This document is a federal contract Amendment (Amendment 0007) for solicitation N4008525R2523, pertaining to the Design-Build project for the 2nd Radio Battalion Complex, Phase 2, Parachute and Supply Facilities at Marine Corps Base Camp Lejeune, North Carolina. The amendment provides responses to Pre-Proposal Inquiries (PPIs) addressing several technical details, including:
Key clarifications include confirming that CAD files of previous design will not be provided beyond RFP documents, a triple dumpster has been previously installed and will serve both the paraloft and supply warehouse, and manual sliding entrance gates will secure the facilities. The amendment also addresses fencing specifications, with the Paraloft facility requiring a decorative fence matching existing architectural standards, and provides guidance on electrical load requirements, specifying that only 15% additional load capacity should be added for switchgear, panel boards, and load centers. The contracting activity is the Naval Facilities Engineering Command Mid-Atlantic, with the amendment dated 05/08/2025.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
N40085
N40085-25-R-2523 - DESIGN-BUILD, P-1458 2ND RADIO BTTALION COMPLEX, PHASE 2, PARACHUTE AND SUPPLY
FACILITIES, MARINE CORPS BASE CAMP LEJEUNE, NORTH CAROLINA
See SF30 Block 14 continuation page(s).
NAVFAC MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511-3095
NAVFACSYSCOM MID-ATLANTIC
ROICC CAMP LEJEUNE
1107A BIRCH STREET
CAMP LEJEUNE NC 28547-2521
N40085-25-R-2523
1 4
05/08/2025
03/25/2025
N40085-25-R-2523
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
The purpose of this amendment is to provide the following:
1. Responses to Pre-Proposal Inquiries (PPIs):
Question # Reference
Question Government Response Page Section Paragraph
Existing
Condition
/ Current
Constructi on
Will CAD files of the previous design be provided to use as existing conditions for this project? Or as-builts?
The only drawings provided before award of contract are those included in the RFP, which are for informational purposes only. This response supersedes the previous response to PPI 95 in
Amendment 0006 in its entirety.
Part 3, Chapter
G204090
Other Site
Improvem ents
Please confirm whether the (1) three-dumpster enclosure is to be provided for the project or if already installed? Further confirm that if needed it is not
(1) triple each for the Supply
Warehouse and the Paraloft.
Since this is outside of the
LODs established in other
PPIs (113 and 114) and the
RFP, where would an additional be located? Please note that section 3.1.3.1 New
Site Work alludes to this dumpster already being installed and not required scope but G204090 states otherwise.
A triple dumpster has been provided under the previous construction contract and is not part of this solicitation.
The triple dumpster will serve both the paraloft and the supply warehouse.
G204001
Fencing and Gates
There is no indication to access controls or operability to the fence gates at the Supply
Warehouse compound. Please indicate any requirements for securing, comm/electrical
The paraloft and supply warehouse will be secured via manual sliding entrance gates per 3.1.3.1 New Site
Work to match the fence adjacent to the gate(s).
needs and if gates are swinging versus sliding.
Sliding gates will be manually locked / unlocked at the close / beginning of each day.
G204001
Fencing and Gates
There is no indication to access controls or operability to the fence gates at the
Paraloft / Parachute compound. Please indicate any requirements for securing, comm/electrical needs and if gates are swinging versus sliding.
Refer to PPI response 181.
G204001
Fencing and Gates
Please indicate whether the
Supply Warehouse requires black ornamental fence surrounding the building to match existing areas or chain link fence as indicated in
3.1.3.1 New Site Work
Refer to 3.1.3.1 New Site
Work
G204001
Fencing and Gates
Please indicate whether the
Paraloft, Parachute Building requires black ornamental fence surrounding the building to match existing areas or chain link fence as indicated in
3.1.3.1 New Site Work
The perimeter fence encompassing the Paraloft
Facility is to be a decorative fence meeting the requirements of the BEAP matching the decorative fence north of the project site and along the east side of Battalion Complex. Refer to 3.1.3.1 New Site Work.
Road.
G204001
Fencing and Gates
Please confirm that temporary fencing and gates as required to facilitate security during construction these requirements are not currently being required on the campus and further not indicated in
Part 6. If required is the entire perimeter around the
Warehouse and Paraloft to be secured during construction?
PENDING
Part 6, F
Estimated
Loads
The RFP indicates existing sectionalizing cabinets to feed the transformers shown on the plans included in the RFP.
Estimated loads in RFP
Per UFC – 3-501-01 (refer to sheet 1957 of 2270 –
Chapter F – Electrical MCB
Camp Lejeune Electrical
Policies & Criteria) you
Chapter F exceed typical requirements. It appears the government added 45% to the subtotals when all that should be required is 20% please confirm that this can be reduced to 20% or if the 45% is necessary as it will increase transformer sizes.
should provide a min. of
15% spare capacity
(ampacity) for all switchgear, panel board, and load centers). So, only 15% additional load should be added.
| 0007 |