This document is an Amendment (0008) to Solicitation N4008525R2523 for a Design-Build project at Marine Corps Base Camp Lejeune, North Carolina. The amendment addresses a pre-proposal inquiry regarding construction site fencing, clarifying that the contractor is not required to install temporary fencing beyond what they deem necessary to secure their work site. The solicitation involves designing and constructing a Parachute Maintenance Facility and Supply Warehouse for the 2nd Radio Battalion, with specific architectural requirements including Georgian or Colonial revival style and Anti-Terrorism/Force Protection (ATFP) features. The project will include low-rise steel frame facilities with concrete masonry unit walls, brick veneer, reinforced concrete floors, and standing seam metal roofing, along with specialized spaces for parachute maintenance, storage, administrative areas, and support infrastructure.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
N40085
N40085-25-R-2523 - DESIGN-BUILD, P-1458 2ND RADIO BTTALION COMPLEX, PHASE 2, PARACHUTE AND SUPPLY
FACILITIES, MARINE CORPS BASE CAMP LEJEUNE, NORTH CAROLINA
See SF30 Block 14 continuation page(s).
NAVFAC MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511-3095
NAVFACSYSCOM MID-ATLANTIC
ROICC CAMP LEJEUNE
1107A BIRCH STREET
CAMP LEJEUNE NC 28547-2521
N40085-25-R-2523
1 2
05/08/2025
03/25/2025
N40085-25-R-2523
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
The purpose of this amendment is to provide the following:
1. Responses to Pre-Proposal Inquiries (PPIs):
Question # Reference
Question Government Response Page Section Paragraph
Part 3, Chapter
G204001
Fencing and Gates
Please confirm that temporary fencing and gates as required to facilitate security during construction these requirements are not currently being required on the campus and further not indicated in
Part 6. If required is the entire perimeter around the
Warehouse and Paraloft to be secured during construction?
This project does not require any construction fencing other than what the contractor decides they need to secure their site.