24R2510 Amendment 0004.pdf

PDF 274 KB Posted

Attached to
Repair Taxiway Pavements Naval Air Station Oceana, Virginia Beach, VA
Solicitation number
N4008524R2510
Issued by

About this file

This solicitation is for repair of taxiway pavements at Naval Air Station Oceana in Virginia Beach, Virginia. The work includes full-depth replacement of all existing asphalt concrete and Portland cement concrete pavement for Taxiways Alpha, a small portion of Bravo, and associated areas, along with improvements to the stormwater system. The response date has been extended to March 28, 2024. The work will be conducted in two phases, with requirements to complete downstream stormwater improvements before upstream work and restrictions on concurrent work in certain areas to avoid impacts to air operations. Pricing is line item based for asphalt and concrete pavement demolition and replacement, ductbank repairs, light base replacements, and stormwater options. The soliciting agency is the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
24R2510 Amendment 0007.pdf PDF
Phase 2 Plans Amendment 6.pdf PDF
Permit Record of Decision Form Amend 0006.pdf PDF
24R2510 Amendment 0006.pdf PDF
Section 03 45 33.pdf PDF
Phase 1 Plans Amendment 6.pdf PDF
Attachment G - Individual Small Business Subcontracting Plan R1.docx DOCX document
Phase 1 Plans Amendment 5.pdf PDF
Spec 33 82 00.pdf PDF
24R2510 Amendment 0005.pdf PDF
Permit Record of Decision Form.pdf PDF
Phase 2 Plans Amendment 5.pdf PDF
Specification 01 45 00.00 20.pdf PDF
Price Proposal REVISED.docx DOCX document
Specification 33 40 00.pdf PDF
Specification 01 45 35.pdf PDF
Phase 1 Plans.pdf PDF
Phase 2 Plans.pdf PDF
05_Phase_1_Plans_Amendment_3.pdf PDF
Amendment 0003.pdf PDF
02_Radios_for_Flight_Line (1).pdf PDF
04_Spec_01_14_00.pdf PDF
03_Phase_2_Sheet_Index.pdf PDF
06_Phase_2_Plans_Addendum_3.pdf PDF
33 01 30.16.pdf PDF
Price Schedule REV 1.docx DOCX document
00 01 15.pdf PDF
01 58 00 NAVFAC Project_Sign_Details.pdf PDF
01 20 00 First Page.pdf PDF
Oceana Test Hole Reports Complete 20NOV2023.pdf PDF
Oceana Historical GW Depth Elev Plot 2018.png PNG image
RepairTaxiwayPvmt-Phase II-Addendum2 Plans.pdf PDF
NASO Taxiway Repair Project Timber Appraisal.pdf PDF
RepairTaxiwayPvmt-Phase I Addendum 2 - Plans .pdf PDF
Analytical Test Results and Location Plan.pdf PDF
PROJECT TOC 23-0109.pdf PDF
24R2510 Amendment 0002.pdf PDF
NASO Taxiway Repair Project MFR.pdf PDF
01 33 00 Appendix A Submittal Register.pdf PDF
Repair Taxiway Pavement Site Visit Log.jpeg JPEG file
24R2510 Amendment 0001.pdf PDF
RM10-9145 Repair Taxiway Pavements Specifications.pdf PDF
Attachment G - Individual Small Business Subcontracting Plan.doc DOC document
02-Phase I Electrical Drawings.pdf PDF
03-Phase II Civil Drawings Part I.pdf PDF
04-Phase II Electrical Drawings.pdf PDF
RFP 24R2510.pdf PDF
Attachment K - SECNAV 5512.pdf PDF
Attachment D - Historical Small Business Utilization.docx DOCX document
03-Phase II Civil Drawings Part II.pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See continuation page(s).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 20

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Mar-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008524R2510

X 9B. DATED (SEE ITEM 11)

19-Jan-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Mar-2024

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008524R2510

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0004

The purpose of this amendment is to:

1. Extend the proposal due date.

2. Incorporate a revised continuation sheet to update plans and specifications.

3. Incorporate a revised price schedule “Price Proposal REVISED” (attached separately).

4. Incorporate revised specifications “01_45_00_00_20”, “ 01_45_35”, and “33_40_00” (attached separately).

5. Incorporate a revised plans “Phase_1_Plans” and “Phase_2_Plans” (attached separately).

6. Incorporate responses to pre-proposal inquiries (PPIs).

2. CONTINUATION SHEET TO UPDATE PLANS AND SPECS

CONTRACT DRAWINGS

NAVFAC Dwg. Nos. Phase 1: 12889502, 12889504, 12889507, 12889518, 12889519, 12889520, 12889521, 12889522, 12889523, 12889524, 12889525, 12889681, 12889714, 12889723, 12889724, 12889725, 12889728, 12889729, 12889730, 12889740, 12889741, 12889742, 12889745, 12889747, 12889756, 12889758, 12889782, 12889783, 12889784, 12889785, 12889786, 12889793.

NAVFAC Dwg. Nos. Phase 2: 12889802, 12889823, 12889825, 12889828, 12889848, 12889849, 12889850, 12889851, 12889852, 12889853, 12889854, 12889855, 12889885, 12889888, 12889898, 12890051, 12890089, 12890098, 12890099, 12890101, 12890102, 12890103, 12890104, 12890105, 12890106, 12890126, 12890127, 12890129, 12890130, 12890131, 12890132, 12890133, 12890152, 12890154, 12890188.

Plans are revised as of March 4, 2024. These revised drawings accompany this amendment.

Requested Documents Revised Price Schedule

Specifications Specification 01 45 00.00 20 has been revised to discuss the Special Inspector.

Specification 01 45 35 add specification section.

Specification 33 40 00 has been revised to address jointing and testing requirements.

PHASE 1

On NAVFAC Dwg. 12889502 (GC402)

Removed the smaller of the two areas. This area cannot longer be used by the Contractor.

On NAVFAC Dwg. 12889504 (GC404)

Area 5 was removed. This area cannot longer be used by the Contractor.

On NAVFAC Dwg. 12889507 (GC407)

Table updated to reflect the smaller Area 2 and Area 5 being removed.

On NAVFAC Dwg. 12889518 (B-001)

Revised Note 3 and the Boring Table.

On NAVFAC Dwg. 12889519 (B-101)

Revised sheet per revisions to Boring Table.

On NAVFAC Dwg. 12889520 (B-102)

Revised sheet per revisions to Boring Table.

On NAVFAC Dwg. 12889521 (B-103)

Revised sheet per revisions to Boring Table.

On NAVFAC Dwg. 12889522 (B-104)

Revised sheet per revisions to Boring Table.

On NAVFAC Dwg. 12889523 (B-105)

Revised sheet per revisions to Boring Table.

On NAVFAC Dwg. 12889524 (B-106)

Revised sheet per revisions to Boring Table.

On NAVFAC Dwg. 12889525 (B-107)

Revised sheet per revisions to Boring Table. This sheet is now blank.

On NAVFAC Dwg. 12889681 (GC519)

Underdrain details added to detail sheet.

On NAVFAC Dwg. 12889714 (E-006)

Demolition Keynotes 5, 19, and 23 revised. Demolition Keynotes 24 and 25 added.

General Sheet Note 12 revised. General Sheet Note 13 added.

New Work Keynote 17 revised. New Work Keynote 18 added.

On NAVFAC Dwg. 12889723 (ED121) Demolition Keynote 5 deleted.

Demolition Keynotes 19 revised.

Demolition Keynotes 24 and 25 added to sheet.

On NAVFAC Dwg. 12889724 (ED122) Demolition Keynote 19 revised.

Demolition Keynotes 24 and 25 added to sheet.

On NAVFAC Dwg. 12889725 (ED123) Demolition Keynotes 5 and19 revised.

Demolition Keynotes 24 and 25 added to sheet.

On NAVFAC Dwg. 12889728 (ED124) Demolition Keynote 25 added to sheet.

On NAVFAC Dwg. 12889729 (ED125) Matchline to Sheet ED1** removed.

Demolition Keynotes 5 and19 revised.

Demolition Keynotes 24 and 25 added to sheet.

On NAVFAC Dwg. 12889730 (ED126) Demolition Keynotes 5, 19 and 23 revised.

Demolition Keynotes 24 and 25 added to sheet.

Call-out to fuel pit vault photo A4 on Sheet E-901 added.

On NAVFAC Dwg. 12889740 (ES101) General Note 12 revised.

General Note 13 added.

New Work Keynote 18 added.

On NAVFAC Dwg. 12889741 (ES102) General Note 12 revised.

General Note 13 added.

New Work Keynote 18 added.

On NAVFAC Dwg. 12889742 (ES103) General Note 12 revised.

General Note 13 added.

New Work Keynote 18 added.

On NAVFAC Dwg. 12889745 (ES104) General Note 12 revised.

General Note 13 added.

New Work Keynote 18 added.

On NAVFAC Dwg. 12889745 (ES105) General Note 12 revised.

General Note 13 added.

New Work Keynote 18 added.

Matchline Sheet ES114 removed.

On NAVFAC Dwg. 12889747 (ES106) General Note 12 revised.

General Note 13 added.

New Work Keynote 17 revised.

New Work Keynote 18 added.

On NAVFAC Dwg. 12889756 (E-505) Detail A1 Airfield Lighting Duct Bank Details Typical Arrangements revised.

On NAVFAC Dwg. 12889758 (E-507) Detail C3 Concrete Encased Ductbank Detail added.

On NAVFAC Dwg. 12889782 (E-708) Cable ID 11 added to Tube Cable Detail Legend.

On NAVFAC Dwg. 12889783 (E-709) Cable ID 11 added to Tube Cable Detail Legend.

On NAVFAC Dwg. 12889784 (E-710) Cable ID 11 added to Tube Cable Detail Legend.

On NAVFAC Dwg. 12889785 (E-711) Cable ID 11 added to Tube Cable Detail Legend.

On NAVFAC Dwg. 12889786 (E-712) Cable ID 11 added to Tube Cable Detail Legend.

On NAVFAC Dwg. 12889793 (E-901) Photo A4 Fuel Pit Vaults added.

PHASE 2

On NAVFAC Dwg. 12889802 (GC100)

Note 3 has been updated.

On NAVFAC Dwg. 12889823 (GC402)

Removed the smaller of the two areas. This area cannot longer be used by the Contractor.

On NAVFAC Dwg. 12889825 (GC404)

Area 5 was removed. This area cannot longer be used by the Contractor.

On NAVFAC Dwg. 12889828 (GC407)

Table updated to reflect the smaller Area 2 and Area 5 being removed.

On NAVFAC Dwg. 12889848 (B-001)

Revised Note 3 and the Boring Table.

On NAVFAC Dwg. 12889849 (B-101)

Revised sheet per revisions to Boring Table.

On NAVFAC Dwg. 12889850 (B-102)

Revised sheet per revisions to Boring Table.

On NAVFAC Dwg. 12889851 (B-103)

Revised sheet per revisions to Boring Table.

On NAVFAC Dwg. 12889852 (B-104)

Revised sheet per revisions to Boring Table.

On NAVFAC Dwg. 12889853 (B-105)

Revised sheet per revisions to Boring Table.

On NAVFAC Dwg. 12889854 (B-106)

Revised sheet per revisions to Boring Table.

On NAVFAC Dwg. 12889855 (B-107)

Revised sheet per revisions to Boring Table. This sheet is now blank.

On NAVFAC Dwg. 12889885 (CD112)

Revised idle pavement keynote callout.

On NAVFAC Dwg. 12889888 (CD114)

Revised idle pavement keynote callout.

On NAVFAC Dwg. 12889898 (CS107)

Proposed pavement north of Fuel Pit 6 removed.

On NAVFAC Dwg. 12890051 (GC519)

Underdrain details added to detail sheet.

On NAVFAC Dwg. 12890089 (E-006)

Demolition Keynotes 1, 5, 15, 20, 30, and 31 revised.

Demolition Keynotes 33, 34, and 35 added.

General Sheet Notes 13 and 14 added.

New Work Keynote 26 revised.

New Work Keynotes 27, 28, 29, 30 added.

On NAVFAC Dwg. 12890098 (ED127) Call-out to fuel pit vault photo A4 on Sheet E-901 added.

Demolition Keynotes 5, 15, and 31 revised.

Demolition Keynote 32 added.

On NAVFAC Dwg. 12890099 (ED128) Demolition Keynote 5 revised.

On NAVFAC Dwg. 12890101 (ED129) Demolition Keynotes 1, 15, 20, and 30 revised.

Demolition Keynote 33, 34, 35 added.

UT and UP ductbank between Taxiway “Alpha” north side to manholes T12 and E12 shown to remain.

On NAVFAC Dwg. 12890102 (ED129A) Demolition Keynotes 1, 15 and 30 revised.

Demolition Keynote 33 and 34 added.

On NAVFAC Dwg. 12890103 (ED130) Demolition Keynotes 1, 5, 15 and 30 revised.

Demolition Keynote 33 added.

On NAVFAC Dwg. 12890104 (ED131) Demolition Keynotes 30 revised.

On NAVFAC Dwg. 12890105 (ED131A) Demolition Keynotes 30 revised.

On NAVFAC Dwg. 12890106 (ED132) Demolition Keynotes 30 revised.

On NAVFAC Dwg. 12890126 (ES107) General Sheet Notes 13 and 14 added.

New Work Keynote 26 revised.

New Work Keynote 27 added.

On NAVFAC Dwg. 12890127 (ES108) General Sheet Notes 13 and 14 added.

New Work Keynote 27 added.

On NAVFAC Dwg. 12890129 (ES109) General Sheet Notes 13 and 14 added.

New Work Keynote 28 revised.

New Work Keynotes 29 and 30 added.

On NAVFAC Dwg. 12890130 (ES109A) General Sheet Notes 13 and 14 added.

New Work Keynotes 29 and 30 added.

On NAVFAC Dwg. 12890131 (ES110) General Sheet Notes 13 and 14 added.

New Work Keynotes 20, 21, and 25 revised.

New Work Keynote 29 added.

On NAVFAC Dwg. 12890132 (ES111) General Sheet Notes 13 and 14 added.

New Work Keynote 20 revised.

New Work Keynote 29 added.

On NAVFAC Dwg. 12890133 (ES111A) General Sheet Notes 13 and 14 added.

New Work Keynote 20 revised.

New Work Keynote 29 added.

On NAVFAC Dwg. 12890152 (E-505) Detail A1 Airfield Lighting Duct Bank Details Typical Arrangements revised.

On NAVFAC Dwg.

On NAVFAC Dwg. 12890154 (E-507)

Detail C3 Concrete Encased Ductbank Detail added.

On NAVFAC Dwg. 12890188 (E-901)

Photo A4 Fuel Pit Vaults added.

6. RESPONSES TO PRE-PROPOSAL INQUIRIES (PPI #’S 154-254)

PPI

No.

Reference/ Page

Section Paragraph Question Government Response

154 Specifica tions

There does not appear to be a specification section that covers the installation of the

Underdrain. Please provide specification for installation.

Spec 33 40 00 Section 2.1.2.1 has been added.

155 Drainage Do underdrains require cleanouts be installed?

No details in the project drawings and no specifications, please clarify if these are required.

Underdrains are required. Details have been added to CG519. Locations of cleanouts and specifications are forthcoming.

156 CG109A &

CG109B

There are 7 underdrain connections along Taxiway Bravo that appear to be outside of the scope of this project but there are no notes clarifying these are to be built in future phases.

Please confirm that underdrains and connections to drainage structures shown between Taxiway Bravo STA 262+00 and the Taxiway Transition are not to be built as part of this project.

Underdrain connections between Taxiway Bravo STA 262+00 and Taxiway

Transition are not part of Phase 1 or 2.

157 CG222,

CG220

Multiple drawings showing the ditch profiles call out for a Fuel Boom but no other mention of this could be found in the drawings or specifications. Please provide details.

The fuel booms are shown for reference. If the booms are damaged during construction they will need to be replaced. The fuel booms are 18"

Spillmaster Superflex.

158 Please provide As built drawings of the existing asphalt/concrete pavement and asphalt edge lighting shoulder.

As-built drawings will not be provided. The as-built drawings the Navy has are not indicitive of field conditions.

159 Bid Form Line

0001D Please provide a typical detail for both an electrical conflict and a communications conflict for contractors to price, including cable type, count, and conduit count/diameter.

This will ensure that each bidder has the same info to use when pricing the contingency item.

See revised price schedule for detailed scope of work.

160 Bid Form Line 0004C

Please provide a typical detail for both an electrical conflict and a communications conflict for contractors to price, including cable type, count, and conduit count/diameter.

This will ensure that each bidder has the same info to use when pricing the contingency item.

See revised price schedule for detailed scope of work.

161 EA501 PH 1

DWG's

PLEASE CONFIRM THAT ALL TAXIWAY

EDGE LIGHT CIRCUITS ARE

INTERLEAVED AND THAT THERE ARE

(2)-2" CONDUITS TO BE DEMOLISHED

AND REPLACED WHERE INDICATED ON

THE PLANS.

Confirmed.

162 Attachment H

Price Schedule

Line Item 0001D

This item is not defined clearly. There are many different types of ductbanks with many different types of cables that could fall under this item. Are we expected to come up with a worst case scenario for the most expensive item? May we suggest breaking this up into several clearly defined unit prices such as 1.

Manhole with spring assist cover 2. Medium voltage ductbank with 15kV cable 3. Airfield lighting ductbank with L-824B #6 cables 4.

Communications ductbank with blown fiber network repairs?

See revised price schedule for detailed scope of work.

163 Attachment H

Price Schedule

Line Item 0004C

This item is not defined clearly. There are many different types of ductbanks with many different types of cables that could fall under this item. Are we expected to come up with a worst case scenario for the most expensive item? May we suggest breaking this up into several clearly defined unit prices such as 1.

Manhole with spring assist cover 2. Medium voltage ductbank with 15kV cable 3. Airfield lighting ductbank with L-824B #6 cables 4.

Communications ductbank with blown fiber network repairs?

See revised price schedule for detailed scope of work.

164 Attachment H

Price Schedule

Line Item 0001D, 0004C

The descripton for juction boxes needs to be clarified for this item. The existing structures all have square spring assist ductile iron covers. The structures for medium voltage, communicatioins and airfield lighting are all separate and vary in size. What should be the cost basis for the "junction boxes" in this case?

Also, it makes sense to make the junction boxes a separate line item in the event the repair is more than 100' long. This way the owner can execute a change that reflects (2) boxes - one on either side of a repair up to 500' long...If a "junction box" is not clearly defined a bidder may think a fiberglass box is acceptable instead of a manhole.

See revised price schedule for detailed scope of work.

165 Attachment H

Price Schedule

Line Items 0001I, 0004H

It is not possible to surgically remove a single light base can and replace it without affecting several lights in the same area. Since the existing taxiway edge lights have interleaved conduits and circuits that are not intermingled it makes each can replacement a significant undertaking. For instance, the conduit that passes by the can is encapsulated in the concrete around the light base can. This means the L-824B #6 cable for BOTH circuits will need to be pulled back to the next can on the same circuit in both directions to salvage the cable. There is not a detail that shows the extent of work. Please confirm this is your intent.

That is the intent. Both circuits will be affected and will need to be pulled bsck to the circuits accociated bases.

166 EA106 Phase I Drawing s

One example of a series airfield cable size conflict is shown on EA106 in the

Construction Keynotes. Note #5 indicates the work should include #8 L-824 cable. This does not match the existing cable size. All existing circuits are #6 L-824B (EPR insulation) throughout the airfield as shown on

Drawing E-601. Which is correct?

All series lighting cable shall be #6 L-824 Type B.

167 ED124 Phase I Drawing s

There is a section of ductbanks leaving A260/E260/C260 heading north off the sheet that is shown to be removed and replaced.

Demolition Keynote 20 indicates that jumper cables should be in place before the existing conduit and wiring can be removed. This is not a situation where a splice can be placed on either side of the work when you have a blown fiber system. The only way to put a "jumper" for the communications line would be to install a temporary fiber optic cable from beginning to end of the entire run for each fiber optic cable in that section of ductbank.

Interrupting a blown fiber raceway anywhere on this airfield is a huge problem for everyone involved. For every instance where the blown fiber system is interrupted we'll need to know all of the buildings that are connected using the specific section of ductbank in order to come up with a fiber optic jumper system to keep everything active. More information is needed for all communcations ductbanks on this project.

Notes have been clarified on ED sheets regarding FO and MV power temporary connections. FO cable run through "C***" handholes are related to airfield lighting systems and locations run to are identifed on cable schedule and handhole foldouts.

168 EA103 PH 1

DWG'S

DRAWING DOES NOT INDICATE IF THE

ELEVATED AND IN PAVEMENT GUARD

LIGHTS ARE TO

REPLACED/SALVAGED/DEMOED? ES103

AND ES105 INDICATE THEY ARE TO

NEW. PLEASE CLARIFY.

Guard lights are to be replaced per the ES series plan sheets. Note that symbol on the ES sheets indicate that these lights are salvaged lights/transformers to be reinstalled.

169 GC100 Project drawings and RFP state that if Phase 2 is to be constructed it should be concurrent with Phase 1. There is no discussion in the

RFP or plans that outlines what Work Packages can be worked concurrently between

Phase 1 & Phase 2. For example, can we construct Work Package "C" & "D" concurrently, or can Work Package "T1" & "F" be worked concurrently?

All of Phase 1 Work Packages that contain Taxiway work must be completed prior to starting work on Phase 2 Work Packages that contain

Taxiway work. Meaning Work Package C in Phase 1 must be complete prior to starting Work Package D in Phase 2.

170 RFP Current bid is due 3/1/2024 with a 120 day price hold, that puts the Award date sometime in July 2024. Per the evaluation criteria Factor

2.2 Schedule states to provide a schedule

assuming Award date of April 2024. With a large number of permits required on this project it is unlikely that a July award will provide the contractor adequate time to obtain necessary permits to begin tree and vegetation removal during the short window of Oct 15th - Dec 14th in 2024. If the contractor does not hit this first window for tree clearing there will be a significant impact to project schedule.

Per the General Phasing Notes #3.3 "The stormwater system SHALL be installed downstream to upstream. Work associated with Ditch-D and Ditch D-1 MUST be completed prior to the upstream stormwater system being removed and reconstructed."

Would the Gov't consider removing the requirement that downstream ditch work be completed prior to upstream stormwater work occuring or extend the Period of Performance to take into account the likely event that permits will not be able to be secured with a

July award?

Navy is obtaining the E&S/Stormwater permit, with approval by 01 May. The contractor will need to apply for the Land Disturbance permit, which normally takes 2-3 weeks for approval.

Therefore, the permits should not hold up the contract for tree clearing.

171 V Series The Core Summary Table shown on B-001 only appears to show borings assocaited with Taxiway Alpha. There appear to be borings along Taxiway Papa (#P-CBOR,P-01 to P-04) that do no provide a Boring Log. Please provide boring logs so existing pavement structure can be determined.

The B Series for Phase 1 and 2 have been revised to provide the requested information.

172 V Series The Core Summary Table shown on B-001 only appears to show borings assocaited with Taxiway Alpha. There appears to be a boring along Taxiway Bravo (#B-BOR,PC-09) that does not provide a Boring Log. Please provide boring log so existing pavement structure can be determined.

The B Series for Phase 1 and 2 have been revised to provide the requested information.

173 V Series The Core Summary Table shown on B-001 only appears to show borings assocaited with Taxiway Alpha. There appears to be a boring between Taxiway Alpha and The Tow Way at the Taxiway A1 end of the project (A- SPBIR,T-001) that does not provide a Boring

Log. Pelase provide boring log so existing pavement structure can be determined.

The B Series for Phase 1 and 2 have been revised to provide the requested information.

174 CD & GC

Series

Typical Sections shown on GC110-GC114 show a Cement Treated Subgrade of 7% for a depth of 12". Per Demolition Note # 14 "Provide Cement Stabilized Subgrade

(Minimum 6%) to a minimum depth of 8 inches". Please confirm that no Cement

Treated Subgrade existings below the existing

Pavement section shown on Typical Sections sheets with 12” cement stabilized subgrade at 7% is correct. Note 14 on the CD sheets should match.

pavement and that Note #14 in the Demolition Plans is incorrect and information found on the Typical Sections is correct?

175 CD112 &

CD114

These drawings show areas of hatched Asphalt shoulder that are called out as #35 (Salvage Ext. Windcone/Turn In to airops and demolish concrete foundation and conduit runs to next junction.) Please confirm that these areas of asphalt are to be removed and should be labeled #10 (Remove Asphalt Paved Shoulder) and not #35?

The label should be #39. Sheets CD112 and CD114 have been revised.

176 GC001 Please confirm Contractor is responsible for all work sequencing within each phase of the project and recommended sequencing found in notes 3A-3G are suggested and not contractual obligations?

Yes it is a contractual obligation.

177 GC110 and

CD100

The typical section sheets GC110-GC114 call out the 12" cement stabilized subgrade at 7%.

The demolition plans CD100- CD106, note

#14 states 8" cement stabilized subgrade with a minimum 6%. Please clarify

Pavement section shown on Typical Sections sheets with 12” cement stabilized subgrade at 7% is correct. Note 14 on the CD sheets should match.

178 CP114 The joint layout is missing for the northeast fuel pit, please provide.

Sheet CS107 has been revised. There is no proposed pavement in this area.

179 32 11

23.23 Please consider replacing this section with a

cement treated drainage layer to provide a stronger pavement section and better workability.

Contractor to bid per RFP.

180 N/A There are 2 runway patches & 2 runway/taxiway crossings, is grooving required? If so, please provide a grooving spec section.

Grooving is not required for this project.

181 GC110 &

CD001

The note on sheet GC110 and other typical section sheets pertaining to the 8" drainage layer says "the drainage layer must be increased as necessary to obtain the planned pavement finish elevations…" Detail B3 on sheet CD001 specifies the use of select fill material. Which of these is correct?

The typical sections are correct.

182 General Conditio ns

Is there, or will there be another gate to faciliate construction traffic (oversized loads, heavy equipment, material stockpiling, etc.), in addition to the main gate on Tomcat Blvd?

If not, will there be modifications made to the main entrance in order faciliate this traffic?

Bids shall be based on ALL contractor traffic entering through truck inspection and the NASO MAIN GATE. ANY / ALL trucks and trailers

MUST clear the gate and drop arms as currently constructed (width and height restrictions apply) . No modifications shall be made to the main entrance in order facilitate contractor traffic.

183 General

Conditio ns

In reference to Area 2, is the contractor allowed to remove the trees and fenceline to expand and connect the two parts of this area?

The smaller area of Area 2 has been removed and can not be used. Sheet CG402 has been revised.

184 General Conditio ns

In reference to Areas 2, 4, and 5, will these area be clear of obstacles (old cars, fences, etc.), or is it the responsibility of the contractor to remove these?

The smaller area of Area 2 has been removed and can not be used. Area 5 has been removed as well. The remaining obsticals shall be removed by the contractor. Sheets CG 402 , 404, and 407 have been revised.

185 32 13 14.13

Is a 467 blend allowed to be used in the PCC mix design?

Contractor to bid per RFP.

186 Spec page 4 01 45

00.00 20

1.5.4 It appears this paragraph describing the

Special Inspector has been cut off. Please provide the rest of that paragraph and also state whether this person is required to be on site full-time.

The specification has been revised and the entire specification section have been included in this Addendum. In addition Specification 01 45 35 has been added to the project specifications.

187 GC110 -

GC114

The typical sections call out an 8"crushed concrete base course layer under the concrete pavement for the taxiway and taxiway shoulder. Is it permissible to utilize recycled aggregate from on-site crushing operations to construct this base layer under the taxiway and taxiway shoulder pavement sections?

Yes, it is permissible and encouraged to use recycled aggregate from on-site crushing operations as the base course layer provided that the material meets all specified requirements.

188 5 01 14 00 1.3.4.e If we encounter an incorrectly connected sanitary sewer line as referenced in 1.3.4.e, will payment for corrective work be made under either line item 0003 or line item 0013 depending on field location?

The only sewer work for this project is the relocation of a sanitary sewer forcemain. However is a gravity sewer line is found to be dischargining into the storm system line items 0003 or 0013 may be used. Depending on scope of work required to fix the cross section another payment method may be used.

189 32 13

14.13 Are there any hauling load limits for the

Base's existing roads and streets? If so, what are the load limits?

There are no hauling limits for the Base's existing roads. All equipment and materials must be able to enter and exit via the main gate.

190 01 32

17.00 20

1.10.1.8 Should we use the NOAA summary of

historical averages for anticipated monthly non-work days due to adverse wether to establish a weather calendar or the table provided in this section?

NOAA historical averages shall be used to anticipate weather delays for scheduling purposes.

191 32 13 14.13

Can a previously approved concrete pavement mix design from prior projects at NAS Oceana be provided as "information only"

No this information will not be provided.

192 33 40 00 Can round precast aircraft rated structures be substituted for the square shown in the plan details?

Circular precast structures will be allowed on a case by case basis. The use of circular structures must not impact any proposed of existing utilities.

193 RFP p. 81 of 88, Specification 01 50 00 para 3.2.2

Please identify and/or confirm the particular utilities that the Government will make available to the contractor.

Water and Power are available at laydown sites, 1, 2, 3, 4, 5. The contractor will be required to coordinate with Base UEM for setup of services and meters. Laydown Site 6 the contractor would need to coordinate with

Dominion Power and the City of Virginia.

194 GC100 What limitations, if any, are there on the use of Sludge Rd. and Navy Rd.? Will access through gates located on Sludge and Navy Rd.

be allowed?

Access through this gates will not be allowed.

195 GC100 What limitations, if any, are there on the use of Sludge Rd. and Navy Rd.? Will access through gates located on Sludge and Navy Rd.

be allowed?

Access through this gates will not be allowed.

196 33 40 00 Section 2.2.1.2 states box culvert joints shall meet ASTM C990 (Standard Specification for

Joints for Concrete Pipe, Manholes, and Precast Box Culvert Sections Using Preformed

Flexible Joint Sealants).

For concrete pipes ASTM C990 speficiation with conseal and conwrap should be used. For Culverts, ASTM C1677 should be used.

197 01 57 19 1.5.1.1.3.3 Please provide the monitoring well and groudwater data environmental reports. This data will determine what treatment technology would be best suited for groundwater treatment

See Amendment 0002, attachments for Spec 01 57 19.

198 Phase II CD112 &

CD114

Please clarify that tag 35 that corresponds to demolition note 35 is the correct callout on each of these 2 sheets. The work graphically appears to consist of pavement demolition, not wind cone salvage.

The Keynote should be 39, not 35. Sheets CD112 and CD114 have been revised.

199 Phase II

ED110

Sheet ED110 sheet is missing the taxiway bravo match line plan view, please confirm this plan view is not required.

Work limits are identified and no further work is required on Taxiwy B.

200 GC110-

GC114

The typical sections call for imported backfill and fill material to be used adjacent to the paved taxiway shoulders. Can the contractor use suitable on-site material for this work in lieu of automatically importing new material and wasting the on-site material?

Yes, the contractor may use suitable on-site material that meets the fill criteria.

201 spec 01 14

1.2 a Will NAVFAC allow multiple work package areas to be closed at a time within a phase (eg.

Work Package A and Work Package B, both in phase 1) The specification discusses not being able to start on other sub phases that would affect normal operation, but no further explanation is given on what constitutes normal operation.

No, working on non consecutive work packages within a Phase impacts air operations too much an will not be allowed.

However it is possible to work on a work package along the taxiway and one that is not. See Note 3 on

Sheet GC 100.

202 spec 01 14

1.2 a Will NAVFAC allow multiple work package areas to be closed at a time between Phases

(eg. Work Package B in Phase 1 and work package D in Phase 2)? The specification discusses not being able to start on other sub phases that would affect normal operation, but does not discuss work package scheduling between phases.

No, working on non consecutive work packages within a Phase impacts air operations too much an will not be allowed.

However it is possible to work on a work package along the taxiway and one that is not. See Note 3 on

Sheet GC 100.

203 As a basis of bid and to determine overall schedule, when should bidders expect to receive notice of award and subsequent NTP for the work contemplated in the options, particularly for the Phase 2 taxiway work?

Please refer to Amendment 0003, PPI #150.

204 52.211-10 As a basis of bid, will NAVFAC provide an overall contract time assuming the options are selected? Section 52.211.10 Prosecution of work states to "…complete the entire work ready for use not later than 1,155 CD…", but

Please refer to Amendment 0003, PPI #151.

this statement seems to correspond to the phase 1 work duration only, without consideration for options.

205 Proposal

Will the government consider providing extending the submission date to 3/22/24.

With a large amount of questions unanswered there will be limited time to coordinate further with subcontractors and suppliers.

See Amendment 0004 Continuation Sheet.

206 E-615 PH 1 &

DETAILS 3A, 4A, 4B AND 4D - ARE WE

REQUIRED TO REPLACE THIS

EQUIPMENT?

Details are provided for information. It is not anticipated that Fuel pit or

Ordnance pad lighting controls will be replaced.

207 ED129 &

ED129A

PH 2 NO CKT/DUCTBANK CALLOUT IS

PROVIDED FOR THE MV 5KV CKT'S TO

BE REWORKED. PLEASE PROVIDE THE

NUMBER OF CIRCUITS ROUTED

THROUGH THE MV DUCTBANKS.

As-built data for existing MV 5KV duct banks are not available. For pricing purposes, assume that MV 5kv duct banks are 4x4 concrete encased duct banks, consisting of 5" conduits, with (1) 3 phase circuit present in each conduit. Assume #4/0 cabling, including 600V gnd.

208 ES109 &

ES109A

PH 2 NO CKT/DUCTBANK CALLOUT IS

PROVIDED FOR THE MV 5KV CKT'S TO

BE REWORKED. PLEASE PROVIDE THE

NUMBER OF CIRCUITS ROUTED

THROUGH THE MV DUCTBANKS.

As-built data for existing MV 5KV duct banks are not available. For pricing purposes, assume that MV 5kv duct banks are 4x4 concrete encased duct banks, consisting of 5" conduits, with (1) 3 phase circuit present in each conduit. Assume #4/0 cabling, including 600V gnd.

209 plan E503

Plan E-503 mentions bird spikes on guidance signs, but there is no specification. Can Bird-X Stainless steel Spikes be used for this scope of work?

Yes Bird-X stainless steel spikes can be used.

210 Can 2nd tier subcontractors and suppliers be counted in the small business goals?

Second tier subcontractors and suppliers are not to be included in the calculation for meeting small business goals under this contract.

211 Sheet E-

Sheet E-001 General Note 20 states that we are to locate, support and protect existing utilities. There are base cans and conduit that are to remain in demolished shoulder areas.

We are concerned the cans and conduit will not remain in place and will be disturbed by the demolition and installation of new pavement. Should these cans and conduit be replaced? If not, how do you recommend protecting them from the demolition and paving activities?

Top section of base can is to be removed, base can covered for protection while should pavement is placed, new top section sahll be installed to new elevation of pavement.

212 Phases I and II Sheet E-006

Phase I and II Sheet E-006 Demolition key note 1 calls out for temporary jumper cables between indicated handholes / manholes to maintain circuit continuity. Is this the same case for the fiber optic cables that run in these same routes?

All "A", "AL", "E", "C" duct banks and other ducts related to airfield systems and cables running through them must be relocated in areas indicated. For cable types where temporary jumper cables are not feasible, install new conduit sections and new cable to manholes where splices are to be made before removing existing ducts to keep outages to a minimum.

213 Phase II Sheet ED-

Phase II ED-127 Demotion Notes as they refer to the Fuel System Control wiring, states we must field verify location. Wiring that conflicts with storm water piping installation must be relocated. Notes also state remove cabling and conduit where it conflicts with storm water piping and cabling is to be replaced in kind after rerouting of conduit.

Drawings appear to indicate conduits in the fuel tank area but sizes of conduit and cabling is not indicated. Please provide additional information.

Conduit, handholes, and cable to be new as indicated on ES sheets. It is expected that there is (1) 120V circuit consisting of (2) #10, (1) #10 gnd in

3/4" C and a separate control circuit consisting of (2) #10, (1) #10 gnd in

3/4" C going to each fuel pit electrical station.

Current as-builts showing acutal underground routing of these circuits where not available during design. Some sections of conduit in this area may contain up to (3) circuits.

Contractor will coordinate with CM and Fuel Farm prior to commencement of work in this area. See D3 on E-901 for a typical fuel pit electrical station.

214 ED100 and EA100 series dwgs

ED100 and EA100 series drawings show 3 action codes as it relates to the fixtures and cans. There are details as it relates to drains at base cans on Sheet EA502 Detail C1. As it relates to action codes please explain what is required for drains at “RE”. Since these cans are installed at a new location, do all of them require new drains? Action code “RR” states the can is reinstalled at the same location. We assume if there is an existing drain we will reconnect to the drain. If there is no drain, none is required. Action code “AD” is adjusting the can to a new grade and we assume no drain work is required at these cans. Please confirm.

Drains are required for new light cans only.

215 E006 Drawing E006 General note 3 - States provide a maintenance pad around new and modified airfield lighting handoles. Do all existing handholes currently have maintenance pads?

No, existing handholes do not have maintenance pads. The contractor will not be responsible for providing maintenance pads around handholes/manholes not modified by this project.

216 Electrical Demo drawings

Various Demolition drawings, general sheet note 8 – States field verify location of power and communication wiring and cabling.

Wiring and cabling that conflicts with civil work of this project must be relocated. Is the note intended to be for conduit and cable not shown on the drawings? What about conduits indicated as to remain but in fact are in conflict? Conduit and cable is not indicated for all conduits, so how would those conduits be quantified for bid purposes? Would this work be done under a change order?

All conduit and wiring systems found that conflicts with the new stormwater piping must be relocated. For work not indicated on drawings, the contractor must notify the CM upon discovery of conflict for further direction. A revised price schedule will be provided with bid options for unit pricing of typical types of systems.

217 Phase I Sheet

ED122

Phase I Drawing ED122 – There is a section of conduit marked as UED that is indicated as a removal just above HH A408. It does not indicate that it goes anywhere or connects to anything on the south end. Please clarify what this ductbank and cable is?

Linetype is incorrect. This section of conduit should be indicated as abandoned-in-place. No work required, unless it conflicts with new storm piping.

218 Phase I Drawing

ED122

Phase I Drawing ED122 – Note 9 indicates that we are to remove power and communication wiring from manhole H79 and adjacent communication manhole to abandoned ACLS trailer location. Since manhole H79 is not indicated can you provide the distance from the manhole to the abandoned trailer location?

There is no abandoned trailer on site, only a pad. The extent of demolition is shown on the drawings.

219 Phase II Drawing

ED129

Phase II Drawing ED129 - 6 Way ductbank marked as UT exiting TMH524 to be demolished, states to unknown location. It is also indicated on drawing ES109 as new ductbank that continues to unknown location.

Can you provide a footage that everyone should include in their bid?

See revised sheets ED129, ES109

220 Phase II Drawing

ED129

Phase II Drawing ED129 - Demolition note 20

- below Taxiway Alpha near station 186+00 Note states field survey and lower to avoid conflicts with new storm water piping, remove abandoned conduit & wire. No new conduit & wire is indicated on ES109. Please advise number of conduits, size of conduits and any wiring that would need to be replaced.

Conduits marked with note 20 are assumed to be abandoned in place. See revised sheet ED129.

221 Phase I Drawing

EA103

Phase I Drawing EA103 – At the circle designations T9.1 029 AD and T9.1 042 AD - Please provide clarification to the note on each that indicates Cable Qnty 2 Conduit Qnty 4.

This contradicts Construction Keynotes 1 and

2 also indicated at these locations.

The referenced light bases are to remain in place and adjusted to new grade. There are 2 conduits located at the light base, one connected to the can and one routed around the base. Each has one cable in each conduit, "CABLE QTY. 2" New conduits will connect to the existing conduits on each side of the base totaling four conduit connections. Note should read, "CABLE QTY. 2, CONDUIT CONNECTION

QTY. 4”

222 Phase II Drawing

ES108

Phase II Drawing ES108 - At the bottom of the drawing, in area 3, there are “US” type conduit systems that appear darker than other systems on the page. Please confirm that there is no work required as it pertains to these conduits.

No work is required to the "US" conduits shown in sheet quadrant A3 on

Sheet ES108. The linetype has been removed on revised sheet.

223 Phase II Drawing

ES109

Phase II Drawing ES109 Grid 3, near the Emergency Vehicle Charging Reps, Conduits indicated as “UT” and “UP”. Note 11 would appear to indicate conduits below Taxiway Alpha are existing as we are to install new cables in existing spare conduits. Drawing ED129 indicates these conduits are to be

See revised sheets ED129, ES109.

removed so there would be no existing ducts.

Please clarify.

224 Phases I and II Sheet

CU001

Phases I and II Sheet CU001 General Demolition Note 2 states that the project is located in a high foot traffic area when training sessions are scheduled. Please clarify the amount of lost time we should expect due to the training sessions.

This note does not apply.

225 Phase I Sheet ES-106 and Phase II Sheet ES-107

Phase I Sheet ES-106 and Phase II Sheet ES- 107 - There are (2) locations where a note indicates to provide a spring assisted cover on an existing vault. Is this cover the same size as the others being provided on the new manholes? Since drawing details indicate the spring assisted covers are to be cast in the new handhole tops, are we expected to provide an entire new vault top or just install a bolt down spring assisted cover at the (2) locations. If we need to provide new vault tops with the spring assisted cover cast in place, please provide the sizes of the existing vaults.

See Revised sheets ED127, ES106, ES107, and

ES109.

226 Please clarify what electrical work is associated with fuel pits for Pay Item No. 3 Option 2 and Pay Item No. Option 5. Is it removal only of the fixtures and light bases in the pavement? Is any electrical work outside the pavement limits required? What lighting, conduit or cable work are included in these

Options?

Removal of the fixtures and light bases and the replacement of the vault covers within the paved areas are part of the bid option. All other electrical work required by storm water piping installation is part of the base bid.

227 Where communications infrastructure is impacted due to demo/relocation, does the existing system have redundancy to avoid outages?

Assume for bidding that the communications infrastructure does not have redundancy to avoid outages. Contractor to coordinate with CM during construction to determine which facilites will be affected by an outage and must have cabling pulled and ready to splice to minimize lenght of outages.

228 Please provide existing network one line diagrams that would provide the contractor location and designation of existing assets.

All available one-lines are included in bid package.

229 Does any of the fiber/communication/control cabling effect any air operations? If so, are there specific outage requirements for the systems?

All fiber run through "C" handholes along airfield are related to airfield lighting controls and there are some within the Transistion area that extend to various radar sites. All work related to relocating communication ducts must be coordinated with CM and air operations prior to commensment of work.

230 Is there a minimum/maximum number of in-line FO splices that are allowed?

Number of in-line splices must be kept to a minimum. Temporary splices may be allowed until all conduit sections have been relocated. See section

33 82 00 for max allowable losses on fiber optic cables.

231 Will underground splice enclosures be permitted for temp FO splicing, or will above ground enclosures for access be required?

Above ground enclosures are not required.

232 Will all temporary and permanent FO splices be required to be OTDR’d and what access points(HUBs) will be designated to do so.

Splices will be OTDR'd as required in Section 33 82 00.

233 Phase II Sheet EA-

Phase II Sheet EA-501 Detail C3 - Please confirm existing edge lighting includes a top section per Step 1. Please clarify the depth of these existing top sections.

Edge lights do include top sections. Top section depth is 3-6 inches.

234 ED-100 series drawings

ED-100 series drawings Demolition Keynote 1 states that temporary jumper cables are required between handholes/manholes to maintain circuit continuity. The cables are to be run above ground, and there is to be a visible marking of cable routes.

- Is the cable to be run in conduit? If so, what type of conduit is required?

- What are the requirements to make the cable routes visible?

Provide Sch 40 PVC conduit for all temporary jumpers. Provide visual indication (for example, flagging) along route to alert other trades and grass cutting crews of presence of temporary jumpers.

Visual indication must comply with airfield operation requirements

235 ED-100 series drawing

ED-100 series drawings Demolition Keynote 1 states that temporary jumper cables are required between handholes/manholes to maintain circuit continuity. The cables are to be run above ground. Phase II Sheet ED130 shows that temporary cable jumpers are required between HH A282/C282 and HH A283/283 and also between HH A281 and A296. Between both of these locations are existing active Runways. Please provide clarification about how and where the temporary cables are to be run.

Installation of jumpers and maintaining continutity of circuits fall within contractor's means and methods. If necessary, contractor may run tempoary cabling in spare conduit that runs below runway or phase work to complete work on one side of runway before starting on other side.

236 ES100 series drawings

ES100 series drawings New Work Keynote 12

- Please confirm that at each location with

Keynote 12 it is acceptable to splice airfield lighting, electrical, and communication cables and fiber.

All cables must be spliced within manholes.

Keynote 12 indicates the anticipated location where the splices will be made.

237 Phase I Sheets ED123 and ED125

Phase I Sheets ED123 and ED125 - There are multiple locations where it shows conduit

(UE) being removed to a sign base foundation that is to be removed (RT). Keynote 5 says only to disconnect the circuit, not remove conduit or cable. Sheets ES103 and ES105 show existing conduit going to all signs, some in the same location as the old sign and some in new lcoations. Is the conduit going to the signs supposed to re-used or new?

Keynote 5 has been clarified. See revised Sheets ED123, ED125. Remove conduit and cable as indicated by linetype.

Provide new conduit and cable to signs, connect to circuit indicated on ES103 and ES105.

238 ED and ES seriies drawings

Please clarify if new conduit it required to new sign base locations? Keynote 5 on the ED and ES drawings appears to show that it is re-used, and there is no new conduit shown going to the new sign bases, but there are multiple locations where the new sign bases are not going in the same location as the existing bases.

Extend new conduit and cable to relocated signs. See sign symbol on

Airfield Construction Legend to identify where circuit information is shown for each relocated sign. Keynote 5 revised to remove direction to retain for reuse.

239 Phase I Sheet

ED126

Phase I Sheet ED126 shows conduit and handholes being demolished to the fuel pit luminaires and going to the fueling station.

Sheet ES106 only says to reconnect and splice cable (Keynote 6, 10, 11) and connect new ducts to existing duct (13). Are the conduit, handholes, and cable to be new? If so, please provide details (size, type) of this work.

Conduit, handholes, and cable to be new as indicated on ES sheets. It is expected that there is (1) 120V circuit consisting of (2) #10, (1) #10 gnd in 3/4" C and a separate control circuit consisting of (2) #10, (1) #10 gnd in 3/4" C going to each fuel pit electrical station.

Current as-builts showing acutal underground routing of these circuits where not available during design. Some sections of conduit in this area may contain up to (3) circuits. Contractor will coordinate with CM and Fuel Farm prior to commencement of work in this area. See D3 on E-901 for a typical fuel pit electrical station.

240 sheet ED

On sheet ED 121 there are 2 structures named

APPROACH LGT HH in which this ductbank is called out to be removed and the circuits temped out.On E602 these are both listed as Flasher Circuit 5R Approach circuits. Please confirm that note 2M would be control cables and are there any special requirements to coordinate the shutdown of the 5R Approach system to execute this work.

Schedule on E602 indicates which cables are power and which are control.

A wiring diagram of the approach lighting is included on Sheet E-615 for reference. Scheduling of work on approach lighting must be coordinated with airfield operations.

241 sheets E-708 to E-712 On sheets E-708 to E-712 for the tube cable legend notes the butterfly callouts list a note

#11. There is no note # 11 in the legend.

Please clarify what this is supposed to be.

See revised sheets E-708-E712

242 Phase II Sheet ED130 and ES110

Phase II Sheet ED130 and…