Amen02 dwg 60039100r1.pdf
PDF 427 KB Posted
- Attached to
- Repair By Replacement TC601
- Solicitation number
- N4008523R2850
About this file
This plumbing drawing package details the domestic water piping plan for a church facility renovation project. The drawings show the layout of water lines 1/2" or larger throughout the building, including lines routed under slab, above ceiling, and overhead. Notes specify that the contractor may use PEX-A piping for domestic water lines under slab if no joints are located under the slab. The related federal contract opportunity is a solicitation from the Department of the Navy to repair a facility by replacement of utility system TC601. No pricing, response dates, or other contract details are provided in the documents reviewed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amen07 Photos1of3.pdf | ||
| Amen 07 Photos3of3.pdf | ||
| Amen07 220049.pdf | ||
| Amen07 Photos2of3.pdf | ||
| Amen06 Dwg SKS-1.pdf | ||
| Amen06 220049.pdf | ||
| Amen05 220049.pdf | ||
| Amen04 220049.pdf | ||
| Amen04 Spec 23 07 00r1.pdf | ||
| Amen04 dwg 60039100r2.pdf | ||
| Amen04 dwg 60039111r1.pdf | ||
| Amen03 220049.pdf | ||
| Amen02 220049.pdf | ||
| Amen02 dwg 60039105r1.pdf | ||
| Amen02 dwg 60039115r1.pdf | ||
| Amen02 220049.pdf | ||
| 22-0049 Design Analysis.pdf | ||
| 22-0049 APPD.pdf | ||
| Amen01 220049.pdf | ||
| 22-0049 PIS.pdf | ||
| N4008522B0049 DRWGS.pdf | ||
| RFP 220049.pdf | ||
| N4008522B0049 SPECS.pdf | ||
| 22-0049 Geotechnical Report.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P
2"
3/4"
HB1
2"
1/2" 1-1/4"
SEE PW101 FOR
CONTINUATION
PIPING ROUTED
UNDER SLAB
2"
1/2" 1"
1/ 2"
1/ 2"
1"
2"
1"
2" 2"
PIPING ROUTED
UNDER SLAB
1/2" 1/2"
1/ 2" 1/ 2" 1-1/2"
1/2" 1/2"
1/2"
SK2
OB1
WC1
MB1
LAV1
2" 2"
2"
1/2"
3/ 4"
SEE PW101 FOR
CONTINUATION
SEE CIVIL UTILITY
PLAN FOR
CONTINUATION
1/ 2" 1/2"
CIRCUIT
SETTER
BALANCING
VALVE
"B"
TRAP
PRIMER
TRAP
PRIMER
SK1
2"
SHUTOFF
VALVE IN
RISER
GWH1
CP1
2"
3/ 4"
HB1
1" 1/2"1/2"
1"
RECIRC., DCW
AND DHW
PIPING DOWN
TO BELOW SLAB
1/ 2"
1/ 2"
3/4"
PIPING ROUTED
ABOVE CEILING
NORTH
TRANSEPT
BAND
PLATFORM
SACRISTY
CLOSET
EXIT
STORAGE
RISER
ROOM
MECH
SOUND
BOOTH
FELLOWSHIP
ENTRY
UNISEX
DRESSING
1/2"
1/2"
2" 2"
2"
1/2" 1-1/2"
1-1/2"
2"
2"
1/2"
1" 1"
PIPING
ROUTED
ABOVE
CEILING
1- 1/
4" 1-
1/ 4"
1- 1/
4" 1/
2" 1/
2" 1/
2"
RECIRC., DCW
AND DHW
PIPING DOWN
TO BELOW SLAB
RECIRC., DCW
AND DHW
PIPING DOWN
TO BELOW SLAB
1" 2"
1/ 2"
1/ 2"
1/ 2"
1/ 2"
1-1/2"
RPZ, MOUNT
OVERHEAD.
LOCATION WITH
MECHANICAL
CONTRACTOR
EW1
1"
PIPING ROUTED
UNDER SLAB
NOTE: CONTRACTOR
MAY USE PEX-A PIPING
FOR DOMESTIC WATER
PIPING UNDER SLAB.
WHEN USING PEX-A, NO
JOINTS ARE PERMITTED
TO BE UNDER THE SLAB.
1"
1-1/2"
2"
1/2" 3/4"
2"
1/ 2"
WC2
WC1
1/ 2"
1/2
2"
1/2"
2" 2"
1/2" 1/2"
MB2
2"
1"
1"1"
1/2"
1/ 2"
2"2" 2"
UR1
WC2
WC1
SEE PW101 FOR
CONTINUATION
PIPING UP TO
ABOVE CEILING
ROUTE PIPING
UNDER SLAB
1/2"1/2" 1/2"
3/4"
3/ 4"
3/ 4"
3/ 4"
1"
1"1"1-1/4"1-1/4"
HB1
HB1
PIPING ROUTED
ABOVE CEILING
HAMMER
ARRESTOR,
TYP.
"C"
"B"
1-1/2"
3/ 4"
1-1/2"1-1/2"
1- 1/
2"
EWC1
3/4"
LAV2LAV2
1/2"
LAV2LAV2
1-1/2"
1" 1"
ADMIN.
OFFICE
WOMEN
104 CLOSET
NARTHEX
MEN
PRAYER
ROOM
JANITOR
I.T.
ROOM
107A
3/ 4"
1/ 2"
1/ 2"
1/ 2"
NOTE: CONTRACTOR
MAY USE PEX-A PIPING
FOR DOMESTIC WATER
PIPING UNDER SLAB.
WHEN USING PEX-A, NO
JOINTS ARE PERMITTED
TO BE UNDER THE SLAB.
043801
TROY O. GRADY
SEAL
R
EENI GN
P R
OF E S S I ON
A
E
L
NO
RT H CAROL I NA
SEE DISCLOSURE OF INFORMATION STATEMENT ON SHEET G-001
2246 Yaupon Drive Wilmington, NC 28401
Phone: 910.791.4000 Fax: 910.791.5266 www.cbhfengineers.com NC# P-0506c Copyright 2023CBHF Engineers, PLLC
Engineers, PLLC
06-08-2023
151 Poole Rd. Suite 100 | Leland, NC, 28451
TEL (910) 383-1044 | FAX (910) 383-1045
www.capefearengineering.com | N.C. LICENSE # C-1621
PW401
PLUMBING DOMESTIC WATER
FIRST ENLARGED FLOOR PLAN
1/4" = 1'-0" 0 4' 8'2'1 DOMESTIC WATER ENLARGED PLAN
PLAN
NORTH
1/4" = 1'-0" 0 4' 8'2'2 DOMESTIC WATER ENLARGED PLAN
PLAN
NORTH
1 REVISED PER RFI 02 08/08/2023
08/08/2023
| 2023-08-08T16:27:24-0400 | |
| Troy O Grady |
File details come from the government source that posted it. Updated .