a time and place to meet for the Preconstruction Meeting . The meeting must take place within 35 calendar days after award of the contract, but prior to commencement of any work at the site. The purpose of this meeting is to discuss and develop a mutual understanding of the administrative requirements of the Contract including but not limited to: daily reporting, invoicing, value engineering, safety, base-access, outage requests, hot work permits, schedule requirements, quality control, schedule of prices or earned value report, shop drawings, submittals, cybersecurity, prosecution of the work, government acceptance, final inspections and contract close-out. Contractor must present and discuss their basic approach to scheduling the construction work and any required phasing.
1.6.1 Attendees
Contractor attendees must include the Project Manager, Superintendent, Site Safety and Health Officer (SSHO), Quality Control Manager . Major subcontractors are encouraged but not required to attend .
SECTION 01 30 00 Page 2
1.7 FACILITY TURNOVER PLANNING MEETINGS (Red Zone Meetings)
Meet with the Government to identify strategies to ensure the project is carried to expeditious closure and turnover to the Client. Start planning the turnover process at the Pre-Construction Conference meeting with a discussion of the Red Zone process and convene at regularly scheduled Red Zone Meetings beginning at approximately 75 percent of project completion. Include the following in the facility Turnover effort:
1.7.1 Red Zone Checklist
a. Contracting Officer's Technical Representative (COTR) will provide the Contractor a copy of the Red Zone Checklist template.
b. Prior to 75 percent completion, modify the Red Zone Checklist template by adding or deleting critical activities applicable to the project and assign planned completion dates for each activity. Submit the modified Red Zone Checklist to the Contracting Officer. The Contracting Officer may request additional activities be added to the Red Zone Checklist at any time as necessary.
1.7.2 Meetings
a. Conduct regular Red Zone Meetings beginning at approximately 75 percent project completion, or three to six months prior to Beneficial Occupancy Date (BOD), whichever comes first.
b. The Contracting Officer will establish the frequency of the meetings, which is expected to increase as the project completion draws nearer.
At the beginning, Red Zone meetings may be every two weeks then increase to weekly towards the final month of the project.
c. Using the Red Zone Checklist as a Plan of Action and Milestones (POAM) and basis for discussion, review upcoming critical activities and strategies to ensure work is completed on time.
d. During the Red Zone Meetings discuss with the COTR any upcoming activities that require Government involvement.
e. The monthly Progress Schedule updates and Red Zone completion dates should reflect matching dates, data, and milestones. Prevent conflicting information between Red Zone Updates and Monthly CPM updates.
1.8 PARTNERING
Host the partnering session within 45 calendar days of contract award. To most effectively accomplish this Contract, the Contractor and Government must form a cohesive partnership with the common goal of drawing on the strength of each organization in an effort to achieve a successful project without safety mishaps, conforming to the Contract, within budget and on schedule. The partnering team must consist of personnel from both the Government and Contractor including project level and corporate level leadership positions. Key Personnel from the supported command, end user, NAVFAC, PWD, ROICC, Contractor, key subcontractors and the Designer of Record (DOR) (regardless of whether the contract is a design-build or a design-bid-build) are required to participate in the Partnering process.
SECTION 01 30 00 Page 3
1.8.1 Team-Led (Informal) Partnering
a. The Contracting Officer will coordinate the initial Team-Led (Informal) Partnering Session with key personnel of the project team, including Contractor and Government personnel. The Partnering Session will be co-led by the Government Construction Manager and Contractor's Project Manager.
b. The Initial Team-led Partnering session may be held concurrently with the Pre-Construction meeting. Partnering sessions will be held at a location mutually agreed to by the Contracting Officer and the Contractor, typically at a conference room on-base or at the Contractor's temporary trailer.
c. The Initial Team-Led Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer.
d. The Partners will determine the frequency of the follow-on sessions.
e. Participants will bear their own costs for meals, lodging and transportation associated with Partnering.
1.9 MOBILIZATION
Mobilize to the jobsite within 60 calendar days after contract award.
Mobilize is defined as having equipment AND having a physical presence of at least one person from the contractor's team on the jobsite. All pre-construction submittals are to be complete prior to mobilization.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
SECTION 01 30 00 Page 4
SECTION 01 31 23.13 20
ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT MANAGEMENT SYSTEM
05/17, CHG 7: 11/21
PART 1 GENERAL
1.1 CONTRACT ADMINISTRATION
Utilize the Naval Facilities Engineering Command's (NAVFAC's) Electronic Construction and Facility Support Contract Management System (eCMS) for the transfer, sharing, and management of electronic technical submittals and documents. The web-based eCMS is the designated means of transferring technical documents between the Contractor and the Government. Paper media or e-mail submission, including originals or copies, of the documents identified in Table 1 are not permitted, except where eCMS is unavailable, non-functional, or specifically requested in addition to electronic submission.
1.1.1 Format Naming Convention for Files Uploaded Into eCMS
Include the identification number of the document, the type of document, the name/subject or title, and for daily reports, the date (day of work) with format YYYY/MM/DD in the filename. For example, for RFI's, 0011_RFI_Roof_Leaking.doc; for submittals, 0032a_Submittals_Light_Fixture.pdf; for Daily Reports, 0132_Daily_Report_20190504.xls. Contact the Contracting Officer's Representative (COR) regarding availability of eCMS training and reference materials.
1.1.2 Uploading Documents Processed Outside of eCMS
When specifically requested to provide documents outside of eCMS, upload all final project documentation (e.g., documents that are signed and/or adjudicated by the Government) mentioned in Table 1 into eCMS by creating a record in the module associated with that document type and uploading the document(s). Subject/title of the record should include the type of record i.e., RFI/Submittal/Other, the identification number(s), and the statement "Processed Outside of eCMS". For example, "RFI 001-012 Processed Outside of eCMS".
1.2 USER PRIVILEGES
The Contractor will be provided access to eCMS. All technical submittals and documents must be transmitted to the Government via the COR. Project roles and system roles will be established to control each user's menu, application, and software privileges, including the ability to create, edit, or delete objects.
1.3 SUBMITTALS
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
List of Contractor's Personnel
SECTION 01 31 23.13 20 Page 1
1.4 SYSTEM REQUIREMENTS AND CONNECTIVITY
1.4.1 General
The eCMS requires a web-browser (platform-neutral) and Internet connection. Obtain from an approved vendor an External Certification Authority (ECA), Primary Key Infrastructure (PKI) certificate, or other similar digital…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .