Amend 0009.pdf
PDF 20 MB Posted
- Attached to
- Repair BEQ G702/G703
- Solicitation number
- N4008526R9050
About this file
This is Amendment No. 0009 to solicitation N40085-26-R-9050 for repairs to MCB Camp Geiger, NC, issued by NAVPAC Mid-Atlantic on August 11, 2026, with an effective date of August 6, 2026. The amendment addresses a request for information regarding window specifications and provides updated technical documentation.
The amendment responds to a contractor question about the unavailability of hopper windows tested for large missile impact by authorizing a change from hopper to awning windows that project to the exterior. Section 08 51 13 (Aluminum Windows) is revised to reflect this change in Paragraph 2.1.1, and architectural drawings (Sheets A-201, A-202, A-203, and A-603, Window Marks A and B) are updated to specify awning function instead of hopper function for operable windows. The solicitation requires proposals to acknowledge receipt of this amendment prior to the proposal deadline of August 20, 2026 at 1:00 PM EST. The specification details requirements for aluminum window fabrication, installation, thermal performance, structural design (54 PSF wind loading for Marine Corps Base Camp Lejeune), large-missile impact protection for glazing within 30 feet of grade, and compliance with AAMA/WDMA/CSA standards. All other terms and conditions of the original solicitation remain unchanged. Project No. 25-0010 is administered by NAVPAC Mid-Atlantic, Resident Officer in Charge of Construction, Camp Lejeune, NC.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0013.pdf | ||
| Amend 0012.pdf | ||
| Amend 0011.pdf | ||
| Amend 0010.pdf | ||
| Amend 0008.pdf | ||
| Amend 0007.pdf | ||
| Amend 0006.pdf | ||
| Amend 0005.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| 25-0010 GEO.pdf | ||
| 25-0051 Asbestos and Lead Report.pdf | ||
| 25-0051 APPD.pdf | ||
| N4008525B0010 DWG_Signed.pdf | ||
| RFP 250010.pdf | ||
| 25-0051 SID.pdf | ||
| 25-0051 BOD.pdf | ||
| 25-0010 BOD.pdf | ||
| 25-0010 APPD.pdf | ||
| N4008525B0051 DWG_Signed.pdf | ||
| N4008525B0051 Specs.pdf | ||
| N4008525B0010 Specs.pdf | ||
| 25-0010 Lead and Asbestos Report.pdf | ||
| 25-0051 DM.pdf | ||
| 25-0010 SID.pdf | ||
| 25-0051 GEO.pdf | ||
| 25-0010 DM for Repair BEQ 702.pdf |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N40085-26-R-9050 Amendment 0009
CONTINUATION SHEET
1. QUESTION: We have checked several window manufactures and can not find one that has a window that projects to the interior that has been tested for large missile impact.
Will you consider changing to awning windows that project to the exterior.
ANSWER: Section 08 51 13, Paragraph 2.1.1. change "hopper" to "awning". Also, Sheets A- 201, A-202, A-203 and Sheet A-603, Window Marks A and B, change operable windows to awning function in lieu of hopper function. See updated documents below.
2. All other terms and conditions remain unchanged.
File details come from the government source that posted it. Updated .