Specification 33 40 00.pdf
PDF 50 KB Posted
- Solicitation number
- N4008524R2510
About this file
This specification covers stormwater utilities work for a project to repair taxiway pavements at Naval Air Station Oceana in Virginia Beach, Virginia. The project includes improvements to the stormwater system such as installation of pipe culverts, box culverts, drainage structures, and repairs to existing structures. Concrete, PVC, and precast reinforced concrete materials will be used. Trenching, bedding, backfilling, placement, and joining of pipes and boxes must meet specifications, as must testing of watertight joints, deflection, leakage, and post-installation inspection. The Navy is soliciting proposals for this work, which includes replacement of AC and PCC concrete taxiway pavements with new PCC, and repair of associated stormwater infrastructure.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR TAXIWAY PAVEMENTS RM109145
NAS OCEANA, VIRGINIA BEACH, VA ePROJECTS WO #1635836
SECTION 33 40 00
STORMWATER UTILITIES
PART 1 GENERAL
The work under this section covers installation of pipe culverts, endwalls, box culverts, precast concrete and metal pipe, storm drains, drop inlets, manholes, spring boxes, junction boxes, and intake boxes and replacing existing structures in accordance with these specifications and in conformity with the lines and grades shown on the plans.
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO LRFD (8th Edition; 2017) Bridge Design Specifications
ASTM INTERNATIONAL (ASTM)
ASTM C76 (2020) Standard Specification for Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe
ASTM C76M (2020) Standard Specification for Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe (Metric)
ASTM C443 (2021) Standard Specification for Joints for Concrete Pipe and Manholes, Using Rubber Gaskets
ASTM C506 (2020) Standard Specification for Reinforced Concrete Arch Culvert, Storm Drain, and Sewer Pipe
ASTM C506M (2020) Standard Specification for Reinforced Concrete Arch Culvert, Storm Drain, and Sewer Pipe (Metric)
ASTM C507 (2020) Standard Specification for Reinforced Concrete Elliptical Culvert, Storm Drain, and Sewer Pipe
ASTM C507M (2020) Standard Specification for Reinforced Concrete Elliptical Culvert, Storm Drain, and Sewer Pipe (Metric)
ASTM C990 (2009; R 2019) Standard Specification for Joints for Concrete Pipe, Manholes, and Precast Box Sections Using Preformed Flexible Joint Sealants
SECTION 33 40 00 Page 1
ASTM D2321 (2020) Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications
ASTM F949 (2020) Standard Specification for Poly(Vinyl Chloride) (PVC) Corrugated Sewer Pipe with a Smooth Interior and Fittings
VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT)
VDOT RBS (2016) Road and Bridge Specifications
Modification of References
Where the term "Engineer" is used in VDOT RBS it shall be construed to mean Contracting Officer, Contracting Officer Technical Representative, or Designer of Record, as applicable in the context. References to measurement and payment must be disregarded as project this project is to be bid on a lump sum basis.
U.S. NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC)
UFC 3-260-01 (2020) Airfield and Heliport Planning and Design Change 1
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Concrete Pipes; G Stormwater Structures;G
SD-03 Product Data
Porous Backfill
Geotextile Fabric
Riprap; G
SD-06 Test Reports
Leakage Test; G
SD-07 Certificates
Hydrostatic Test on Watertight Joints; G
Frame and Cover or Gratings; G
SD-08 Manufacturer's Instructions
SECTION 33 40 00 Page 2
Placing Pipe and Box Culvert; G
SD-11 Closeout Submittals
Post-Installation Inspection Report; G
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery and Storage
Inspect materials delivered to site for damage and unload and store materials with minimum handling. Do not store materials directly on the ground. Keep the inside of pipes and fittings free of dirt and debris.
Before, during, and after installation, protect plastic pipe and fittings from any environment that would result in damage or deterioration to the material. Keep a copy of the manufacturer's instructions available at the construction site at all times and follow these instructions unless directed otherwise by the Contracting Officer. Store solvents, solvent compounds, lubricants, elastomeric gaskets, and any similar materials required to install plastic pipe in accordance with the manufacturer's recommendations and discard if the storage period exceeds the recommended shelf life. Discard solvents in use when the recommended pot life is exceeded.
1.3.2 Handling
Handle materials in a manner that ensures delivery to the trench in sound, undamaged condition. Carry pipe to the trench.
PART 2 PRODUCTS
2.1 PIPE FOR CULVERTS AND STORM DRAINS
Pipe sizes for culverts and storm drains are indicated on the drawings.
2.1.1 Concrete PipesConcrete Pipe
2.1.1.1 Reinforced Culvert and Storm Drain Pipe
Manufactured in accordance with and conforming to ASTM C76M ASTM C76, Class V.
2.1.1.2 Reinforced Arch Culvert and Storm Drain Pipe
Manufactured in accordance with and conforming to ASTM C506M ASTM C506, Class A-V.
2.1.1.3 Reinforced Elliptical Culvert and Storm Drain Pipe
Manufactured in accordance with and conforming to ASTM C507M ASTM C507, Class HE-V for horizontal elliptical pipe and Class VE-V for vertical elliptical pipe.
2.1.1.4 Reinforced Rectangular Pipe
Manufactured in accordance with and conforming to ASTM C507M ASTM C507, Class V for rectangular concrete pipe.
SECTION 33 40 00 Page 3
2.1.2 Poly Vinyl Chloride (PVC) Pipe 2.1.2.1 Corrugated PVC Pipe
ASTM F949.
2.2 PIPE JOINTS
Provide joints that have been tested for and meet the requirements of paragraph HYDROSTATIC TEST ON WATERTIGHT JOINTS on all circular RCP up to 48-inch in diameter.
2.2.1 Concrete Pipe
2.2.1.1 Rubber Gasket Joints
Provide rubber gasket joints of a design and physical requirements conforming to ASTM C443.
2.2.1.2 Preformed Flexible Sealant Joints
Provide joints made with preformed flexible joint sealant conforming to ASTM C990 rectangular pipe and ASTM C1677 for culverts.
2.3 PRECAST REINFORCED CONCRETE BOX CULVERT
Manufacture precast reinforced concrete box culverts in accordance with and conforming to section 03 45 33. Provide STANDARD type culverts and/or AIRCRAFT RATED Type culverts as designated on plans. Refer to plans for culvert span, rise, layout, and end treatment requirements
2.3.1 Rubber gaskets for joints in Box Culvert
Gaskets for box culvert sections shall conform to ASTM C1677 and confirm to the ozone cracking resistance as described in section 03 45 33.
2.3.2 Porous Backfill
Firnish porous backfill consisting of gravel, stone, or air-cooled blast furnace slag, with gradation of 100 percent passing the No.2 sieve, 30 percent passing the 3/8 inch sieve, and 10 percent passing the No.8 sieve.
The sodium Sulfate soundness loss shall not exceed 15 percent.
2.3.3 Riprap
Construct riprap at locations shown on plans. Provide flat stones or brocken concrete. Ensure that individual pieces are roughly rectangular in cross-section with a minimum volume of 1/3 cubic foot and a minimum thickness of 3 inches. Place individual pieces by hand in courses and so that the pieces overlap the joints in the course below. Place riprap with the flat surfaces roughly perpendicular to the slope and in contact with the courses immediately below and above. Fill spaces between larger pieces with spalls that are rammed into place to present an even and tight surface, pleasing in appearance and varying not more than 3 inches from that shown on the plans. When required by the plans, fill riprap with grout.
Compact the backing as riprap construction progresses. Ensure that the thickness of the riprap, measured perpendicular to the slope, is not less than 9 inches and averages not less than 12 inches.
SECTION 33 40 00 Page 4
2.3.4 Geotextile Fabric
Furnish geotextile fabric per 31 23 00.00 20 except the minimum tensile strength of 80 LB and minimum puncture and tear strengths are 25 Lb
2.4 TESTS, INSPECTIONS, AND VERIFICATIONS
2.4.1 Hydrostatic Test on Watertight Joints
Perform a hydrostatic test on the watertight joint types as proposed.
This test will be conducted at the plant or by an independent laboratory.
Only one sample joint of each type needs testing; however, if the sample joint fails because of faulty design or workmanship, an additional sample joint may be tested.
2.4.1.1 Concrete Pipe
Provide joints in reinforced concrete pipe meeting the performance requirements in ASTM C990 .
PART 3 EXECUTION
3.1 EXCAVATION FOR PIPE CULVERTS, BOX CULVERTS, STORM DRAINS, AND DRAINAGE
STRUCTURES
Excavate trenches, excavate for appurtenances and backfill for culverts and storm drains, in accordance with the applicable portions of Section 31 23 00.00 20 EXCAVATION AND FILL and the requirements specified below.
3.1.1 Trenching
Excavate trenches to the width indicated on the drawings or as specified herein. Trench width should permit satisfactory jointing and thorough tamping of the bedding material under and around the pipe. Place sheeting and bracing, where required, within the trench width as specified, without any overexcavation.
3.1.2 Removal of Rock
Replace rock in either ledge or boulder formation with suitable materials to provide a compacted earth cushion. Provide a compacted earth cushion between unremoved rock and the pipe with a thickness of at least 8 inches or 1/2 inch for each foot of fill over the top of the pipe, whichever is greater, but not more than three-fourths the nominal diameter of the pipe. Maintain the cushion under the bell as well as under the straight portion of the pipe where bell-and-spigot pipe is used. Provide a compacted earth cushion between unremoved rock and the box culvert of at least 8 inches in thickness for concrete box culverts. Excavate rock as specified and defined in Section 31 23 00.00 20 EXCAVATION AND FILL .
3.1.3 Removal of Unstable Material
Where wet or otherwise unstable soil incapable of properly supporting the pipe or box culvert, as determined by the Contracting Officer, is unexpectedly encountered in the bottom of a trench, remove such material to the depth required and replace with select granular material to the
SECTION 33 40 00 Page 5 proper grade. Compact select granular material as specified in paragraph FINAL BACKFILL. When removal of unstable material is due to the fault or neglect of the Contractor while performing shoring and sheeting, water removal, or other specified requirements, perform such removal and replacement at no additional cost to the Government.
3.2 BEDDING AND INITIAL BACKFILL
Provide a firm bedding foundation of uniform density throughout the entire length of the pipe or box culvert.
3.2.1 Concrete Pipe
Use select granular material conforming to Section 31 23 00.00 20 EXCAVATION AND FILL for haunch and bedding material. Compact haunch and outer bedding to at least 90 percent laboratory maximum density and place in layers not exceeding 6 inch loose thickness for compaction by hand-operated compactors and 200 mm 8 inches for other than hand-operated machines. Loosely place middle bedding and do not compact. After the pipe has been properly bedded, place haunch material, at a moisture content that will facilitate compaction, evenly along both sides of the pipe and thoroughly compact each layer with mechanical tampers or rammers to the springline of the pipe. Thoroughly compact the haunch material under the haunches of the pipe. For bell and spigot pipe, form a depression in bedding material for bells so entire barrel of pipe is uniformly supported. Minimize the length, depth, and width of bell depressions to that required for properly making the particular type of joint.
3.2.1.1 Trenches
After the pipe has been properly bedded and haunch material placed to the midpoint (springline) of the pipe, backfill and compact the remainder of the trench by spreading and rolling or compacting by mechanical rammers or tampers in layers not exceeding 6 inches. Test for density as necessary to ensure conformance to the compaction requirements specified below.
3.2.1.2 Fill Sections
For pipe placed in fill sections, uniformly spread fill material longitudinally on both sides of the pipe in layers not exceeding 6 inches in compacted depth, and compact by rolling parallel with pipe or by mechanical tamping or ramming. Prior to commencing normal filling operations, the crown width of the fill at a height of 12 inches above the top of the pipe must extend a distance of not less than twice the outside pipe diameter on each side of the pipe or 12 feet, whichever is less.
After the backfill has reached at least 12 inches above the top of the pipe, place and thoroughly compact the remainder of the fill in layers not exceeding 8 inches.
3.2.2 Plastic Pipe
Provide bedding for PVC, PE, SRPE and PP pipe meeting the requirements of ASTM D2321. Use Class IB or II material for PVC, PE, SRPE pipe bedding, haunching, and initial backfill. Use Class I, II, or III material for PP pipe bedding, haunching and initial backfill.
SECTION 33 40 00 Page 6
3.2.3 Precast Reinforced Box Culvert
Use granular material a minimum of 6 inches in depth for bedding precast concrete box culverts and wingwalls with soil foundation. The minimum depth of bedding will be 8 inch up to a maximum depth of 24 inches.
Loosely place the granular bedding. Provide uniform support along the entire length of box culvert.
3.2.3.1 Backfilling inTrenches
After the box culvert has been properly bedded, place selected material from excavation or borrow, at a moisture content that will facilitate compaction, along both sides of box culvert in layers not exceeding 6 inches in compacted depth. Bring the backfill up evenly on both sides of box culvert for the full length box culvert. Thoroughly compact each layer with mechanical tampers or rammers. Continue this method of filling and compacting until the fill has reached an elevation equal to the top of the box culvert. Backfill and compact the remainder of the trench by spreading and rolling or by compacting with mechanical rammers or tampers in layers not exceeding 12 inches. Test density as necessary to ensure conformance to the compaction requirements specified below.
3.2.3.2 Backfilling in Fill Sections
Use backfill material and placement and compaction procedures for box culvert placed in fill sections as specified below. Uniformly spread the fill material longitudinally on both sides of the box in layers not exceeding 6 inches in compacted depth. Compacted by rolling parallel with pipe or by using mechanical tamping or ramming. Prior to commencing normal filling operations, the width of the fill at a height of 12 inches above the top of the box must extend a distance of not less than twice the outside width of the box culvert on each side of the box or 12 feet, whichever is less. After the backfill has reached at least 12 inches above the top of the box, place and thoroughly compact the remainder of the fill in layers not exceeding 12 inches.
3.2.3.3 Culvert Wingwalls
Provide 1'-6" wide porous backfill behind wingwalls. Wrap porous backfill in geotextile fabric. Porous backfill shall extend up to 6 inches below the embankment surface, and laterally to the end of the wingwall. Bottom of porous backfill shall be sloped toward the weephole to drain. Provide 2 Cu.Ft. of bagged #3 aggregate at the backside of each weephole.
3.3 PLACING PIPE AND BOX CULVERT
Submit printed copies of the pipe or box culvert manufacturer's recommended pipe or box culvert installation procedures prior to installation. Thoroughly examine each section of pipe or box culvert before being laid; do not use defective or damaged pipe.
Contracting Officer and Contractor shall visually inspect all culvert sections and joints before any backfill is placed. Inspect the precast units for any cracks and defects. Ensure that the sections are free of fractures spalls and chips. Ensure that all surfaces have a smooth and regular finish being defined as a 1/4-inch variation within 4 feet.
Ensure that the slab and walls are perpendicular with a diagonal difference of not more than 0.5 percent. Ensure that the location of the product marking is on the interior side of the wall. The Contractor shall rejoin, re-lay, or replace all units out of joint tolerance, alignment, SECTION 33 40 00 Page 7 settled, or damaged at no additional cost to the project.
When specified on the plans, the Contractor shall construct a temporary diversion channel to facilitate installation of a pipe or box culvert.
After pipe installation and prior to backfilling, the Contractor shall install a lift hole plug furnished by the manufacturer. The plugs shall be installed from the exterior of the pipe and snugly seated.
Lay pipelines to the grades and alignment indicated. Provide proper facilities for lowering sections of pipe into trenches. Do not lay pipe in water or when trench conditions or weather are unsuitable for such work. Divert drainage or dewater trenches during construction as necessary. Deflection of installed flexible pipe must not exceed the following limits:
TYPE OF PIPE MAXIMUM ALLOWABLE
DEFLECTION (percent)
3.3.1 Concrete Pipe
Lay pipe proceeding upgrade with spigot ends of bell-and-spigot pipe and tongue ends of tongue-and-groove pipe pointing in the direction of the flow.
3.3.2 Elliptical and Elliptical Reinforced Concrete Pipe
Place pipe so that the manufacturer's reference lines, designating the top of the pipe, are within 5 degrees of a vertical plane through the longitudinal axis of the pipe. Prevent damage to or misalignment of the pipe during backfilling operations.
3.3.3 Multiple Culverts
Where double or greater lines of precast units are used, a buffer zone of 3 to 6 inches between lines shall be provided. This buffer zone shall be backfilled with porous backfill. The porous backfill shall be drained by a 3-inch-diameter weep hole, formed by non-rigid tubing, located at the top of the bottom haunch, centered in the outlet end section and at approximately 50-foot intervals along the length of the box culvert. Weep holes shall be covered with a 3-foot-square section of filter barrier cloth firmly attached to the outside of the box. A 3-foot width of filter barrier cloth shall also be centered over the buffer zone for the entire length of the structure after placement of the porous backfill material.
3.3.4 Jacking Reinforced Concrete Pipe
Install jacking pipe and operate jacking equipment in accordance with Section 33 05 23 TRENCHLESS UTILITY INSTALLATION.
SECTION 33 40 00 Page 8
3.3.5 Precast Reinforced Concrete Box Culvert
Proceed upgrade with laying of sections and point tongue ends of tongue-and-groove box culvert section in the direction of flow.
3.4 JOINTING
3.4.1 Concrete Pipe
3.4.1.1 Plastic Sealing Compound Joints for Tongue-and-Grooved Pipe and Box Culverts
Follow the recommendation of the particular manufacturer in regard to sealing compound special installation requirements. When lubricants, primers, or adhesives are used, only apply on surfaces that are dry and clean. Affix sealing compounds to the pipe or box culvert not more than 3 hours prior to installation of the pipe or box culvert. Protect sealing compounds from the sun, blowing dust, and other deleterious agents at all times. Inspect sealing compounds before installation of the pipe or box culvert, and remove and replace any loose or improperly affixed sealing compound. Align the pipe or box culvert with the previously installed pipe or box culvert, and pull the joint together.
3.4.1.2 Flexible Watertight Joints
Use lubricants, cements, adhesives, and other special installation requirements for gaskets and jointing materials as recommended by the manufacturer. When lubricants, cements, or adhesives are used, only apply on surfaces that are clean and dry. Affix gaskets and jointing materials to the pipe not more than 24 hours prior to the installation of the pipe, and protect from the sun, blowing dust, and other deleterious agents at all times. Inspect gaskets and jointing materials before installing the pipe; remove and replace any loose or improperly affixed gaskets and jointing materials. Align the pipe with the previously installed pipe, and push the joint home. If the gasket becomes visibly dislocated when joining sections of pipe, remove the pipe and remake the joint.
3.5 DRAINAGE STRUCTURES
3.5.1 Manholes and Inlets
Construct manholes of precast reinforced concrete. Construct inlets of precastorcast in place reinforced concrete. Provide manholes and inlets complete with frames and covers or gratings; and with fixed galvanized steel ladders as indicated. The wall along the line where steel ladders are installed must be vertical for its entire length. Adequately anchor ladders to the wall by means of steel inserts spaced not more than 6 feet vertically, and install to provide at least 6 inches of space between the wall and the rungs. Make pipe connections to concrete manholes and inlets for pipe diameter 48-inches and less shall be with flexible, watertight connectors. For all other pipe connection non shrink grout may be used.
Unless otherwise noted in the plans or specifications the structures shall be aircraft rated. Reference UFC 3-260-01 for aircraft ratings.
Prior to fabrication submit shop drawings Stormwater Structures for precast concrete units and/or cast-in-place designs and obtain approval by the Contracting Officer. Submittal must demonstrate that the applicable industry design standards have been met.
Shop drawings must represent a complete design, details and all
SECTION 33 40 00 Page 9 dimensions, installation, and construction information in such detail as to enable the Contracting Officer to determine the adequacy of the proposed units for the intended purpose. Shop drawings must indicate joints and sealants between structures if required. All attachments must be detailed on the shop drawings.
The shop drawings must include but not limited to:
-strength properties for concrete, steel and other material, -all dead, live, handling, erection and other applicable loads used in the design.
-details of steel reinforcement size and placement -details of drainage structures, manholes, or junction boxes attachments.
-signature and seal of the registered design professional who prepared the design.
For STANDARD VDOT VDOT RBS structures submit cut sheets showing conformance to contract requirements.
For AIRCRAFT RATED type shop drawings must include design calculations prepared and sealed by a registered professional engineer.
Include in the calculations the analysis of units for handling stresses.
3.5.2 Wingwalls and Headwalls
Construct wingwalls and headwalls as indicated.
3.6 INSTALLATION OF TRACER WIRE AND WARNING TAPE
Install warning tape above all storm drain pipe in accordance with Section
31 23 00.00 20 EXCAVATION AND FILL .
3.7 FINAL BACKFILL
Backfill trenches with satisfactory material deposited in layers of a maximum of 8 inches loose thickness and compacted to 90 percent of maximum density for cohesive soils and 95 percent of maximum density for cohesionless soils in accordance with Section 31 23 00.00 20 EXCAVATION AND FILL . Testing is the responsibility of the Contractor and will be performed at no additional cost to the Government. Unless otherwise specified, determine field in-place density of final backfill at a frequency of one test per 100 linear feet, or fraction thereof, of each lift of backfill. Submit test results in accordance with Section 31 23 00.00 20 EXCAVATION AND FILL . Do not displace or damage pipe or box when compacting final backfill by rolling or operating heavy equipment parallel with the pipe or box. Movement of construction machinery over a culvert or storm drain at any stage of construction will be at the Contractor's risk. Repair or replace any damaged pipe. Protect concrete pipes with a minimum of 3 feet of cover prior to permitting heavy construction equipment to pass over them during construction. Provide the minimum cover for construction loads over corrugated steel pipes as specified in Section 12, Division II of AASHTO LRFD. Provide minimum cover for construction loads over plastic pipes as specified in ASTM D2321.
3.8 FIELD QUALITY CONTROL
3.8.1 Tests
Testing is the responsibility of the Contractor. Perform all testing and
SECTION 33 40 00 Page 10 retesting at no additional cost to the Government.
3.8.1.1 Deflection Testing
Conduct deflection test no sooner than 30 days after completion of final backfill and compaction testing. Clean or flush all lines prior to testing. Perform a deflection test on entire length of installed flexible pipeline upon completion of work adjacent to and over the pipeline, including backfilling, placement of fill, grading, paving, placement of concrete, and any other superimposed loads. Deflection of pipe in the installed pipeline under external loads must not exceed the limits in paragraph PLACING PIPE AND BOX CULVERT above as percent of the average inside diameter of pipe. Use a laser profiler or mandrel to determine if allowable deflection has been exceeded.
3.8.1.1.1 Laser Profiler
Inspect pipe interior with laser profiling equipment. Utilize low barrel distortion video equipment in accordance with UFGS 33 01 30.16 TV INSPECTION OF SEWER LINES for pipe diameters 48 inches or less. For initial post installation inspections for pipe diameters larger than 48 inches, perform a visual inspection of the pipe interior.
3.8.1.1.2 Mandrel
Pass the mandrel through each run of pipe by pulling it by hand. If deflection readings in excess of the allowable deflection of average inside diameter of pipe are obtained, stop and begin test from the opposite direction. The mandrel must meet the pipe manufacturer's recommendations and the following requirements. Provide a mandrel that is rigid, nonadjustable, has a minimum of 9 fins, pulling rings at each end, and is engraved with the nominal pipe size and mandrel outside diameter.
The mandrel must be 5 percent less that the ceritified-actual pipe diameter for plastic pipe, 5 percent less than the certified-actual pipe diameter for corrugated steel and aluminum, 3 percent less than the certified-actual pipe diameter for ductile iron culvert pipe. The Government will verify the outside diameter (OD) of the Contractor provided mandrell through the use of Contractor provided proving rings.
3.8.2 Inspection
3.8.2.1 Post-Installation Inspection
Perform a CCTV inspection and video recording of pipes with diameters 48 inches or less in accordance with UFGS 33 01 30.16 TV INSPECTION OF SEWER LINES. Visually inspect pipes with diameters larger than 48 inches.
Inspect each segment of pipe for alignment, settlement, joint separations, soil migration through the joint, cracks, buckling, bulging and deflection. An engineer must evaluate all defects to determine if any remediation or repair is required.
3.8.2.1.1 Concrete Pipe
An engineer must evaluate all pipes with cracks with a width greater than
0.25 mm 0.01 inches, but less than 0.10 inches to determine if any remediation or repair is required.
SECTION 33 40 00 Page 11
3.8.2.1.2 Flexible Pipe
Check each flexible pipe (PE, PVC, PP, corrugated steel and aluminum) for rips, tears, joint separations, soil migration throught the joint, cracks, localized buckling, bulges, settlement and alignment. 3.8.2.1.3
Post-Installation Inspection Report
The deflection results and final post installation inspection report must include: a copy of all video taken, pipe location identification, equipment used for inspection, inspector name, deviation from design, grade, deviation from line, deflection and deformation of flexible pipe, inspector notes, condition of joints, condition of pipe wall (e.g.
distress, cracking, wall damage dents, bulges, creases, tears, holes, etc.).
3.8.3 Repair of Defects
3.8.3.1 Leakage Test
When leakage exceeds the maximum amount specified, correct source of excess leakage by replacing damaged pipe and gaskets and retest.
3.8.3.2 Deflection Testing
When deflection readings are in excess of the allowable deflection of average inside diamater of pipe are obtained, remove pipe which has excessive deflection and replace with new pipe. Retest 30 days after completing backfill, leakage testing and compaction testing.
3.8.3.3 Inspection
Replace pipe or repair defects indicated in the Post-Installation Inspection Report.
3.8.3.3.1 Concrete Pipe
Replace pipes having cracks with a width greater than 0.1 inches.
3.8.3.3.2 Flexible Pipe
Replace pipes having cracks or splits.
3.9 PROTECTION
Protect storm drainage piping and adjacent areas from superimposed and external loads during construction.
3.10 WARRANTY PERIOD
Pipe segments found to have defects during the warranty period must be replaced with new pipe and retested.
-- End of Section --
SECTION 33 40 00 Page 12
| DIVISION 33 - UTILITIES |
| 33 40 00 - STORMWATER UTILITIES |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DELIVERY, STORAGE, AND HANDLING |
| 1.3.1 Delivery and Storage |
| 1.3.2 Handling |
| PART 2 PRODUCTS |
| 2.1 PIPE FOR CULVERTS AND STORM DRAINS |
| 2.1.1 Concrete PipesConcrete Pipe |
| 2.1.1.1 Reinforced Culvert and Storm Drain Pipe |
| 2.1.1.2 Reinforced Arch Culvert and Storm Drain Pipe |
| 2.1.1.3 Reinforced Elliptical Culvert and Storm Drain Pipe |
| 2.1.1.4 Reinforced Rectangular Pipe |
2.1.2 Poly Vinyl Chloride PVC Pipe2.1.2.1 Corrugated PVC Pipe
| 2.2 PIPE JOINTS |
| 2.2.1 Concrete Pipe |
| 2.2.1.1 Rubber Gasket Joints |
| 2.2.1.2 Preformed Flexible Sealant Joints |
| 2.3 PRECAST REINFORCED CONCRETE BOX CULVERT |
| 2.3.1 Rubber gaskets for joints in Box Culvert |
| 2.3.2 Porous Backfill |
| 2.3.3 Riprap |
| 2.3.4 Geotextile Fabric |
| 2.4 TESTS, INSPECTIONS, AND VERIFICATIONS |
| 2.4.1 Hydrostatic Test on Watertight Joints |
| 2.4.1.1 Concrete Pipe |
| PART 3 EXECUTION |
| 3.1 EXCAVATION FOR PIPE CULVERTS, BOX CULVERTS, STORM DRAINS, AND DRAINAGE |
| 3.1.1 Trenching |
| 3.1.2 Removal of Rock |
| 3.1.3 Removal of Unstable Material |
| 3.2 BEDDING AND INITIAL BACKFILL |
| 3.2.1 Concrete Pipe |
| 3.2.1.1 Trenches |
| 3.2.1.2 Fill Sections |
| 3.2.2 Plastic Pipe |
| 3.2.3 Precast Reinforced Box Culvert |
| 3.2.3.1 Backfilling inTrenches |
| 3.2.3.2 Backfilling in Fill Sections |
| 3.2.3.3 Culvert Wingwalls |
| 3.3 PLACING PIPE AND BOX CULVERT |
| 3.3.1 Concrete Pipe |
| 3.3.2 Elliptical and Elliptical Reinforced Concrete Pipe |
| 3.3.3 Multiple Culverts |
| 3.3.4 Jacking Reinforced Concrete Pipe |
| 3.3.5 Precast Reinforced Concrete Box Culvert |
| 3.4 JOINTING |
| 3.4.1 Concrete Pipe |
| 3.4.1.1 Plastic Sealing Compound Joints for Tongue-and-Grooved Pipe and |
| 3.4.1.2 Flexible Watertight Joints |
| 3.5 DRAINAGE STRUCTURES |
| 3.5.1 Manholes and Inlets |
| 3.5.2 Wingwalls and Headwalls |
| 3.6 INSTALLATION OF TRACER WIRE AND WARNING TAPE |
| 3.7 FINAL BACKFILL |
| 3.8 FIELD QUALITY CONTROL |
| 3.8.1 Tests |
| 3.8.1.1 Deflection Testing |
| 3.8.1.1.1 Laser Profiler |
| 3.8.1.1.2 Mandrel |
| 3.8.2 Inspection |
| 3.8.2.1 Post-Installation Inspection |
| 3.8.2.1.1 Concrete Pipe |
| 3.8.2.1.2 Flexible Pipe |
| 3.8.2.1.3 |
| 3.8.3 Repair of Defects |
| 3.8.3.1 Leakage Test |
| 3.8.3.2 Deflection Testing |
| 3.8.3.3 Inspection |
| 3.8.3.3.1 Concrete Pipe |
| 3.8.3.3.2 Flexible Pipe |
| 3.9 PROTECTION |
| 3.10 WARRANTY PERIOD |
File details come from the government source that posted it. Updated .