N4008525B0009 Specs.pdf

PDF 11 MB Posted

Attached to
Repair BEQ FC555
Solicitation number
N4008526R9043
Issued by

About this file

This is a specifications document for a repair project at Bachelor Enlisted Quarters (BEQ) facility FC555 located in the Camp Lejeune area of responsibility. The project is being solicited under solicitation number N4008526R9043 by the Department of the Navy Naval Facilities Engineering Command and is restricted to General MACC (Military Construction and Maintenance Contractors) contractors listed on the General Requirements cover page. The repair scope of work and applicable drawings are included in the attached documentation. This is a ROICC (Resident Officer in Charge of Construction) Camp Lejeune project, indicating it falls under the Navy's regional facilities management oversight for this geographic area.

The specifications document provides the technical requirements and detailed guidance necessary for qualified contractors to develop accurate repair proposals. Eligible contractors must verify their General MACC listing status prior to submission and review all attached scope documents and drawings to understand the full extent of work required for the BEQ facility repairs.

View the file

Other files

File Type Posted
Amend 0008.pdf PDF
Amend 0007.pdf PDF
Amend 0006.pdf PDF
Amend 0005.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
25-0009 SID.pdf PDF
25-0009 BOD.pdf PDF
25-0009 Asbestos and Lead Survey.pdf PDF
25-0009 APPD.pdf PDF
25-0009 ACM Report.pdf PDF
25-0009 DM.pdf PDF
RFP 250009.pdf PDF
N4008525B0009 DWGs.pdf PDF
25-0009 GEO.pdf PDF
25-0009 FPDA.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT N40085-25-B-0009

NAVFAC SPECIFICATION

NO. 05-25-0009

REPAIRS BEQ FC555

AT THE

MARINE CORPS BASE, CAMP LEJEUNE, NORTH CAROLINA

DESIGN BY:

MBF ARCHITECTS, P.A.

317-C POLLOCK ST.

NEW BERN, NC 28560

A/E Contract: N40085-22-D-0005

SPECIFICATION PREPARED BY:

Darden J. Eure, III MBF Architects, PA

Date: 13 May 2026

SPECIFICATION APPROVED BY:

Christopher J. Maas, PE, Director Design Branch Public Works Division

Jonathan D. McGuire, Commander, CEC, U.S. Navy for Commander, Naval Facilities Engineering Command

05250009

SECTION COVER Page 1

13 May 2026

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION COVER Page 2

Repair BEQ FC555 PROJECT NO.: 25-0009 MCB Camp Lejeune, NC 13 May 2026

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 08/25 SUMMARY OF WORK

01 14 00 04/22 WORK RESTRICTIONS (MCBL)

01 20 00 11/20, CHG 3: 02/23 PRICE AND PAYMENT PROCEDURES

01 30 00 08/25 ADMINISTRATIVE REQUIREMENTS

01 31 23.13 20 05/17, CHG 7: 11/21 ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

01 31 50 04/22 TRANSFER AND ACCEPTANCE OF MILITARY

REAL PROPERTY

01 32 16.00 20 08/18, CHG 1: 08/20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

01 33 00 04/22 SUBMITTAL PROCEDURES

01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND

REPORTING

01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 29.13 11/15, CHG 1: 08/22 HEALTH, SAFETY, AND EMERGENCY RESPONSE

PROCEDURES FOR CONTAMINATED SITES

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 08/23 QUALITY CONTROL

01 50 00 12/21 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 09/25 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 04/22 CLOSEOUT SUBMITTALS

01 78 23 04/22 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 03/23 FACILITY ELECTRONIC OPERATION AND

MAINTENANCE SUPPORT INFORMATION (eOMSI)

01 78 30.00 22 5/22 GIS DATA DELIVERABLES

DIVISION 02 - EXISTING CONDITIONS

02 41 00 08/22 DEMOLITION

02 41 01 08/22 BUILDING DECONSTRUCTION

02 82 00 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION

02 83 00 08/25 LEAD REMEDIATION

DIVISION 03 - CONCRETE

03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE

03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE

(SIDEWALKS)

03 45 33 05/16, CHG 1: 11/21 PRECAST STRUCTURAL CONCRETE

DIVISION 04 - MASONRY

04 20 01 11/15, CHG 2: 05/19 MASONRY INFILL AND PATCHING

DIVISION 05 - METALS

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING

05 50 13 08/24, CHG 1: 08/25 MISCELLANEOUS METAL FABRICATIONS

05 51 33 02/16, CHG 2: 02/18 METAL LADDERS

05 52 01 02/18, CHG 1: 02/20 ALUMINUM RAILINGS

PROJECT TABLE OF CONTENTS Page 1

SCHEDULE OF FIRE PROTECTION SYSTEM INSPECTIONS

SUBMITTAL REGISTER

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 3: 05/25 ROUGH CARPENTRY

06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

06 82 14 08/23 DECORATIVE FIBERGLASS REINFORCED

PLASTIC (FRP)

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 19 00 05/11, CHG 1: 08/17 WATER REPELLENTS

07 21 13 08/23, CHG 1: 08/25 BOARD AND BLOCK INSULATION

07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION

07 22 00 08/23 ROOF AND DECK INSULATION

07 27 19.01 08/23, CHG 1: 08/24 SELF-ADHERING AIR BARRIERS

07 27 26 08/23 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 08/23 SPRAY FOAM AIR BARRIERS

07 60 00 08/23, CHG 1: 05/25 FLASHING AND SHEET METAL

07 61 15.00 20 08 March 2021 CL ALUMINUM STANDING SEAM ROOFING

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/23 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 14 00 08/16, CHG 1: 08/18 WOOD DOORS

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 51 13 05/19 ALUMINUM WINDOWS

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 06/24 MCBCL CL ALUMINUM WALL LOUVERS

DIVISION 09 - FINISHES

09 03 00 03/22 LOW PRESSURE BUILDING CLEANING

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR GYPSUM BOARD

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 65 00 11/24 RESILIENT FLOORING

09 67 23.13 11/19 STANDARD RESINOUS FLOORING

09 72 00 08/17, CHG 1: 08/18 WALLCOVERINGS

09 90 00 02/21 PAINTS AND COATINGS

09 97 11 05/24 PEDESTRIAN TRAFFIC EPOXY COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE

10 14 00.20 08/20 INTERIOR SIGNAGE

10 28 13 08/20 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

10 50 00 02/16 MISCELLANEOUS SPECIALTIES

DIVISION 11 - EQUIPMENT

11 24 24 08/20 PERMANENT HORIZONTAL FALL PROTECTION,

METAL ROOFING

PROJECT TABLE OF CONTENTS Page 2

DIVISION 12 - FURNISHINGS

12 24 13 08/20 ROLLER WINDOW SHADES

DIVISION 21 - FIRE SUPPRESSION

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

DIVISION 22 - PLUMBING

22 00 00 05/24, CHG 1: 11/24 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 03 00.00 20 08/24 MCBCL BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 05/22, CHG 1: 02/24 COMMON PIPING FOR HVAC

23 05 48.19 05/18 BRACING FOR HVAC

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 09 00 02/25 MCBCL INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 02/25 MCBCL INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 02/25 MCBCL BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 21 13.00 20 04/06, CHG 2: 11/19 LOW TEMPERATURE WATER (LTW) HEATING

SYSTEM

23 23 00 08/21 REFRIGERANT PIPING

23 24 00 08/10 HYDRONIC PIPE CLEANING AND FLUSHING

PROCEDURES

23 25 00 05/21 CHEMICAL TREATMENT OF WATER FOR

MECHANICAL SYSTEMS

23 30 00 02/25 HVAC AIR DISTRIBUTION

23 52 43.00 20 05/15, CHG 2: 08/18 LOW PRESSURE WATER HEATING BOILERS

(UNDER 800,000 BTU/HR OUTPUT)

23 64 10 05/25 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 08/09, CHG 5: 11/19 CHILLED WATER PIPING SYSTEMS

23 74 33 05/24 DEDICATED OUTDOOR AIR SYSTEMS (DOAS)

23 81 00 05/24 DECENTRALIZED UNITARY HVAC EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.00 09/22 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS - ISOLATED SYSTEMS

DIVISION 26 - ELECTRICAL

26 05 73 08/23 POWER SYSTEM STUDIES

26 08 00 11/22 APPARATUS INSPECTION AND TESTING

26 12 19 05/24 PAD-MOUNTED, LIQUID-FILLED,

MEDIUM-VOLTAGE TRANSFORMERS

26 20 00 05/25, CHG 1: 08/25 INTERIOR DISTRIBUTION SYSTEM

26 24 13 08/21 SWITCHBOARDS

26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING

26 41 00 08/23 LIGHTNING PROTECTION SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 56 00 08/21 EXTERIOR LIGHTING

PROJECT TABLE OF CONTENTS Page 3

DIVISION 27 - COMMUNICATIONS

27 10 00 04/22 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM (MCBCL)

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 08/23 EARTHWORK

31 11 00 11/18 CLEARING AND GRUBBING

31 31 16.13 08/22, CHG 1: 11/23 CHEMICAL TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 05 33 08/17 LANDSCAPE ESTABLISHMENT

32 11 23 05/22 AGGREGATE BASE COURSE

32 11 26 05/20 HOT-MIX BITUMINOUS BASE COURSE FOR

ROADS AND STREETS

32 17 23.16 11/24 ROAD AND PARKING LOT PAVEMENT MARKINGS

32 31 13.53 11/21 HIGH-SECURITY FENCES (ORNAMENTAL) AND

GATES

32 92 23 04/06, CHG 1: 08/21 SODDING

32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00 08/24 WATER UTILITY DISTRIBUTION PIPING

33 30 00 05/18 SANITARY SEWERAGE

33 40 00 11/21 STORMWATER UTILITIES

33 61 14 02/10 EXTERIOR BURIED PREINSULATED WATER

PIPING

33 71 01 02/26 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 08/22 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

APPENDIX

HAZARDOUS MATERIALS SURVEY

LIST OF DRAWINGS

Contract drawings are as follows:

SHEET

NO. TITLE

G GENERAL

60042589 G-001 TITLE SHEET AND INDEX OF DRAWINGS

GI LIFE SAFETY

60042590 GI001 LIFE SAFETY GENERAL NOTES AND LEGEND

60042591 GI002 CODE COMPLIANCE SITE PLAN

60042592 GI101 LIFE SAFETY FIRST FLOOR PLAN

60042593 GI102 LIFE SAFETY SECOND FLOOR PLAN

60042594 GI103 LIFE SAFETY THIRD FLOOR PLAN

C CIVIL

60042595 C-001 CIVIL NOTES, LEGEND AND ABBREVIATIONS

60042596 CD101 SITE PLAN - EXISTING CONDITIONS AND DEMOLITION

60042597 CD102 ENLARGED SITE DEMOLITION PLAN

60042598 CD103 SITE PLAN - EXISTING CONDITIONS AND DEMOLITION

60042599 CS101 SITE PLAN - NEW WORK

60042600 CS102 SITE PLAN - NEW WORK

60042601 CG101 GUTTER LEADER SYSTEM

60042602 CG102 SITE GRADING PLAN

60042603 CG103 SITE GRADING PLAN

60042604 CU101 SITE UTILITY PLAN

60042605 CU102 ENLARGED SITE UTILITY PLAN

60042606 CS501 DETAILS

60042607 CS502 DETAILS

60042608 CG501 DETAILS

60042609 CG502 DETAILS

60042610 CU501 DETAILS

60042611 L-701 SITE LANDSCAPE PLAN

60042612 L-702 DETAILS

S STRUCTURAL

60042613 S-101 GENERAL NOTES

60042614 S-102 CONCRETE REPAIR PLAN

60042615 S-103 FIRST FLOOR, ROOF AND ATTIC REPAIR PLANS

60042616 S-104 MECHANICAL EQUIPMENT BUILDING - CONSTRUCTION

60042617 S-201 MECHANICAL EQUIPMENT BUILDING SECTIONS

60042618 S-501 TYPICAL CONSTRUCTION DETAILS

A ARCHITECTURAL

60042619 A-001 SYMBOL LEGEND AND ABBREVIATIONS

60042620 AD101 FIRST AND SECOND FLOOR PLANS - EXISTING/DEMOLITION

60042621 AD102 THIRD FLOOR PLAN - EXISTING/DEMOLITION

60042622 AD103 ATTIC AND ROOF PLANS - EXISTING/DEMOLITION

60042623 AD104 FIRST AND SECOND FLOOR REFLECTED CEILING PLANS

- EXISTING/DEMOLITION

60042624 AD105 THIRD FLOOR REFLECTED CEILING PLAN - EXISTING/DEMOLITION

60042625 AD110 BUILDING FC556- EXISTING/DEMOLITION

60042626 AD201 EXTERIOR ELEVATIONS - EXISTING/DEMOLITION

60042627 AD401 ENLARGED FLOOR PLANS- EXISTING/DEMOLITION

60042628 AD402 ENLARGED FLOOR PLANS- EXISTING/DEMOLITION

60042629 AD403 ENLARGED FLOOR PLANS- EXISTING/DEMOLITION

SECTION DWGLIST - SI Template Page 1

SHEET

NO. TITLE

60042630 A-101 FIRST AND SECOND FLOOR PLANS - CONSTRUCTION

60042631 A-102 THIRD FLOOR PLAN - CONSTRUCTION

60042632 A-103 ATTIC AND ROOF PLANS - CONSTRUCTION

60042633 A-104 FIRST AND SECOND FLOOR REFLECTED CEILING PLANS

- CONSTRUCTION

60042634 A-105 THIRD FLOOR REFLECTED CEILING PLAN - CONSTRUCTION

60042635 A-110 BUILDING FC555B PLANS AND DETAILS - CONSTRUCTION

60042636 A-111 BUILDING FC555B EXTERIOR ELEVATIONS, SECTIONS, AND DETAILS

- CONSTRUCTION

60042637 A-201 EXTERIOR ELEVATIONS - CONSTRUCTION

60042638 A-301 BUILDING SECTIONS

60042639 A-310 WALL SECTIONS

60042640 A-401 ENLARGED PLANS - CONSTRUCTION

60042641 A-402 ENLARGED PLANS - CONSTRUCTION

60042642 A-403 ENLARGED PLANS - CONSTRUCTION

60042643 A-404 ENLARGED REFLECTED CEILING PLANS - CONSTRUCTION

60042644 A-405 ENLARGED REFLECTED CEILING PLANS - CONSTRUCTION

60042645 A-406 ENLARGED SLEEPING ROOM BATH, INTERIOR ELEVATIONS, AND

DETAILS

60042646 A-407 ENLARGED TOILET PLANS, INTERIOR ELEVATIONS, AND DETAILS

60042647 A-408 ENLARGED LAUNDRY ELEVATIONS AND DETAILS

60042648 A-501 ASSEMBLIES

60042649 A-502 DETAILS

60042650 A-503 DETAILS

60042651 A-504 DETAILS

60042652 A-505 GUARDRAIL DETAILS

60042653 A-601 DOOR AND FRAME SCHEDULE AND DETAILS

60042654 A-602 DOOR AND FRAME DETAILS

60042655 A-603 DOOR AND FRAME DETAILS

60042656 A-604 WINDOW SCHEDULE AND DETAILS

AI ARCHITECTURAL INTERIOR

60042657 AI101 FIRST AND SECOND FLOOR FURNITURE PLANS

60042658 AI102 SECOND FLOOR FURNITURE PLAN

I INTERIOR DESIGN

60042659 I-101 FIRST FLOOR FINISH PLAN

60042660 I-102 SECOND FLOOR FINISH PLAN

60042661 I-103 THIRD FLOOR FINISH PLAN

60042662 I-111 FIRST FLOOR SIGNAGE PLAN

60042663 I-112 SECOND FLOOR SIGNAGE PLAN

60042664 I-113 THIRD FLOOR SIGNAGE PLAN

60042665 I-201 INTERIOR ELEVATIONS

60042666 I-202 INTERIOR ELEVATIONS

60042667 I-301 CASEWORK SECTIONS

60042668 I-401 ENLARGED FINISH PLANS

60042669 I-402 ENLARGED SIGNAGE PLAN

60042670 I-501 SIGNAGE DETAILS

60042671 I-502 INTERIOR DETAILS

60042672 I-601 SCHEDULES & LEGEND

F FIRE PROTECTION

60042673 FD001 FIRE PROTECTION DEMOLITION GENERAL NOTES AND LEGEND

60042674 FD101 FIRE PROTECTION DEMOLITION FIRST FLOOR PLAN

60042675 FD102 FIRE PROTECTION DEMOLITION SECOND FLOOR PLAN

60042676 FD103 FIRE PROTECTION DEMOLITION THIRD FLOOR PLAN

60042677 FD104 FIRE PROTECTION DEMOLITION ATTIC PLAN

SECTION DWGLIST - SI Template Page 2

SHEET

NO. TITLE

60042678 FA001 FIRE ALARM GENERAL NOTES AND LEGEND

60042679 FA101 FIRE ALARM FIRST FLOOR PLAN

60042680 FA102 FIRE ALARM SECOND FLOOR PLAN

60042681 FA103 FIRE ALARM THIRD FLOOR PLAN

60042682 FA501 FIRE ALARM DETAILS

60042683 FA502 FIRE ALARM DETAILS

60042684 FX001 FIRE SUPPRESSION GENERAL NOTES AND LEGEND

60042685 FX101 FIRE SUPPRESSION FIRST FLOOR PLAN

60042686 FX102 FIRE SUPPRESSION SECOND FLOOR PLAN

60042687 FX103 FIRE SUPPRESSION THIRD FLOOR PLAN

60042688 FX501 FIRE SUPPRESSION DETAILS

P PLUMBING

60042689 P-001 PLUMBING COVER SHEET

60042690 PD101 FIRST AND SECOND FLOOR PLANS - EXISTING/DEMOLITION -

PLUMBING

60042691 PD102 THIRD FLOOR PLAN - EXISTING/DEMOLITION - PLUMBING

60042692 P-101 FIRST AND SECOND FLOOR PLANS - WASTE AND WENT

60042693 P-102 THIRD AND ATTIC FLOOR PLANS - WASTE AND VENT

60042694 P-103 PARTIAL ENLARGED FLOOR PLANS - FIRST FLOOR - WASTE AND

VENT

60042695 P-104 PARTIAL ENLARGED FLOOR PLANS - SECOND FLOOR - WASTE AND

VENT

60042696 P-105 PARTIAL ENLARGED FLOOR PLANS - THIRD FLOOR - WASTE AND

VENT

60042697 P-106 FIRST AND SECOND FLOOR PLANS - WATER

60042698 P-107 THIRD FLOOR PLAN - WATER

60042699 P-108 PARTIAL ENLARGED FLOOR PLANS - FIRST FLOOR - WATER

60042700 P-109 PARTIAL ENLARGED FLOOR PLANS - SECOND FLOOR - WATER

60042701 P-110 PARTIAL ENLARGED FLOOR PLANS - THIRD FLOOR - WATER

60042702 P-501 PLUMBING DETAILS

60042703 P-601 PLUMBING SCHEDULES

60042704 P-701 RISER DIAGRAMS - WASTE AND VENT

60042705 P-702 RISER DIAGRAMS - WATER

M MECHANICAL

60042706 M-001 MECHANICAL NOTES, LEGEND & ABBREVIATIONS

60042707 MD101 OVERALL FIRST FLOOR PLAN - MECHANICAL DEMOLITION

60042708 MD102 OVERALL SECOND FLOOR PLAN - MECHANICAL DEMOLITION

60042709 MD103 OVERALL THIRD FLOOR PLAN - MECHANICAL DEMOLITION

60042710 MD104 OVERALL ROOF FLOOR PLAN - MECHANICAL DEMOLITION

60042711 MD105 ENLARGED FIRST FLOOR PLAN - TYPICAL SLEEPING ROOM

- MECHANICAL DEMOLITION

60042712 MD106 ENLARGED FIRST FLOOR PLAN - MECHANICAL ROOMS

- MECHANICAL DEMOLITION

60042713 MD107 ENLARGED FIRST FLOOR PLAN - CENTRAL CORE

- MECHANICAL DEMOLITION

60042714 MD108 ENLARGED SECOND FLOOR PLAN - MECHANICAL ROOMS

- MECHANICAL DEMOLITION

60042715 MD109 ENLARGED SECOND FLOOR PLAN - CENTRAL CORE

- MECHANICAL DEMOLITION

60042716 MD110 ENLARGED THIRD FLOOR PLAN - MECHANICAL ROOMS

- MECHANICAL DEMOLITION

60042717 MD111 ENLARGED THIRD FLOOR PLAN - CENTRAL CORE

- MECHANICAL DEMOLITION

60042718 MD112 SITE PLAN - MECHANICAL DEMOLITION

60042719 MD113 ENLARGED MECHANICAL BUILDINGS - MECHANICAL DEMOLITION

SECTION DWGLIST - SI Template Page 3

SHEET

NO. TITLE

60042720 M-101 OVERALL FIRST FLOOR PLAN - MECHANICAL

60042721 M-102 OVERALL SECOND FLOOR PLAN - MECHANICAL

60042722 M-103 OVERALL THIRD FLOOR PLAN - MECHANICAL

60042723 M-104 OVERALL ATTIC FLOOR PLAN - MECHANICAL

60042724 M-105 ENLARGED FIRST FLOOR PLAN - TYPICAL SLEEPING ROOM

- MECHANICAL

60042725 M-106 ENLARGED FIRST FLOOR PLAN - MECHANICAL ROOMS - MECHANICAL

60042726 M-107 ENLARGED FIRST FLOOR PLAN - CENTRAL CORE - MECHANICAL

60042727 M-108 ENLARGED SECOND FLOOR PLAN - MECHANICAL ROOMS - MECHANICAL

60042728 M-109 ENLARGED SECOND FLOOR PLAN - CENTRAL CORE - MECHANICAL

60042729 M-110 ENLARGED THIRD FLOOR PLAN - MECHANICAL ROOMS - MECHANICAL

60042730 M-111 ENLARGED THIRD FLOOR PLAN - CENTRAL CORE - MECHANICAL

60042731 M-112 SITE PLAN - MECHANICAL

60042732 M-113 ENLARGED MECHANICAL BUILDINGS - MECHANICAL

60042733 M-301 MECHANICAL SECTION VIEWS

60042734 M-302 MECHANICAL SECTION VIEWS

60042735 M-303 MECHANICAL SECTION VIEWS

60042736 M-501 MECHANICAL DETAILS

60042737 M-502 MECHANICAL DETAILS

60042738 M-503 MECHANICAL DETAILS

60042739 M-504 MECHANICAL DETAILS

60042740 M-505 MECHANICAL DETAILS

60042741 M-506 MECHANICAL DETAILS

60042742 M-601 MECHANICAL SCHEDULES

60042743 M-602 MECHANICAL SCHEDULES

60042744 M-603 MECHANICAL SCHEDULES

60042745 M-604 MECHANICAL SCHEDULES

60042746 M-701 MECHANICAL CONTROLS

60042747 M-702 MECHANICAL CONTROLS

60042748 M-703 MECHANICAL CONTROLS

60042749 M-704 MECHANICAL CONTROLS

60042750 M-705 MECHANICAL CONTROLS

60042751 M-706 MECHANICAL CONTROLS

60042752 M-801 EXISTING DUAL TEMPERATURE WATER SYSTEM DIAGRAM

60042753 M-802 CHILLED WATER SYSTEM DIAGRAM

60042754 M-803 HOT WATER SYSTEM DIAGRAM

60042755 M-901 3D ISOMETRIC VIEWS

E ELECTRICAL

60042756 E-001 ELECTRICAL NOTES AND LEGENDS

60042757 ES101 SITE PLAN - ELECTRICAL

60042758 ES501 SITE ELECTRICAL DETAILS

60042759 ES502 SITE ELECTRICAL DETAILS

60042760 ED101 OVERALL FLOOR PLANS - ELECTRICAL DEMOLITION

60042761 ED102 OVERALL FLOOR PLANS - ELECTRICAL DEMOLITION

60042762 ED103 TYPICAL SLEEPING ROOM PLAN - ELECTRICAL DEMOLITION

60042763 ED104 FIRST FLOOR PLANS - ELECTRICAL DEMOLITION

60042764 ED105 SECOND FLOOR PLANS - ELECTRICAL DEMOLITION

60042765 ED106 THIRD FLOOR PLANS - ELECTRICAL DEMOLITION

60042766 ED107 MECHANICAL BUILDING PLANS - ELECTRICAL DEMOLITION

60042767 E-101 OVERALL FLOOR PLANS - ELECTRICAL

60042768 E-102 OVERALL FLOOR PLANS - ELECTRICAL

60042769 E-103 OVERALL FLOOR PLANS - CABLE TRAY

60042770 E-104 TYPICAL SLEEPING ROOM PLAN - ELECTRICAL

60042771 E-105 FIRST FLOOR PLANS - ELECTRICAL

60042772 E-106 FIRST FLOOR PLANS - ELECTRICAL

60042773 E-107 SECOND FLOOR PLANS - ELECTRICAL

SECTION DWGLIST - SI Template Page 4

SHEET

NO. TITLE

60042774 E-108 SECOND FLOOR PLANS - ELECTRICAL

60042775 E-109 THIRD FLOOR PLANS - ELECTRICAL

60042776 E-110 THIRD FLOOR PLANS - ELECTRICAL

60042777 E-111 ROOF PLAN - LIGHTNING PROTECTION

60042778 E-112 MECHANICAL BUILDING PLANS - ELECTRICAL

60042779 E-501 ELECTRICAL DETAILS

60042780 E-502 ELECTRICAL DETAILS

60042781 E-503 ELECTRICAL DETAILS

60042782 E-504 ELECTRICAL DETAILS

60042783 E-505 ELECTRICAL DETAILS

60042784 E-601 ELECTRICAL SCHEDULES

60042785 E-602 ELECTRICAL SCHEDULES

60042786 E-603 ELECTRICAL SCHEDULES

60042787 E-604 ELECTRICAL SCHEDULES

60042788 E-605 ELECTRICAL SCHEDULES

60042789 E-606 ELECTRICAL SCHEDULES

60042790 E-607 ELECTRICAL SCHEDULES

60042791 E-701 ELECTRICAL RISER DIAGRAM

SECTION DWGLIST - SI Template Page 5

SECTION DWGLIST - SI Template Page 6

SECTION 01 11 00

SUMMARY OF WORK

08/25

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

The work includes the repair and renovation of building FC555, demolition of existing mechanical building FC556, construction of a new mechanical building adjacent to building FC555, and the construction of a new trash dumpster enclosure and incidental related work.

1.1.2 Location

The work shall be located at the Marine Corps Base Camp Lejeune, North Carolina, at the building and/or area as described in the project description above . The exact location will be indicated by the Contracting Officer.

1.2 PHASED CONSTRUCTION SCHEDULE

Within the overall project schedule, commence and complete the work in phases as described in the project description above.

1.3 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

1.4 LOCATION OF UNDERGROUND FACILITIES

The Contractor will be responsible for obtaining the services of a professional utility locator to scan the construction site with electromagnetic or sonic equipment, and mark the surface of the ground where existing underground utilities are discovered. If the underground utility cannot be confirmed, the contractor shall pot-hole area until piping location is verified. Dowsing or any other type of divination method is not considered an acceptable practice for locating utilities on board MCB Camp Lejeune. Verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated or specified to be removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be

SECTION 01 11 00 Page 1 installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.4.1 Notification Prior to Excavation

Notify the Contracting Officer's Representative (COR) 48 hours prior to starting excavation work.

1.5 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT

Government furnished material and equipment will be indicated on drawings and in scope of work if applicable.

1.6 MARINE CORPS ENTERPRISE NETWORK (MCEN) COORDINATION REQUIREMENTS

1.6.1 BaseTel Access

Allow BaseTel access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections. Coordinate efforts with BaseTel to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer Representative has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with BaseTel into the construction schedule to demonstrate a plan for maintaining the Contract duration.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 2

SECTION 01 14 00

WORK RESTRICTIONS (MCBL)

04/22

PART 1 GENERAL

1.1 SUBMITTALS

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel

1.2 SPECIAL SCHEDULING REQUIREMENTS

a. The Contractor shall comply with all special scheduling requirements as described in the attached project description, and as noted on the drawings.

d. Permission to interrrupt any Station roads, railroads, and/or utility service shall be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, include delivery vehicles, are clearly identified with their company name.

1.3.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.3.1.2 Installation Access

Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html . No fees are associated with obtaining a DBIDS credential.

Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.

SECTION 01 14 00 Page 1

The following are specific details regarding contractor personnel requirements. For the most up-to-date information regarding Base Access please visit https://www.lejeune.marines.mil/Base-Access/.

1.3.1.2.1 Registration for DBIDS

Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html . Procedure includes:

a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.

b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html .

d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.

e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.

1.3.1.2.2 DBIDS Eligibility Requirements

Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.

The Government is the final authority.

1.3.1.2.3 DBIDS Notification Requirements

a. Immediately report instances of lost or stolen badges to the Contracting Officer.

b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:

(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.

SECTION 01 14 00 Page 2

1.3.1.2.4 One-Day Passes

Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

1.3.2 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.3.3 Working Hours

Regular working hours shall be 0730-1600, Monday through Friday, excluding Government holidays .

1.3.4 Work Outside Regular Hours

Work outside regular working hours requires COR approval. Provide written request at least 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress. During periods of darkness, the different parts of the work shall be lighted in a manner approved by the COR.

1.3.5 Occupied Building and Existing Buildings

The Contractor shall be working in portions of an existing building which is occupied. The existing building and its contents shall be kept secure at all times.

1.3.6 Utility Cutovers and Interruptions

a. The Contractor shall coordinate a minimum of 14 calendar days prior to any planned utility cutover / interruption. Make utility cutovers and interruptions OUTSIDE normal working hours. Working hours are indicated on the drawings.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air shall be considered utility cutovers. This time limit includes time for deactivation and reactivation.

d. Operation of Station Utilities: The Contractor shall not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor shall notify the Contracting Officer at least 15 days prior to such operation.

SECTION 01 14 00 Page 3

1.4 SECURITY REQUIREMENTS

Contract Clause "FAR 52.204-2, Security Requirements and Alternate II," "FAC 5252.236-9301, Special Working Conditions and Entry to Work Area," apply.

1.5 EMERGENCY UNEXPLODED ORDNANCE (UXO) RESPONSE

In the event that UXO, as defined in 40 CFR 260 is encountered during the construction activities that is deemed to be a threat to human health or the environment, Camp Lejeune Military Police and EOD professionals shall be immediately contacted to conduct an emergency response. Additionally, immediately contact the Contracting Officer if UXO is encountered. An evaluation of this scenario and procedures, with contract numbers, shall be included in the Health and Safety Plan (HASP) for the fieldwork.

1.5.1 3R TRAINING

All Contractor personnel performing ground disturbing activities must complete contractor awareness training related to recognizing UXO. This training (3R TRAINING) is available online at:

http://www.lejeune.marines.mil/OfficesStaff/EnvironmentalMgmt/TrainingVideo.aspx

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 14 00 Page 4

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

11/20, CHG 3: 02/23

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EP 1110-1-8 (2021) Engineering and Design -- Construction Equipment Ownership and Operating Expense Schedule

1.2 SUBMITTALS

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Schedule of Prices ; G

1.3 SCHEDULE OF PRICES

1.3.1 Data Required

Within 15 calendar days of notice of award, prepare and deliver to COR a schedule of prices (construction contract). Schedule of Prices must have cost summarized and totals provided for each construction category.

Provide a detailed breakdown of the Contract price, giving quantities for each of the various kinds of work, unit prices and extended prices.

Schedule of prices shall be separated by individual building numbers with subtotals for each building. Contractor overhead and profit including salaries for field office personnel, if applicable, must be proportionately spread over all pay items and not included as individual pay items.

1.3.2 Payment Schedule Instructions

Payments will not be made until the Schedule of Prices has been submitted to and accepted by the Contracting Officer.

Additionally, the Schedule of Prices must be separated as follows:

a. Primary Facilities Cost Breakdown:

Defined as work on the primary facilities out to the 5 foot line.

Work out to the 5 foot line includes construction encompassed within a theoretical line 5 foot from the face of exterior walls and includes attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 5 foot line.

SECTION 01 20 00 Page 1

b. Supporting Facilities Cost Breakdown:

Defined as site work, including incidental work, outside the 5 foot line.

1.4 CONTRACT MODIFICATIONS

In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, base equipment use rates upon the applicable provisions of the

EP 1110-1-8 .

1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT

1.5.1 Content of Invoice

Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27 Prompt Payment for Construction Contracts and FAR 52.232-5 Payments Under Fixed-Price Construction Contracts. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies. The requests for payment shall include the documents listed below.

a. The Contractor's invoice, on NAVFAC Form 7300/30 furnished by the Government, showing in summary form, the basis for arriving at the amount of the invoice. Form 7300/30 must include certification by Quality Control (QC) Manager as required by the Contract.

b. The Estimate for Voucher/ Contract Performance Statement on NAVFAC Form 4330/54 furnished by the Government. Use NAVFAC Form 4330, unless otherwise directed by the Contracting Officer, on NAVFAC Contracts when a Monthly Estimate for Voucher is required.

c. Contractor's Monthly Estimate for Voucher and Contractors Certification (NAVFAC Form 4330) with Subcontractor and supplier payment certification. Other documents, including but not limited to, that need to be received prior to processing payment include the following submittals as required. These items are still required monthly even when a pay voucher is not submitted.

d. Monthly Work-hour report.

e. Updated Construction Progress Schedule and tabular reports required by the contract.

f. Contractor Safety Self Evaluation Checklist.

g. Updated submittal register.

h. Solid Waste Disposal Report.

i. Certified payrolls.

j. Updated testing logs.

k. Other supporting documents as requested.

SECTION 01 20 00 Page 2

1.5.2 Submission of Invoices

If DFARS Clause 252.232-7006 Wide Area WorkFlow Payment Instructions is included in the Contract, provide the documents listed in above paragraph CONTENT OF INVOICE in their entirety as attachments in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction, provide it as instructed by the Contracting Officer.

Monthly invoices and supporting forms for work performed through the anniversary award date of the Contract must be submitted to the Contracting Officer within 5 calendar days of the date of invoice. For example, if Contract award date is the 7th of the month, the date of each monthly invoice must be the 7th and the invoice must be submitted by the 12th of the month.

1.5.3 Final Invoice

a. A final invoice must be accompanied by the certification required by DFARS 252.247.7023 Transportation of Supplies by Sea, and the Contractor's Final Release. If the Contractor is incorporated, the Final Release must contain the corporate seal. An officer of the corporation must sign and the corporate secretary must certify the Final Release.

b. For final invoices being submitted via WAWF, the original Contractor's Final Release Form and required certification of Transportation of Supplies by Sea must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final Release Form and required certification of Transportation of Supplies by Sea has been confirmed by the Contracting Officer, the Contractor must then submit final invoice and attach a copy of the Final Release Form and required certification of Transportation of Supplies by Sea in WAWF.

c. Final invoices not accompanied by the Contractor's Final Release and required certification of Transportation of Supplies by Sea will be considered incomplete and will be returned to the Contractor.

1.6 PAYMENTS TO THE CONTRACTOR

Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous payments to the Contractor.

1.6.1 Obligation of Government Payments

The obligation of the Government to make payments required under the provisions of this Contract will, at the discretion of the Contracting Officer, be subject to reductions and suspensions permitted under the FAR and agency regulations including the following in accordance with FAR

32.103 Progress Payments Under Construction Contracts:

a. Reasonable deductions due to defects in material or workmanship;

b. Claims which the Government may have against the Contractor under or in connection with this Contract;

SECTION 01 20 00 Page 3

c. Unless otherwise adjusted, repayment to the Government upon demand for overpayments made to the Contractor; and

d. Failure to maintain accurate "as-built" or record drawings in accordance with FAR 52.236.21.

1.6.2 Payment for Onsite and Offsite Materials

Progress payments may be made to the Contractor for materials delivered on the site, for materials stored off construction sites, or materials that are in transit to the construction sites under the following conditions:

a. FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts.

b. Materials delivered on the site but not installed, including completed preparatory work, and off-site materials to be considered for progress payment must be major high cost, long lead, special order, or specialty items, not susceptible to deterioration or physical damage in storage or in transit to the construction site. Examples of materials acceptable for payment consideration include, but are not limited to, structural steel, non-magnetic steel, non-magnetic aggregate, equipment, machinery, large pipe and fittings, precast/prestressed concrete products, plastic lumber (e.g., fender piles/curbs), and high-voltage electrical cable. Materials not acceptable for payment include consumable materials such as nails, fasteners, conduits, gypsum board, glass, insulation, and wall coverings.

c. Materials to be considered for progress payment prior to installation must be specifically and separately identified in the Contractor's estimates of work submitted for the Contracting Officer's approval in accordance with Schedule of Prices requirement of this Contract.

Requests for progress payment consideration for such items must be supported by documents establishing their value and that the title requirements of the clause at FAR 52.232-5 Payments Under Fixed-Price Construction Contracts have been met.

d. Materials are adequately insured and protected from theft and exposure.

e. Provide a written consent from the surety company with each payment request for offsite materials.

f. Materials to be considered for progress payments prior to installation must be stored either in Hawaii, Guam, Puerto Rico, or the Continental United States. Other locations are subject to written approval by the Contracting Officer.

g. Materials in transit to the job site or storage site are not acceptable for payment.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 20 00 Page 4

SECTION 01 20 00 Page 5

SECTION 01 20 00 Page 6

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

08/25

PART 1 GENERAL

1.1 SUBMITTALS

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

View Location Map

Progress and Completion Pictures

1.2 VIEW LOCATION MAP

Submit, prior to or with the first digital photograph submittals, a sketch or drawing indicating the required photographic locations. Update as required if the locations are moved.

1.3 PROGRESS AND COMPLETION PICTURES

Photographically document site conditions prior to start of construction operations. Provide monthly, and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color minimum resolution in JPEG file format showing the sequence and progress of work. Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten different viewpoints selected by the Contractor unless otherwise directed by the Contracting Officer. Submit with the monthly invoice one set of digital photographs in the agency construction management system of record, cumulative of all photos to date. Indicate photographs demonstrating environmental procedures. Provide photographs for each month in a separate monthly directory and name each file to indicate its location on the view location sketch. Also provide the view location sketch with the submission in the agency construction management system of record as a digital file. Include a date designator in file names. Photographs provided are for unrestricted use by the Government.

1.4 MINIMUM INSURANCE REQUIREMENTS

Provide the minimum insurance coverage required by FAR 28.307-2 Liability, during the entire period of performance under this contract. Provide other insurance coverage as required by State law.

1.5 SUPERVISION

1.5.1 Superintendent Qualifications

The Contractor shall provide a full-time, on-site Superintendent with a minimum of five (5) years of experience managing field construction operations of similar size, scope, and complexity. The Superintendent shall hold a valid OSHA 30-hour Construction certificate and demonstrate experience coordinating subcontractors, materials, equipment, and project schedules.

SECTION 01 30 00 Page 1

For projects where the superintendent is permitted to also serve as the Quality Control (QC) Manager as established in Section 01 45 00 QUALITY CONTROL,(one person, three hats) the superintendent must have qualifications in accordance with that section.

1.5.2 Minimum Communication Requirements

Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of Contract work. In addition, if a Quality Control (QC) representative is required on the Contract, then that individual must also have fluent English communication skills.

1.5.3 Duties

The project superintendent is primarily responsible for managing subcontractors and coordinating day-to-day production and schedule adherence on the project. The superintendent is required to attend Red Zone meetings, partnering meetings, and quality control meetings. The superintendent or qualified alternative must be on-site at all times during the performance of this contract until the work is completed and accepted.

1.5.4 Non-Compliance Actions

The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to ensure timely completion.

Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time or excess costs or damages by the Contractor.

1.6 PRECONSTRUCTION MEETING

Immediately after award, prior to commencing any work at the site, coordinate with the Contracting Officer a time and place to meet for the Preconstruction Meeting . The meeting must take place within 35 calendar days after award of the contract, but prior to commencement of any work at the site. The purpose of this meeting is to discuss and develop a mutual understanding of the administrative requirements of the Contract including but not limited to: daily reporting, invoicing, value engineering, safety, base-access, outage requests, hot work permits, schedule requirements, quality control, schedule of prices or earned value report, shop drawings, submittals, cybersecurity, prosecution of the work, government acceptance, final inspections and contract close-out. Contractor must present and discuss their basic approach to scheduling the construction work and any required phasing.

1.6.1 Attendees

Contractor attendees must include the Project Manager, Superintendent, Site Safety and Health Officer (SSHO), Quality Control Manager . Major subcontractors are encouraged but not required to attend .

SECTION 01 30 00 Page 2

1.7 FACILITY TURNOVER PLANNING MEETINGS (Red Zone Meetings)

Meet with the Government to identify strategies to ensure the project is carried to expeditious closure and turnover to the Client. Start planning the turnover process at the Pre-Construction Conference meeting with a discussion of the Red Zone process and convene at regularly scheduled Red Zone Meetings beginning at approximately 75 percent of project completion. Include the following in the facility Turnover effort:

1.7.1 Red Zone Checklist

a. Contracting Officer's Technical Representative (COTR) will provide the Contractor a copy of the Red Zone Checklist template.

b. Prior to 75 percent completion, modify the Red Zone Checklist template by adding or deleting critical activities applicable to the project and assign planned completion dates for each activity. Submit the modified Red Zone Checklist to the Contracting Officer. The Contracting Officer may request additional activities be added to the Red Zone Checklist at any time as necessary.

1.7.2 Meetings

a. Conduct regular Red Zone Meetings beginning at approximately 75 percent project completion, or three to six months prior to Beneficial Occupancy Date (BOD), whichever comes first.

b. The Contracting Officer will establish the frequency of the meetings, which is expected to increase as the project completion draws nearer.

At the beginning, Red Zone meetings may be every two weeks then increase to weekly towards the final month of the project.

c. Using the Red Zone Checklist as a Plan of Action and Milestones (POAM) and basis for discussion, review upcoming critical activities and strategies to ensure work is completed on time.

d. During the Red Zone Meetings discuss with the COTR any upcoming activities that require Government involvement.

e. The monthly Progress Schedule updates and Red Zone completion dates should reflect matching dates, data, and milestones. Prevent conflicting information between Red Zone Updates and Monthly CPM updates.

1.8 PARTNERING

Host the partnering session within 45 calendar days of contract award. To most effectively accomplish this Contract, the Contractor and Government must form a cohesive partnership with the common goal of drawing on the strength of each organization in an effort to achieve a successful project without safety mishaps, conforming to the Contract, within budget and on schedule. The partnering team must consist of personnel from both the Government and Contractor including project level and corporate level leadership positions. Key Personnel from the supported command, end user, NAVFAC, PWD, ROICC, Contractor, key subcontractors and the Designer of Record (DOR) (regardless of whether the contract is a design-build or a design-bid-build) are required to participate in the Partnering process.

SECTION 01 30 00 Page 3

1.8.1 Team-Led (Informal) Partnering

a. The Contracting Officer will coordinate the initial Team-Led (Informal) Partnering Session with key personnel of the project team, including Contractor and Government personnel. The Partnering Session will be co-led by the Government Construction Manager and Contractor's Project Manager.

b. The Initial Team-led Partnering session may be held concurrently with the Pre-Construction meeting. Partnering sessions will be held at a location mutually agreed to by the Contracting Officer and the Contractor, typically at a conference room on-base or at the Contractor's temporary trailer.

c. The Initial Team-Led Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer.

d. The Partners will determine the frequency of the follow-on sessions.

e. Participants will bear their own costs for meals, lodging and transportation associated with Partnering.

1.9 MOBILIZATION

Mobilize to the jobsite within 60 calendar days after contract award.

Mobilize is defined as having equipment AND having a physical presence of at least one person from the contractor's team on the jobsite. All pre-construction submittals are to be complete prior to mobilization.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

SECTION 01 30 00 Page 4

SECTION 01 31 23.13 20

ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT MANAGEMENT SYSTEM

05/17, CHG 7: 11/21

PART 1 GENERAL

1.1 CONTRACT ADMINISTRATION

Utilize the Naval Facilities Engineering Command's (NAVFAC's) Electronic Construction and Facility Support Contract Management System (eCMS) for the transfer, sharing, and management of electronic technical submittals and documents. The web-based eCMS is the designated means of transferring technical documents between the Contractor and the Government. Paper media or e-mail submission, including originals or copies, of the documents identified in Table 1 are not permitted, except where eCMS is unavailable, non-functional, or specifically requested in addition to electronic submission.

1.1.1 Format Naming Convention for Files Uploaded Into eCMS

Include the identification number of the document, the type of document, the name/subject or title, and for daily reports, the date (day of work) with format YYYY/MM/DD in the filename. For example, for RFI's, 0011_RFI_Roof_Leaking.doc; for submittals, 0032a_Submittals_Light_Fixture.pdf; for Daily Reports, 0132_Daily_Report_20190504.xls. Contact the Contracting Officer's Representative (COR) regarding availability of eCMS training and reference materials.

1.1.2 Uploading Documents Processed Outside of eCMS

When specifically requested to provide documents outside of eCMS, upload all final project documentation (e.g., documents that are signed and/or adjudicated by the Government) mentioned in Table 1 into eCMS by creating a record in the module associated with that document type and uploading the document(s). Subject/title of the record should include the type of record i.e., RFI/Submittal/Other, the identification number(s), and the statement "Processed Outside of eCMS". For example, "RFI 001-012 Processed Outside of eCMS".

1.2 USER PRIVILEGES

The Contractor will be provided access to eCMS. All technical submittals and documents must be transmitted to the Government via the COR. Project roles and system roles will be established to control each user's menu, application, and software privileges, including the ability…

This is the start of the file's text. The full file is on GovTribe.