This is an Asbestos Inspection Report for Building FC555 (Forward Maint Alpha Company BEQ) at MCB Camp Lejeune, dated September 2, 2025. The building was constructed in 1978 and currently holds a Hazard Rank 3/Green designation as of March 2023. The report documents a comprehensive asbestos survey history spanning from 2002 through March 2023, tracking the identification, testing, and condition of asbestos-containing materials (ACM) within the structure.

The inspection identified non-friable ACM present in the building, including tar paper and roofing sealants in the attic/old roof perimeter and parapet wall flashings (2,880 square feet), and residual mastic patches at mechanical rooms and under existing flooring in dormitory rooms (ranging from 2-5 square feet as of the most recent 2023 inspection). The report notes that no friable ACM has been identified. Testing results from multiple sampling dates confirm the presence of chrysotile asbestos (denoted as "9" in the testing columns) in tar paper, roofing sealants, and residual mastic. The Camp Lejeune Asbestos Program Manager maintains oversight of the building and can be contacted at 910-451-5837. The report emphasizes that intact and undisturbed ACM does not constitute a significant health hazard, and recommends avoiding disturbance, preventing damage to materials, and reporting any changes in condition to the Program Manager. Periodic inspections of the ACM will continue to evaluate condition changes.

View the file

Other files

File Type Posted
Amend 0008.pdf PDF
Amend 0007.pdf PDF
Amend 0006.pdf PDF
Amend 0005.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
N4008525B0009 Specs.pdf PDF
25-0009 SID.pdf PDF
25-0009 BOD.pdf PDF
25-0009 Asbestos and Lead Survey.pdf PDF
25-0009 APPD.pdf PDF
RFP 250009.pdf PDF
N4008525B0009 DWGs.pdf PDF
25-0009 DM.pdf PDF
25-0009 GEO.pdf PDF
25-0009 FPDA.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS INSPECTION REPORT of:

Building # FC555

MCB CAMP LEJEUNE

Tuesday, September 2, 2025

Print Date

Tuesday, September 2, 2025 Page 1 of 9Print Date:

INSPECTION SUMMARY

BLDG #:

OCCUPANT:

YEAR BUILT:

BUILDING COMMENTS:

FC555

FORWARD MAINT ALPHA

COMPANY BEQ

HAZ RANK 3/GREEN [MAR2023]

ROOFING MATERIALS

MAR2023

ACM REMAINS

SEPT2019

NO CHANGES

JUN2016

ACM REMAINS

NOV2013

LIMITED RESIDUAL MASTIC AND ROOFING MATERIALS REMAIN

AUG2011

BUILDING HAS BEEN RENOVATED, OLD FLOORING REMOVED/ REPLACED, OLD ROOFING AND RESIDUAL MASTIC REMAINS ADDL

SAMPLING, ACM CONFIRMED, NO ADDL ACM ID'D

NOV08

PVS. ACM REMAINS, ADDL SAMPLING, ACM INCLUDES:

RESIDUAL TILE MASTIC

ROOFING TAR PAPER

ROOFING SEALANTS

SEP05

PVS. ACM TILE AND MASTIC REMAINS; ADDL SAMPLING, NO ADDL ACM ID'D

JUL02 AES

ACM INCLUDES:

12" BEIGE TILE AND ADHESIVE

ASBESTOS MANAGER: 910-451-5837

Friable ACM(s) identified

Non-friable ACM(s) identified

NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.

DESCRIPTION LOCATION Date Quantity

DESCRIPTION LOCATION Date Quantity

No friable ACM records found in database

NOTIFICATION OF ACM IN BUILDING

TAR PAPER, BLACK 2,880 SFATTIC/ OLD ROOF; PERIMETER

PARAPET WALL FLASHINGS

11/17/2008

Tuesday, September 2, 2025 Page 2 of 9Print Date:

ROOFING SEALANT, BLACK 2,880 SFATTIC/ OLD ROOF; PERIMETER

PARAPET WALL FLASHINGS

(INCORPORATES HMs 30, 32, 34)

11/17/2008

RESIDUAL MASTIC 2 SFPATCHES AT MECHANICAL ROOMS

(PREVIOUS HM01 FLOORING);

POTENTIAL PATCHES UNDER NEW/

EXISTING FLOORING [HM40] IN DORM

ROOMS

11/17/2008

ROOFING SEALANT, BLACK 2,880 SFATTIC/ OLD ROOF; PERIMETER

PARAPET WALL FLASHINGS

(INCORPORATES HMs 30, 32, 34)

9/18/2019

TAR PAPER, BLACK 2,880 SFATTIC/ OLD ROOF; PERIMETER

PARAPET WALL FLASHINGS

9/18/2019

RESIDUAL MASTIC 5 SFPATCHES AT MECHANICAL ROOMS

(PREVIOUS HM01 FLOORING);

POTENTIAL PATCHES UNDER NEW/

EXISTING FLOORING [HM40] IN DORM

ROOMS

9/18/2019

RESIDUAL MASTIC 4 SFPATCHES AT MECHANICAL ROOMS

(PREVIOUS HM01 FLOORING);

POTENTIAL PATCHES UNDER NEW/

EXISTING FLOORING [HM40] IN DORM

ROOMS

8/24/2011

TAR PAPER, BLACK 2,880 SFATTIC/ OLD ROOF; PERIMETER

PARAPET WALL FLASHINGS (w/HM31)

8/24/2011

ROOFING SEALANT, BLACK 2,880 SFATTIC/ OLD ROOF; PERIMETER

PARAPET WALL FLASHINGS

(INCORPORATES HMs 30, 32, 34)

8/24/2011

ROOFING SEALANT, BLACK 2,880 SFATTIC/ OLD ROOF; PERIMETER

PARAPET WALL FLASHINGS

(INCORPORATES HMs 30, 32, 34)

11/12/2013

TAR PAPER, BLACK 2,880 SFATTIC/ OLD ROOF; PERIMETER

PARAPET WALL FLASHINGS

6/9/2016

ROOFING SEALANT, BLACK 2,880 SFATTIC/ OLD ROOF; PERIMETER

PARAPET WALL FLASHINGS

(INCORPORATES HMs 30, 32, 34)

6/9/2016

RESIDUAL MASTIC 4 SFPATCHES AT MECHANICAL ROOMS

(PREVIOUS HM01 FLOORING);

POTENTIAL PATCHES UNDER NEW/

EXISTING FLOORING [HM40] IN DORM

ROOMS

6/9/2016

RESIDUAL MASTIC 4 SFPATCHES AT MECHANICAL ROOMS

(PREVIOUS HM01 FLOORING);

POTENTIAL PATCHES UNDER NEW/

EXISTING FLOORING [HM40] IN DORM

ROOMS

11/12/2013

TAR PAPER, BLACK 2,880 SFATTIC/ OLD ROOF; PERIMETER

PARAPET WALL FLASHINGS (w/HM31)

11/12/2013

Tuesday, September 2, 2025 Page 3 of 9Print Date:

Tested Non ACM or REMOVED Materials

DESCRIPTION LOCATION Date

RESIDUAL MASTIC 2 SFPATCHES AT MECHANICAL ROOMS

(PREVIOUS HM01 FLOORING);

POTENTIAL PATCHES UNDER NEW/

EXISTING FLOORING [HM40] IN DORM

ROOMS

3/28/2023

TAR PAPER, BLACK 2,880 SFATTIC/ OLD ROOF; PERIMETER

PARAPET WALL FLASHINGS

3/28/2023

ROOFING SEALANT, BLACK 2,880 SFATTIC/ OLD ROOF; PERIMETER

PARAPET WALL FLASHINGS

(INCORPORATES HMs 30, 32, 34)

3/28/2023

ROOFING SEALANT, SILVER ATTIC/ OLD ROOF; PERIMETER

PARAPET WALL FLASHINGS (OVER HM

30, 31)

11/17/2008

MISCELLANEOUS SEALANT MECHANICAL ROOMS AT DUCT TO

CHASE PLATES

11/17/2008

DUCT SEALANT, GRAY DORM ROOM OVHD DUCTS AND

DEBRIS/ DRIPPAGE IN MECHANICAL

ROOMS

11/17/2008

MISCELLANEOUS SEALANT CONDUIT PACKING/ FIRESTOP IN

CENTRAL PIPE CHASES

11/17/2008

INTERIOR CAULKING, METAL PIPE CHASE DOORS 11/17/2008

CAULKING MATERIAL DEBRIS IN MECHANICAL ROOMS (SEE

ALSO HM23)

11/17/2008

INTERIOR CAULKING, DORM ROOMS (AND CONVERTED

MECHANICAL ROOMS) AT HEAD

AREAS, SHOWER TILE WALLS (SEE

ALSO HM29)

11/17/2008

INTERIOR CAULKING, PIPE CHASES AT CABLE/ CONDUIT

PENETRATIONS

11/17/2008

ROOFING MATERIAL, ROOFING SYSTEM UNDERLAYMENT

BOARD DEBRIS

11/17/2008

ROOFING MATERIAL, ROOF/ ATTIC; MAIN ROOF MEMBRANE

UNDERLAYMENT (SEE ALSO HM30, 31,

32)

11/17/2008

TEXTURED CEILING MATERIAL THROUGHOUT HOMOGENOUS

BUILDINGS

9/20/2005

TAR PAPER, BLACK NEW ROOF, UNDER ASPHALT SHINGLES 8/24/2011

12" BEIGE FLOOR TILE AND ADHESIVE OFFICES AND LIVING QUARTERS 7/18/2002

EXTERIOR CAULKING, METAL DOORS TO PIPE CHASES

THROUGHOUT

9/20/2005

DUCT SEALANT, GRAY CHASES AND ATTIC/ OLD ROOF DUCTS

THROUGHOUT

9/20/2005

EXTERIOR CAULKING, BRICK EXPANSION JOINTS, EAST AND

WEST CENTER

9/20/2005

Tuesday, September 2, 2025 Page 4 of 9Print Date:

ACM only presents a health hazard when asbestos fibers are airborne and inhaled.

Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.

HEALTH ASPECTS:

Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.

CONDITIONS TO AVOID:

Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos

Program Manager.

REPORTS OF DAMAGE:

Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:

ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:

The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.

RECORDKEEPING:

CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837

EXTERIOR CAULKING, CONCRETE DECK JOINTS AT WALLS 11/17/2008

JOINT MATERIAL DORM ROOM HEAD AREA CEILINGS

(SKIM COAT)

11/17/2008

FELT PAPER DORM ROOM SHOWER PAN LINER

MATERIAL (UNDER TILE AND

CONCRETE)

8/24/2011

BUILT-UP ROOFING ATTIC/ ROOF; TOP LAYER MAIN

MEMBRANE

8/24/2011

ROOFING SEALANT, BLACK NEW ROOF; ACCESS HATCH FLASHINGS 8/24/2011

ROOFING SEALANT, GRAY NEW ROOF; ACCESS HATCH FLASHINGS 8/24/2011

12" TAN FLOOR TILE AND ADHESIVE [NEW] FLOORING THROUGHOUT 8/24/2011

12" BEIGE FLOOR TILE AND ADHESIVE OFFICES AND LIVING QUARTERS 11/17/2008

TEXTURED CEILING MATERIAL MECH ROOM 11/17/2008

ROOFING MATERIAL, ROOF/ ATTIC, MAIN ROOF MEMBRANE

(SEE ALSO HM30, 31, 32)

8/24/2011

12" BEIGE FLOOR TILE AND ADHESIVE OFFICES AND LIVING QUARTERS 9/20/2005

INTERIOR CAULKING, DORM ROOMS (AND CONVERTED

MECHANICAL ROOMS) AT HEAD

AREAS, SHOWER TILE WALLS (SEE

ALSO HM29); DOORS INTERIOR AND

EXTERIOR

8/24/2011

ROOFING SEALANT, SILVER ATTIC/ OLD ROOF; PERIMETER

PARAPET WALL FLASHINGS (OVER HM

30, 31)

8/24/2011

ROOFING SEALANT, SILVER ATTIC/ OLD ROOF; PERIMETER

PARAPET WALL FLASHINGS (OVER HM

30, 31)

11/12/2013

Tuesday, September 2, 2025 Page 5 of 9Print Date:

SAMPLES COLLECTED

Sample Sample

Date

HA Sample Location Chr

Amo

Oth

Description

FC555-01-00 7/18/200201 FC550 9 9 912" BEIGE FLOOR TILE

AND ADHESIVE

FC555-01-00ri05 9/20/200501 N/A 9 9 912" BEIGE FLOOR TILE

AND ADHESIVE

FC555-01-00ri07 11/17/200801 N/A 9 9 912" BEIGE FLOOR TILE

AND ADHESIVE

FC555-11-10 9/20/200511 1ST FL NORTH CNTR CHASE 0 0 0EXTERIOR CAULKING, GRAY

FC555-12-10 9/20/200512 CHASE 0 0 0DUCT SEALANT, GRAY

FC555-13-10 9/20/200513 NORTH WING, SE OFFICE 0 0 0TEXTURED CEILING

MATERIAL

FC555-14-10 9/20/200514 1ST FL EAST CNTR 0 0 0EXTERIOR CAULKING, GRAY

FC555-20-20 11/17/200820 1ST FL NORTH CNTR CHASE 0 0 0EXTERIOR CAULKING, WHITE

FC555-21-20 11/17/200821 1ST FL NORTH, NE RM 0 0 0JOINT MATERIAL

FC555-21-21 11/17/200821 1ST FL SOUTH, NW RM 0 0 0JOINT MATERIAL

FC555-21-22 11/17/200821 1ST FL SOUTH, SE RM 0 0 0JOINT MATERIAL

FC555-21-23 11/17/200821 2ND FL NORTH, EAST CNTR

RM

0 0 0JOINT MATERIAL

FC555-21-24 11/17/200821 2ND FL NORTH, NW RM 0 0 0JOINT MATERIAL

FC555-21-25 11/17/200821 2ND FL SOUTH, SW RM 0 0 0JOINT MATERIAL

FC555-21-26 11/17/200821 3RD FL SOUTH, SE RM 0 0 0JOINT MATERIAL

FC555-21-27 11/17/200821 3RD FL NORTH, NE RM 0 0 0JOINT MATERIAL

FC555-21-28 11/17/200821 3RD FL NORTH, EAST CNTR

RM

0 0 0JOINT MATERIAL

FC555-22-20 11/17/200822 1ST FL SOUTH CHASE, SOUTH 0 0 0INTERIOR CAULKING, YELLOW

FC555-23-20 11/17/200823 1ST FL NORTH, WEST CNTR

MR

0 0 0INTERIOR CAULKING, WHITE

FC555-23-21 11/17/200823 2ND FL NORTH, WEST CNTR

MR

0 0 0INTERIOR CAULKING, WHITE

FC555-23-22 11/17/200823 2ND FL SOUTH, WEST CNTR

MR

0 0 0INTERIOR CAULKING, WHITE

Tuesday, September 2, 2025 Page 6 of 9Print Date:

HA Sample Location Chr

Amo

Oth

Description

FC555-23-23 11/17/200823 2ND FL SOUTH, WEST CNTR

MR

0 0 0INTERIOR CAULKING, WHITE

FC555-23-24 11/17/200823 3RD FL NORTH, WEST CNTR

MR

0 0 0INTERIOR CAULKING, WHITE

FC555-23-30 8/24/201123 1ST FL CNTR LOUNGE 0 0 0INTERIOR CAULKING, WHITE

FC555-23-31 8/24/201123 1ST FL NORTH, WEST CNTR

MECH RM

0 0 0INTERIOR CAULKING, WHITE

FC555-23-32 8/24/201123 1ST FL NORTH, WEST CNTR

MECH RM DOOR

0 0 0INTERIOR CAULKING, WHITE

FC555-24-20 11/17/200824 1ST FL NORTH, WEST CNTR

MR

0 0 0MISCELLANEOUS

SEALANT

RED

FC555-24-21 11/17/200824 3RD FL NORTH, WEST CNTR

MR

0 0 0MISCELLANEOUS

SEALANT

RED

FC555-25-20 11/17/200825 1ST FL NORTH, WEST CNTR

MR

0 0 0DUCT SEALANT, GRAY

FC555-25-21 11/17/200825 3RD FL NORTH, WEST CNTR

MR

0 0 0DUCT SEALANT, GRAY

FC555-26-00ri13 11/12/201326 N/A 9 9 9RESIDUAL MASTIC BLACK

FC555-26-00ri16 6/9/201626 N/A 9 9 9RESIDUAL MASTIC BLACK

FC555-26-00ri19 9/18/201926 N/A 9 9 9RESIDUAL MASTIC BLACK

FC555-26-00ri23 3/28/202326 N/A 9 9 9RESIDUAL MASTIC BLACK

FC555-26-20 11/17/200826 1ST FL SOUTH, WEST CNTR

MECH RM

3 0 0RESIDUAL MASTIC BLACK

FC555-26-30 8/24/201126 2ND FL SOUTH, WEST CNTR

MECH RM

3 0 0RESIDUAL MASTIC BLACK

FC555-27-20 11/17/200827 2ND FL NORTH CHASE,

SOUTH CNTR

0 0 0MISCELLANEOUS

SEALANT

GRAY

FC555-28-20 11/17/200828 3RD FL SOUTH, SOUTH 0 0 0INTERIOR CAULKING, GRAY

FC555-29-20 11/17/200829 3RD FL NORTH, WEST CNTR

MR

0 0 0CAULKING MATERIAL WHITE

FC555-30-00ri13 11/12/201330 N/A 9 9 9TAR PAPER, BLACK

FC555-30-00ri16 6/9/201630 N/A 9 9 9TAR PAPER, BLACK

FC555-30-00ri19 9/18/201930 N/A 9 9 9TAR PAPER, BLACK

Tuesday, September 2, 2025 Page 7 of 9Print Date:

HA Sample Location Chr

Amo

Oth

Description

FC555-30-00ri23 3/28/202330 N/A 9 9 9TAR PAPER, BLACK

FC555-30-20 11/17/200830 ATTIC/ ROOF; SOUTH CNTR 45 0 0TAR PAPER, BLACK

FC555-30-21 11/17/200830 ATTIC/ ROOF; NORTH CNTR 35 0 0TAR PAPER, BLACK

FC555-30-30 8/24/201130 ATTIC/ ROOF; SOUTH CNTR 4 0 0TAR PAPER, BLACK

FC555-31-00ri11 8/24/201131 N/A 9 9 9ROOFING SEALANT, BLACK

GRAY, SILVER

FC555-31-00ri13 11/12/201331 N/A 9 9 9ROOFING SEALANT, BLACK

GRAY, SILVER

FC555-31-00ri16 6/9/201631 N/A 9 9 9ROOFING SEALANT, BLACK

GRAY, SILVER

FC555-31-00ri19 9/18/201931 N/A 9 9 9ROOFING SEALANT, BLACK

GRAY, SILVER

FC555-31-00ri23 3/28/202331 N/A 9 9 9ROOFING SEALANT, BLACK

GRAY, SILVER

FC555-31-20 11/17/200831 ROOF/ ATTIC; SOUTH CNTR 8 0 0ROOFING SEALANT,

BLACK

GRAY, SILVER

FC555-31-21 11/17/200831 ROOF/ ATTIC; NORTH CNTR 0 0 0ROOFING SEALANT,

BLACK

GRAY, SILVER

FC555-32-00ri13 11/12/201332 N/A 9 9 9ROOFING SEALANT, SILVER

FC555-32-20 11/17/200832 ATTIC/ ROOF; SOUTH CNTR 3 0 0ROOFING SEALANT,

SILVER

FC555-32-21 11/17/200832 ATTIC/ ROOF, NORTH CNTR 3 0 0ROOFING SEALANT,

SILVER

FC555-32-30 8/24/201132 ATTIC/ ROOF; SOUTH CNTR 5 0 0ROOFING SEALANT,

SILVER

FC555-33-20 11/17/200833 ATTIC/ ROOF; SOUTH CNTR 0 0 0ROOFING MATERIAL, BROWN

FC555-34-20 11/17/200834 ATTIC/ ROOF, SOUTH CNTR 0 0 0ROOFING MATERIAL, BLACK

FC555-34-21 11/17/200834 ATTIC/ ROOF, NORTH CNTR 2 0 0ROOFING MATERIAL, BLACK

FC555-34-30 8/24/201134 ATTIC/ ROOF; SOUTH CNTR

ON CONCRETE

0 0 0ROOFING MATERIAL, BLACK

FC555-34-31 8/24/201134 ATTIC/ ROOF; CNTR ON

CONCRETE

0 0 0ROOFING MATERIAL, BLACK

FC555-34-32 8/24/201134 ATTIC/ ROOF; NORTH CNTR

ON CONCRETE

0 0 0ROOFING MATERIAL, BLACK

Tuesday, September 2, 2025 Page 8 of 9Print Date:

HA Sample Location Chr

Amo

Oth

Description

FC555-40-30 8/24/201140 1ST FL SOUTH, NE RM117

CLOSET

0 0 012" TAN FLOOR TILE

AND ADHESIVE

FC555-40-30tem 8/24/201140 1ST FL SOUTH, NE RM117

CLOSET

0 0 012" TAN FLOOR TILE

AND ADHESIVE

FC555-40-31 8/24/201140 1ST FL SOUTH, SW RM128 0 0 012" TAN FLOOR TILE

AND ADHESIVE

FC555-40-32 8/24/201140 2ND FL SOUTH, SW RM226 0 0 012" TAN FLOOR TILE

AND ADHESIVE

FC555-40-33 8/24/201140 3RD FL NORTH, EAST CNTR

RM311

0 0 012" TAN FLOOR TILE

AND ADHESIVE

FC55-41-31 8/24/201141 3RD FL NORTH, WEST MECH

RM

0 0 0FELT PAPER BLACK

FC555-41-30 8/24/201141 2ND FL SOUTH, WEST MECH

RM

0 0 0FELT PAPER BLACK

FC555-42-30 8/24/201142 ATTIC/ ROOF; SOUTH CNTR 0 0 0BUILT-UP ROOFING BLACK

FC555-42-31 8/24/201142 ATTIC/ ROOF; CNTR 0 0 0BUILT-UP ROOFING BLACK

FC555-42-32 8/24/201142 ATTIC/ ROOF; NORTH CNTR 0 0 0BUILT-UP ROOFING BLACK

FC555-43-30 8/24/201143 ROOF; SOUTH ACCESS

HATCH

0 0 0ROOFING SEALANT,

BLACK

FC555-44-30 8/24/201144 ROOF; SOUTH ACCESS

HATCH

0 0 0ROOFING SEALANT,

GRAY

FC555-45-30 8/24/201145 ROOF; SOUTH ACCESS

HATCH

0 0 0TAR PAPER, BLACK