Amend 0002.pdf

PDF 1 MB Posted

Attached to
Repair BEQ FC555
Solicitation number
N4008526R9043
Issued by

About this file

This is Amendment No. 0002 to Solicitation N40085-26-R-9043 for repair of Building Equipped Quarters (BEQ) FC555 at MCB Camp Lejeune, issued by NAVPAC Mid-Atlantic on June 23, 2026, with an effective date of June 12, 2026. The amendment provides clarifications to two line items in the pricing sheet based on contractor questions and answers.

The amendment revises ELIN 0001 to clarify that the price includes all interior and exterior renovations of FC555 per drawings and specifications, excluding work in ELINs 0002–0012, with all costs including overhead and profit. ELIN 0003 is revised to specify that asphalt pavement demolition and replacement for the parking lot (5,808 square yards) is included only in this ELIN and excluded from the base bid, with pricing structured as a unit price per square yard. All other terms and conditions remain unchanged. The proposal deadline remains July 13, 2026 at 2:00 PM EST, and contractors must acknowledge this amendment when submitting proposals. The complete pricing sheet encompasses 12 ELINs covering interior/exterior renovations, lightning protection, parking lot work, sidewalk replacement, asbestos removal, lead removal, soil replacement, buried utilities removal, formal partnering, roof repairs, and landscaping, with all offers requiring submission on all line items or facing rejection as non-responsive.

View the file

Other files

File Type Posted
Amend 0008.pdf PDF
Amend 0007.pdf PDF
Amend 0006.pdf PDF
Amend 0005.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amend 0001.pdf PDF
N4008525B0009 Specs.pdf PDF
25-0009 SID.pdf PDF
25-0009 BOD.pdf PDF
25-0009 Asbestos and Lead Survey.pdf PDF
25-0009 APPD.pdf PDF
25-0009 ACM Report.pdf PDF
RFP 250009.pdf PDF
N4008525B0009 DWGs.pdf PDF
25-0009 DM.pdf PDF
25-0009 GEO.pdf PDF
25-0009 FPDA.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N40085-26-R-9043 Amendment 0002 Page 2 of

CONTINUATION SHEET

1. QUESTION: Should there be a ELIN for the site work and utilities. There does not appear to be a line item for this work.

ANSWER: ELIN 0001 shall be revised to state the following. SEE UPDATED PRICING

SHEET BELOW.

"ELIN 0001: Price includes completing all work associated with the interior and exterior renovations of FC555 in accordance with the provided drawings and specifications, but excluding work described in ELIN 0002-0012. The price for this line item should include all applicable costs, overhead and profit for this work."

2. QUESTION: Is the base bid to include demo and replacement of the asphalt parking lot and ELIN 0003 mill and overlay in lieu of base bid.

ANSWER: No, demolition and replacement of the asphalt parking lot shall be included in ELIN 0003 only. ELIN 0003 shall be revised to state the following. SEE UPDATED PRICING

SHEET BELOW.

"ELIN 0003: Price includes completing all work associated with asphalt pavement, and pavement markings for the parking lot at BEQ FC555 (reference sheets CD103, CS102 & CS501) but excluding work described in ELIN 0001, 0002, and 0004-0012. The price for this line item should include all applicable costs, overhead and profit for this work."

3. All other terms and conditions remain unchanged.

REPAIR BEQ FC555 Solicitation No. N40085-26-R-9043 MCB Camp Lejeune Project No. 25-0009

PRICING SHEET

Under the line items furnished, the offers shall state prices for each Exhibit Line Item Number (ELIN) given hereinafter:

ELIN 0001

Price includes completing all work associated with the interior and exterior renovations of FC555 in accordance with the provided drawings and specifications, but excluding work described in ELIN 0002-0012. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0002

Price includes completing all work associated with installation of lightning protection in accordance with the provided drawings and specifications, but excluding work described in ELIN 0001, and 0003-0012. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0003

Price includes completing all work associated with asphalt pavement, and pavement markings for the parking lot at BEQ FC555 (reference sheets CD103, CS102 & CS501) but excluding work described in ELIN 0001, 0002, and 0004-0012. The price for this line item should include all applicable costs, overhead and profit for this work.

Quantity Unit Price Total

5,808 SY $ $

ELIN 0004

Price includes completing all work associated with replacement of sidewalks including demolition, sub-grade preparation, permits, and replacement (see detail A/CS501) but excluding work described in ELIN 0001-0003, 0005-0012. The price for this line item should include all applicable costs, overhead and profit for this work.

Quantity

Unit Price

Total

1,650 LF $ $

ELIN 0005

Price includes completing all work associated with unforeseen asbestos containing material (ACM) (piping, pipe insulation, HVAC insulation, etc.). This includes identification, removal, wetting/handling, proper packaging, and disposal of ACM in accordance with all state/federal asbestos handling laws. This excludes work described in ELIN 0001-0004, 0006-0012. The price for this line item should include all applicable costs, overhead and profit for this work.

Quantity Unit Price Total

100 LF $_________ $___________________________________

ELIN 0006

Price includes completing all work associated with unforeseen asbestos containing material (ACM) (Adhesives, vinyl floor tiles, wall and ceiling insulation, roofing, etc.). This includes identification, removal, wetting/handling, proper packaging, and disposal of ACM in accordance with all state/federal asbestos handling laws. This excludes work described in ELIN 0001-0005, and 0007-0012. The price for this line item should include all applicable costs, overhead and profit for this work.

1,000 SF $_________ $___________________________________

ELIN 0007

Price includes completing all work associated with unforeseen lead removal. This includes identification, scraping/removal, encapsulation, handling, proper packaging, and disposal of lead based material per local requirements of North Carolina. This excludes work described in ELIN 0001-0006, 0008-0012. The price for this line item should include all applicable costs, overhead and profit for this work.

Quantity Unit Price Total

1,000 SF $_________ $___________________________________

ELIN 0008

Price includes completing all work associated with removal, disposal, and replacement of unsuitable soil (non-contaminated) but excluding work described in ELIN 0001-0007, and 0009-0012. The price for this line item should include all applicable costs, overhead and profit for this work.

200 CY $ $

ELIN 0009

Price includes completing all work associated with removal, disposal, and replacement of unforeseen buried utilities (concrete duct banks, piping, cable, etc.), but excluding work described in ELIN 0001-0008, and 0010-0012. The price for this line item should include all applicable costs, overhead and profit for this work.

400 TONS $ $

ELIN 0010

Price includes completing all work associated with Formal Partnering, but excluding work described in ELIN 0001-0009, and 0011-0012. The price for this line item should

1___ $ $

ELIN 0011

Price includes completing all work associated with replacement of 10% of the existing roof underlayment and plywood sheathing, and replacement of five (5) damaged roof trusses, but excluding work described in ELIN 0001-0010, and 0012. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0012

Price includes completing all work associated with landscaping including landscape bed surrounding BEQ with aluminum edging, landscape weed control fabric, river rock, and ornamental grass to be executed at the end of construction (see sheets L701 and L702), but excluding work described in ELIN 0001-0011. The price for this line item should

TOTAL ELIN 0001 - 0012: $______________________________________

Notes A. Offers must be submitted on all line items. Failure to propose on all line items may result in the offer being rejected as non-responsive.

B. ELINs shall include all markups (overhead, labor burden, and profit).

C. Evaluation of Options (NOV 2025). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for ELINs 0001 through 0012. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).

File details come from the government source that posted it. Updated .