Amen07 220049.pdf
PDF 161 KB Posted
- Attached to
- Repair By Replacement TC601 Federal contract opportunity
- Solicitation number
- N4008523R2850
About this file
This document is an amendment to a solicitation for the repair by replacement of Camp Geiger Chapel TC601. The amendment provides responses to contractor questions, extends the proposal due date, and includes pictures of the existing pews. All 54 existing pews at the chapel are to be refurbished and kneelers replaced. The contractor questions and answers clarify that while the furniture plan depicts 42 pews, all 54 pews must be refinished and kneelers replaced. Additionally, the end user will coordinate historical pew locations with new pews provided by an outside source. The amendment does not extend the proposal due date. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command for repair work at the chapel located on Camp Johnson, North Carolina.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amen07 Photos2of3.pdf | ||
| Amen 07 Photos3of3.pdf | ||
| Amen07 Photos1of3.pdf | ||
| Amen06 Dwg SKS-1.pdf | ||
| Amen06 220049.pdf | ||
| Amen05 220049.pdf | ||
| Amen04 220049.pdf | ||
| Amen04 Spec 23 07 00r1.pdf | ||
| Amen04 dwg 60039111r1.pdf | ||
| Amen04 dwg 60039100r2.pdf | ||
| Amen03 220049.pdf | ||
| Amen02 220049.pdf | ||
| Amen02 220049.pdf | ||
| Amen02 dwg 60039105r1.pdf | ||
| Amen02 dwg 60039100r1.pdf | ||
| Amen02 dwg 60039115r1.pdf | ||
| 22-0049 PIS.pdf | ||
| Amen01 220049.pdf | ||
| 22-0049 APPD.pdf | ||
| 22-0049 Design Analysis.pdf | ||
| 22-0049 Geotechnical Report.pdf | ||
| N4008522B0049 DRWGS.pdf | ||
| N4008522B0049 SPECS.pdf | ||
| RFP 220049.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 2
AMENDMENT NO. 0007 08/22/23
5. PROJECT NO. (If applicable) 22-0049
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-23-R-2850
7/31/23
✘ is extended, is not extended.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
22-0049, Repair By Replacement TC601, Amendment 0007, RFI Responses
The time and date for receipt of proposals remains unchanged.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
X
N40085-23-R-2850 Amendment 0007
A. The following RFI responses are provided:
1. QUESTION: The "General Description" mentions a Camp Johnson Chapel. Is this a typo or are we to refinish pews for a chapel other than TC601 located on Camp Johnson?
ANSWER: This is a mistake. Should state “Camp Geiger Chapel.”
2. QUESTION: Pew count: the government states in amend 6 that the contractor is to transport and refinish 54 pews. I count 42 pews on the current floor plan A-103. How many pews are to be refinsihed and installed? Just the 42 of the 54?
ANSWER: The furniture plan provided on A-103 is a conceptual plan. All 54 pews should be refinished, but the end user will coordinate installation/location of historical pews to be refinished with new pews that are going to be provided by an outside source.
The locations/sizes of pews on sheet A-103 may not depict what will actually be installed.
3. QUESTION: Amend 6 mentions replacing kneelers with like and kind. Is this for all 54 pews or for the 42 pews depicted on sheet A-103?
ANSWER: This is for all 54 existing pews.
4. QUESTION: This is very short notice for getting this added SOW priced, but we do have a company willing to price the refiurbishing but they will need photographs of the existing pews &/or a scheduled site visit to review current conditions. They are not in business to make assumptions. Confirmed current conditions will be required in order for pricing to be submitted. Please provide good quality pictures &/or schedule a date for either the GC or our contractor to perform a site visit.
ANSWER: Pictures have been provided with this amendment.
5. QUESTION: Will the govn't consider extending the RFP due date after the pew existing conditions are reviewed to allow for fair and accurate pricing?
ANSWER: Proposal due date remains unchanged at this time.
B. All other terms and conditions remain unchanged.
| Amend 0004 |
| Continuation sheet |
| Amen02.pdf |
| Amend 0004 |
| Continuation sheet |