P1495 (B1337)_Drawings_Excerpt.pdf

PDF 2 MB Posted

Attached to
P1556 10th Marines Maintenance and Operations Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina
Solicitation number
N4008525R2532
Issued by

About this file

This document is a comprehensive fire alarm and mass notification system design specification for a U.S. Marine Corps HIMARS site. The technical drawings and specifications detail a complete addressable fire alarm system to be installed across a two-floor facility, with requirements for equipment, device placement, wiring, and system performance. Key specifications include using Simplex, Notifier, or Fire-Lite systems, installing devices according to UFC 3-600-01 and NFPA standards, providing Class A wiring, and ensuring 48-hour battery backup with an additional 15-minute alarm capability.

The design covers extensive requirements for device installation, including mounting heights for control panels, manual pull stations, and notification appliances, with specific guidelines for smoke/heat detectors, speakers, and strobes. The system must provide comprehensive coverage across all floors, including maintenance bays, offices, mechanical rooms, and storage areas, with notification devices synchronized and placed to meet intelligibility and visibility standards. The specification emphasizes coordination with mechanical systems, proper conduit installation, surge protection, and compliance with multiple fire safety and building codes.

View the file

Other files

File Type Posted
N4008525R2532 Amendment 0009.pdf PDF
N4008525R2532 Amendment 0008.pdf PDF
1450-04A.pdf PDF
1760523 Geotech Report_Addendum 3.pdf PDF
1760523 P1556_ADDENDUM_GEOTECH REPORT_FIGURES.pdf PDF
1760523 P1556_ADDENDUM_GEOTECH REPORT_APPENDICES.pdf PDF
P1556_FINAL_GEOTECH REPORT_TEXT.pdf PDF
P1556_FINAL_GEOTECH REPORT_FIGURES.pdf PDF
N4008525R2532 Amendment 0006.pdf PDF
DD_Maneuver_Area.pdf PDF
1760523 Camp-Lejeune-SCPTu-01-Footing-Settlement-and-Liquefaction-Analyses.xls XLS spreadsheet
1760523 Amendment 05_Dwgs.pdf PDF
1760523 Amendment 04_Specs.pdf PDF
Attachment J - Price Proposal Form (rev1).docx DOCX document
1760523 PROD - Final (Rev02).xlsx XLSX spreadsheet
Tank_PPI.pdf PDF
HP 500 9158DBCivStruct-10th Dwg.pdf PDF
1760523 P1556_ADDENDUM_GEOTECH REPORT_TEXT.pdf PDF
P1556_FINAL_TESTS AND ANALYSES.pdf PDF
P1556_FINAL_GEOTECH REPORT_APPENDICES.pdf PDF
1760523 Amendment 04_Dwgs.pdf PDF
1760523 Amendment 03_Specs.pdf PDF
N4008525R2532 Amendment 0004.pdf PDF
N4008525R2532 Amendment 0003.pdf PDF
1760523 DWG Amendment 01.pdf PDF
Site Visit Log - N4008525R2532 P1556.pdf PDF
1760523 DWG Amendment 02.pdf PDF
N4008525R2532 Amendment 0002.pdf PDF
BLDG P1556 -1760523 COMBINED.pdf PDF
N4008525R2532 Amendment 0001.pdf PDF
Attachment J - Price Proposal Form.docx DOCX document
Attachment I - D2_HAZ.pdf PDF
Attachment I - A2_HCNTRL.pdf PDF
Attachment H - SPECS.pdf PDF
Attachment G - Small Business Subcontracting Plan (SBSP) Template.docx DOCX document
Attachment F - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Attachment E - Historical Small Business Utilization.docx DOCX document
N4008525R2532.pdf PDF
Attachment I - D1_B1450.pdf PDF
Attachment I - C1_HP500.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Attachment A - PPI Log Template.xlsx XLSX spreadsheet
P1556 Interior Finishes Brand Name or Equal Redacted.pdf PDF
Attachment I - B1_B1445.pdf PDF
Attachment I - A5_B1337.pdf PDF
Attachment C - Construction Experience Data Sheet.docx DOCX document
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment I - A4_ARTSHLTR.pdf PDF
Attachment I - A3_NMSHLTR.pdf PDF
Attachment I - A1_FLDMAINT.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FAAP

FMCP

DACT

NAC

LOC

SPD

CM

MM

F

P

ID

C

S

C

S

V

F S

ST

F

CF

TRAN

DOC

FIRE ALARM LEGEND

SYMBOL DESCRIPTION

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM/MASS NOTIFICATION CONTROL PANEL

DIGITAL ALARM COMMUNICATOR TRANSMITTER

NOTIFICATION APPLIANCE CIRCUIT PANEL

LOCAL OPERATOR CONSOLE

SURGE PROTECTION DEVICE

CONTROL MODULE

MONITOR MODULE

MANUAL PULL STATION

SMOKE DETECTOR / PHOTOELECTRIC

SMOKE DETECTOR / IN DUCT

CO CARBON MONOXIDE SENSOR

COMBINATION SPEAKER / VISIBLE WALL MOUNTED.

CD INDICATES CANDELA RATING.

COMBINATION SPEAKER / VISIBLE CEILING MOUNTED.

CD INDICATES CANDELA RATING.

CD

CD

SPEAKER WALL MOUNTED.

SPEAKER CEILING MOUNTED.

ELECTRIC BELL - VIBRATING

FLOW SWITCH

TAMPER SWITCH

FIRE ALARM WALL MOUNTED VISUAL ONLY STROBE.

CD INDICATES CANDELA RATING.

FIRE ALARM CEILING MOUNTED VISUAL ONLY STROBE.

CD INDICATES CANDELA RATING.

CD

CD

RADIO TRANSCEIVER (GOVERNMENT PROVIDED)

WEATHERPROOF

EXPLOSION PROOF

WP

EX

DOCUMENT CABINET

1. PROVIDE A COMPLETE, ADDRESSABLE, FIRE ALARM AND MASS NOTIFICATION SYSTEM IN THE FACILITY. FIRE ALARM AND MASS NOTIFICATION SYSTEM MUST BE DESIGNED AND INSTALLED TO MEET THE REQUIREMENTS OF UFC 3-600-01, UFC 4-021-01, NFPA 70, NFPA 72, AND NFPA 101. SYSTEM SHALL BE SIMPLEX, NOTIFIER, OR

FIRE-LITE.

2. IT IS THE INTENT OF THESE DOCUMENTS TO PROVIDE DESIGN, MATERIALS, AND EQUIPMENT FOR A TOTALLY FUNCTIONING AND OPERATING FIRE ALARM AND MASS NOTIFICATION SYSTEMS, INCLUDING THE PROPER

INTERFACING AND COORDINATION WITH OTHER BUILDING SYSTEMS.

3. THE GENERAL CHARACTER AND SCOPE OF THE WORK IS ILLUSTRATED IN THE SPECIFICATIONS AND THE DRAWINGS. THE SPECIFICATIONS AND DRAWINGS ARE DIVIDED INTO SEVERAL SECTIONS FOR CONVENIENCE ONLY AND THE CONTRACT DOCUMENTS MUST BE CONSIDERED AS A WHOLE. THE CONTRACTOR MUST BE RESPONSIBLE FOR THE COORDINATION OF ALL TRADES, SUBCONTRACTORS, AND VENDORS ENGAGED IN THIS

WORK.

4. THESE DRAWINGS DEPICT GENERAL LOCATIONS OF FIRE ALARM AND MASS NOTIFICATION SYSTEM EQUIPMENT AND FIELD DEVICES. FINAL LOCATIONS, QUANTITIES, APPLIANCE RATINGS, ETC. MUST BE PROVIDED BY THE INSTALLING CONTRACTOR IN ACCORDANCE WITH THE APPLICABLE CODES, STANDARDS, AND CONTRACT

DOCUMENTS.

5. THE CONTRACTOR MUST OBTAIN REQUIRED PERMITS AND APPROVALS AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION. THE CONTRACTOR MUST PAY FOR AND SECURE PERMITS AND FEES FOR FIRE

PROTECTION SYSTEMS WORK.

6. PROVIDE FINAL SYSTEM LAYOUT DRAWINGS INCLUDING BATTERY CALCULATIONS AND VOLTAGE DROP CALCULATIONS AND OBTAIN APPROVAL OF THE FIRE MARSHAL AND ALL AUTHORITIES HAVING JURISDICTION.

BATTERY CALCULATIONS MUST INCLUDE 20 PERCENT SAFETY MARGIN TO THE CALCULATED AMP-HOUR RATING PER NFPA 72. A BILL OF MATERIAL AND CONTACT ID POINT DESCRIPTION TABLE MUST BE INCLUDED IN

THE FIRE ALARM AS-BUILT DRAWINGS.

7. PROVIDE FIRE ALARM AND MASS NOTIFICATION SPEAKERS AND STROBES THROUGHOUT THE PROJECT AREAS.

PROVIDE ADDITIONAL NOTIFICATION APPLIANCE CIRCUIT (NAC) PANELS AS REQUIRED. EACH NAC LOADING

MUST NOT EXCEED 75% OF ITS RATED OUTPUT.

8. PROVIDE DUCT SMOKE DETECTORS IN ALL SUPPLY DUCTS OF AIR HANDLING UNITS GREATER THAN 2,000 CFM .

PROVIDE RELAYS FOR SHUT DOWN OF ASSOCIATED AIR HANDLING UNITS.

9. PROVIDE MONITOR MODULES, TAMPER AND FLOW SWITCHES FOR THE SPRINKLER RISER AND CONTROL

VALVES.

10. WIRING FOR DEVICES MUST BE CLASS A. PROVIDE ALL FIRE ALARM CIRCUITS IN ELECTRICAL METALLIC

TUBING (EMT) OR INTERMEDIATE METAL CONDUIT (IMC).

11. ALL RACEWAYS MUST BE FACTORY PAINTED RED. FLEXIBLE METALLIC OCNDUIT (FMC) SHALL NOT EXCEED 6 FEET AND MUST ONLY BE PERMITTED FOR CONNECTIONS TO JUNCTION BOXES TO FIELD DEVICES. PROVIDE A RACEWAY LISTED FOR THE INSTALLATION IN WET LOCATIONS, SUCH AS RIGID METALLIC CONDUIT (RMC) AND LIQUID TIGHT FLEXIBLE METAL CONDUIT (LFMC). WET LOCATIONS ARE CONSIDERED ANY LOCATION WITHIN A 5

FOOT RADIUS OF FIRE SUPPRESSION EQUIPMENT AS DEFINED BY NFPA 70.

12. DEVICES MUST BE FACTORY FINISHED WHITE.

13. PROVIDE RECHARGEABLE SEALED LEAD ACID TYPE BATTERIES TO OPERATE THE FIRE ALARM SYSTEM UNDER

SUPERVISORY CONDITIONS FOR 48 HOURS AND AUDIBLE AND ALARM DEVICES FOR AN ADDITIONAL 15 MINUTES OR 60 MINUTES FOR THE MASS NOTIFICATION SYSTEM IMMEDIATELY UPON LOSS OF POWER, WHICHEVER IS GREATER.

14. INSTALLING CONTRACTOR MUST COORDINATE WITH MECHANICAL, ELECTRICAL AND OTHER TRADES TO FACILITATE INSTALLATION THAT IS COORDINATED AND CONSISTENT WITH BUILDING DESIGN, USE AND INTENT.

15. COORDINATE FINAL SYSTEM TESTING WITH OTHER CONTRACTORS TO PROVIDE FULL SYSTEM OPERATION AT

TIME OF TESTING.

16. THE FIRE PROTECTION CONTRACTOR MUST BE RESPONSIBLE FOR SCHEDULING AND PERFORMING

INSPECTIONS AND TESTS AS REQUIRED BY THE CONTRACTING OFFICER.

17. FLOOR AND WALL CONDUIT PENETRATIONS MUST BE SLEEVED AND SEALED AS REQUIRED.

18. PENETRATIONS OF THE BUILDING AIR BARRIER MUST BE SEALED TO MAINTAIN THE INTEGRITY OF THE AIR

BARRIER.

19. CONDUIT SIZE AND PERCENTAGE OF FILL TO BE DETERMINED BY INSTALLING CONTRACTOR AND MUST

COMPLY WITH APPLICABLE STANDARDS AND SYSTEM MANUFACTURER'S REQUIREMENTS.

20. CONDUIT AND WIRING MUST BE CONCEALED ABOVE CEILINGS IN FINISHED AREAS AND AREAS WITH DROPPED

CEILINGS. CONDUIT AND WIRING INSTALLED ABOVE CEILINGS MUST NOT INTERFERE WITH THE REMOVAL OF THE CEILING TILES, AND HVAC UNIT AIR FILTERS. IN AREAS WITHOUT CEILING, CONDUIT AND WIRING MUST BE INSTALLED AS TIGHT AS POSSIBLE TO UNDERSIDE OF FLOOR SLAB, UNLESS OBSTRUCTIONS REQUIRE

OTHERWISE.

21. FIRE ALARM WIRING MUST NOT BE INSTALLED IN THE SAME CONDUITS OR JUNCTION BOXES AS LIGHTING, POWER OR OTHER WIRING.

22. RUN WIRING TO CONTROL PANELS IN THE VERTICAL OR HORIZONTAL PLANE, MAKE TURNS AT 90 DEGREE ANGLES, AND TIGHTLY BUNDLE, WRAP, AND IDENTIFY CONDUCTORS INDIVIDUALLY WITH PERMANENT

MARKINGS.

23. PULL CONDUCTORS SPLICE FREE. THE USE OF WIRE NUTS, CRIMPED CONNECTORS, OR TWISTING OF

CONDUCTORS IS PROHIBITED.

24. TERMINATIONS MUST BE AT A TERMINAL STRIP. DEVICES MUST HAVE SCREW TERMINALS.

25. SIGNALING LINE CIRCUITS MUST BE MINIMUM 18 GAUGE WIRE. INITIATING DEVICE AND NOTIFICATION

APPLIANCE CIRCUITS MUST BE MINIMUM 16 GAUGE WIRE.

26. ALL ADDRESSABLE CONTROL MODULES AND ADDRESSABLE MONITOR MODULES MUST BE LOCATED WITHIN 10

FEET OF THE DEVICES BEING MONITORED. DUCT SMOKE DETECTORS MUST BE WITHIN 3 FEET OF

ADDRESSABLE RELAY.

27. CONTRACTOR MUST PROVIDE ADEQUATE AUDIBLE NOTIFICATION DEVICES TO MEET THE AUDIBILITY AND INTELLIGIBILITY REQUIREMENTS OF NFPA 72 AND UFC 4-021-01. THE MINIMUM REQUIRED COMMON

INTELLIGIBILITY SCALE IS 0.7.

28. PROVIDE SPEAKERS MOUNTED ON THE EXTERIOR OF THE BUILDING IN ADDITION TO NOTIFICATION IN ANY AREAS COMMONLY USED BY BUILDING OCCUPANTS. AREAS INCLUDE COURTYARDS, COVERED BREAK AREAS, DESIGNATED SMOKING AREAS, AND SIDEWALKS LEADING FROM THE BUILDING'S EXIT DOORS TO A PUBLIC

STREET OR FROM PARKING AREAS FOR A DISTANCE UP TO 16 FEET FROM THE BUILDING.

29. PROVIDE VISIBLE NOTIFICATION APPLIANCES IN ALL NORMALLY OCCUPIED, PUBLIC AND COMMON USE AREAS SUCH AS BREAK ROOMS, CORRIDORS, AUDITORIUMS, OR CONFERENCE ROOMS. VISUAL NOTIFICATION MUST BE PROVIDED IN ALL OFFICES THAT ARE DESIGNED FOR, OR MAY CONTAIN, MORE THAN 4 PERSONS AT ANY

ONE TIME. REFER TO INTERIOR SHEETS FOR FURNITURE PLANS.

30. PROVIDE CLEAR STROBE MARKED "ALERT" FOR FIRE ALARM AND MASS NOTIFICATION SYSTEM NOTIFICATIONS.

31. COORDINATE DUCT SMOKE DETECTION WITH MECHANICAL DESIGN CONTRACTOR. DUCT SMOKE DETECTOR

REMOTE LAMPS AND TEST STATION MUST BE WALL MOUNTED, ACCESSIBLE, VISIBLE, AND PERMANENTLY LABELED. THE DUCT DETECTORS MUST RECEIVE THEIR POWER AND RESET FROM THE FIRE ALARM CONTROL

UNIT.

32. PROVIDE REMOTE TEST LAMPS FOR ANY INACCESSIBLE DEVICES.

33. PROVIDE SURGE PROTECTION FOR CIRCUITS THAT ENTER OR EXIT A BUILDING.

34. PROVIDE WEATHERPROOF DEVICES AS REQUIRED AND AS INDICATED.

35. DEVICES MOUNTED IN SUSPENDED CEILING MUST BE MOUNTED IN THE CENTER OF THE CEILING TILE.

36. PROVIDE A DOCUMENTATION CABINET ADJACENT TO FIRE ALARM CONTROL PANEL. CABINET MUST BE STEEL

WITH LOCKING, HINGE MOUNTED DOOR PROMINENTLY LABELED "SYSTEM RECORD DOCUMENTS". CABINET MUST STORE LIFE SAFETY, FIRE ALARM, AND SPRINKLER AS-BUILT DRAWINGS AND NFPA 72 RECORD OF COMPLETION IN PAPER FORMAT. CD/DVD OF SITE-SPECIFIC SOFTWARE, FIRE ALARM AND SPRINKLER AS-BUILT DRAWINGS, NFPA 72 RECORD OF COMPLETION, AND OPERATIONS AND MAINTENANCE MANUALS MUST BE

STORED IN A CD JEWEL CASE.

37. PROVIDE A PARTS BOX ADJACENT TO THE FMCP. CABINET MUST BE STEEL, LOCKING, WITH HINGE-MOUNTED DOOR, KEYED THE SAME AS THE FMCP. CABINET MUST INCLUDE SPARE PARTS AS DEFINED IN THE PROJECT

SPECIFICATIONS, PLUS FOUR (4) FUSES FOR EACH FUSED CONDUIT.

38. DUAL-ACTION, MANUAL FIRE PULL STATIONS MUST BE PROVIDED WITHIN 5 FEET OF EVERY EXIT OF THE BUILDING. MANUAL PULL STATIONS MUST BE RESET WITH THE USE OF A KEY ONLY. USE OF A WRENCH, HEX KEY, ALLEN KEY, OR ALLEN WRENCH TO OPEN A MANUAL PULL STATION MUST NOT BE PERMITTED.

39. WATER FLOW ALARM AND VALVE TAMPER SWITCHES ATTACHED TO THE BUILDING WET-PIPE SPRINKLER SYSTEM TO PROVIDE REQUIRED SUPERVISION MUST BE CONNECTED TO THE FIRE ALARM SYSTEM.

40. INSTALL A POINT REPORTING DIGITAL ALARM COMMUNICATOR TRANSMITTER THAT IS COMPATIBLE WITH THE SUR-GARD SYSTEM III MULTI-PLATFORM DIGITAL TELEPHONE RECEIVER AND IS PROGRAMMED TO REPORT BY POINTS VIA CONTACT ID PROTOCOL. PROVIDE TWO (2) CAT 6 UTP CABLES INSIDE 1-INCH CONDUIT FROM THE

FMCP TO THE TELEPHONE EQUIPMENT ROOM.

41. THE GOVERNMENT WILL INSTALL THE TRX-401 MASS NOTIFICATION TRANSCEIVER. THE CONTRACTOR MUST PROVIDE CONDUIT FOR MOUNTING THE MASS NOTIFICATION ANTENNA, CONDUIT FOR THE MASS NOTIFICATION ANTENNA CABLE, CONDUIT TO CONNECT THE TRANSCEIVER TO THE FIRE ALARM CONTROL PANEL, AND 120V

POWER FOR THE TRANSCEIVER.

42. PROVIDE AND ATTACH A LEGIBLE, TYPED LABEL ON ALL ADDRESSABLE DEVICES TO INDICATE ITS ADDRESS.

FOR ANY DEVICE LOCATED ABOVE A FALSE CEILING, CONTRACTOR MUST PROVIDE A LEGIBLE, TYPED LABEL

ATTACHED TO THE CEILING GRID THE DEVICE NOMENCLATURE AND ADDRESS.

FIRE ALARM AND MASS NOTIFICATION GENERAL NOTES FIRE ALARM AND MASS NOTIFICATION GENERAL NOTES (CONTINUED)

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

DP-02 IFC - 06/08/2021

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

DP-02 IFC - 06/08/2021

* A SUPERVISORY SIGNAL SHALL BE TRANSMITTED BY MNS OPERATIONS ONLY WHEN THE MNS OVERRIDES THE ACTIVE FIRE ALARM SIGNAL

CONFIGURATOIN

SIGNAL FROM WIDE AREA MASS NOTIFICATION SYSTEM* 19 X X X X X

LOC ACTIVATION OR PRE-RECORDED MNS MESSAGES* 18 X X X X X X

LOCAL MICROPHONE MNS OPERATION* 17 X X X X X X

ACTIVATION OF MASS NOTIFICATION SYSTEM* 16 X X X X X

ACTIVATION OF DUCT SMOKE DETECTOR 3 X X X X

TAMPER SWITCH 15 X X

SU

PE

RV

IS

OR

Y

CO

ND

IT

IO

NS COMMON SUPERVISORY 14 X X

GROUND FAULT 13 X X

CIRCUIT DISCONNECT 12 X X

LOW BATTERY 11 X X

NAC SHORT 10 X X

OPEN CIRCUIT 9 X X

LOSS OF PRIMARY AC POWER 8 X X

FIELD WIRING OR SYSTEM COMPONENT FAULT 7 X X

TR

OU

BL

E

CO

ND

IT

IO

NS

COMMON TROUBLE 6 X X

ACTIVATION OF A CARBON MONOXIDE DETECTOR 5 X X X X X X X

ACTIVATION OF WATERFLOW SWITCH 4 X X X X X X X

ACTIVATION OF AREA SMOKE DETECTOR 2 X X X X X X

AL

AR

M

CO

ND

IT

IO

NS

ACTIVATION OF A MANUAL FIRE ALARM PULL STATION 1 X X X X X X

A B C D E F G H I J K L M N O P

AN

NU

NC

IA

TE

A

LA

RM

S

IG

NA

L A

T

CO

NT

RO

L P

AN

EL

AN

NU

NC

IA

TE

T

RO

UB

LE

S

IG

NA

L A

T

CO

NT

RO

L P

AN

EL

AN

NU

NC

IA

TE

S

UP

ER

VI

SO

RY

S

IG

NA

L A T

CO

NT

RO

L P

AN

EL

AC

TI

VA

TE

F

IR

E

AL

AR

M/

MA

SS

N

OT

IF

IC

AT

IO

N

VI

SU

AL

A

ND

A

UD

IB

LE

A

PP

LIA

NC

ES

SE

ND

A

LA

RM

S

IG

NA

L T O

SU

PE

RV

IS

IN

G

ST

AT

IO

N

SE

ND

T

RO

UB

LE

S

IG

NA

L T

O

SU

PE

RV

IS

IN

G

ST

AT

IO

N

SE

ND

S

UP

ER

VI

SO

RY

S

IG

NA

L T

O

SU

PE

RV

IS

IN

G

ST

AT

IO

N

SH

UT

DO

W

N

AS

SO

CI

AT

ED

A

IR

H

AN

DL

IN

G

UN

IT

S

AC

TI

VA

TE

W

AT

ER

FL

OW

A

LA

RM

E

LE

CT

RI

C

BE

LL

DE

AC

TI

VA

TE

F

IR

E

AL

AR

M

AU

DI

BL

E

SI

GN

AL

S

AC

TI

VA

TE

E

GR

ES

S

LIG

HT

IN

G

SE

ND

S

IG

NA

L T

O

BA

SE

W

ID

E

MA

SS

N

OT

IF

IC

AT

IO

N

SY

ST

EM

SH

UT

DO

W

N

HI

GH

V

OL

UM

E, LO

W S

PE

ED

(H

VL

S) F

AN

S

SI

LE

NC

E

PA

S

YS

TE

M

SE

ND

U

NI

QU

E

CA

RB

ON

M

ON

OX

ID

E

AL

AR

M

SI

GN

AL

T O

SU

PE

RV

IS

IN

G

ST

AT

IO

N

IN

IT

IA

TE

U

NI

QU

E

CA

RB

ON

M

ON

OX

ID

E

MA

SS

N

OT

IF

IC

AT

IO

N

ME

SS

AG

E

SCALE: NOT TO SCALE

FIRE ALARM/MASS NOTIFICATION SYSTEM SEQUENCE OF OPERATIONS

FE

FEC

FE

C

FF

F

F

F

F

C 30

C 15

S

F

C 95 C 95

S

C 95 C 95

S

SS

S S

S S S

S

GENERAL NOTES

1. REFER TO SHEET FA001 FOR GENERAL NOTES AND SYMBOLS.

2. FINAL FIRE ALARM AUDIBLE AND VISUAL DEVICE PLACEMENT SHALL BE

DETERMINED BY THE INSTALLING CONTRACTOR.

ELECTRICAL

WOMEN'S HEAD

G102

ORGANIC STORAGE

AREAS (3)

CAGED EQUIP STOR 'R'

144r

CAGED EQUIP STOR 'S'

144s

CAGED EQUIP STOR 'T'

144t

OFFICE

UNISEX

G103

TELE

3.8

2.6

2.1

A'

A'

A

A

B

B

C

C

D

D

E

E F'

F

F

WPWP

WP

WP

WP WP WP

WP

WP

FA

FA

CM2

N

KEYPLAN

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

DP-02 IFC - 06/08/2021

SCALE: 1/8" = 1'-0"

FIRE ALARM - 1ST FLOOR PLAN - AREA A

KEYNOTES

1 STROBES MUST BE MOUNTED SUCH THAT THE MAXIMUM HEIGHT OF THE

LENS IS 30 FEET.

2 PROVIDE CONTROL MODULE TO ACTIVATE THE LIGHTING CONTROL DEVICE(S)

UPON ACTIVATION OF THE BUILDING FIRE ALARM SYSTEM IN ACCORDANCE

WITH NFPA 101: 7.8.1.2.2.

SCALE: 1/8" = 1'-0"

0 4'-0" 8'-0" 16'-0"

K

FE

C

FM

CP

TR

AN

DA

CT

F F

F S

MM

ST

MM

DO

C

SP

D

F

P

F

FA

AP

F

F F F

ID

CM

LO

C

C

S

C

S

C 15

C

S

C

S

C

S

C

S

C 30

C 15

C 30

C 15F

C 15

C 30

C 75

C 15

C 75

C 15 C 15

C 15

C 15

C 15

C 15 30

C 30

C 15

C 30

C 30

C

S

C 15F

C

S

C

S

C

S

C

S

C

S

C 15

S

C 15 F

30 30 30

ID

CM

ID

CM

ID

CM

S

S S

S S

C 15F

C 15F75 75

V

X 4

X

FSR OFFICE

ORDO OFFICE

HQ FAC OFFICE

BATTERY FAC OFFICE S

HIMARS MAINT. OFFICER

110a

BATTERY FAC OFFICE R

BREAK ROOM

CONFERENCE ROOM

CLASSROOM

HIMAR MAINT. OFFICE

FSR TOOL ROOM + PARTS

STORAGE

PRINT/ FILE

CORRIDOR

C101

VEST

V100

VEST

V101

JAN.

TELECOM

TIRE STORAGE

LEAD ACID BATTERY

STORAGE

MECHANICAL

WOMEN'S HEAD

G102

MEN'S HEAD

G101

STAIR A

STA1

HQ STORAGE

BOILER ROOM

DISPATCH

STAIR B

STB1

'R' STORAGE

105r

'S' STORAGE

105s

'T' STORAGE

105t

GENERAL STORAGE

MEN'S SHOWERS

G101a

BATTERY FAC OFFICE T

CORRIDOR

C100

CORRIDOR

C102

CORRIDOR

C103

CORRIDOR

C104

3.8

F'

F

F

G

G

H

H

J

J

K

K

L'

L'

L

L

1.6

1.9

2.5

3.3

WP

WP WP

NA

C

WP WP

MOTHER'S ROOM

G102a

VEST

V102

CO

FA

FA

FA

FA

1 2 3

GENERAL NOTES

1. REFER TO SHEET FA001 FOR GENERAL NOTES AND SYMBOLS.

2. FINAL FIRE ALARM AUDIBLE AND VISUAL DEVICE PLACEMENT SHALL BE

DETERMINED BY THE INSTALLING CONTRACTOR.

N

KEYPLAN

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

DP-02 IFC - 06/08/2021

SCALE: 1/8" = 1'-0"

FIRE ALARM - 1ST FLOOR PLAN - AREA B

KEYNOTES

1 PROVIDE CONTROL MODULE TO SHUT DOWN AIR HANDLING UNIT AHU-01A

UPON ACTIVATION OF DUCT SMOKE DETECTOR IN SUPPLY AIR DUCTWORK.

2 PROVIDE CONTROL MODULE TO SHUT DOWN AIR HANDLING UNIT AHU-01B

UPON ACTIVATION OF DUCT SMOKE DETECTOR IN SUPPLY AIR DUCTWORK.

3 PROVIDE CONTROL MODULE TO SHUT DOWN AIR HANDLING UNIT AHU-02

UPON ACTIVATION OF DUCT SMOKE DETECTOR IN SUPPLY AIR DUCTWORK.

4 PROVIDE CONTROL MODULE TO SHUT DOWN AIR HANDLING UNIT AHU-03

UPON ACTIVATION OF DUCT SMOKE DETECTOR IN SUPPLY AIR DUCTWORK.

5 THE GOVERNMENT WILL INSTALL THE MASS NOTIFICATION TRANSCEIVER.

THE CONTRACTOR MUST PROVIDE CONDUIT FOR MOUNTING THE MASS

NOTIFICATION ANTENNA, CONDUIT FOR THE MASS NOTIFICATION ANTENNA

CABLE, CONDUIT TO CONNECT THE TRANSCEIVER TO THE FACP, AND 120V

POWER FOR THE TRANSCEIVER. ADEQUATE CLEAR SPACE FOR FUTURE

PANEL MOUNTING SHALL BE PROVIDED.

6 PROVIDE SEPARATE NAC PANELS PER FLOOR. FINAL NUMBER OF NAC

PANELS MUST BE DETERMINED BY FIRE ALARM CONTRACTOR BASED ON

SHOP DRAWING CALCULATIONS.

7 PROVIDE ANTENNA FOR MASS NOTIFICATION SYSTEM RADIO TRANSCEIVER

AT THE ROOF.

F

F

F

F

C 15

S

C 75

C 75 C 75

C 75

NA

C

P

C 15

C

S

C 75C 75

C 75C 75

C 75C 75

C

S

C

S

S

S

S S

S

C

S

SP

D

LAUNCHER MAINTENANCE

BAYS [6]

AUTO MAINTENANCE

BAYS [6]

POL STORAGE

HIMARS MAINTENANCE

TOOL ROOM

HIMARS PARTS STORAGE

TELECOM

CORRIDOR

C105

COMPRESSOR

L

L

M

M

N

N

P

P

P'

P'

R

R

S

S

T

T

U

U

V

V

V'

V'

2.4

2.8

3.2

1.6

1.9

2.5

3.3

WP

WP

WP

WP

WP

ELEC

MECHANICAL

FA

FA

EX

EX

3 44

F

CM CM55

GENERAL NOTES

1. REFER TO SHEET FA001 FOR GENERAL NOTES AND SYMBOLS.

2. FINAL FIRE ALARM AUDIBLE AND VISUAL DEVICE PLACEMENT SHALL BE

DETERMINED BY THE INSTALLING CONTRACTOR.

N

KEYPLAN

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

DP-02 IFC - 06/08/2021

SCALE: 1/8" = 1'-0"

FIRE ALARM - 1ST FLOOR PLAN - AREA C

KEYNOTES

1 LOCATE AND SPACE CARBON MONOXIDE DETECTORS IN ACCORDANCE WITH

MANUFACTURER SPECIFICATION.

2 ROOM IS TO BE RATED CLASS 1 DIVISION 1 HAZARDOUS CLASSIFICATION

RATING. ALL DEVICES IN ROOM TO BE EXPLOSION PROOF. SEE ELECTRICAL

SHEETS.

3 CO DETECTION IS NOT REQUIRED IN SPACES WITH CEILINGS GREATER THAN

12 FEET IN ACCORDANCE WITH UFC 3-600-01 SECTION 9-19.2.3.

4 STROBES MUST BE MOUNTED SUCH THAT THE MAXIMUM HEIGHT OF THE

LENS IS 30 FEET.

5 PROVIDE CONTROL MODULE TO SHUT DOWN HIGH-VOLUME, LOW SPEED

(HVLS) FANS UPON FIRE ALARM/MASS NOTIFICATION SYSTEM ACTIVATION IN

ACCORDANCE WITH UFC 3-600-01: 7-6.

C

S

C

S

C 15

C 15 C 15

C 15 C 15

C

S

C

S

C 30

C 30

C 30

C

S

C

S

C

S

C

S

C

S

C

S

C 15C 15

C 15

NAC

SPDP

BATTERY OFFICE R

BATTERY OFFICE S

OFFICE R

205a

BATTERY OFFICE T

209STAIR B

STB2

BATALLION OFFICER

203a

BATALLION OFFICE

MEN'S HEAD

G202

OFFICE S

207a

OFFICE T

209a

BATTALION OPEN OFFICE

CLASSROOM

CORRIDOR

C202

STAIR A

STA2

JAN.

CONF ROOM

COPY

CORRIDOR

C201

CORRIDOR

C203

H

H

J

J

K

K

L'

L'

L

L

1.6

1.9

2.5

3.3

ELEC

WOMEN'S HEAD

G201

GENERAL NOTES

1. REFER TO SHEET FA001 FOR GENERAL NOTES AND SYMBOLS.

2. FINAL FIRE ALARM AUDIBLE AND VISUAL DEVICE PLACEMENT SHALL BE

DETERMINED BY THE INSTALLING CONTRACTOR.

N

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

DP-02 IFC - 06/08/2021

SCALE: 1/8" = 1'-0"

FIRE ALARM - 2ND FLOOR PLAN

FINISHED

FLOOR

42" TO 48" AFF TO TOP OF

MESSAGE BUTTONS ON

LOC

NAC

PANEL

NO HIGHER THAN 60" TO

CENTER OF PANEL

LOC

72"

60"NOTE:

RECESSED OR SEMI-RECESSED

IN FINISHED SPACES AND SURFACE

MOUNTED IN UNFINISHED SPACES

TOP OF CABINET 72" ABOVE

FINISHED FLOOR OR CENTER

OF CABINET AT 60" ABOVE

FINISHED FLOOR, WHICHEVER

IS LOWER.

CONTROL

PANEL

FAAP

80" MIN (NFPA)

ALERT ALERT

CEILING

96" MAX (NFPA)

ABOVE FINISHED FLOORSYNCHRONIZE MORE THAN

TWO APPLIANCES IN ANY

FIELD OF VIEW.

REF. 80" MIN

REF. 96" MAX

ABOVE FINISHED FLOOR

NOTE: REFER TO THE PROPER DEVICE

INSTALLATION INSTRUCTIONS FOR

BACKBOX MOUNTING HEIGHT.

AUDIO / VISUAL

& VISUAL ONLY

DEVICES

FINISHED FLOOR

90" TO TOP

OF DEVICE

AUDIO ONLY

DEVICES

FIRE ALARM

PULL DOWN

TO EXIT

DOOR 5'

(MAX.)

42" MIN/48" MAX

(NFPA) NFPA 72 2010

EDITION (SECTION

17.14.4)

MANUAL

PULL STATION

FINISHED

WALL

FINISHED

FLOOR

CEILING

3' (MIN)

A/C

SUPPLY

OR

RETURN

DIFFUSER

4"

NOTE:

MEASUREMENTS

SHOWN ARE TO THE

CLOSEST EDGE OF

THE DETECTOR.

12" (MAX)

4"

CEILING MOUNTED

SMOKE / HEAT

DETECTOR

ACCEPTED HERE

WALL MOUNTED

SMOKE / HEAT

DETECTOR

FINISHED WALL

HEAT DETECTOR

NEVER HERE

GENERAL NOTES

1. REFER TO SHEET FA001 FOR GENERAL NOTES AND SYMBOLS.

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

DP-02 IFC - 06/08/2021

SCALE: NOT TO SCALE C1CONTROL PANEL, NAC PANEL, AND LOC MOUNTING HEIGHT

SCALE: NOT TO SCALE A3

AUDIO / VISUAL DEVICE

INSTALLATION DETAIL

SCALE: NOT TO SCALE C3MANUAL PULL STATION HEIGHTS

SCALE: NOT TO SCALE A1SMOKE / HEAT DETECTOR INSTALLATION REQUIREMENTS

MM

F S

F ID

(TYP)

NAC

TYPICAL NOTIFICATION APPLIANCE CIRCUIT

SS

WPWP

FMCP

SPD120 VAC POWER TO 20A

DEDICATED CIRCUIT BREAKER

(TYP)

WET-PIPE

SPRINKLER SYSTEM

MM

(TYP)

T S

TWO DEDICATED

PHONE LINES

DACT P

FIRST FLOOR

SECOND FLOOR

JB

NAC

TYPICAL NOTIFICATION APPLIANCE CIRCUIT

(TYP)

SPD 120 VAC POWER TO 20A

DEDICATED CIRCUIT BREAKER

SIGNALING LINE CIRCUIT

F SIGNALING LINE CIRCUIT

FAAP

LOC

CM

RTL

SHUTDOWN ASSOCIATED

AIR HANDLING UNIT

TO NAC

TO NAC

TO FMCP

TO FMCP

TO FMCP

CO

INSTALL 8" X 8" X 8" PULL BOX ABOVE/ADJACENT TO THE MNS EQUIPMENT

AREA. INSTALL 1.5" RMC FROM THE PULL BOX TO A POINT 4 FEET ABOVE

THE APEX OF THE ROOFLINE. INSTALL THE RMC IN THE MOST DIRECT

VERTICAL ROUTE POSSIBLE, IF SHARP BENDS ARE REQUIRED THEN UTILIZE

ADDITIONAL PULL BOXES APPROPRIATELY. TERMINATE THE TOP OF THE

EXTERIOR RMC WITH A U.L. LISTED WEATHER HEAD. INSTALL 50 OHM,

LMR-400 RF CABLE IN THE RMC. PROVIDE A THREE FOOT CABLE LENGTH

MAINTENANCE LOOP AT BOTH ENDS OF THE CABLE ROUTE AND

TERMINAT4E ROOF CABLE WITH A STRAIGHT MALE N-TYPE CONNECTOR;

LEAVE THE RF CABLE UNTERMINATED AT THE MNS MOUNTING AREA AND

CLEARLY LABEL THE RF CABLE "FOR MNS", TEST RF CABLE FOR PROPER

CONNECTIVITY. INSTALL ONE 9DBI OMNI-DIRECTIONAL ANTENNA, COOPER

ANT-109-OM OR, MOBILE MARK OD9-2400 OR EQUAL, ON TOP OF ROOFTOP

ANTENNA MAST. DIRECTIONAL ANTENNAE MAY BE MOUNTED ON FACILITIES

BELOW ROOFLINE IF PLACEMENT OF ANTENNA LOCATION IS PRE-

APPROVED BY SPAWAR OR PHYSICAL SECURITY PERSONNEL DURING THE

DESIGN STAGES. REFER ANY QUESTIONS TO PMO PHYSICAL SECURITY

OFFICE OR SPAWAR MNS SME.

USMC MNS

MOUNTING

AREA AND

ENCLOSURE

1.5" RMC

MAXIMUM CONDUIT LENGTH TO

ROOF TERMINATION = 115'

8"x8"x8" PULL BOX 1.5"

INSTALL USMC MASS NOTIFICATION SYSTEM

MOUNTING BOARD. PROVIDE DEDICATED WALL

SPACE FOR A 24"x24"x1" MOUNTING BOARD

ADJACENT TO THE FACP. ENSURE THE

MOUNTING BOARD IS CLEARLY MARKED FOR

"BASE-WIDE MNS USE". ENSURE MNS

EQUIPMENT AREA IS WITHIN 15 CONDUIT FEET

OF THE FACP.

MOUNT A NON-METALLIC 18"Hx16"Wx10"D NEMA 4X ENCLOSURE

WITH RAISED COVER AND PAD LOCKABLE LATCHES W/ INTERIOR

MOUNTING PLATE (INTEGRA 181610HLL OR EQUAL), CENTERED ON

THE MNS MOUNTING AREA BOARD. INSTALL 3/4" RMC WITH 3

CONDUCTORS, 12 GAUGE ELECTRICAL WIRE FROM THE

ENCLOSURE TO A DEDICATED LOCKABLE BREAKER FROM THE

SAME POWER PANEL UTILIZED BY THE FACP. INSTALL AC SURGE

PROTECTION DEVICE (120V, 15A MAX, ISLATROL HASP-121BT1RU

OR EQUAL) IN LINE WITH POWER CIRCUIT INSIDE THE LOWER

RIGHT CORNER OF THE ENCLOSURE. THE AC SURGE DEVICE

MUST BE WIRED IN SERIES WITH A DUAL AC ELECTRICAL OUTLET

MOUNTED INSIDE THE MNS ENCLOSURE LOCATED ABOVE THE

SURGE DEVICE ON THE BOTTOM RIGHT SIDE OF THE MNS

ENCLOSURE.

INSTALL TWO (2) 3/4-INCH ELECTRICAL METAL TUBING

WITH 18 AWG SHIELDED AUDIO WIRE FROM THE NEMA-4

ENCLOSURE TO TWO (2) DIFFERENT CENTRAL FACILITY

LOCATIONS (E.G. DUTY ROOM, ADMINISTRATION AREA,

CENTRAL HALLWAY, ETC.). AT THESE LOCATIONS

TERMINATE RMVC IN A FLUSH MOUNTED 4"x4"x2" EMT

BOX. ENSURE THE TWO CONDUIT RUNS AND THE EMT

FLUSH MOUNT ENCLOSURES ARE LABELED "FOR MNS

USE"

MAY BE COMBINED INTO ONE CONDUIT FOR

ROUTING PURPOSES.

CM

EGRESS LIGHTING

GENERAL NOTES

1. REFER TO SHEET FA001 FOR GENERAL NOTES AND SYMBOLS.

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

DP-02 IFC - 06/08/2021

SCALE:NTS

SCHEMATIC FIRE ALARM / MASS NOTIFICATION SYSTEM RISER DIAGRAM

1. PROVIDE AN AUTOMATIC, SUPERVISED WET PIPE FIRE SPRINKLER SYSTEM THROUGHOUT THE FACILITY.

2. THE CONTRACTOR MUST PERFORM A FIRE HYDRANT FLOW TEST IN ACCORDANCE WITH NFPA 291.

3. THE FIRE PROTECTION SYSTEM MUST COMPLY WITH NFPA 13 (2019), UFC 3-600-01 (7 FEBRUARY 2020), AND

WITH THESE CONTRACT DRAWINGS.

4. FIRE PROTECTION MATERIALS MUST BE UL LISTED AND/OR FM APPROVED.

5. INSTALLING CONTRACTOR MUST OBTAIN APPROVAL OF AUTHORITIES HAVING JURISDICTION.

6. IT IS THE INTENT OF THESE DOCUMENTS TO PROVIDE DESIGN, MATERIALS AND EQUIPMENT FOR A TOTALLY

FUNCTIONING AND OPERATING FIRE PROTECTION SYSTEM, INCLUDING THE PROPER INTERFACING AND

COORDINATING WITH ALL OTHER BUILDING SYSTEMS.

7. THE GENERAL CHARACTER AND SCOPE OF THE WORK IS ILLUSTRATED IN THE SPECIFICATIONS AND DRAWINGS. THE SPECIFICATIONS AND DRAWINGS ARE DIVIDED INTO SEVERAL SECTIONS FOR CONVENIENCE ONLY AND THE CONTRACT DOCUMENTS MUST BE CONSIDERED AS A WHOLE. THE CONTRACTOR MUST BE RESPONSIBLE FOR THE COORDINATION OF ALL TRADES, SUBCONTRACTORS, AND VENDORS ENGAGED IN

WORK.

8. THE SPRINKLER SYSTEM DESIGNER MUST BE RESPONSIBLE FOR AVOIDING CONFLICTS BETWEEN FIRE PROTECTION SYSTEMS AND LIGHTING FIXTURES, DIFFUSERS, GRILLES, DUCTS, EQUIPMENT FIXTURES, STRUCTURAL MEMBERS, PIPES, CONDUITS, AND OTHER OBSTRUCTIONS ENCOUNTERED.

9. PIPING LAYOUTS, WHERE SHOWN, ARE DIAGRAMMATIC AND SHOW SYSTEM INTENT. PIPING MAY REQUIRE ADDITIONAL OFFSETS, DROPS, AND RISERS. CONTRACTOR MUST BE RESPONSIBLE FOR FINAL PIPING LAYOUT

AND HYDRAULIC CALCULATIONS.

10. SPRINKLER PIPING MUST BE INSTALLED SO THAT ALL PORTIONS OF THE SYSTEM CAN BE DRAINED BACK THROUGH THE MAIN DRAIN VALVES. WHERE TRAPPED SECTIONS OF PIPING CANNOT BE AVOIDED, AUXILIARY

DRAINS MUST BE PROVIDED. PROVIDE TEST AND DRAIN CONNECTIONS IN ACCORDANCE WITH

SPECIFICATIONS AND NFPA 13.

11. THE INCOMING SPRINKLER SERVICE MUST BE PROVIDED WITH A REDUCED PRESSURE ZONE BACKFLOW PREVENTER. NEW BACKFLOW PREVENTER MUST INCLUDE A FORWARD FLOW TEST CONNECTION, WITH ONE 2 1/2 INCH HOSE CONNECTION FOR EVERY 250 GPM OF ANTICIPATED FLOW OF THE SPRINKLER SYSTEM.

PROVIDE A MEANS OF DRAINING THE BACKFLOW PREVENTER PRESSURE RELIEF DISCHARGE. DRAIN TO

OUTSIDE. SIZE DRAIN PIPE ACCORDING TO MANUFACTURER RECOMMENDATION.

12. DRAINS MUST TERMINATE TO THE EXTERIOR OF THE BUILDING AND BE PROVIDED WITH A SPLASH BLOCK.

DRAINS MAY NOT TERMINATE AT JANITOR'S CLOSETS OR OTHER INTERNAL DRAINS.

13. LOCATE CONTROL VALVES, TEST VALVES, AND LOW POINT DRAIN VALVES IN READILY ACCESSIBLE AREAS WITHIN 5 FEET OF THE FLOOR. TEST VALVES MUST DISCHARGE TO THE OUTSIDE OF THE BUILDING ONTO A

SPLASH BLOCK IF NOT DISCHARGING TO A PAVED SURFACE.

14. SPRINKLER HYDRAULIC DESIGN MUST BE BASED ON NEW HYDRANT FLOW TESTS PERFORMED BY THE CONTRACTOR. NEW FIRE HYDRANT FLOW TESTS MUST BE PERFORMED IN ACCORDANCE WITH NFPA 291.

15. HYDRAULIC CALCULATIONS MUST BE BASED ON AREA/DENSITY APPROACH ONLY. SPECIAL DESIGN

APPROACHES, SUCH AS ROOM DESIGN MUST NOT BE USED.

16. PROVIDE AT LEAST ONE HYDRAULIC CALCULATION FOR EACH HAZARD CLASSIFICATION. HYDRAULIC CALCULATIONS MUST INCLUDE A MINIMUM PRESSURE DROP ACROSS THE BACKFLOW PREVENTERS OF 12 PSI

OR THE ACTUAL PRESSURE DROP WHICHEVER IS GREATER, REGARDLESS OF TYPE OR SIZE.

17. THE SPRINKLER SYSTEMS MUST BE DESIGNED HYDRAULICALLY FOR UNIFORM DISCHARGE DENSITIES ON THE

FOLLOWING BASIS.

18. HIGH PILE STORAGE AND TIRE STORAGE AREAS MUST BE PROTECTED IN ACCORDANCE WITH THE APPLICABLE REQUIREMENTS OF NFPA 13. TIRE STORAGE 125 MUST BE PROTECTED IN ACCORDANCE WITH THE MISCELLANEOUS TIRE STORAGE PROVISIONS OF NFPA 13: 4.3.1.6. AND TABLE 4.3.1.7.1. TIRE STORAGE SHALL BE PROTECTED IN ACCORDANCE WITH NFPA 13: TABLE 4.3.1.7.1. FOR ON FLOOR, ON SIDE STORAGE UP

TO 12 FEET.

19. MAXIMUM SPRINKLER PROTECTION AREA MUST BE 225 SQUARE FEET PER SPRINKLER FOR LIGHT HAZARD AREAS, 130 SQUARE FEET PER SPRINKLER FOR ORDINARY HAZARD AREAS, AND 100 SQUARE FEET PER SPRINKLER FOR EXTRA HAZARD AREAS. EXTENDED COVERAGE SPRINKLERS ARE NOT PERMITTED.

20. PROVIDE PROTECTIVE CAGES ON SPRINKLERS LOCATED LESS THAN 7 FEET ABOVE THE FINISHED FLOOR AND

IN AREAS SUBJECT TO MECHANICAL DAMAGE.

21. PROVIDE INTERMEDIATE AND HIGH TEMPERATURE HEADS AS NEEDED TO MEET NFPA 13, SECTION 8.3.2.5.

THIS INCLUDES BUT IS NOT LIMITED TO UNIT HEATERS, HEATING DUCTS AND DIFFUSERS.

22. CENTER SPRINKLERS IN CENTER OF CEILING TILE.

23. WHERE FREEZE PROTECTION IS REQUIRED FOR A SPECIFIC SPACE, DRY-TYPE SPRINKLERS MAY BE USED.

24. SPRINKLER CONTROL VALVES MUST BE ELECTRICALLY SUPERVISED UNLESS OTHERWISE NOTED.

25. GALVANIZED PIPING IS NOT PERMITTED TO BE USED IN DRY PIPE, PREACTION, OR WET PIPE SPRINKLER

SYSTEMS.

26. PIPING MUST BE INSTALLED TO MAINTAIN CEILING HEIGHTS OR CLEARANCES IN ACCORDANCE WITH NFPA 13, NFPA 101, AND THE CONTRACT DOCUMENTS.

27. SPRINKLER SYSTEM MUST NOT REQUIRE PROTECTION OF PIPING AGAINST DAMAGE FROM EARTHQUAKES IN

ACCORDANCE WITH NFPA 13 AS THE BUILDING IS CLASSIFIED AS SEISMIC DESIGN CATEGORY B.

28. PENETRATIONS OF THE BUILDING AIR BARRIER MUST BE SEALED TO MAINTAIN THE INTEGRITY OF THE AIR

BARRIER. REFER TO ARCHITECTURE DRAWINGS FOR LOCATION AND DETAILS OF AIR BARRIERS.

29. DAMAGE TO WALLS, PARTITIONS, CEILINGS AND FLOORS FROM PENETRATIONS, INSTALLATION OR OTHER

ACTIONS OF THE SPRINKLER INSTALLER MUST BE PATCHED, REPAIRED, PAINTED WITH NEW MATERIALS TO

ORIGINAL CONDITION.

30. STRUCTURAL MEMBERS MUST NOT BE CUT, DRILLED OR BURNED UNLESS PREVIOUSLY APPROVED BY THE

PROJECTS STRUCTURAL ENGINEER AND CONTRACTING OFFICER.

31. PROVIDE SPRINKLER PROTECTION UNDER OBSTRUCTIONS, INCLUDING DUCTS, THAT ARE GREATER THAN 4

FEET.

32. PAINT CONCEALED PIPING AND PIPING IN NORMALLY UNOCCUPIED SPACES WITH PRIMER AND TWO COATS OF

RED OIL BASED PAINT.

33. PAINT EXPOSED PIPING IN OCCUPIED SPACES WITH PRIMER AND TWO COATS OF OIL BASE MATCHING THE

CEILING PAINT IN THE SPACE.

34. PROVIDE SPRINKLER GAUGE INSTALLATION LABELS ON EACH SPRINKLER GAUGE SHOWING SPRINKLER

GAUGES HAVE BEEN TEST OR REPLACED WITHIN FIVE YEARS.

35. PROVIDE A FIVE-INCH, 30 DEGREE ELBOW STORZ CONNECTION MOUNTED TO THE WALL FOR THE FIRE

DEPARTMENT CONNECTION.

36. ISOLATE THE SERVICE LATERAL CONNECTION TO THE SERVICE MAIN WITH AN UNDERGROUND GATE VALVE IN

AN APPROVED ROADWAY BOX INSTALLED IN ACCORDANCE WITH NFPA 24.

FIRE PROTECTION GENERAL NOTESFIRE PROTECTION ABBREVIATIONS AND LEGEND

SYMBOL ABBREVIATION DESCRIPTION

ORDINARY HAZARD

EXTRA HAZARD

ORDINARY

EXTRA

STORAGE AREA DESIGNED WITH

NFPA 13 APPLICABLE CRITERIANFPA 13

[ X / X ] SPRINKLER DESIGN DENSITY

[GPM/SF / SF]

OH

EH

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

DP-02 IFC - 06/08/2021

K-FACTOR 11.2 11.2 11.2 25.2EXTRA DESIGN 0.3/2,500 0.3/3,600 0.5/3,000 12 SPRINKLERS AT 7 PSI K-FACTOR 8.0 11.2 11.2 25.2ORDINARY DESIGN 0.2/2,500 0.2/2,500 0.2/2,500 12 SPRINKLERS AT 7 PSI K-FACTOR 5.6 11.2 11.2 25.2LIGHT DESIGN 0.1/1,500 0.2/2,500 0.2/2,500 12 SPRINKLERS AT 7 PSI

CEILING HEIGHT

UP TO 30 FEET

CEILING HEIGHT

30 TO 45 FEET

CEILING HEIGHT

45 TO 60 FEET

CEILING HEIGHT 60 TO 100

FEET

HAZARD CLASSIFICATION

WET-PIPE SPRINKLERS: (GPM/FT2)/FT2 [MINIMUM K-FACTOR]

BASED ON HYDRANT FLOW TEST DATA, 61.9 PSI IS AVAILABLE AT 850 GPM. THIS LEAVES 14.3 PSI FOR AVAILABLE INTERIOR LOSSES. A PRELIMINARY COMPUTER GENERATED FRICTION LOSS CALCULATION WAS PERFORMED FOR THE BUILDING USING HRS HASS SOFTWARE. THE CALCULATION UTILIZED SCHEDULE 10, 8-INCH MAINS AND SCHEDULE 10 AND SCHEDULE 40 PIPE WHERE PERMITTED BY UFC 3-600-01. CALCULATIONS INDICATED THAT A PRESSURE OF 54.6 PSI AT A FLOW OF 903 GPM IS REQUIRED FOR THE BUILDING. THIS EQUATES TO A SAFETY

FACTOR OF 13.0 PERCENT.

TOTAL PRESSURE NOT INCLUDING INTERIOR LOSSES 47.6 PSI

UNDERGROUND LOSS 8 INCH AT 600 GPM = 0.428 PSI/100 FT X 1,200 FT 5.2 PSI

BACKFLOW PREVENTER UFC 3-600-01 12.0 PSI

SPRINKLER ELEVATION 54 FT X 0.433 = 23.4 PSI

END HEAD PRESSURE (130 SF X 0.2 GPM/SF / 11.2)^2 7.0 PSI

TOTAL FIRE WATER DEMAND 850 GPM

EXTERIOR HOSE DEMAND 250 GPM 250 GPM

TOTAL SPRINKLER DEMAND 600 GPM

HYDRAULIC IMBALANCE 20% 100 GPM

SPRINKLER DEMAND (0.2 GPM/SF X 2,500 SF) 500 GPM

EXTERIOR HOSE DEMAND 250 GPM UFC 3-600-01

SPRINKLER K-FACTOR 11.2 MINIMUM UFC 3-600-01

DESIGN AREA 2,500 SF UFC 3-600-01

DESIGN DENSITY 0.2 GPM/SF UFC 3-600-01

HAZARD CLASSIFICATION ORDINARY HAZARD UFC 3-600-01

FLOW: 1,210 GPM

RESIDUAL PRESSURE: 60 PSI

STATIC PRESSURE: 64 PSI

PRESSURE HYDRANT: INTERSECTION OF BIRCH AND O STREETS

FLOW HYDRANT: INTERSECTION OF BIRCH AND DUNCAN STREETS

TESTED BY: A. DOBLADO LARA, MBI & D. WALTER, MBI

TEST DATE: 21 APRIL 2021

HYDRANT FLOW DATA

10TH MARINES HIMARS SITE

FE

FE FE

FE

FE

FEC

FE

FE

FE

FE

FE

FE

FE

FE

C

GENERAL NOTES

1. REFER TO SHEET FX001 FOR GENERAL NOTES AND SYMBOLS.

2. ALL AREAS ARE CONSIDERED LIGHT HAZARD UNLESS NOTED OTHERWISE.

3. FIRE SPRINKLER PIPING, WHERE SHOWN, IS FOR REFERENCE ONLY AND

INTENDED TO SHOW SYSTEM INTENT. IT IS THE RESPONSIBLITY OF THE

INSTALLING CONTRACTOR TO DETERMINE FINAL PIPING LAYOUT.

ORDINARY

ORDINARY

ELECTRICAL

ORGANIC STORAGE

AREAS (3)

CAGED EQUIP STOR 'R'

144r

CAGED EQUIP STOR 'S'

144s

CAGED EQUIP STOR 'T'

144t

OFFICE

UNISEX

G103

TELE

3.83.8

2.6

2.1

A'

A'

A

A

B

B

C

C

D

D

E

E F'

F

F

ORDINARY

ORDINARY

ORDINARY

CEILING HEIGHT: 12'-0"

CEILING HEIGHT: 12'-0"

CEILING HEIGHT: 12'-0"

MAXIMUM CEILING HEIGHT: 35'-0"

FX

FX

ORDINARY

N

KEYPLAN

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

DP-02 IFC - 06/08/2021

KEYNOTES

1 SPRINKLER PIPING MUST NOT BE PERMITTED TO TRAVEL THROUGH THE

ROOM UNLESS IT IS SERVING THE ROOM. COMPLY WITH NFPA 70 FOR

CLEARANCES WITH ELECTRICAL EQUIPMENT. SIDEWALL SPRINKLERS ARE

RECOMMENDED.

2 PROVIDE PROTECTIVE GUARDS ON SPRINKLERS IN THIS ROOM.

SCALE: 1/8" = 1'-0"

FIRE PROTECTION - 1ST FLOOR PLAN - AREA A

C

FE

C

FE

C

FE

FE FE FE

FE

FEFE FE

FE FE FE

FE

C

FE

C

FE

C

FE

FE

C

ORDINARY

ORDINARY

ORDINARY

ORDINARY

NFPA 13

FSR OFFICE

ORDO OFFICE

HQ FAC OFFICE

BATTERY FAC OFFICE S

HIMARS MAINT. OFFICER

110a BATTERY FAC OFFICE R

BREAK ROOM

CONFERENCE ROOM

CLASSROOM

HIMAR MAINT. OFFICE

FSR TOOL ROOM + PARTS

STORAGE

PRINT/ FILE

CORRIDOR

C101

VEST

V100

VEST

V101

JAN.

TELECOM

TIRE STORAGE

LEAD ACID BATTERY

STORAGE

MECHANICAL

WOMEN'S HEAD

G102

MEN'S HEAD

G101

STAIR A

STA1

HQ STORAGE

DISPATCH

STAIR B

STB1

'R' STORAGE

105r

'S' STORAGE

105s

'T' STORAGE

105t

GENERAL STORAGE

MEN'S SHOWERS

G101a

BATTERY FAC OFFICE T

CORRIDOR

C100

CORRIDOR

C102

CORRIDOR

C103

CORRIDOR

C104

FX401

C3

NFPA 13 NFPA 13 NFPA 13

3.8

F'

F

F

G

G

H

H

J

J

K

K

L'

L'

L

L

1.6

1.9

2.5

3.3

ORDINARY

BOILER ROOM

ORDINARY

[0.3 GPM/SF / 395 SF]

VEST

V102

[0.24 GPM/SF / 860 SF]

MOTHER'S ROOM

G102a

CEILING HEIGHT: 13'-7"

FX

FX

FX

FX

ORDINARY

GENERAL NOTES

1. REFER TO SHEET FX001 FOR GENERAL NOTES AND SYMBOLS.

2. ALL AREAS ARE CONSIDERED LIGHT HAZARD UNLESS NOTED OTHERWISE.

3. FIRE SPRINKLER PIPING, WHERE SHOWN, IS FOR REFERENCE ONLY AND

INTENDED TO SHOW SYSTEM INTENT. IT IS THE RESPONSIBLITY OF THE

INSTALLING CONTRACTOR TO DETERMINE FINAL PIPING LAYOUT.

N

KEYPLAN

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

DP-02 IFC - 06/08/2021

KEYNOTES

1 SPRINKLER PIPING MUST NOT BE PERMITTED TO TRAVEL THROUGH THE

ROOM UNLESS IT IS SERVING THE ROOM. COMPLY WITH NFPA 70 FOR

CLEARANCES WITH ELECTRICAL EQUIPMENT. SIDEWALL SPRINKLERS ARE

RECOMMENDED.

2 PROVIDE PROTECTIVE GUARDS ON SPRINKLERS IN THIS ROOM.

SCALE: 1/8" = 1'-0"

FIRE PROTECTION - 1ST FLOOR PLAN - AREA B

BOILER ROOM 117 36,580 4,020

SPRINKLER RISER LOCATION FIRST FLOOR FIRE

AREA PROTECTED (SF)

SECOND FLOOR FIRE

AREA PROTECTED (SF)

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

ORDINARY

ORDINARY

ORDINARY

ORDINARY

LAUNCHER MAINTENANCE

BAYS [6]

AUTO MAINTENANCE

BAYS [6]

POL STORAGE

HIMARS MAINTENANCE

TOOL ROOM

HIMARS PARTS STORAGE

TELECOM

CORRIDOR

C105

COMPRESSOR

EXTRA

L

L

M

M

N

N

P

P

P'

P'

R

R

S

S

T

T

U

U

V

V

V'

V'

2.4

2.8

3.2

1.6

1.9

2.5

3.3

ORDINARY

[0.4 GPM/SF / 187 SF]

MAXIMUM CEILING HEIGHT: 54'-0"

ELEC

MECHANICAL

MAXIMUM CEILING HEIGHT: 36'-0"

ORDINARY

ORDINARY

ORDINARY

2 2

GENERAL NOTES

1. REFER TO SHEET FX001 FOR GENERAL NOTES AND SYMBOLS.

2. ALL AREAS ARE CONSIDERED LIGHT HAZARD UNLESS NOTED OTHERWISE.

3. FIRE SPRINKLER PIPING, WHERE SHOWN, IS FOR REFERENCE ONLY AND

INTENDED TO SHOW SYSTEM INTENT. IT IS THE RESPONSIBLITY OF THE

INSTALLING CONTRACTOR TO DETERMINE FINAL PIPING LAYOUT.

N

KEYPLAN

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

DP-02 IFC - 06/08/2021

SCALE: 1/8" = 1'-0"

FIRE PROTECTION - 1ST FLOOR PLAN

KEYNOTES

1 SPRINKLER PIPING MUST NOT BE PERMITTED TO TRAVEL THROUGH THE

ROOM UNLESS IT IS SERVING THE ROOM. COMPLY WITH NFPA 70 FOR

CLEARANCES WITH ELECTRICAL EQUIPMENT. SIDEWALL SPRINKLERS ARE

RECOMMENDED.

2 PROVIDE PROTECTIVE GUARDS ON SPRINKLERS IN THIS ROOM.

FEC

H

H

J

J

K

K

L'

L'

L

L

1.6

1.9

2.5

3.3

STAIR A

STA2

COPY

BATALLION OFFICE

CORRIDOR

C201

BATTALION OPEN OFFICE

BATALLION OFFICER

203a

OFFICE R

205a

CORRIDOR

C202

CONF ROOM

CLASSROOM

BATTERY OFFICE R

BATTERY OFFICE S

OFFICE S

207a

CORRIDOR

C203

STAIR B

STB2

MEN'S HEAD

G202

BATTERY OFFICE T

OFFICE T

209a

WOMEN'S HEAD

G201

JAN.

ELEC

GENERAL NOTES

1. REFER TO SHEET FX001 FOR GENERAL NOTES AND SYMBOLS.

2. ALL AREAS ARE CONSIDERED LIGHT HAZARD UNLESS NOTED OTHERWISE.

3. FIRE SPRINKLER PIPING, WHERE SHOWN, IS FOR REFERENCE ONLY AND

INTENDED TO SHOW SYSTEM INTENT. IT IS THE RESPONSIBLITY OF THE

INSTALLING CONTRACTOR TO DETERMINE FINAL PIPING LAYOUT.

N

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

DP-02 IFC - 06/08/2021

SCALE: 1/8" = 1'-0"

FIRE PROTECTION - 2ND FLOOR PLAN

KEYNOTES

1 FIRE SPRINKLER SYSTEM MUST EXTEND TO SECOND FLOOR THROUGH THIS

LOCATION.

BOILER ROOM

H

B3

FX401

B3

FX401

GENERAL NOTES

1. REFER TO SHEET FX001 FOR GENERAL NOTES AND SYMBOLS.

2. FIRE SPRINKLER PIPING, WHERE SHOWN, IS FOR REFERENCE ONLY AND

INTENDED TO SHOW SYSTEM INTENT. IT IS THE RESPONSIBLITY OF THE

INSTALLING CONTRACTOR TO DETERMINE FINAL PIPING LAYOUT.

FLOW SWITCH

TEST AND DRAIN VALVE

CHECK VALVE

BUTTERFLY VALVE

TEST HEADER

5-INCH STORZ

FIRE DEPARTMENT CONNECTION

LOW POINT DRAIN

CONCRETE SPLASH BLOCK

CHECK VALVE

BUTTERFLY VALVE

(NORMALLY CLOSED)

8-INCH INCOMING FIRE

SERVICE LATERAL

REDUCED PRESSURE ZONE

BACKFLOW PREVENTER

TO WET-PIPE

SPRINKLER SYSTEM

RPZ DRAIN WITH AIR GAP WITH DRAIN TO

FLOOR DRAIN OR OUTSIDE

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

DP-02 IFC - 06/08/2021

KEYNOTES

1 FIRE WATER SERVICE ENTRANCE

2 LOW POINT DRAIN

3 BACKFLOW PREVENTER FORWARD FLOW TEST HEADER

4 FIRE SPRINKLER RISER

5 5-INCH STORZ FIRE DEPARTMENT CONNECTION

6 REDUCED PRESSURE ZONE BACKFLOW PREVENTER

7 THRUST ROD AND SLEEVE ALL PIPE PENETRATIONS THROUGH THE GRADE

FLOOR SLAB IN ACCORDANCE WITH UFC 3-600-01.

SCALE: NOT TO SCALE C3

FIRE PROTECTION - ENLARGED

RISER PLAN

SCALE: A3

FIRE PROTECTION - RISER

ISOMETRIC

SCALE: NOT TO SCALE B3FIRE PROTECTION - RISER DETAIL

File details come from the government source that posted it. Updated .