This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a Design-Bid-Build project at the P1556 10th Marines Maintenance and Operations Complex, Marine Corps Base Camp Lejeune in North Carolina. Amendment 0007, issued on 02 Jan 2026, provides responses to Pre-Proposal Inquiries (PPIs) addressing technical clarifications for the project.

Key details include contractor responsibilities for removing a 250-gallon double-wall steel aboveground storage tank near Building 1425, confirmation that natural gas tanks will be removed by the gas company, and clarification that hose reels will be Contractor Furnished, Contractor Installed (CFCI) and mounted on walls. The amendment also confirms bidding terms for PFAS-contaminated soil media and construction dewatering effluent disposal, with disposal expected at a non-hazardous permitted facility. The proposal due date remains 08 January 2026 at 2:00 PM EST.

View the file

Other files

File Type Posted
N4008525R2532 Amendment 0009.pdf PDF
1760523 Geotech Report_Addendum 3.pdf PDF
1760523 P1556_ADDENDUM_GEOTECH REPORT_FIGURES.pdf PDF
1760523 P1556_ADDENDUM_GEOTECH REPORT_APPENDICES.pdf PDF
P1556_FINAL_GEOTECH REPORT_TEXT.pdf PDF
P1556_FINAL_GEOTECH REPORT_FIGURES.pdf PDF
N4008525R2532 Amendment 0006.pdf PDF
1760523 PROD - Final (Rev02).xlsx XLSX spreadsheet
Tank_PPI.pdf PDF
HP 500 9158DBCivStruct-10th Dwg.pdf PDF
1760523 P1556_ADDENDUM_GEOTECH REPORT_TEXT.pdf PDF
P1556_FINAL_TESTS AND ANALYSES.pdf PDF
P1556_FINAL_GEOTECH REPORT_APPENDICES.pdf PDF
1760523 Amendment 04_Dwgs.pdf PDF
1760523 Amendment 03_Specs.pdf PDF
Drawings - Building 1450.pdf PDF
1760523 Geotech Report_Addendum 2.pdf PDF
1760523 P1556_ADDENDUM_GEOTECH REPORT_01302024.pdf PDF
P1556_FINAL_GEOTECH REPORT_12182023.pdf PDF
DD_Maneuver_Area.pdf PDF
P1495 (B1337)_Drawings_Excerpt.pdf PDF
N4008525R2532 Amendment 0005.pdf PDF
N4008525R2532 Amendment 0004.pdf PDF
N4008525R2532 Amendment 0003.pdf PDF
1760523 DWG Amendment 01.pdf PDF
Site Visit Log - N4008525R2532 P1556.pdf PDF
1760523 DWG Amendment 02.pdf PDF
N4008525R2532 Amendment 0002.pdf PDF
BLDG P1556 -1760523 COMBINED.pdf PDF
N4008525R2532 Amendment 0001.pdf PDF
Attachment J - Price Proposal Form.docx DOCX document
Attachment I - D2_HAZ.pdf PDF
Attachment I - A2_HCNTRL.pdf PDF
Attachment H - SPECS.pdf PDF
Attachment G - Small Business Subcontracting Plan (SBSP) Template.docx DOCX document
Attachment F - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Attachment E - Historical Small Business Utilization.docx DOCX document
N4008525R2532.pdf PDF
P1556 Interior Finishes Brand Name or Equal Redacted.pdf PDF
Attachment I - B1_B1445.pdf PDF
Attachment I - A5_B1337.pdf PDF
Attachment C - Construction Experience Data Sheet.docx DOCX document
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment I - A4_ARTSHLTR.pdf PDF
Attachment I - A3_NMSHLTR.pdf PDF
Attachment I - A1_FLDMAINT.pdf PDF
Attachment I - D1_B1450.pdf PDF
Attachment I - C1_HP500.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Attachment A - PPI Log Template.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

N4008525R25320007

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

AMENDMENT 0007

The Amendment is issued to incorporate the following:

1. Provide responses to PPIs.

1. PPI Responses:

Date

Submitted

Reference

Question Government Response Page Section Para.

10/20/25

C-002, C- 003, CD102,

and

CD103

Amendment 0002, BLDG+P1556+-

1760523+COMBINED:

Reference is made to Sheet C- 003, Key Note #1 regarding the removal of the Aboveground

Storage Tank (AST) near Building 1425. The note specifies that the tank must be properly drained, cleaned, and triple-rinsed to remove all vapors before disposal.

Additionally, the wastewater from the rinsing process must be containerized and disposed of in accordance with proper protocols. However, Sheets C-

002 (note #8 under Utilities) and

CD102 & CD103, Key Notes #8 and #9, respectively, seem to indicate that the utility company is responsible for removing the tank, while the General

Contractor (GC) is only tasked with removing the concrete pad, bollards, and associated piping. Please confirm which party is responsible for the removal of the AST. If the GC is responsible, kindly provide the following details for the tank (including the salvage tank shown on Sheet CD101):

- Size and capacity

- Materials of construction

- Amount of residual fuel remaining

- Location coordinates (to allow for interference checks)

- Estimated schedule for removal

The referenced note #8 on C-002 refers to natural gas tanks and the key notes on sheets CD102 &

CD103 point to natural gas tanks.

Natural gas tanks will be removed by the gas company as called out on

C-002 and CD102 & CD103.

The Contractor is responsible for removal of the AST near building 1425. The information received from the Installation is the following:

1. Tank size and capacity (gallons or volume). 250 gallons

2. Material of construction (e.g., steel, fiberglass, double-wall, etc.).

Double Wall Steel/HDPE Liner/Concrete

3. Approximate amount and type of residual fuel or oil remaining. No record of product being removed from tank, ultra-low sulfur diesel fuel

4. Confirmation of any known contamination, leaks, or prior environmental assessments related to the tank. No additional record beyond attached of compliance report provided.

10/21/25

A5

Building, P-102, P-

Building A5, P-102 and detail B2/P-501 note the hose reels are mounted to ceiling. P-701 appears to show hose reels mounted on wall. Verify these will be GFGI mounted on wall per

P-701.

Hose reels to be CFCI, mounted on wall. Third party vendor referred to on plan note 3, sheet P-102 is

Contractor provided Delegated Design consultant.

10/21/25 3 Price Schedule

CLIN 0001N describes the unit price for excavation, handling, storage, sampling, analysis, treatment, and disposal of PFAS-contaminated soil media at a permitted licensed facility. CLIN 0001O describes the unit price for handling, containerizing, treatment, and testing of PFAS-impacted construction dewatering effluent. Please confirm whether the PFAS-contaminated soil media and dewatering effluent are to be treated and disposed of as non-hazardous materials, and that the scope of work under these

CLINs assumes disposal at a

PFAS-permitted, lined non-hazardous facility (e.g., Subtitle D landfill or equivalent), rather than a RCRA Subtitle C hazardous waste facility.

Bid per RFP.

(End of Summary of Changes)

IDCode: J
Page: 1
Pages: 2
AmendNo: 0007
EffDate: 02 Jan 2026
ReqNo: See Continuation Sheet
ProjNo: WON 1760523
IssCode: N40085
AdmCode:
IssuedBy: NAVFACSYSCOM MID-ATLANTIC

9324 VIRGINIA AVENUE, NORFOLK VA 23511-0395

NORFOLK, VA 23511-0395

UNITED STATES

James Godwin, Email: james.a.godwin41.civ@us.navy.mil Telephone: 7573411999 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N4008525R2532
SolDate: 17 Sep 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section 00 70 00 - Conditions of the Contract
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: DESIGN-BID-BUILD, P1556 10TH MARINES MAINTENANCE AND OPERATIONS COMPLEX, MARINE CORPS BASE (MCB) CAMP LEJEUNE, NORTH CAROLINA

The proposal due date has not been extended and remains 08 January 2026 NLT 2:00 PM EST. See Continuation Page(s).

ContNameTitle:
CoNameTitle: JAMES A. GODWIN
ContDate:
CODate: 02 Jan 2026