This document is an Amendment (Amendment 0006) to Solicitation N4008525R2523 for the P-1458 2nd Radio Battalion Complex, Phase 2, Parachute and Supply Facilities project at Marine Corps Base Camp Lejeune, North Carolina. The amendment provides responses to Pre-Proposal Inquiries (PPIs) addressing technical specifications and design requirements, including warehouse sprinkler protection, fire pump location, water and sewer main sizing, and various site improvement details. Several key questions remain marked as "PENDING", indicating ongoing clarification is needed for specific aspects such as dumpster enclosures, fence gate access controls, fencing requirements, and electrical load estimations. The amendment maintains the original solicitation's core requirements for a design-build project involving construction of parachute maintenance and supply warehouse facilities.

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

N40085

N40085-25-R-2523 - DESIGN-BUILD, P-1458 2ND RADIO BTTALION COMPLEX, PHASE 2, PARACHUTE AND SUPPLY

FACILITIES, MARINE CORPS BASE CAMP LEJEUNE, NORTH CAROLINA

See SF30 Block 14 continuation page(s).

NAVFAC MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK, VA 23511-3095

NAVFACSYSCOM MID-ATLANTIC

ROICC CAMP LEJEUNE

1107A BIRCH STREET

CAMP LEJEUNE NC 28547-2521

N40085-25-R-2523

1 4

05/06/2025

03/25/2025

N40085-25-R-2523

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

The purpose of this amendment is to provide the following:

1. Responses to Pre-Proposal Inquiries (PPIs):

Question # Reference

Question Government Response Page Section Paragraph

Part 3

Chapter

D4020 In accordance with UFC 3-

600-01, warehouse sprinkler protection, at a minimum, must be based on Class IV, nonencapsulated commodities, as defined by NFPA 13, unless a more severe class of storage is anticipated, and must be based on the maximum potential height of storage.

Please confirm if a more severe class of storage than

Class IV, nonencapsulated commodities (including Group

A Plastics) will be stored within any portions of the facilities, and confirm maximum potential height of the this storage.

Bid in accordance with the minimum requirements as laid out in the RFP.

Warehouse sprinkler protection, at a minimum, must be based on Class IV, in accordance with UFC 3-

600-01, and supply warehouse ceiling clearance of 18ft minimum as stated in

Chapter 5 Room

Requirements. Storage height is calculated at three feet below the roof height according to UFC 4-440-01, 3-15.1. Prior to the start of design, the QFPE is to meet with the NAVFAC FPE to determine the extent and types of fire protection required, A per RFP Chapter

6 D40.

Part 3

Chapter

D4040 In accordance with the RFP, the fire pump must be located within the building enclosure that it is protecting. NFPA 20 does not require Fire Pumps to be housed in the building they are serving and allows for Fire

Pumps to be housed in a neighboring enclosure. Please confirm if the Government

Bid in accordance with the

RFP. Fire pump must be located within the building enclosure it is protecting.

would accept a NFPA 20 code compliant solution.

Existing

Condition

/ Current

Constructi on

Will CAD files of the previous design be provided to use as existing conditions for this project? Or as-builts?

Aside from the proof-of-concept plan, it is unlikely previous design documents or as-built drawings will be provided.

1846 Chapter

B

Drawing s

CS100 Please confirm that the water and sewer are sized for the proposed demand and specify if there is a required connection point

The water and sewer mains are sized to handle the demand of the project. The final water and sewer connection points will be determined during design.

Part 3, Chapter

G204090

Other Site

Improvem ents

Please confirm whether the (1) three-dumpster enclosure is to be provided for the project or if already installed? Further confirm that if needed it is not

(1) triple each for the Supply

Warehouse and the Paraloft.

Since this is outside of the

LODs established in other

PPIs (113 and 114) and the

RFP, where would an additional be located? Please note that section 3.1.3.1 New

Site Work alludes to this dumpster already being installed and not required scope but G204090 states otherwise.

PENDING

G204001

Fencing and Gates

There is no indication to access controls or operability to the fence gates at the Supply

Warehouse compound. Please indicate any requirements for securing, comm/electrical needs and if gates are swinging versus sliding.

G204001

Fencing and Gates

There is no indication to access controls or operability to the fence gates at the

Paraloft / Parachute compound. Please indicate any requirements for securing, comm/electrical needs and if gates are swinging versus sliding.

G204001

Fencing and Gates

Please indicate whether the

Supply Warehouse requires black ornamental fence surrounding the building to match existing areas or chain link fence as indicated in

3.1.3.1 New Site Work

G204001

Fencing and Gates

Please indicate whether the

Paraloft, Parachute Building requires black ornamental fence surrounding the building to match existing areas or chain link fence as indicated in

3.1.3.1 New Site Work

G204001

Fencing and Gates

Please confirm that temporary fencing and gates as required to facilitate security during construction these requirements are not currently being required on the campus and further not indicated in

Part 6. If required is the entire perimeter around the

Warehouse and Paraloft to be secured during construction?

Part 6, F

Estimated

Loads

The RFP indicates existing sectionalizing cabinets to feed the transformers shown on the plans included in the RFP.

Estimated loads in RFP

Chapter F exceed typical requirements. It appears the government added 45% to the subtotals when all that should be required is 20% please confirm that this can be reduced to 20% or if the 45% is necessary as it will increase transformer sizes.

0006
25R2523 Amendment 0006 pRINTED